NUCLEAR REGULATORY COMMISSION
Proposed Generic Communication and Draft Regulatory Guide;
Issuance, Availability
AGENCY: Nuclear Regulatory Commission.
ACTION: Notice of opportunity for public comment on the proposed
bulletin and draft guide.
-----------------------------------------------------------------------
SUMMARY: The Nuclear Regulatory Commission (NRC) is proposing to issue
a bulletin titled ``Potential Plugging of Emergency Core Cooling
Suction Strainers for Debris in Boiling Water Reactors''; the text of
the bulletin is included in this notice under the Supplementary
Information heading. The proposed bulletin would request boiling water
reactor (BWR) licensees to implement appropriate procedural measures
and plant modifications to minimize the potential for clogging of
suppression pool suction strainers of emergency core cooling systems
(ECCS) by debris generated during a loss-of-coolant accident (LOCA).
The NRC has also issued a related Draft Regulatory Guide, DG-1038,
``Water Sources for Long-Term Recirculation Cooling Following a Loss-
of-Coolant Accident,'' which is a proposed Revision 2 to Regulatory
Guide 1.82. The draft guide provides additional technical guidance to
BWR licensees. The draft guide has not received complete staff review
and does not represent an official NRC staff position.
The proposed bulletin and draft guide are being issued to involve
the public in the development of a regulatory position in this area.
The NRC is seeking comment from interested parties regarding both the
technical and regulatory aspects of the proposed bulletin and draft
guide. The titles of the proposed bulletin and draft guide should be
mentioned in all correspondence.
[[Page 39022]]
The staff is also seeking specific technical comments from
interested parties on the following questions:
1. Does reflective metallic insulation contribute to the potential
clogging of the ECCS suction strainers? Provide any available
supporting data with the response.
2. How effective are alternative strainer designs (e.g., the
``star'' strainer or the ``stacked disk'' strainer) at preventing or
reducing the potential for strainer clogging? Provide any available
supporting test data with the response.
3. How effective are active features (e.g., self-cleaning strainer
designs or backflushing of strainers) at mitigating or preventing
strainer clogging? Provide any available supporting test data with the
response.
4. What criteria should be used for determining adequate sizing of
passive ECCS suction strainers? The staff is seeking specific comments
and supporting technical justification regarding what assumptions
should be used in estimating the strainer head loss including types and
amounts of debris generated, debris characteristics (e.g., size and
shape), amounts of debris transported from the drywell to the
suppression pool, calculation of debris quantities entrained on the
strainer surfaces, and head loss correlations. Where possible,
supporting data should be provided along with recommended assumptions.
5. What actions would be required by licensees to ensure
operability of active features (e.g., backflush and self-cleaning
strainers) installed in response to the proposed bulletin's requested
actions? The staff is also seeking suggestions on ways to incorporate
appropriate actions and surveillance requirements into the Technical
Specifications (TS) which are consistent with the form of the improved
standard TS for the associated safety systems.
The proposed bulletin, draft guide, and supporting documentation
were discussed in meeting number 275 of the Committee to Review Generic
Requirements (CRGR) on June 27, 1995. The relevant information that was
sent to the CRGR to support its review of the proposed bulletin is
available in the NRC Public Document Room under accession number
9507200223. The NRC will consider comments received from interested
parties before issuing the final version of the proposed bulletin and
draft guide. The NRC's evaluation will include a review of the
technical position and, as appropriate, an analysis of the value/impact
on licensees.
Public Meeting: During the public comment period, the staff will
hold a public meeting with the Boiling Water Reactor Owners Group to
discuss the above questions as well as any other comments on the
proposed bulletin and draft guide. The meeting will be held on August
24 and 25, 1995. The meeting will run from 8:00 a.m. to 5:00 p.m. on
August 24th and from 8:00 a.m. to 12:00 p.m. on August 25th. The public
meeting will be held at the Two White Flint North Auditorium, U.S.
Nuclear Regulatory Commission, 11545 Rockville Pike, Rockville,
Maryland. A meeting notice will be issued approximately two weeks prior
that will provide the agenda for the meeting. Interested parties, who
have questions about the proposed bulletin or draft guide and plan to
attend this meeting, are requested to submit their questions in writing
to the staff at least a week before the meeting, so that the staff may
be better prepared to respond to the questions at the meeting. Written
questions for the meeting should be sent to M. David Lynch, U.S.
