Federal Register · Notice · Oct 6, 2022
The draft EIS assesses the potential environmental effects of the construction and operation of the Project in accordance with the requirements of the National Environmental policy Act (NEPA). … valve yard, taps, and internal inspection device ( e.g., pig launchers and receivers 3 ). 3 A “pig” is a tool that the pipeline company inserts into and pushes through the pipeline for cleaning
87 FR 60681Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Sep 26, 2014
The Application was filed under section 3(a) of the Natural Gas Act (NGA). … LLNG states that it is standard practice for FERC to act as the lead agency for the environmental review, with DOE acting as a cooperating agency.
79 FR 57896Energy DepartmentFederal Register · Notice · Apr 30, 2019
Description: Supplement to January 23, 2019 Application for Authorization Under Section 203 of the Federal Power Act, et al. of Oklahoma Gas and Electric Company, et al. … Description: § 205(d) Rate Filing: Attachment AE Clean-Up Filing Effective 20190501 to be effective 5/1/2019. Filed Date: 4/24/19. Accession Number: 20190424-5078.
84 FR 18275Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · May 7, 2021
DOE received no substantive comments 5 in response to the Notification of Petition for Waiver. 5 One comment was received, but it contained no content. … Tables 15 and 16 shall be modified to read as follows: Table 15—Refrigerator Unit Cooler Test description Unit cooler air entering dry-bulb, °F Unit cooler air entering relative
86 FR 24603Energy DepartmentFederal Register · Notice · Jan 23, 2018
CP17-490-000 requesting a Certificate of Public Convenience and Necessity pursuant to Section 7(c) of the Natural Gas Act to construct and operate certain natural gas pipeline facilities entirely within … Additionally, in response to the Notice of Application, the Commission received comments from the Hackensack Riverkeeper.
83 FR 3134Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Feb 26, 2016
The draft EIS assesses the potential environmental effects of the construction and operation of the Projects in accordance with the requirements of the National Environmental Policy Act (NEPA). … include 10 new compressor stations, 19 new meter stations, 5 new tie-ins, 78 mainline valves, and 11 pig launcher and receiver facilities. 1 1 A pig is an internal tool that can be used to clean
81 FR 9839Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jun 25, 2026
Description: Joint Application for Authorization Under Section 203 of the Federal Power Act of Greensville County Solar Project, LLC, et al. Filed Date: 6/18/26. … Applicants: Country Acres Clean Power LLC, Roadrunner Battery Storage LLC, Roadrunner Solar LLC, Quail Ranch Energy Storage LLC, Quail Ranch Solar LLC, Atrisco Energy Storage LLC, Atrisco Solar LLC,
91 FR 38415Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jan 22, 2002
SUMMARY: This notice announces BPA's intention to prepare a joint National Environmental Policy Act (NEPA)/State Environmental Policy Act (SEPA) EIS in cooperation with Benton County, State of Washington … Steam cycle cooling would utilize an air cooled condenser and a conventional mechanical draft tower in combination to minimize water use.
67 FR 2868Energy DepartmentBonneville Power AdministrationFederal Register · Notice · Sep 28, 2009
The final EIS was prepared to satisfy the requirements of the National Environmental Policy Act of 1969 (NEPA). … The Project would require permits from the COE pursuant to Section 404 of the Clean Water Act (33 United States Code [U.S.C.] 1344) and Section 10 of the Rivers and Harbors Act (33 USC 403).
74 FR 49374Energy DepartmentFederal Energy Regulatory CommissionEl Paso Natural Gas Company; Notice of Amendment
Federal Register · Notice · Mar 22, 2001
The Commission will consider all comments and concerns equally, whether filed by commenters or those requesting intervenor status. … Watson, Jr., Acting Secretary. [FR Doc. 01-7105 Filed 3-21-01; 8:45 am] BILLING CODE 6717-01-M
66 FR 16047Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jul 28, 2010
Water Act section 401 certification. … Applicant Comments on Study Dispute Mon, 8/16/2010. Dispute Resolution Panel Technical Conference Tues, 8/31/2010. Dispute Resolution Panel Findings Thurs, 9/9/2010.
75 FR 44236Energy DepartmentFederal Energy Regulatory CommissionNational Coal Council; Open Meeting
Federal Register · Uncategorized Document · Apr 11, 1994
DEPARTMENT OF ENERGY Office of Fossil Energy National Coal Council; Open Meeting Pursuant to the provisions of the Federal Advisory Committee Act (Pub. … --Public comment--10-minute rule. --Adjournment. Public Participation: The meeting is open to the public.
Energy DepartmentOffice Of Fossil EnergyFederal Register · Notice · Feb 19, 2021
Water Quality Certification Applicant stated that a water quality certificate under section 401 of the Clean Water Act is required for the project from Florida Department of Environmental Protection ( … Comments Any person wishing to comment on the project may do so. The Commission considers all comments received about the project in determining the appropriate action to be taken.
86 FR 10261Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Proposed Rule · Feb 26, 2013
Periodic Review of Waiver Mechanism IV. Procedural Requirements A. Review Under Executive Orders 12866 and 13563 B. Review Under the Regulatory Flexibility Act C. … from the standards for residential central air conditioners as an example.
78 FR 12969Energy DepartmentEnergy Conservation Program: Energy Conservation Standards for Commercial and Industrial Pumps
Federal Register · Proposed Rule · Aug 11, 2022
For this NODA, DOE has opted instead to provide a 45-day comment period. … In response to comment received from stakeholders, DOE extended the comment period for the August 2021 RFI another 30 days.
87 FR 49537Energy DepartmentFederal Register · Notice · Mar 11, 2016
Description: Section 205(d) Rate Filing: 2016-02-29_1st Quarter 2016 Clean-Up Filing to be effective 3/1/2016. Filed Date: 2/29/16. Accession Number: 20160229-5215. … Description: Second Supplement to February 12, 2016 Application of Nebraska Public Power District to Terminate Mandatory Purchase Obligation Under the Public Utility Regulatory Policies Act.
81 FR 12897Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Apr 28, 2009
The draft EIS was prepared to satisfy the requirements of the National Environmental Policy Act of 1969 (NEPA). … The Project would require permits from the cooperating agencies pursuant to Section 404 of the Clean Water Act (33 United States Code [U.S.C.] 1344), Section 10 of the Rivers and Harbors Act (33 U.S.C.
74 FR 19216Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Nov 8, 2022
ADDRESSES: Interested parties are to submit comments electronically to dpaheatpump@energy.gov and include “NOI/RFI: Heat Pump Defense Production Act” in the subject line. … U.S. manufacturing output of electric heat pumps, which include ground-source and air-source heat pumps as well as both space heating and water heating equipment, is not yet at the rate or volume needed
87 FR 67459Energy DepartmentOgden Energy China (Alpha) Ltd., et al.; Electric Rate and Corporate Regulation Filings
Federal Register · Notice · Dec 24, 1997
ER98-28-001] Take notice that on December 5, 1997, PECO Energy Company filed a compliance filing in the above-captioned docket consisting of clean and redlined version of First Revised Sheet No. 13 … All such motions or protests should be filed on or before the comment date.
62 FR 67356Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jun 8, 2004
The final EIS was prepared to satisfy the requirements of the National Environmental Policy Act (NEPA). … The Commission's decision for this proposed action is subject to a 30-day rehearing period.
69 FR 31988Energy DepartmentFederal Energy Regulatory Commission