Documents
Briefs, oral arguments, agency decisions and the Federal Register.
10,000+ results
0.30s
Federal Register · Notice · Feb 26, 2026
Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r. h. Applicant Contact: Christine Johnson, (303) 294-2224, christine.johnston@xcelenergy.com . i. … Water Quality Certification: A water quality certificate under section 401 of the Clean Water Act is required for this proposal from the Colorado Water Quality Control Division (Colorado WQCD).
91 FR 9613Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Sep 26, 2017
Description: Request for Extension of Existing Blanket Authorization under Section 203(a)(1) of the Federal Power Act of SOLA LTD, et. al. Filed Date: 9/19/17. … Description: § 205(d) Rate Filing: Clean-Up Amendments; Amendment to Data-Only Participant Application Fee to be effective 9/20/2017. Filed Date: 9/20/17.
82 FR 44770Energy DepartmentFederal Energy Regulatory CommissionEnvironmental Management Site-Specific Advisory Board, Hanford
Federal Register · Notice · Dec 26, 2023
The Federal Advisory Committee Act requires that public notice of this meeting be announced in the Federal Register . DATES: Tuesday, February 6, 2024; 9 a.m.-3:15 p.m. PST. … Individuals wishing to make public comments will be provided a maximum of five minutes to present their comments.
88 FR 88896Energy DepartmentEnvironmental Management Site-Specific Advisory Board, Northern New Mexico
Federal Register · Notice · Dec 19, 2024
Written public comments received prior to the meeting will be read into the record. … Individuals wishing to submit public comments should follow as directed above.
89 FR 103805Energy DepartmentEnvironmental Management Site-Specific Advisory Board, Rocky Flats
Federal Register · Notice · Mar 2, 1998
. ----------------------------------------------------------------------- SUMMARY: Pursuant to the provisions of the Federal Advisory Committee Act (Pub. … Each individual wishing to make public comment will be provided a maximum of 5 minutes to present their comments at the beginning of the meeting.
63 FR 10209Energy DepartmentFederal Register · Notice · May 18, 2011
The EA assesses the potential environmental effects of the Project construction and operation in accordance with the requirements of the National Environmental Policy Act of 1969 (NEPA). … stations), 12 mainline block valves, 4 pig 1 launchers/receivers, 2 over-pipeline protection facilities, and 1 side tap valve setting; and 1 A pig is an internal tool that can be used to clean
76 FR 28764Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Oct 13, 2010
The EA assesses the potential environmental effects of the construction and operation of the Princeton Lateral Project in accordance with the requirements of the National Environmental Policy Act. … a pig 2 launcher assembly located adjacent to the Northern Border Kasbeer side valve site; and 2 A “pig” is a tool that is inserted into and moves through the pipeline, and is used for cleaning
75 FR 62807Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Nov 1, 2017
Description: Request of MDU Resources Group, Inc., et al. for Approvals Pursuant to Section 203 of the Federal Power Act. Filed Date: 10/24/17. Accession Number: 20171024-5162. … Description: § 205(d) Rate Filing: 2017-10-24_MISO-SPP JOA Clean-Up Revisions to Article XI and Attachment 3 to be effective 12/24/2017. Filed Date: 10/24/17.
82 FR 50644Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Rule · Oct 21, 2011
Background on the Test Procedures for Walk-In Coolers and Freezers The Energy Policy and Conservation Act (EPCA), as amended by section 312(c) of the Energy Independence and Security Act (EISA 2007), … Discussion of Comments and Summary of Final Rule In response to the August 2011 NOPR, DOE received 3 comments, which are discussed in detail below. A.
76 FR 65362Energy DepartmentFederal Register · Notice · Apr 3, 2024
Description: 205(d) Rate Filing: Midcontinent Independent System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2024-03-28_Entergy Companies Attachment O Clean Up to be effective 6/1/2024. … Reese, Acting Secretary. [FR Doc. 2024-07047 Filed 4-2-24; 8:45 am] BILLING CODE 6717-01-P
89 FR 23008Energy DepartmentFederal Energy Regulatory CommissionSecretary of Energy Advisory Board Natural Gas Subcommittee
Federal Register · Notice · Oct 13, 2011
SEAB was reestablished pursuant to the Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) (the Act). This notice is provided in accordance with the Act. … Approximately 30 minutes will be reserved each day for public comments.
76 FR 63613Energy DepartmentFederal Register · Notice · May 21, 2025
Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r. h. … Water Quality Certification: A water quality certificate under section 401 of the Clean Water Act may be required for this proposal from the Utah Department of Environmental Quality (Utah DEQ).
90 FR 21765Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · May 24, 2018
CP18-26-000 requesting a Certificate of Public Convenience and Necessity pursuant to sections 7(b) and 7(c) of the Natural Gas Act to abandon, construct, and operate certain natural gas pipeline facilities … All substantive comments will be addressed in the EA.
83 FR 24095Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Feb 3, 2016
Department of Transportation safety standards. 1 A “pig” is a tool that the pipeline company inserts into and pushes through the pipeline for cleaning the pipeline, conducting internal inspections … The EA assesses the potential environmental effects of the construction and operation of the Line WB2VA Integrity Project in accordance with the requirements of the National Environmental Policy Act (NEPA
81 FR 5728Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Aug 29, 2016
The EA assesses the potential environmental effects of the construction and operation of the Orion Project in accordance with the requirements of the National Environmental Policy Act (NEPA). … crossover, and connecting facilities at the beginning of the proposed pipeline loop in Wayne County; 2 A “pig” is a tool that the pipeline company inserts into and pushes through the pipeline for cleaning
81 FR 59208Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Sep 18, 2015
assesses the potential environmental effects of the construction and operation of the Southern Indiana Market Lateral Project in accordance with the requirements of the National Environmental Policy Act … gas pipeline lateral; • one new meter and regulator station; • one pig 1 launcher; and 1 A “pig” is a tool that is inserted into and moves through the pipeline, and is used for cleaning
80 FR 56454Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Dec 16, 2016
The EA assesses the potential environmental effects of the construction and operation of the Cedar Station Upgrade Project in accordance with the requirements of the National Environmental Policy Act ( … • a new pig 2 launcher and takeoff valve setting at Northern's existing Rosemount Junction facility; and 2 A “pig” is an internal pipeline tool used to clean a pipeline and/or to
81 FR 91159Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Feb 16, 2018
EA assesses the potential environmental effects of the construction and operation of the North Seattle Lateral Upgrade Project in accordance with the requirements of the National Environmental Policy Act … an existing 8-inch pig launcher and a 20-inch pig receiver 1 to project milepost 7.76; and 1 A “pig” is a tool that the pipeline company inserts into and pushes through the pipeline for cleaning
83 FR 7029Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · May 14, 2020
The EA assesses the potential environmental effects of construction and operation of the Project in accordance with the requirements of the National Environmental Policy Act. … ranging from 30 inches to 42 inches in diameter; • four meter stations; • one mainline block valve; and • one pig launcher/receiver facility. 1 1 A pipeline pig is a device used to clean
85 FR 28941Energy DepartmentFederal Energy Regulatory CommissionPacific Gas and Electric Company, et al.; Electric Rate and Corporate Regulation Filings
Federal Register · Notice · Nov 8, 1996
Naval Air Station, Lemoore, California of the Navy's substation and PG&E's transmission system; and 2) to facilitate payment of PG&E's costs of designing, constructing, procuring, installing, testing, … long-term securities, from time to time, in an aggregate principal amount of not more than $500 million outstanding at any one time, during the period December 1, 1996 through November 30, 1998, with final
61 FR 57860Energy Department
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.