Documents
Briefs, oral arguments, agency decisions and the Federal Register.
5,874 results
2.43s
Exelon Generation Co., LLC; Dresden Nuclear Power Station, Units 2 and 3
Federal Register · Notice · Oct 5, 2015
Horn had no comments. … Therefore, consultation was not required under Section 7 of the Endangered Species Act or under Section 106 of the National Historic Preservation Act. III.
80 FR 60183Nuclear Regulatory CommissionFederal Register · Notice · Dec 31, 2012
After each pit was filled with waste, it was backfilled to surface grade with at least 5 feet of clean soil. … Air sampling and analysis will be conducted to ensure regulatory criteria are met for air effluents. No liquid effluents are expected to be generated during decommissioning.
77 FR 77118Nuclear Regulatory CommissionFederal Register · Notice · Nov 3, 2010
STPNOC would be required to implement environmental controls specified in its Clean Water Act Section 402(p) Texas Pollutant Discharge Elimination System (TPDES) general permit for construction of STP … minimize impacts to air.
75 FR 67784Nuclear Regulatory CommissionFederal Register · Notice · Oct 28, 1996
The State official had no comments. … Buckley, Acting Director, Project Directorate II-1, Division of Reactor Projects--I/II, Office of Nuclear Reactor Regulation. [FR Doc. 96-27558 Filed 10-25-96; 8:45 am] BILLING CODE 7590-01-P
61 FR 55673Nuclear Regulatory CommissionFederal Register · Notice · Aug 23, 1999
The resulting dose to the worker cleaning up the spilled material was 0.11 mSv (11 mrem) TEDE. … DEQ in its letter Dated July 12, 1999, stated that they had no comments.
64 FR 45982Nuclear Regulatory CommissionFederal Register · Proposed Rule · Jun 30, 1999
The written public comment period will extend until after the last public meeting is held. … The regulations in 10 CFR, Chapter I, have been developed using a rulemaking process that provides the opportunity for public review and comment under the Administrative Procedure Act and includes the
64 FR 35090Nuclear Regulatory CommissionFederal Register · Notice · Dec 10, 2024
The NRC received no comments from the State. … Therefore, the NRC has determined that no further consultation is required under Section 7 of the Endangered Species Act. III.
89 FR 99314Nuclear Regulatory CommissionFederal Register · Correction · Jun 3, 2002
(c) (2) Central air conditioners and central air conditioning heat pumps manufactured on or after January 23, 2006 , shall have Seasonal Energy Efficiency Ratio and Heating Seasonal Performance Factor … Michele ENVIRONMENTAL PROTECTION AGENCY [CA077-NOD; FRL-7215-1] Notice of Deficiency for 34 Clean Air Act Operating Permits Programs in California Correction In notice document 02-12847
67 FR 38324Commerce DepartmentUnder Secretary for Industry and SecurityFederal Register · Notice · Nov 5, 2003
Likewise, while environmental justice matters may be appropriately addressed during the permitting process under other environmental statutes including the Resource Conservation and Recovery Act, the Clean … Water Act, and the Clean Air Act, the NRC does not have permitting authority under those statutes.
68 FR 62642Nuclear Regulatory CommissionFederal Register · Notice · Sep 19, 1996
A second notice appeared in the Federal Register (60 FR 57253) on November 14, 1995, providing for a 45-day public comment period on the compliance plan. … Comments received during the comment period, together with transcripts of the public meetings, are available in the PDR and the LPDRs, and were reviewed and considered by the staff during the certification
61 FR 49360Nuclear Regulatory CommissionFederal Register · Notice · Sep 26, 2024
The NRC plans to hold public meetings periodically to support the NRC's implementation of the ADVANCE Act. … The NRC will periodically hold public meetings on the NRC's efforts to implement the ADVANCE Act.
89 FR 78916Nuclear Regulatory CommissionFederal Register · Notice · Nov 28, 2023
In addition, the Commission may issue any of these amendments prior to the expiration of the 30-day comment period if circumstances change during the 30-day comment period such that failure to act in a … If the Commission takes action on any of these amendments prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
88 FR 83165Nuclear Regulatory CommissionFederal Register · Notice · Jan 4, 2001
The Army will implement an environmental air monitoring program. … There will be no significant/prolonged periods of increased noise levels. The decommissioning activities will generate some elevated sound levels for a 6-8 week period.
66 FR 812Nuclear Regulatory CommissionFederal Register · Notice · Jan 3, 1996
provision of section 189 of the Act. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
61 FR 174Nuclear Regulatory CommissionBiweekly NoticeRadiological Criteria for License Termination
Federal Register · Rule · Jul 21, 1997
The public comment period closed on January 20, 1995. Comments received on the proposed rule were summarized in NUREG/CR-6353. … been demonstrated; and that SSABs are inconsistent with Federal Advisory Committee Act, Administrative Procedures Act, and Atomic Energy Act requirements.
62 FR 39058Nuclear Regulatory CommissionFederal Register · Notice · Mar 23, 2006
Therefore, the drywell atmosphere changes from low humidity air to nearly 100% steam (no air) as the event progresses. … The CRFA system consists of two independent and redundant high efficiency air filtration subsystems for treatment of recirculated air or outside supply air.
71 FR 14726Nuclear Regulatory CommissionRequirements for Shipping Packages Used To Transport Vitrified High-Level Waste
Federal Register · Proposed Rule · May 8, 1997
DATE: The comment period expires July 22, 1997. … EPA reviewed the petition in accordance with its responsibilities under Section 309 of the Clean Air Act and had no specific comments.
62 FR 25146Nuclear Regulatory CommissionList of Approved Spent Fuel Storage Casks: Holtec HI-STORM 100 Addition
Federal Register · Rule · May 1, 2000
The comment period ended on December 6, 1999. Four comment letters were received on the proposed rule. … Comment I.12: One commenter asked how cool air was provided to the space inside the vault at the bottom of the overpack.
65 FR 25241Nuclear Regulatory CommissionNational Institute of Standards and Technology; National Bureau of Standards Test Reactor
Federal Register · Notice · Nov 17, 2022
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period if circumstances change during the 30-day comment period such that failure to act in a timely way … If the Commission takes action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
87 FR 69056Nuclear Regulatory CommissionTennessee Valley Authority; Browns Ferry Nuclear Plant, Units 1, 2, and 3
Federal Register · Notice · May 31, 2017
period (NRC 2016a; 81 FR 86732). … The reservoir is currently included on the State of Alabama's Federal Water Pollution Control Act ( i.e., Clean Water Act (CWA)) of 1972, as amended, Section 303(d) list of impaired waters as partially
82 FR 24998Nuclear Regulatory Commission
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.