Documents
Briefs, oral arguments, agency decisions and the Federal Register.
10,000+ results
0.60s
Federal Register · Rule · May 5, 2014
Table II.1—Stakeholders That Submitted Comments on the NOPR Name Acronym Organization type Air-Conditioning, Heating, and Refrigeration Institute AHRI Trade Association. … DOE received one comment on this proposal.
79 FR 25486Energy DepartmentFederal Register · Rule · May 9, 2014
furnaces; commercial packaged boilers; small, large, and very large commercial package air conditioning and heating equipment; packaged terminal air conditioners and packaged terminal heat pumps; and … (3) A petitioner may, within 10 working days of the close of the comment period specified in the Federal Register , submit a rebuttal statement to DOE.
79 FR 26591Energy DepartmentFederal Register · Proposed Rule · Jul 18, 1995
Potentially, the most significant of the impacts will be the level, type, and location of air emissions. … A 45-day comment period will be provided for reviewing the Draft EIS. We will consider all comments on the Draft EIS and revise the document, as [[Page 36755]] necessary, before issuing a Final EIS.
60 FR 36752Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Oct 21, 2004
Please note that the scoping period for the project will close on November 23, 2004. Comments may be submitted by electronic submission, in written form, or verbally. … A 45-day comment period will be allotted for review of the draft EIS. We will consider all comments on the draft EIS and revise the documents, as necessary, before issuing final EIS.
69 FR 61823Energy DepartmentFederal Energy Regulatory CommissionEnergy Conservation Program: Test Procedures for Residential Clothes Dryers
Federal Register · Proposed Rule · Feb 7, 2013
All external joints should be taped to avoid air leakage. … All external joints should be taped to avoid air leakage.
78 FR 8992Energy DepartmentFederal Register · Notice · Jul 9, 2013
Description: Iroquois Gas Transmission System, L.P. submits Measurement Variance/Fuel Use Factors utilized by Iroquois during the period January 1, 2013 through June 30, 2013. … Description: Clean Up Negotiated Rate and Non-Conforming Agreements to be effective 8/1/2013. Filed Date: 7/1/13. Accession Number: 20130701-5134. Comments Due: 5 p.m.
78 FR 41052Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Oct 24, 2014
Please note that the scoping period will close on November 10, 2014. You may submit comments in written form or verbally. … Depending on the comments received during the scoping process, we may also publish and distribute the EA to the public for an allotted comment period.
79 FR 63615Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Nov 23, 1999
project under these general headings: Geology and soils Water resources, fisheries, and wetlands Vegetation and wildlife Endangered and threatened species Public safety Land use Cultural resources Air … A comment period will be allotted for review if the EA is published. We will consider all comments on the EA before we make our recommendations to the Commission.
64 FR 65694Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Dec 29, 2008
Please note that the scoping period will close on January 15, 2009. … A comment period will be allotted for review if the EA is published. We will consider all comments on the EA before we make our recommendations to the Commission.
73 FR 79464Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jul 28, 2017
and operation of the proposed project under these general headings: • Geology and soils; • land use; • water resources, fisheries, and wetlands; • cultural resources; • vegetation and wildlife; • air … Depending on the comments received during the scoping process, we may also publish and distribute the EA to the public for an allotted comment period.
82 FR 35196Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · May 29, 1997
The cost proposal will be structured to include a five (5) year project period consisting of five one (1) year budget periods. … Army at Kwajalein and Hickam Air Force Base at Honolulu.
62 FR 29125Energy DepartmentLockhart Power Company, Inc.; Notice of Availability of Draft Environmental Assessment
Federal Register · Notice · Dec 19, 2013
5 1.3.2 Clean Water Act 6 1.3.3 Endangered Species Act 6 1.3.4 Coastal Zone Management Act 6 1.3.5 National Historic Preservation Act 7 1.4 PUBLIC REVIEW AND CONSULTATION … In section 5.4, we also discuss how we address the agency recommendations and comply with section 10(j). 1.3.2 Clean Water Act Under section 401 of the Clean Water Act (CWA), a license applicant
78 FR 76904Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jun 17, 2003
construction and operation of the proposed project under these general headings: • Geology and soils • land use • Water resources and fisheries • cultural resources • Vegetation and wildlife • air … A comment period will be allotted for review if the EA is published. We will consider all comments on the EA before we make our recommendations to the Commission.
68 FR 35877Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Aug 5, 2002
of the construction and operation of the proposed project under these general headings: • Geology and soils • Water resources, fisheries, • Vegetation and wildlife • Endangered and threatened • Air … A comment period will be allotted for review if the EA is published. We will consider all comments on the EA before we make our recommendations to the Commission.
67 FR 50661Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Dec 31, 2024
Reasonable Period of Time to Act on the Certification Requests: One year, November 4, 2025. … waived pursuant to section 401(a)(1) of the Clean Water Act, 33 U.S.C. 1341(a)(1).
89 FR 107131Energy DepartmentFederal Energy Regulatory CommissionNotice of Availability of Preliminary Plan for Retrospective Analysis of Existing Rules
Federal Register · Proposed Rule · Jul 11, 2011
One commenter suggested DOE use the Air-Conditioning Heating and Refrigeration Institute (AHRI) VICP as a model. (Hussmann Corporation, 4). … Another comment encouraged DOE to modernize its approach to National Environmental Policy Act (NEPA) rulemaking. (Alton Strategic Environmental Group, 3-9).
76 FR 40646Energy DepartmentFederal Register · Notice · Mar 19, 2003
Air quality and noise 7. Endangered and threatened species 8. Hazardous waste 9. … A comment period will be allotted for review if the EA is published. We will consider all comments on the EA before we make our recommendations to the Commission.
68 FR 13294Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Nov 5, 2002
construction and operation of the proposed project under these general headings: —Geology and soils —Land use —Water resources, fisheries, and wetlands —Cultural resources —Vegetation and wildlife —Air … A comment period will be allotted for review if the EA is published. We will consider all comments on the EA before we make our recommendations to the Commission.
67 FR 67400Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jan 28, 2008
Please note that the scoping period will close on February 19, 2008. Comments may be submitted in written or verbal form. … A 30-day comment period will be allotted for review of the EA. We will consider all comments submitted on the EA in any Commission Order that is issued for the project.
73 FR 4856Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Mar 23, 2000
• Air quality and noise. • Public safety. … A comment period will be allotted for review if the EA is published. We will consider all comments on the EA before we make our recommendations to the Commission.
65 FR 15630Energy DepartmentFederal Energy Regulatory Commission
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.