Federal Register · Notice · Sep 22, 1997
The radiation doses resulting from atmospheric releases were estimated using the CAP88-PC (Clean Air Assessment Package 1988) Version 1.0 computer code. … Anyone with questions or comments about this proposed action should contact Ms. Heather Astwood, NRC's Project Manager for the facility, at Mail Stop T-8D-14, U.S.
62 FR 49538Nuclear Regulatory CommissionFederal Register · Notice · Apr 12, 2002
C-T project buildings and equipment remaining on-site will be cleaned and released for unrestricted use. … Craig, Acting Chief, Decommissioning Branch, Division of Waste Management, Office of Nuclear Material Safety, and Safeguards.
67 FR 18041Nuclear Regulatory CommissionFederal Register · Notice · Jul 31, 2024
Under this definition, the cooling pond is not considered waters of the State under Illinois Administrative Code (35 IAC 301.440) or waters of the United States under the Federal Clean Water Act (40 CFR … Water Act.
89 FR 61500Nuclear Regulatory CommissionFederal Register · Notice · Mar 19, 1997
In the first case, if a 90-day storage period is presumed, the average exposure distance over the entire period needed to ensure a dose less than the position's exposure criteria would be on the order … provide for an institutional control period.
62 FR 13176Nuclear Regulatory CommissionFederal Register · Notice · Apr 15, 2003
provision of section 189 of the Act. … NRC Acting Section Chief: Mark Thaggard.
68 FR 18269Nuclear Regulatory CommissionFederal Register · Notice · Sep 25, 1996
However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license … for the drywell air lock seal.
61 FR 50338Nuclear Regulatory CommissionBiweekly NoticeFederal Register · Notice · Jun 17, 2026
Should the project involve an impact to a jurisdictional wetland or water source in the future, Powertech would take the appropriate actions in accordance with Section 404 of the Clean Water Act. … SDDANR responded on May 22, 2026, with comments regarding the scope and status of the unique lands determination, large-scale mine permit, air quality permit, water appropriations permit, Groundwater Discharge
91 FR 36623Nuclear Regulatory CommissionFederal Register · Notice · Sep 25, 1996
However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license … for the drywell air lock seal.
61 FR 50338Nuclear Regulatory CommissionBiweekly NoticeFederal Register · Notice · May 7, 2010
On April 30, 2010, TDEC responded that it had reviewed the draft EA and had no comments (Ref. 6). … Therefore, no consultation is required under Section 7 of the Endangered Species Act.
75 FR 25301Nuclear Regulatory CommissionFederal Register · Notice · May 9, 2006
Also, in accordance with the position paper, this Draft Environmental Assessment and Finding of No Significant Impact is being published in the Federal Register with a 30-day public comment period. … DATES: The comment period expires June 8, 2006.
71 FR 26985Nuclear Regulatory CommissionFederal Register · Notice · Nov 25, 2025
In addition, the Commission may issue any of these amendments prior to the expiration of the 30-day comment period if circumstances change during the 30-day comment period such that failure to act in a … If the Commission takes action on any of these amendments prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
90 FR 53396Nuclear Regulatory CommissionReforming and Modernizing the NRC's Radiation Protection Framework
Federal Register · Proposed Rule · Jul 15, 2026
Additionally, the NRC has used these types of regulations to meet environmental protection-related obligations under the Clean Air Act (CAA) and to demonstrate compliance with the environmental protection … Final Rule, “Resolution of Dual Regulation of Airborne Effluents of Radioactive Materials; Clean Air Act,” December 10, 1996 61 FR 65120.
91 FR 43456Nuclear Regulatory CommissionFederal Register · Notice · Sep 9, 1998
provision of section 189 of the Act. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
63 FR 48256Nuclear Regulatory CommissionFederal Register · Notice · Aug 9, 2007
and/or the Clean Air Act because of failures to address critical aspects regarding limits on emissions of hazardous air pollutants necessary for the protection of public health and safety; (2) Whether … Oral limited appearance statements will be entertained during the hours specified above, although a lesser time period may be sufficient to accommodate the speakers who are present.
72 FR 44877Nuclear Regulatory CommissionBrowns Ferry Nuclear Plant, Unit 1; Issuance of Director's Decision Under 10 CFR 2.206
Federal Register · Notice · Apr 2, 1999
Through such meetings, the public may hear and comment on the licensee's restart plans and the results of NRC reviews of the restart activities. … Public comments and concerns are considered by the NRC and may be factored into the restart review, as appropriate.
64 FR 16007Nuclear Regulatory CommissionTennessee Valley AuthorityFederal Register · Notice · Aug 10, 2021
In addition, the Commission may issue any of these amendments prior to the expiration of the 30-day comment period if circumstances change during the 30-day comment period such that failure to act in a … If the Commission takes action on any of these amendments prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
86 FR 43686Nuclear Regulatory CommissionNortheast Ohio Regional Sewer District; Denial of Petition for Rulemaking
Federal Register · Proposed Rule · Jan 27, 2005
, already have requirements to follow the Clean Water Act, and may establish a pretreatment program for wastewater acceptance. … are dispersed into water or air.
70 FR 3898Nuclear Regulatory CommissionFederal Register · Notice · Nov 9, 1999
During refueling operations, some of these fission products may enter the SFP and subsequently be released into the air. … The State official had no comments.
64 FR 61167Nuclear Regulatory CommissionExelon Generation Company, LLC; LaSalle County Station, Units 1 and 2
Federal Register · Notice · Aug 3, 2015
high air temperature, high humidity, and low wind. … Under this definition, the cooling pond is not considered waters of the State under Illinois Administrative Code (35 IAC 301.440) or waters of the United States under the Federal Clean Water Act (40 CFR
80 FR 46062Nuclear Regulatory CommissionCriteria for the Release of Individuals Administered Radioactive Material
Federal Register · Rule · Jan 29, 1997
Furthermore, 10 CFR 20.1301(d) does not incorporate the EPA's Clean Air Act standards in 40 CFR part 61 that applies to hospitals. … The NRC is separately pursuing actions with the EPA to minimize the impact of dual regulation under the Clean Air Act and to take agreed upon actions that will lead to EPA recision of 40 CFR part 61 for
62 FR 4120Nuclear Regulatory Commission