Documents
Briefs, oral arguments, agency decisions and the Federal Register.
10,000+ results
0.49s
Clean Energy for New Federal Buildings and Major Renovations of Federal Buildings; Correction
Federal Register · Proposed Rule · Feb 26, 2024
DEPARTMENT OF ENERGY 10 CFR Parts 433 and 435 [EERE-2010-BT-STD-0031] RIN 1904-AB96 Clean Energy for New Federal Buildings and Major Renovations of Federal Buildings; Correction AGENCY: Office … Pursuant to the Administrative Procedure Act, 5 U.S.C. 553(b), DOE finds that there is good cause to not issue a separate notice to solicit public comment on the technical corrections contained in this
89 FR 13999Energy DepartmentFederal Register · Notice · Sep 30, 2014
Description: § 205(d) rate filing per 35.13(a)(2)(iii): 2014-09-22_SA 2694 ITC Transmission-Oregon Clean Energy FCA (Y1-069) to be effective 9/23/2014. Filed Date: 9/22/14. … Description: Amendment to July 31, 2014 Application to issue securities pursuant to Section 204 of the Federal Power Act of Wheeling Power Company. Filed Date: 9/22/14.
79 FR 58763Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Mar 25, 2019
CP19-52-000 with the Federal Energy Regulatory Commission (FERC or Commission) pursuant to section 7(c) of the Natural Gas Act to construct, operate and maintain new facilities in Ward, Reeves, and Pecos … All substantive comments will be addressed in the EA.
84 FR 11085Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Aug 12, 2021
Description: Application for Authorization Under Section 203 of the Federal Power Act of Broad River Solar, LLC. Filed Date: 8/5/21. Accession Number: 20210805-5156. … Joseph Energy Center, LLC, Oregon Clean Energy, LLC, Newark Energy Center, LLC, EIF Newark, LLC, Hill Top Energy Center LLC.
86 FR 44354Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jul 29, 2015
project under these general headings: • Geology and soils; • land use; • water resources, fisheries, and wetlands; • cultural resources; • vegetation and wildlife, including migratory birds; • air … Depending on the comments received during the scoping process, we may also publish and distribute the EA to the public for an allotted comment period.
80 FR 45210Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Oct 27, 1997
DOE invites all interested parties to submit written comments or suggestions during the scoping period. Written comments must be postmarked by December 11, 1997 to ensure consideration. … Draft EIS Public Comment Period: Summer 1998. Availability of Final EIS: Late 1998. Record of Decision: Early 1999.
62 FR 55615Energy DepartmentFederal Register · Notice · Oct 18, 2023
In addition, the Oregon and Idaho Departments of Environmental Quality each issued a water quality certification under section 401 of the Clean Water Act for the Hells Canyon Project on May 24, 2019. … Comments on Draft EIS due April 2024. Commission issues Final EIS November 2024.
88 FR 71852Energy DepartmentFederal Energy Regulatory CommissionImplementation of Special Refund Procedures
Federal Register · Uncategorized Document · Jun 6, 1994
The PDO provided a period of 30 days from the date of publication in the Federal Register in which comments could be filed regarding the tentative refund process. … /Army and Air Force Exchange Serv., 12 DOE 85,015 (1984).
Energy DepartmentHearings and Appeals Office, Interior DepartmentState Energy Advisory Board (STEAB)
Federal Register · Notice · Nov 4, 2013
The Federal Advisory Committee Act (Pub. L. 92-463; 86 Stat. 770) requires that public notice of these meetings be announced in the Federal Register . … Requests to make oral comments must be received five days prior to the meeting; reasonable provision will be made to include requested topic(s) on the agenda.
78 FR 65980Energy DepartmentState Energy Advisory Board (STEAB)
Federal Register · Notice · Jul 25, 2013
The Federal Advisory Committee Act (Pub. L. 92-463; 86 Stat.770) requires that public notice of these meetings be announced in the Federal Register . … Requests to make oral comments must be received five days prior to the meeting; reasonable provision will be made to include requested topic(s) on the agenda.
