Documents

Briefs, oral arguments, agency decisions and the Federal Register.

255 results

0.10s

  • Environmental Impact Statement for Allen Fossil Plant Ash Impoundment Closures

    Federal Register · Notice · Nov 30, 2018

    (NEPA) and Section 106 of the National Historic Preservation Act (NHPA) and its implementing regulations (36 CFR part 800). … After consideration of comments received during the scoping period, TVA will develop and distribute a scoping document that will summarize public and agency comments that were received and identify the

    83 FR 61708Tennessee Valley Authority
  • Environmental Impact Statement for Muscle Shoals Reservation Redevelopment

    Federal Register · Notice · Jun 18, 2009

    (NEPA), and Section 106 of the National Historic Preservation Act (NHPA) and its implementing regulations (36 CFR part 800). … This part of the MSR contains a number of solid waste management units (SWMUs), which have been cleaned, i.e., remediated, to industrial standards.

    74 FR 29017Tennessee Valley Authority
  • Browns Ferry Nuclear Plant, Unit 1; Issuance of Director's Decision Under 10 CFR 2.206

    Federal Register · Notice · Apr 2, 1999

    Through such meetings, the public may hear and comment on the licensee's restart plans and the results of NRC reviews of the restart activities. … Public comments and concerns are considered by the NRC and may be factored into the restart review, as appropriate.

    64 FR 16007Nuclear Regulatory CommissionTennessee Valley Authority
  • Public Meeting To Receive Comments on the Draft Environmental Impact Statement for Addition of Electric Generation Baseload Capacity in Franklin County, TN

    Federal Register · Notice · Jul 2, 2001

    Air Force will hold a public meeting to receive comments on the Draft Environmental Impact Statement (DEIS) titled, “Addition of Electric Generation Baseload Capacity in Franklin County, Tennessee.” … The period for public scoping comments for the EIS closed April 16, 2001.

    66 FR 34975Tennessee Valley Authority
  • Approval of Construction in the Tennessee River System; Regulation of Structures; Residential Related Use on TVA-Controlled Residential Access Shoreland and TVA Flowage Easement Shoreland

    Federal Register · Rule · Aug 7, 2003

    (b) Tables or benches for cleaning fish are permitted on docks or piers. … (f) The grade of the channel must allow drainage of water during reservoir drawdown periods.

    68 FR 46930Tennessee Valley Authority
  • Environmental Impact Statement for Addition of Electric Generation Baseload Capacity in Tennessee

    Federal Register · Notice · Mar 14, 2001

    Yeager, Senior Specialist, National Environmental Policy Act, Tennessee Valley Authority, mail stop WT 8C, 400 West Summit Hill Drive, Knoxville, Tennessee 37902-1499. … Air Force and other federal, state, and local agencies, as appropriate.

    66 FR 14975Tennessee Valley Authority
  • Meeting of the Regional Resource Stewardship Council

    Federal Register · Notice · Aug 2, 2005

    (4) Clean marina efforts on Fontana Reservoir. (5) Water quality improvement efforts of the Hiwassee River Watershed Coalition and Little River Water Quality Forum. … Persons wishing to speak are requested to register at the door and are then called on by the Regional Council Chair during the public comment period.

    70 FR 44416Tennessee Valley Authority
  • Allen Aeroderivative Combustion Turbine Project

    Federal Register · Notice · Jan 14, 2026

    TVA also held a public webinar during the comment period. … In total, TVA received 210 submissions from the public, local officials, state and federal agencies, and community organizations during the comment period.

    91 FR 1595Tennessee Valley Authority
  • Spring Valley II Solar Project

    Federal Register · Notice · Sep 19, 2023

    DATES: The public scoping period begins with the publication of this Notice of Intent in the Federal Register . … EIS Preparation and Schedule After consideration of comments received during the scoping period, TVA will develop and distribute a scoping document that will summarize public and agency comments that

    88 FR 64506Tennessee Valley Authority
  • Addition of Electric Generation for Peaking and Baseload Capacity at Greenfield Sites, Haywood County, Tennessee

    Federal Register · Notice · May 11, 2000

    Aquatic Ecology • Monitoring of aquatic life impacts will be conducted during periods of wet stream blasting, if conducted. … EPA comment on TVA response 43 in the FEIS concerned the need for additional cumulative air quality assessment for sulfur dioxide (SO 2 ).