Nuclear Regulatory Commission, Mail Stop 0-13 D1, Washington, DC 20555-
0001.
Visitor parking is very limited around the NRC office in Rockville,
Maryland. No visitor parking is available in the NRC buildings. It is
recommended that people attending the meeting commute to the meeting
via the Metro. The NRC is located immediately across the street from
the White Flint Metro stop.
DATES: Comment period expires October 2, 1995. Comments submitted after
this date will be considered if it is practical to do so, but assurance
of consideration cannot be given except for comments received on or
before this date.
ADDRESSES: The proposed bulletin and the draft guide are available for
inspection at the NRC Public Document Room, 2120 L Street NW (Lower
Level), Washington, DC. Single copies of the proposed bulletin or the
draft guide may be obtained free of charge by writing to the U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Distribution and Mail Services Section. Requests for single copies of
the proposed bulletin or draft guide may also be faxed to (301) 415-
2260. Telephone requests cannot be accommodated. Regulatory guides and
bulletins are not copyrighted, and NRC approval is not required to
reproduce them. Both the proposed bulletin and draft guide can be
accessed electronically; instructions for doing this are provided
below.
Written comments on the proposed bulletin and draft guide may be
submitted to the Rules Review and Directives Branch, U.S. Nuclear
Regulatory Commission, Washington, DC 20555-0001. Written comments may
also be delivered to 11545 Rockville Pike, Rockville, Maryland, from
7:30 a.m. to 4:15 p.m., Federal workdays. Copies of written comments
received may be examined at the NRC Public Document Room, 2120 L Street
NW (Lower Level), Washington, DC.
Electronic Access: The proposed bulletin and draft guide may be viewed
electronically, and comments may be submitted electronically, in either
ASCII text or WordPerfect format (version 5.1 or later), by calling the
NRC Electronic Bulletin Board Service (BBS) on FedWorld. The bulletin
board may be accessed using a personal computer, a modem, and one of
the commonly available communications software packages, or directly
via Internet.
By using a personal computer and modem, the NRC subsystem on
FedWorld can be accessed directly by dialing the toll free number: 1-
800-303-9672. Communication software parameters should be set as
follows: parity to none, data bits to 8, and stop bits to 1 (N,8,1).
Using ANSI or VT-100 terminal emulation, the NRC NUREGs and RegGuides
for Comment subsystem can then be accessed by selecting the ``Rules
Menu'' option from the ``NRC Main Menu.'' For further information about
options available for NRC at FedWorld, consult the ``Help/Information
Center'' from the ``NRC Main Menu.'' Users will find that the
``FedWorld Online User's Guides'' are particularly helpful. Many NRC
subsystems and databases also have a ``Help/Information Center'' option
that is tailored to the particular subsystem.
The NRC subsystem on FedWorld can also be accessed by a direct dial
phone number for the main FedWorld BBS, 703-321-3339, or by using
Telnet via Internet, fedworld.gov. If using 703-321-3339 to contact
FedWorld, the NRC subsystem may be accessed from the main FedWorld menu
by selecting the ``Regulatory, Government Administration and State
Systems,'' then selecting ``Regulatory Information Mall.'' At that
point, a menu will be displayed that has an option ``U.S. Nuclear
Regulatory Commission'' that will take the user to the NRC Online main
menu. The NRC Online area also can be accessed directly by typing ``/go
nrc'' at a FedWorld command line. If the user accesses NRC from
FedWorld's main menu, the user may return to FedWorld by selecting the
``Return to FedWorld'' option from the NRC Online Main Menu. However,
if the user accesses NRC at FedWorld by using the NRC's toll-free
number, the user will have full access to all NRC systems, but
[[Page 39023]]
will not have access to the main FedWorld system.
If the user contacts FedWorld using Telnet, the user will see the
NRC area and menus, including the Rules menu. The user will be able to
download documents and leave messages, but will not be able to write
comments or upload files (comments). If the user contacts FedWorld
using file transfer protocol (FTP), all files can be accessed and
downloaded but uploads are not allowed; the user will only see a list
of files without descriptions (normal Gopher look). An index file
listing all files within a subdirectory, with descriptions, is
included. There is a 15-minute time limit for FTP access.
