Documents
Briefs, oral arguments, agency decisions and the Federal Register.
4,423 results
0.27s
Proposed Generic Communication; Laboratory Testing of Nuclear- Grade Activated Charcoal (M97978)
Federal Register · Notice · Feb 25, 1998
DATES: Comment period expires March 27, 1998. … test (in a laboratory) samples of charcoal taken from the air-cleaning units.
63 FR 9581Nuclear Regulatory CommissionFederal Register · Notice · Aug 7, 2008
This would only be for the period of construction. … Comments received by HMC can be found in the HMC Environmental Report (HMC, 2007a).
73 FR 46042Nuclear Regulatory CommissionFederal Register · Notice · Jan 31, 2025
The staff will consider comments on the draft EA and draft FONSI over a 30-day public comment period from Federal, State, local, and Tribal officials, and members of the public. … Holtec cites the State of Michigan's Public Acts of 2023, Act No. 235 (enrolled Senate Bill 271), which establishes a clean energy standard for electric providers to provide at least 80 percent clean energy
90 FR 8721Nuclear Regulatory CommissionFederal Register · Notice · Aug 17, 2016
Additional Information The DG-1280, was published in the Federal Register on June 29, 2012 (77 FR 38857), for a 60-day public comment period. … The public comment period closed on August 27, 2012. Public comments on DG-1280 and the NRC staff responses to the public comments are available in ADAMS under Accession No. ML16070A279. III.
81 FR 54855Nuclear Regulatory CommissionFederal Register · Notice · May 30, 2025
The NRC issued the draft EA and draft FONSI in the Federal Register and offered a 30-day public comment period (90 FR 8721) in accordance with 10 CFR 51.33, “Draft finding of no significant impact; … Regarding the need for clean energy, Holtec cites the State of Michigan's Public Acts of 2023, Act No. 235 (enrolled Senate Bill 271), which establishes a clean energy standard for electric providers to
90 FR 23071Nuclear Regulatory CommissionEntergy Operations, Inc.; Grand Gulf Nuclear Station, Unit 1
Federal Register · Notice · May 11, 2012
The licensee states that the auxiliary cooling towers remain in service year round, with the exception of a short period (i.e., hours) when they are taken out of service for cleaning. … through a permitting process (e.g., NPDES and 401/404 permits under the Clean Water Act) under State or Federal authority.
77 FR 27804Nuclear Regulatory CommissionFederal Register · Notice · Oct 3, 2012
The revision to ASME-AG-1 consolidated select requirements from ASME-N509, “Nuclear Power Plant Air-Cleaning Units and Components,” ASME-N510, “Testing of Nuclear Air-Treatment Systems,” and other documents … Further Information DG-1274 was published in the Federal Register on December 30, 2011 (76 FR 82323), for a 60-day public comment period. The public comment period closed on February 25, 2012.
77 FR 60481Nuclear Regulatory CommissionFederal Register · Notice · Nov 16, 2001
DATES: The comment period expires December 17, 2001. … The licensee submitted information on the DNPS intake structure to the IEPA pursuant to section 316(b) of Clean Water Act.
66 FR 57750Nuclear Regulatory CommissionFederal Register · Notice · Aug 8, 2008
NMDEQ had multiple comments on the Draft EA and the overall design of the proposed channel. … Army Corps of Engineers (USACE) to inquire if this project would require a Section 404 (Clean Water Act) permit.
73 FR 46337Nuclear Regulatory CommissionIn the Matter of Curium US LLC; Confirmatory Order Modifying License
Federal Register · Notice · Jun 26, 2024
Air sampling for airborne radioactivity is performed for the duration of the cleaning of the cask; e. Each occurrence shall be documented in the Radiation Safety Corrective Action Program. 4. … radioactivity is performed for the duration of cask cleaning.
89 FR 53455Nuclear Regulatory CommissionProposed Generic Communication and Draft Regulatory Guide; Issuance, Availability
Federal Register · Notice · Jul 31, 1995
Public Meeting: During the public comment period, the staff will hold a public meeting with the Boiling Water Reactor Owners Group to discuss the above questions as well as any other comments on the proposed … DATES: Comment period expires October 2, 1995.
60 FR 39021Nuclear Regulatory CommissionPeach Bottom Atomic Power Station, Units 2 and 3
Federal Register · Notice · Mar 31, 2014
The draft EA and draft FONSI were published in the Federal Register on October 24, 2013 (78 FR 63506) with a 30-day period for public comment. … Under the Clean Water Act, water quality certification is required prior to the issuance of the license amendment.
79 FR 18073Nuclear Regulatory CommissionFederal Register · Notice · Dec 4, 1996
emissions to states by the Clean Air Act. … NRC will conduct periodic tests of licensee ERDS data links.
61 FR 64379Nuclear Regulatory CommissionFederal Register · Notice · Jan 15, 2010
No comments were received on the draft EA. … However, in a Section 316(a) Clean Water Act (CWA) Demonstration project in 1975, for MNGP that included an evaluation of plant impacts on aquatic organisms, the evidence indicated that operations
75 FR 2565Nuclear Regulatory CommissionFederal Register · Notice · Jan 4, 2005
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
70 FR 398Nuclear Regulatory CommissionFederal Register · Notice · Aug 29, 2002
A decay period of 72 hours between reactor shutdown and fuel movement was assumed. … The State official had no comments.
67 FR 55436Nuclear Regulatory CommissionFederal Register · Notice · Oct 24, 2013
For any such future modifications, the PADEP must, in accordance with Section 316(a) of the Clean Water Act, ensure thermal effluent limitations assure the protection and propagation of a balanced, … NPDES and 401/404 permits under the Clean Water Act). In these cases, impacts are managed as long as these actions are in compliance with their respective permits and conditions of certification.
78 FR 63506Nuclear Regulatory CommissionEntergy Operations, Inc.; Grand Gulf Nuclear Station, Unit 1
Federal Register · Notice · Jul 16, 2012
June 11, 2012, as the deadline for submitting public comments. … The licensee states that the auxiliary cooling towers remain in service year round, with the exception of a short period (i.e., hours) when they are taken out of service for cleaning.
77 FR 41814Nuclear Regulatory CommissionFederal Register · Notice · Oct 25, 2005
The Air Force maintains the clean-up of the range at Nellis Air Force Base by implementing an on-going process to dispose of objects that require disposition or decontamination in lieu of postponing clean-up … On November 2, 2004, the State of Idaho, Department of Environmental Quality, provided comments regarding the draft EA, and those comments have been incorporated in the final EA. III.
70 FR 61649Nuclear Regulatory CommissionFederal Register · Notice · Dec 18, 2006
DATES: The comment period expires 30 days from the date of this publication. … Following the public comment period, the model LAR and model SE will be finalized, and posted on the NRC Web page.
71 FR 75774Nuclear Regulatory Commission
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.