    65 FR 30469Tennessee Valley Authority
  • Environmental Impact Statement for Addition of Electric Generation Peaking Capacity at Greenfield Sites, Mississippi

    Federal Register · Notice · Aug 3, 2000

    Late comments will receive every consideration possible. ADDRESSES: Written comments should be sent to Bruce L. … Energy Vision 2020 analyzed a full range of supply-side and demand-side options to meet customer energy needs for the period 1995 to 2020.

    65 FR 47817Tennessee Valley Authority
  • Hope Solar and Storage Project

    Federal Register · Notice · Mar 13, 2025

    DATES: The public scoping period begins with the publication of this Notice of Intent in the Federal Register . … After consideration of comments received during the scoping period, TVA will develop and distribute a scoping document that will summarize public and agency comments that were received and identify the

    90 FR 12030Tennessee Valley Authority
  • Environmental Impact Statement for the Disposal of Coal Combustion Residuals From the Bull Run Fossil Plant

    Federal Register · Notice · May 21, 2015

    BRF has state-of-the-art air pollution controls and is one of TVA's coal plants that is planned to continue to operate in the future. … After consideration of the comments received during this scoping period, TVA will develop and distribute a document that will summarize public and agency comments that were received and identify the issues

    80 FR 29381Tennessee Valley Authority
  • Hillsboro III Solar Project

    Federal Register · Notice · Sep 1, 2023

    DATES: The public scoping period begins with the publication of this Notice of Intent in the Federal Register . … After consideration of comments received during the scoping period, TVA will develop and distribute a scoping document that will summarize public and agency comments that were received and identify the

    88 FR 60529Tennessee Valley Authority
  • Integrated Resource Plan

    Federal Register · Notice · Feb 28, 1996

    in which to submit written comments. … After release of the draft IRP and EIS, TVA provided more than 80 days for public review and comment.

    61 FR 7572Tennessee Valley Authority
  • Integrated Resource Plan

    Federal Register · Notice · Sep 17, 2019

    Consistent with Section 113 of the Energy Policy Act of 1992, codified within the TVA Act, TVA employs a least-cost system planning process in developing its IRPs. … TVA accepted comments on the Draft IRP and EIS until April 8, 2019. During the comment period, TVA held seven public meetings and a public webinar to describe the project and accept comments.

    84 FR 48987Tennessee Valley Authority
  • Environmental Impact Statement for Addition of Electric Generation Peaking and Baseload Capacity at Greenfield Sites, Haywood County, Tennessee

    Federal Register · Notice · Jun 3, 1999

    ADDRESSES: Written comments should be sent to Greg Askew, P.E., Senior Specialist, National Environmental Policy Act, Tennessee Valley Authority, Mail stop WT 8C, 400 West Summit Hill Drive, Knoxville, … Energy Vision 2020 analyzed a full range of supply-side and demand-side options to meet customer energy needs for the period 1995 to 2020.

    64 FR 29935Tennessee Valley Authority
  • Environmental Impact Statement; Integrated Resource Plan

    Federal Register · Notice · Jun 15, 2009

    The IRP/EIS will project future resource demands over at least a 10-20-year period. Generally speaking, TVA will conduct the following steps in the IRP process: 1. … After consideration of the comments received during this scoping period, TVA will develop and distribute a document which will summarize public and agency comments that were received and identify the issues

    74 FR 28322Tennessee Valley Authority
  • Cumberland Fossil Plant Coal Combustion Residuals Management Operations Final Environmental Impact Statement

    Federal Register · Notice · Jun 7, 2018

    (NOA) of the Draft EIS was published in the Federal Register on November 17, 2017, initiating a 45-day public comment period. … The public comment period closed on January 2, 2018. TVA received 69 comments from 15 commenters.

    83 FR 26534Tennessee Valley Authority
  • Floating Cabin Regulation

    Federal Register · Rule · Aug 31, 2018

    Comments on the Proposed Rule and TVA's Responses TVA received 32 comments during the public review period consisting of three letters and 29 emails. … TVA performs periodic compliance inspections along the shoreline to review existing facilities and detect violations. Also, see response to Comment Group 1.

    83 FR 44467Tennessee Valley Authority

Ask Donna what matters in the record.

She can read the source against your case and show you exactly where the answer came from.

Ask Donna

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.