Accessing FedWorld through the World Wide Web, like FTP, only
provides access for downloading files and does not display the NRC
Rules menu.
For more information on NRC bulletin boards call Mr. Arthur Davis,
Systems Integration and Development Branch, U.S. Nuclear Regulatory
Commission, Washington, DC 20555, telephone (301) 415-5780, e-mail
[email protected].
FOR FURTHER INFORMATION CONTACT: M. David Lynch at (301) 415-3023, e-
mail [email protected] or Robert Elliott at (301) 415-1397, e-mail
[email protected].
SUPPLEMENTARY INFORMATION:
United States Nuclear Regulatory Commission, Office of Nuclear Reactor
Regulation, Washington, DC 20555
NRC Bulletin 95-XX: Potential Plugging of Emergency Core Cooling
Suction Strainers by Debris in Boiling Water Reactors
Addressees
All holders of operating licenses or construction permits for
boiling-water reactors (BWRs).
Purpose
The U.S. Nuclear Regulatory Commission (NRC) is issuing this
bulletin to: (1) Request addressees to implement appropriate procedural
measures and plant modifications to minimize the potential for clogging
of emergency core cooling system (ECCS) suppression pool suction
strainers by debris generated during a loss-of-coolant accident (LOCA),
and
(2) Require that addressees report to the NRC whether and to what
extent the requested actions will be taken and notify the NRC when
actions associated with this bulletin are complete.
Background
On July 28, 1992, an event occurred at Barseback Unit 2, a Swedish
BWR, which involved the plugging of two ECCS suction strainers. The
strainers were plugged by mineral wool insulation that had been
dislodged by steam from a pilot-operated relief valve that spuriously
opened while the reactor was at 3,100 kPa [435 psig]. Two of the five
strainers on the suction side of the containment spray pumps were in
service and became partially plugged with mineral wool. Following an
indication of high differential pressure across both suction strainers
70 minutes into the event, the operators shut down the containment
spray pumps and backflushed the strainers. The Barseback event
demonstrated that the potential exists for a pipe break to generate
insulation debris and transport a sufficient amount of the debris to
the suppression pool to clog the ECCS strainers.
On January 16 and April 14, 1993, two events involving the clogging
of ECCS strainers also occurred at the Perry Nuclear Power Plant, a
domestic BWR. The first Perry event involved clogging of the suction
strainers for the residual heat removal (RHR) pumps by debris in the
suppression pool. The second Perry event involved the deposition of
filter fibers on these strainers. The debris consisted of glass fibers
from temporary drywell cooling unit filters that had been inadvertently
dropped into the suppression pool, and corrosion products that had been
filtered from the pool by the glass fibers which accumulated on the
surface of the strainer. The Perry events demonstrated the deleterious
effects on strainer pressure drop caused by the filtering of
suppression pool particulates (corrosion products or ``sludge'') by
fibrous glass materials entrained on the ECCS strainer surfaces. These
corrosion products are typically present in large quantities in
domestic BWRs. Separate test programs have been conducted by the
Boiling Water Reactor Owners Group (BWROG) and the staff to quantify
this filtering effect.
Based on these events, the NRC issued Bulletin 93-02, ``Debris
Plugging of Emergency Core Cooling Suction Strainers,'' on May 11,
1993. The bulletin requested licensees to remove fibrous air filters
and other temporary sources of fibrous material, not designed to
withstand a LOCA, from the containment. In addition, licensees were
requested to take any immediate compensatory measures necessary to
ensure the functional capability of the ECCS.
Following these events, the staff performed calculations to assess
the vulnerability of each domestic BWR. The results of these
calculations showed that the potential existed for the ECCS pumps to
lose net positive suction head (NPSH) margin due to clogging of the
suction strainers by LOCA-generated debris. The staff then conducted a
detailed study of a reference BWR 4 plant with a Mark I containment.
The preliminary results of the staff study are contained in a draft
report, ``Parametric Study of the Potential for BWR ECCS Strainer
Blockage Due to LOCA Generated Debris,'' which was published in August
1994. The preliminary study results reaffirmed the results of the
earlier staff calculations.
