Documents
Briefs, oral arguments, agency decisions and the Federal Register.
10,000+ results
0.27s
Federal Register · Notice · Apr 26, 2011
, Motions To Intervene, and Competing Applications On April 1, 2011, Storage Development Partners, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act … (FPA), proposing to study the feasibility of the Vandenberg #5 Project (project) to be located on Vandenberg Air Force Base, in Santa Barbara County, California.
76 FR 23322Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Dec 26, 2013
To Intervene, and Competing Applications On August 7, 2013, Hydro Green Energy, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing … to study the feasibility of the Vandenberg East Project to be located near Vandenberg Air Force Base in Santa Barbara County, California.
78 FR 78355Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Proposed Rule · Nov 27, 1995
Federal Energy Regulatory Commission has prepared a draft environmental impact statement for the proposed rulemaking in this proceeding to satisfy the requirements of the National Environmental Policy Act … The most frequently raised issue involves air quality impacts, particularly the possible transport of nitrogen oxides (NOx) emissions by Midwestern generating plants to airsheds in the Northeast and the
60 FR 58304Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jan 2, 2020
Publication of the NOA began a 30-day public comment period that ended on October 21, 2018. DOE received seven comments in response to the NOA. … Comments on the LCA GHG Update and DOE Responses DOE has evaluated the comments received during the public comment period.
85 FR 72Energy DepartmentEnergy Research Financial Assistance Program; Atmospheric Chemistry Program
Federal Register · Notice · Mar 17, 1997
These studies are intended to be in support of DOE information needs under the National Energy Policy Act (Public Law 102-486). … ozone and heterogeneous chemistry, atmospheric chemical-conversion processes, and wet-removal and air/surface exchange is encouraged.
62 FR 12626Energy DepartmentEnergy Research OfficeCombined Notice of Filings, #1
Federal Register · Notice · Oct 14, 2008
Description: American Electric Power submits a Request for Disclaimer of Jurisdiction or, in the Alternative Application for Approvals under section 203 of the Federal Power Act, Request for Expedited … Description: Black Hills Power, Inc submits revised pages comprising Attachment N, in clean and blacklined formats to supplement its September 29, 2008 filing.
73 FR 60684Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Nov 27, 2006
Description: Midwest Independent Transmission System Operator, Inc., submits copies of a clean and redlined revisions to Sheet 966A and 966C of FERC Electric Rate Schedule 10-C, etc., under ER06-1308 … Description: PJM Interconnection, LLC submits an executed Wholesale Market Participation Agreement with Great Bear Hydropower, Inc., et al., pusuant to Section 205 of the Federal Power Act etc., under
71 FR 68595Energy DepartmentFederal Energy Regulatory CommissionEI Services Canada Limited, et al.; Electric Rate and Corporate Regulation Filings
Federal Register · Uncategorized Document · Mar 14, 1994
, ventilating and air conditioning company. … Watson, Jr., Acting Secretary. [FR Doc. 94-5830 Filed 3-11-94; 8:45 am] BILLING CODE 6717-01-P
Energy DepartmentRequest for Information Regarding Interregional and Offshore Wind Transmission
Federal Register · Notice · Aug 19, 2024
priority to address reliability issues within the national electrical grid and to improve the flow of new energy generation, including offshore wind, both between regions and within regions to meet national clean … DATES: Written comments and information are requested on or before October 3, 2024. ADDRESSES: Interested parties may submit comments to OSWTransmission@hq.doe.gov.
89 FR 67075Energy DepartmentFederal Register · Notice · Apr 8, 2009
Description: Application for Authorization Under Section 203 of the Federal Power Act, Request for Waivers of Filing Requirements and Expedited Treatment of Application of PPL Shoreham Energy, LLC, … Comment Date: 5 p.m. Eastern Time on Thursday, April 16, 2009. Docket Numbers: ER06-743-002. Applicants: Air Liquide Large Industries U.S. LP.
