Federal Register · Notice · Mar 25, 2024
Description: § 205(d) Rate Filing: Duke Energy Florida, LLC submits tariff filing per 35.13(a)(2)(iii: Joint OATT Clean Up Filing 2024 to be effective 11/9/2022. Filed Date: 3/19/24. … Reese, Acting Secretary. [FR Doc. 2024-06261 Filed 3-22-24; 8:45 am] BILLING CODE 6717-01-P
89 FR 20649Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Mar 12, 2015
Working knowledge of laws relevant to expertise, such as: the Fish and Wildlife Coordination Act, the Endangered Species Act, the Clean Water Act, the Coastal Zone Management Act, the Wild and Scenic Rivers … Act, the Federal Power Act, or other applicable laws. 4.
80 FR 12995Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Uncategorized Document · Oct 24, 1994
The public scoping period begins with the publication of this Notice of Intent in the Federal Register and will continue until January 6, 1995. … Potential generic impacts to soil, water, and air pathways; Sensitive Habitat Resources.
Energy DepartmentEnergy Conservation Program: Energy Conservation Standards for Miscellaneous Refrigeration Products
Federal Register · Proposed Rule · May 7, 2024
Submission of Comments B. Public Meeting V. Procedural Issues and Regulatory Review A. Review Under the Regulatory Flexibility Act 1. Description of Reasons Why Action Is Being Considered 2. … Manufacturing of MREFs is classified under 335220: “Major Household Appliance Manufacturing” or NAICS code 333415: “Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration
89 FR 37987Energy DepartmentFederal Register · Notice · Jun 3, 2014
Description: Application For Authorization Under Section 203 Of The Federal Power Act, Requests For Waivers Of Filing Requirements, Expedited Review And Confidential Treatment of PEI Power II, LLC. … Description: Ministerial Clean-Up re RAA Article 1 and Sched 8.1.D due to Overlapping Filings to be effective 3/2/2014. Filed Date: 5/21/14. Accession Number: 20140521-5110.
79 FR 31934Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Aug 24, 2017
The EA assesses the potential environmental effects of the construction and operation of the Fairburn Expansion Project in accordance with the requirements of the National Environmental Policy Act (NEPA … 18,000-horsepower electric Fairburn Compressor Station with pig 1 receiver in Fulton County; 1 A pig is a tool that the pipeline company inserts into and pushes through the pipeline for cleaning
82 FR 40151Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Aug 7, 2012
The EA assesses the potential environmental effects of the construction and operation of the Project in accordance with the requirements of the National Environmental Policy Act (NEPA). … facility); • Installing associated appurtenant aboveground facilities including mainline valves and pig 3 launchers and receivers; and 3 A pig is an internal tool that can be used to clean
77 FR 47058Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jun 24, 2014
Description: Application for Authorization to Transfer Jurisdictional Assets under Section 203 of the Federal Power Act of Duke Energy Kentucky, Inc. Filed Date: 6/16/14. … Description: Supplemental Filing to Ministerial Clean-up in ER14-2003-000 to be effective N/A. Filed Date: 6/16/14. Accession Number: 20140616-5255. Comments Due: 5 p.m.
79 FR 35748Energy DepartmentFederal Energy Regulatory CommissionCentral Valley Project, National Defense Authorization Act Power Allocation
Federal Register · Notice · Jan 26, 1996
To the extent power reserved by the NDA Act is not disposed of through long-term contracts, it shall be made available on a temporary basis beginning November 30, 1993, for a 10-year period to military … As of the date of this publication, McClellan Air Force Base, a military installation with a CVP contract rate of delivery, is scheduled to close pursuant to the 1990 Act.
61 FR 2503Energy DepartmentWestern Area Power AdministrationFederal Register · Notice · Mar 5, 2025
Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a—825r. h. … Water Quality Certification: A water quality certificate under section 401 of the Clean Water Act is required for this proposal from the Environmental Protection Agency and the Utah Department of Environmental
90 FR 11305Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Uncategorized Document · Jun 15, 1994
DATES: Comments on the proposed action must be received by June 30, 1994. … Clean Water Act Section 404 permit authorization has been received for the trenching in these areas. 7.
Energy DepartmentFederal Register · Notice · Jul 8, 2025
Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r. h. … Water Quality Certification: A water quality certificate under section 401 of the Clean Water Act is required for this proposal from the California State Water Resources Control Board (California SWRCB
90 FR 30063Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Dec 15, 2009
Background Title III of the Energy Policy and Conservation Act (EPCA) sets forth a variety of provisions concerning energy efficiency, including Part A-1, which establishes an energy efficiency program … DOE received one comment on the Mitsubishi petition from Daikin AC (Americas), Inc. (Daikin), which supported Mitsubishi's waiver request.
74 FR 66311Energy DepartmentFederal Register · Notice · Nov 6, 2001
• Potential environmental impacts, including air and water quality impacts, caused by decommissioning and/or long-term stewardship activities. … The scoping process will include a public meeting and a public comment period on the scope of the EIS.
66 FR 56090Energy DepartmentFederal Register · Notice · Nov 9, 2016
CP16-487-000 requesting a Certificate of Public Convenience and Necessity pursuant to section 7(c) of the Natural Gas Act to construct and operate certain natural gas pipeline facilities. … the following facilities: • About 7.86 miles of 20-inch-diameter pipeline loop; • a pig 2 launcher and takeoff valve at milepost 0.0; and 2 A pig is an internal pipeline tool used to clean
81 FR 78802Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Apr 7, 2020
Description: Joint Application for Authorization Under Section 203 of the Federal Power Act, et al. of PSEG Fossil LLC, et al. Filed Date: 3/30/20. Accession Number: 20200330-5419. … Comments Due: 5 p.m. ET 5/14/20.
85 FR 19464Energy DepartmentFederal Energy Regulatory CommissionSendero Carlsbad Gateway, LLC; Notice of Schedule for Environmental Review of the Gateway Project
Federal Register · Notice · Oct 23, 2018
In response to the NOI, the Commission received comments from the U.S. … All substantive comments will be addressed in the EA.
83 FR 53467Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Proposed Rule · Aug 6, 2021
Scope of Applicability The Energy Policy and Conservation Act defines “ceiling fan” as “a nonportable device that is suspended from a ceiling for circulating air via the rotation of fan blades.” (42 … (5) Room air conditioners; Central air conditioners and central air conditioning heat pumps; and Commercial heating, ventilating, air conditioning (HVAC) equipment July 1.
86 FR 43120Energy DepartmentFederal Register · Notice · Aug 11, 2015
Description: Initial rate filing: Air Products TX Interconnection Refile to be effective 9/1/2014. Filed Date: 8/3/15. Accession Number: 20150803-5259. Comments Due: 5 p.m. … Description: Initial rate filing: Air Products TX NITSA & NOA Refile to be effective 9/1/2014. Filed Date: 8/3/15. Accession Number: 20150803-5262. Comments Due: 5 p.m.
80 FR 48088Energy DepartmentFederal Energy Regulatory CommissionTest Procedure Interim Waiver Process
Federal Register · Rule · Dec 11, 2020
period and providing an automatic grant only if no adverse comments are received; ASE, No. 43, at p. 4, stating that a comment period is needed; A.O. … period, including notice and comment but not replacing comment period after publication of interim waiver; Lennox, No. 48 at pp. 2-3, suggests setting a reasonable deadline with an expedited comment period
85 FR 79802Energy Department