Members of the NRC staff also attended an Organization for Economic
Cooperation and Development/Nuclear Energy Agency (OECD/NEA) workshop
on the Barseback incident held in Stockholm, Sweden, on January 26 and
27, 1994. Representatives from other countries at this conference
discussed actions taken or planned which would prevent or mitigate the
consequences of BWR strainer blockage. Based on the preliminary results
of the staff's study, as reinforced by information learned at the OECD/
NEA workshop, the staff issued NRC Bulletin 93-02, Supplement 1,
``Debris Plugging of Emergency Core Cooling Suction Strainers,'' on
February 18, 1994. The purpose of the bulletin supplement was to
request that BWR licensees take the appropriate interim actions to
ensure reliability of the ECCS so that the staff and industry would
have sufficient time to develop a permanent resolution. In addition,
the bulletin supplement informed licensees of pressurized water
reactors (PWRs) and BWRs of new information on the vulnerability of
ECCS suction strainers in BWRs and containment sumps in PWRs to
clogging during the recirculation phase of a LOCA.
Licensee responses to NRC Bulletin 93-02 and its supplement have
demonstrated that appropriate interim measures have been implemented by
licensees to ensure adequate protection of public health and safety,
and to allow continued operation until the final actions requested in
this bulletin are implemented.
In responding to these bulletins, licensees ensured: (1) the
availability of alternate water sources (both safety and non-safety
related sources) to mitigate a strainer clogging event, (2) that
emergency operating procedures (EOPs) provided adequate guidance on
mitigating a strainer clogging event, (3) that operators were
adequately trained to mitigate a strainer clogging event, and (4) that
loose and temporary fibrous materials stored in containment were
removed. In addition, a generic safety assessment conducted by the
Boiling Water Reactor Owners Group (BWROG)
[[Page 39024]]
concluded that operators would have adequate time to make use of
alternate water sources (25-35 minutes). The staff also notes that the
probability of the initiating event is low. The actions requested in
this bulletin will ensure that the ECCS can perform its safety function
and minimize the need for operator action to mitigate a LOCA.
Discussion
The results of the staff study, initially documented in the draft
NUREG/CR-6224, demonstrate that for the reference plant, there is a
high probability that the available NPSH margin for the ECCS pumps will
be inadequate following dislodging of insulation caused by a LOCA and
transport of insulation debris to the suction strainers. In addition,
the study calculated that the loss of NPSH could occur quickly (less
than 10 minutes into the event). The study also demonstrated that
determining the adequacy of NPSH margin for an ECCS system is highly
plant-specific because of the large variations in such plant
characteristics as containment type, ECCS flow rates, insulation types,
plant layout, and available NPSH margin. The final version of NUREG/CR-
6224 is scheduled for issuance in September 1995.
The Barseback event demonstrated that a pipe break can generate and
transport large quantities of insulation debris to the suppression pool
where they can be deposited onto strainer surfaces and potentially
cause the ECCS to lose NPSH. The Perry events further demonstrated that
fibrous insulation debris combined with corrosion products present in
the suppression pool (sludge) can exacerbate the problem. This
phenomenon was confirmed in the staff study which showed that the
calculated loss of NPSH could occur soon (less than 10 minutes) after
ECCS initiation. The effect of filtering sludge from the suppression
pool water by fibrous debris deposited on the strainer surface was
further confirmed in NRC-sponsored testing conducted at the Alden
Research Laboratory which demonstrated that the pressure drop across
the strainer was greatly increased by this filtering effect. Additional
testing sponsored by the NRC at Alden Research Laboratory demonstrated
that the energy conveyed to the suppression pool during the
``chugging'' phase of a LOCA is sufficient to ensure that the fibrous
debris and sludge are well-mixed and evenly distributed in the
suppression pool, and can remain suspended for a sufficiently long
period of time to allow large quantities to be deposited onto the
strainer surfaces. The staff has concluded that this problem is
applicable to all domestic BWRs. The basis for the staff's conclusion
is as follows: (1) there does not appear to be any features specific to
a particular plant, class of plants, or containment type which would
mitigate or prevent the generation, transport to the suppression pool,
or deposition on the ECCS strainers of sufficient material to clog the
strainers, and (2) parametric analyses performed in support of the
NUREG/CR-6224 study using parameter ranges which bound most domestic
BWRs failed to find parameter ranges which would prevent BWRs with
other containment types from being susceptible to this problem. In
addition, the staff study was conducted on a Mark I; Barseback had a
strainer clogging event and is similar in design to a Mark II; and
Perry, a Mark III, also had a strainer clogging event.