74 FR 15961Energy DepartmentFederal Energy Regulatory CommissionCoordination of the Scheduling Processes of Interstate Natural Gas Pipelines and Public Utilities
Federal Register · Rule · Apr 24, 2015
NAESB also provides a free electronic read-only version of the standards for a three business day period or, in the case of a regulatory comment period, through the end of the comment period. 232 … Regulatory Flexibility Act Certification 162.
80 FR 23198Energy DepartmentFederal Energy Regulatory CommissionPublic Utility Transmission Rate Changes To Address Accumulated Deferred Income Taxes
Federal Register · Proposed Rule · Nov 23, 2018
General NOI Comments at 6-7; PSEG NOI Comments at 7-8. 61 AEP NOI Comments at 6-7 (“However, in the event the Commission develops a broadly applicable amortization period, AEP recommends that … period be 25 years or longer”); Avangrid NOI Comments at 9-11; Dominion, Comments to NOI, Docket No.
83 FR 59331Energy DepartmentFederal Energy Regulatory CommissionCommission Information Collection Activities, Proposed Collection; Comment Request; Extension
Federal Register · Notice · Mar 7, 2007
compare each fuel type by quality determinants, in the study of developments in fuel supply which may affect the reliability of electric service, (2) in environmental improvement programs for the different air … Statutory Authority: Statutory provisions of sections 205 (a) and (e) of the Federal Power Act, 16 U.S.C. 824d. Magalie R. Salas, Secretary. [FR Doc.
72 FR 10191Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Rule · Jul 29, 2014
DOE, therefore, finds that good cause exists to waive prior notice and an opportunity to comment for this rulemaking. … Review Under the Regulatory Flexibility Act The Regulatory Flexibility Act (5 U.S.C. 601 et seq. ) requires preparation of an initial regulatory flexibility analysis for any rule that by law must
79 FR 43927Energy DepartmentFederal Register · Proposed Rule · Dec 16, 2011
After the public meeting, interested parties may submit further comments on the proceedings as well as on any aspect of the RFI until the end of the comment period. … After the close of the comment period, DOE will begin collecting data, conducting the analyses, and reviewing the public comments.
76 FR 78174Energy DepartmentMaritimes & Northeast Pipeline, L.L.C.; Notice of Application
Federal Register · Notice · Oct 18, 1996
piping and valving, pressure regulating devices, gas metering equipment, cathodic protection devices, and launchers, receivers and associated piping and valves for internal inspection instruments and cleaning … This includes all capacity made available in the future because of the termination of the precedent agreements or service agreements prior to the end of the period of twenty years from the date of commencement
61 FR 54430Energy DepartmentFederal Register · Notice · Nov 5, 2024
Description: Joint Application for Authorization Under Section 203 of the Federal Power Act of Reworld Holding Corporation, et al. Filed Date: 10/28/24. … Comment Date: 5 p.m. ET 11/19/24. Docket Numbers: ER24-1894-001. Applicants: Stanton Clean Energy, LLC.
89 FR 87869Energy DepartmentFederal Energy Regulatory CommissionEnerZ Corporation, et al.; Electric Rate and Corporate Regulation Filings
Federal Register · Notice · Nov 18, 1999
ER99-2997-002] Take notice that on November 1, 1999, the North American Electric Reliability Council (NERC) filed a clean, non-red-lined version of the Transmission Loading Relief (TLR) amendments … Watson, Jr., Acting Secretary. [FR Doc. 99-30080 Filed 11-17-99; 8:45 am] BILLING CODE 6717-01-P
64 FR 63016Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Proposed Rule · Jun 4, 2021
Life-Cycle Cost and Payback Period Analysis 3. Manufacturer Impact Analysis III. Submission of Comments I. … DOE actively encourages the participation and interaction of the public during the comment period in each stage of this process.
86 FR 29954Energy DepartmentFederal Register · Notice · Feb 24, 2014
(Archon) filed and amended, respectively, an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the proposed Purisima Point Wave … For a simpler method of submitting text only comments, click on “Quick Comment.”
79 FR 10141Energy DepartmentFederal Energy Regulatory Commission
Ask Donna what matters in the record.