Documents
Briefs, oral arguments, agency decisions and the Federal Register.
5,874 results
0.96s
Federal Register · Notice · Jun 24, 2025
The NRC staff finds the additional period of operations would not affect most resource areas and not have significant impacts on air quality, transportation, occupational health and safety, and waste management … The NRC received no comments on the EA. Section 106 of the National Historic Preservation Act (NHPA) requires Federal agencies to consider the effects of their undertakings on historic properties.
90 FR 26839Nuclear Regulatory CommissionAP1000 Design Certification Amendment
Federal Register · Rule · Dec 30, 2011
The public comment period for the proposed rule closed on May 10, 2011. … period, and the public had a fair opportunity to comment on this matter.
76 FR 82079Nuclear Regulatory CommissionFederal Register · Proposed Rule · Nov 10, 2011
The NRC is not instituting a public comment period for these PRMs at this time. … Diane Curran, on behalf of Southern Alliance for Clean Energy PRM-51-16 ML11223A291 Watts Bar.
76 FR 70067Nuclear Regulatory CommissionProposed Generic Communication; Degradation of Steam Generator Internals
Federal Register · Notice · Dec 31, 1996
DATES: Comment period expires January 30, 1997. … Comments submitted after this date will be considered if it is practical to do so, but assurance of consideration cannot be given except for comments received on or before this date.
61 FR 69116Nuclear Regulatory CommissionFederal Register · Notice · Feb 5, 2002
Laufer, Acting. … Munday, Acting.
67 FR 5323Nuclear Regulatory CommissionFederal Register · Notice · Nov 28, 1995
Before issuance of the proposed license amendment, the Commission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
60 FR 58688Nuclear Regulatory CommissionRespiratory Protection and Controls To Restrict Internal Exposures
Federal Register · Proposed Rule · Jul 17, 1998
DATES: Submit comments by September 30, 1998. … For the reasons set out in the preamble and under the authority of the Atomic Energy Act of 1954, as amended, the Energy Reorganization Act of 1974, as amended, and 5 U.S.C. 553, the NRC is proposing to
63 FR 38511Nuclear Regulatory CommissionFederal Register · Notice · Apr 17, 2012
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
77 FR 22808Nuclear Regulatory CommissionFederal Register · Notice · Jul 30, 1997
provision of section 189 of the Act. … and breathing air containment penetrations to remain open under administrative control during periods of core alterations or movement of irradiated fuel inside containment.
62 FR 40843Nuclear Regulatory CommissionBiweekly NoticeFederal Register · Notice · Jul 29, 2024
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period if circumstances change during the 30-day comment period such that failure to act in a timely way … If the Commission takes action prior to the expiration of either the comment period or the notice period, it will publish a notice of issuance in the Federal Register .
89 FR 60930Nuclear Regulatory CommissionFederal Register · Notice · Apr 15, 2014
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
79 FR 21294Nuclear Regulatory CommissionEnvironmental Statements; Availability, etc.: Combustion Engineering, Inc.
Federal Register · Uncategorized Document · Mar 28, 1994
Air, soil, vegetation, surface water, and ground water samples are collected from various locations on or near the plant site. … The staff also contacted personnel from the State of Missouri, Department of Natural Resources, Air Pollution Control Program.
Nuclear Regulatory CommissionList of Approved Spent Fuel Storage Casks: (HI-STAR 100) Addition
Federal Register · Rule · Sep 3, 1999
The comment period ended on March 29, 1999. Nine comment letters were received on the proposed rule. … Comment No. 45: One commenter asked if the casks are checked in winter for ice and snow loads or ice around the base and if the pads will be kept clean.
64 FR 48259Nuclear Regulatory CommissionFederal Register · Notice · Apr 6, 2000
Exigent circumstances exist due to the need to repair an air leak on a pneumatic door seal on the inner main equipment access air lock. … However, should circumstances change during the notice period, such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the
65 FR 18141Nuclear Regulatory CommissionFederal Register · Notice · Jul 30, 1997
provision of section 189 of the Act. … and breathing air containment penetrations to remain open under administrative control during periods of core alterations or movement of irradiated fuel inside containment.
62 FR 40843Nuclear Regulatory CommissionBiweekly NoticeFederal Register · Notice · May 15, 2025
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period if circumstances change during the 30-day comment period such that failure to act in a timely way … If the Commission takes action prior to the expiration of either the comment period or the notice period, it will publish a notice of issuance in the Federal Register .
90 FR 20689Nuclear Regulatory CommissionMark Edward Leyse; Receipt of Petition for Rulemaking
Federal Register · Proposed Rule · May 23, 2007
DATES: Submit comments by August 6, 2007. … of time and could cause the cladding to fracture during the reflood period and lose structural integrity.
72 FR 28902Nuclear Regulatory CommissionFederal Register · Rule · Oct 11, 2016
ML101040620), notes that for storage systems with internal air flow passages, the NRC has accepted periodic visual inspection of vents coupled with temperature measurements to verify proper thermal performance … That SER noted that in addition to the mandatory initial air temperature rise test when the system is first placed in service, the overpack air inlet and outlet vents would be periodically surveyed or
81 FR 70004Nuclear Regulatory CommissionFederal Register · Notice · Dec 7, 2000
The licensee will use a vacuum to clean the floor of the fuel transfer canal following the drying of the canal prior to installing the new fuel racks. … The state official had no comments.
65 FR 76672Nuclear Regulatory CommissionFederal Register · Rule · Aug 4, 1999
Registration Program Comment: One commenter noted that the language of the proposal did not call for a periodic registration program requiring reporting at least annually. … The commenter used the example of the cost for cleaning a steel mill contaminated by melting such a source.
64 FR 42269Nuclear Regulatory Commission