Section 50.46 of Title 10 of the Code of Federal Regulations (10
CFR 50.46) requires that licensees design their ECCS systems to meet
five criteria, one of which is to provide long-term cooling capability
of sufficient duration following a successful system initiation so that
the core temperature shall be maintained at an acceptably low value and
decay heat shall be removed for the extended period of time required by
the long-lived radioactivity remaining in the core. The ECCS is
designed to meet this criterion, assuming the worst single failure.
Experience gained from operating events and detailed analysis, as
previously discussed, demonstrate that excessive buildup of debris from
thermal insulation, corrosion products, and other particulates on ECCS
pump strainers is highly likely to occur, creating the potential for a
common-cause failure of the ECCS, which could prevent the ECCS from
providing long-term cooling following a LOCA. The staff concludes;
therefore, that this issue must be resolved by licensees in order to
ensure compliance with the regulations; specifically, to ensure that
long-term cooling can be provided in accordance with 10 CFR 50.46.
Plant-specific analyses to resolve this issue are difficult to
perform because a substantial number of uncertainties are involved.
Examples of these uncertainties include the amount of debris that would
be generated by a pipe break for various insulation types; the amount
of the debris that would be transported to the suppression pool; the
characteristics of debris reaching the suppression pool (e.g., size and
shape); and head loss correlations for various insulation types
combined with suppression pool corrosion products, paint chips, dirt,
and other particulates. Many of these uncertainties would be plant-
specific because of the differences in plant characteristics, such as
plant layout, insulation types, ECCS flow rates, containment types, and
NPSH margin. Testing may be required to quantify these uncertainties
for licensees to demonstrate compliance with 10 CFR 50.46.
The staff has also closely followed the work of the BWROG to
resolve this issue. The BWROG has evaluated several potential
solutions, and is currently testing three new strainer designs: two
passive strainer designs and one self-cleaning design. The ongoing
BWROG effort is consistent with the options proposed in this bulletin
for resolution of the the ECCS potential strainer clogging issue. These
options are discussed in the next section under Requested Actions. The
BWROG is also developing a utility resolution guidance (URG) document
for providing the utilities with: 1) guidance on evaluation of the ECCS
potential strainer clogging issue for their plant, 2) a standard
industry approach to resolution of the issue which is technically
sound, and 3) guidance which is consistent with the requested actions
in this bulletin for demonstrating compliance with 10 CFR 50.46. The
staff considers this document to be an important part of the
implementation of the final resolution of this issue, and will closely
monitor the development and application of the URG.
Requested Actions
All BWR licensees are requested to implement appropriate measures
to ensure the capability of the ECCS to perform its safety function
following a LOCA. The staff has identified three potential resolution
options; however, licensees may propose others which provide an
equivalent level of assurance that the ECCS will be able to perform its
safety function following a LOCA. The three options identified by the
staff are as follows:
Option 1: Installation of a large capacity passive strainer design.
Draft Regulatory Guide DG-1038, proposed Revision 2 of Regulatory Guide
1.82 (RG 1.82), ``Water Sources for Long-Term Recirculation Cooling
Following a Loss-of-Coolant Accident,'' has been revised to provide
additional technical guidance to BWR licensees on the conduct of
evaluations to ensure compliance with 10 CFR 50.46. If this option is
selected by a licensee, the strainer design used should have sufficient
capacity to ensure that debris loadings equivalent to a scenario
calculated in accordance with Section C.2.2 of DG-1038 do not cause
[[Page 39025]]
a loss of net positive suction head (NPSH) for the ECCS. This option
has two main advantages. First, it is completely passive and,
therefore, requires no operator intervention. Second, it does not
require an interruption of ECCS flow. While this is the most
advantageous of the options identified, the staff recognizes that it
may be difficult for most licensees to implement this option due to the
difficulty in providing sufficient structural support for the strainers
to handle LOCA-induced hydrodynamic loads. However, the staff notes
that licensees may take appropriate measures in combination with this
option to reduce the potential debris sources in containment and the
suppression pool, which would, in turn, reduce the required capacity
and physical size of the strainer, and therefore, assist in reducing
the structural burden of the strainer installation. Licensees choosing
this option for resolution should establish programs, as necessary, to
ensure that the potential for debris to be generated and transported to
the strainer surface does not at any time exceed the assumptions used
in estimating the amounts of debris for sizing of the strainers in
accordance with DG-1038.