78 FR 44943Energy DepartmentEnergy Efficiency and Renewable Energy OfficeFederal Register · Notice · Apr 7, 2021
In its Application, ERCOT noted that numerous generation units would be unable to operate at full capacity without violating federal air quality or other permit limitations. … The total mass emissions that exceeded permit limits, summed over all generating units for the reporting period, are: 77.03 U.S. tons of NO X and 10.76 U.S. tons of CO.
86 FR 18046Energy DepartmentEnergy Conservation Program: Test Procedures for Fluorescent Lamp Ballasts
Federal Register · Proposed Rule · Nov 24, 2010
National Environmental Policy Act C. Regulatory Flexibility Act D. Paperwork Reduction Act E. Unfunded Mandates Reform Act of 1995 F. Treasury and General Government Appropriations Act, 1999 G. … conditioning and air handling controls and could require some specialized equipment.
75 FR 71570Energy DepartmentState Energy Advisory Board (STEAB)
Federal Register · Notice · Aug 22, 2013
The Federal Advisory Committee Act (Pub. L. 92-463; 86 Stat.770) requires that public notice of these meetings be announced in the Federal Register . … Requests to make oral comments must be received five days prior to the meeting; reasonable provision will be made to include requested topic(s) on the agenda.
78 FR 52171Energy DepartmentEnergy Efficiency and Renewable Energy OfficeEquipment Price Forecasting in Energy Conservation Standards Analysis
Federal Register · Proposed Rule · Feb 22, 2011
In addition, DOE requests information regarding the potential for improving the methodology for projecting the cost of efficiency improvements over the analysis period in general. … Annual shipments (for calculating cumulative production) of several appliances can be found in industry publications ( e.g., Appliance Magazine) and industry association ( e.g., the Air-Conditioning
76 FR 9696Energy DepartmentFederal Register · Notice · Nov 9, 2016
CP16-487-000 requesting a Certificate of Public Convenience and Necessity pursuant to section 7(c) of the Natural Gas Act to construct and operate certain natural gas pipeline facilities. … the following facilities: • About 7.86 miles of 20-inch-diameter pipeline loop; • a pig 2 launcher and takeoff valve at milepost 0.0; and 2 A pig is an internal pipeline tool used to clean
81 FR 78802Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Feb 3, 1999
Changes in Project Period: The project period may be extended by the awarding agency without additional financial support, for such additional period(s) as the ADO determines may be necessary to complete … Such comments will be forwarded to the Secretary or his designee for use in meeting the requirements of section 103(c)(2) of the Agricultural Research, Extension, and Education Reform Act of 1998 (Pub.
64 FR 5562Agriculture DepartmentCooperative State Research, Education, and Extension ServiceEnergy Conservation Program: Test Procedures for Residential and Commercial Clothes Washers
Federal Register · Proposed Rule · May 22, 2020
The comment period on a proposed rule to amend a test procedure shall be at least 60 days and may not exceed 270 days. … DOE actively encourages the participation and interaction of the public during the comment period in each stage of this process.
85 FR 31065Energy DepartmentFederal Register · Notice · Sep 7, 2001
Air Quality and Noise 11. Socioeconomics 12. Reliability and Safety 13. … A 45-day comment period will be allotted for review of the Draft EIS. We will consider all comments on the Draft EIS and revise the document, as necessary, before issuing a Final EIS.
66 FR 46786Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Nov 15, 2011
Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. … You must include your name and contact information at the end of your comments.
76 FR 70713Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Feb 20, 2014
The draft EIS assesses the potential environmental effects of the construction and operation of the projects in accordance with the requirements of the National Environmental Policy Act (NEPA). … the addition of 22,000 horsepower of incremental compression and other miscellaneous modifications its existing Wright Compressor Station with. 1 A pig is an internal tool that can be used to clean
79 FR 9735Energy DepartmentFederal Energy Regulatory Commission
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.