Option 2: Installation of a self-cleaning strainer.
This option automatically prevents strainer clogging by providing
continuous cleaning of the strainer surface with a scraper blade or
brush. Like Option 1, the self-cleaning strainer design would not rely
on operator action or interrupt ECCS flow. However, this option does
rely on an active component which is fully exposed to the LOCA effects
in the suppression pool to keep the strainer surface clean. Therefore,
appropriate measures should be taken to ensure the operability of the
strainer. Installation of this type of strainer should be combined with
the following measures to protect the strainer and ensure its
operability: (1) implementation of reasonable measures to eliminate
debris sources which could potentially damage or overload the strainer
during a LOCA, including, as a minimum, removal of all debris from the
suppression pool every refueling outage, and (2) implementation of
surveillances to ensure periodic cleaning of the suppression pool and
the operability of the strainer.
Option 3: Installation of a backflush system.
The backflush system is a reactive system that relies on operator
action to remove debris from the surface of the strainer to prevent it
from clogging. In order to ensure that operators can adequately deal
with a strainer clogging event, installation of this type of system
should be combined with the following measures: (1) reasonable measures
to maximize the amount of time before clogging could occur; (2)
instrumentation and alarms to indicate when strainer differential
pressure increases; (3) operator training on recognition and mitigation
of a strainer clogging event, and (4) implementation of surveillances
to ensure the operability of the strainer instrumentation and backflush
system. A supporting analysis for installation of a backflush system
which is consistent with Section C.2.2 of DG-1038 should be performed
to demonstrate that operators have sufficient time to recognize the
onset of clogging and to take appropriate action, taking into
consideration their other responsibilities after a LOCA. In addition,
this analysis should ensure that operators have the capability and
sufficient time to cycle backflushing at the expected frequency and for
the required total number of actuations anticipated in providing long-
term core cooling following a LOCA.
Compliance with 10 CFR 50.46 requires the use of safety grade
equipment. Any request to deviate from this position would require an
exemption with a supporting technical analysis, and must meet the
specific requirements of 10 CFR 50.12. Active features such as
backflush and the self-cleaning strainer must be supported by test data
that demonstrate the design effectiveness for removal of debris
entrained on the surface of the strainer. Strainers installed for
Option 1 must be supported by test data that demonstrate their
performance characteristics, and their ability to handle the worst case
scenario for debris deposition on the strainer surface.
On July 22, 1993, the Commission published its final policy
statement on Technical Specifications (TS) improvements for nuclear
power reactors in the Federal Register (58 FR 39132). Part of that
policy statement stated that the purpose of TS is to impose those
conditions or limitations upon reactor operation necessary to obviate
the possibility of an abnormal situation or event giving rise to an
immediate threat to the public health and safety by identifying those
features that are of controlling importance to safety and establishing
on them certain conditions of operation which cannot be changed without
prior Commission approval. Based on this purpose and 10 CFR 50.36, the
Commission also provided four criteria that delineate those constraints
on design and operation of nuclear power plants that belong in TS.
Criterion 3 of the policy statement states that a structure, system or
component which is part of the primary success path and which functions
or actuates to mitigate a Design Basis Accident or Transient that
either assumes the failure of or presents a challenge to the integrity
of a fission product barrier should be captured in the TS. The staff
believes that self-cleaning strainers, backflush systems, and
instrumentation installed to support backflush systems meet Criterion 3
of the Commission's policy and should be captured in the TS because
these components are necessary for the primary success path (i.e., the
ECCS) to mitigate design basis LOCA. TS should be proposed to support
the above actions and should include, where appropriate for the option
selected: (1) appropriate limiting conditions for operation (LCOs); (2)
channel checks, channel functional tests, and calibrations of strainer
instrumentation at an interval commensurate with other ECCS
instrumentation, and (3) testing of active features at the same
interval as functional tests of the low-pressure coolant injection
(LPCI) system. The final version of this bulletin will include sample
TS for Options 2 and 3.
Plant procedures and other actions implemented in response to NRC
Bulletin 93-02 and its supplement, should remain in place until the
final corrective actions requested in this bulletin have been
implemented.
All licensees are requested to implement these actions by December
31, 1997. This timeframe for implementation of the final resolution is
considered appropriate by the staff due to the interim actions already
taken by licensees and the low probability of the initiating event.
Required Response
All addressees are required to submit the following written
reports:
(1) Within 180 days of the date of this bulletin, a report
indicating whether the addressee intends to comply with these requested
actions, including a detailed description of planned actions and
mitigative strategies to be used, the schedule for implementation, and
proposed TS; or, if the licensee does not intend to comply with these
actions, a detailed description of the safety basis for the decision.
The report must contain a detailed description of any proposed
alternative course of action, the schedule for completing this
alternative course of action, the safety basis for determining the
acceptability of the planned alternative course of action, and proposed
TSs, if
[[Page 39026]]
appropriate, that support the proposed alternative course of action and
are consistent with the Commission's Policy Statement on TS. The staff
considers the 180-day response period to be appropriate given the
amount of engineering that licensees may wish to perform before they
provide their formal response to the staff.
(2) Within 30 days of completion of all requested actions, a report
confirming completion and summarizing any actions taken.
Address the required written reports to the U.S. Nuclear Regulatory
Commission, ATTN: Document Control Desk, Washington, D.C. 20555-0001,
under oath or affirmation under the provisions of Section 182a, the
Atomic Energy Act of 1954, as amended, and 10 CFR 50.54(f). In
addition, submit a copy of the reports to the appropriate regional
administrator.
Related Generic Communications
NRC Bulletin 93-02, ``Debris Plugging of Emergency Core Cooling
Suction Strainers,'' dated May 11, 1993 and its supplement dated
February 18, 1994.
Backfit Discussion
The actions requested by this bulletin are considered backfits in
accordance with NRC procedures and are necessary to ensure that
licensees are in compliance with existing NRC rules and regulations.
Specifically, 10 CFR 50.46 requires that adequate ECCS flow be provided
to maintain the core temperature at an acceptably low value and to
remove decay heat for the extended period of time required by the long-
lived radioactivity remaining in the core following a design-basis
accident. Therefore, this bulletin is being issued as a compliance
backfit under the terms of 10 CFR 50.109(a)(4)(i), and a full backfit
analysis was not performed. An evaluation was performed in accordance
with NRC procedures, including a statement of the objectives of and the
reasons for the requested actions and the basis for invoking the
compliance exception. A copy of this evaluation will be made available
in the NRC Public Document Room.
Paperwork Reduction Act Statement
The information collections contained in this request are covered
by the Office of Management and Budget clearance number 3150-0011,
which expires July 31, 1997. The public reporting burden for this
collection of information is estimated to average 160 hours per
response, including the time for reviewing instructions, searching
existing data sources, gathering and maintaining the data needed, and
completing and reviewing the collection of information. Send comments
regarding this burden estimate or any other aspect of this collection
of information, including suggestions for reducing this burden, to the
Information and Records Management Branch (T-6 F33), U.S. Nuclear
Regulatory Commission, Washington, D.C. 20555-0001, and to the Desk
Officer, Office of Information and Regulatory Affairs, NEOB-10202,
(3150-0011), Office of Management and Budget, Washington, D.C. 20503.
Compliance with the following request for information is purely
voluntary. The information would assist NRC in evaluating the cost of
complying with this bulletin:
(1) The licensee staff time and costs to perform requested
inspections, corrective actions, and associated testing;
(2) The licensee staff time and costs to prepare the requested
reports and documentation;
(3) The additional short-term costs incurred as a result of the
inspection findings, such as the costs of the corrective actions or the
costs of down time;
(4) An estimate of the additional long-term costs that will be
incurred in the future as a result of implementing commitments such as
the estimated costs of conducting future inspections or increased
maintenance.
Dated at Rockville, Maryland, this 19th day of July 1995.
For the Nuclear Regulatory Commission.
Brian K. Grimes,
Director Division of Project Support Office of Nuclear Reactor
Regulation.
John W. Craig,
Deputy Director Division of Engineering Technology Office of Nuclear
Regulatory Research.
[FR Doc. 95-18686 Filed 7-28-95; 8:45 am]
BILLING CODE 7590-01-P