Documents
Briefs, oral arguments, agency decisions and the Federal Register.
10,000+ results
0.60s
Federal Register · Notice · Jun 7, 2001
A 45-day comment period will be allotted for review of the Draft EIS. We will consider all comments on the Draft EIS and revise the document, as necessary, before issuing the Final EIS. … • Air Quality and Noise —Potential impact of pipeline construction on local air quality and noise environment.
66 FR 30728Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jan 22, 2015
Applicants: ALLETE Clean Energy, Inc., Chanarambie Power Partners LLC. … Description: Joint Application Under section 203 of the Federal Power Act And Request for Waivers, Confidential Treatment, and Expedited Consideration of ALLETE Clean Energy, Inc. and Chanarambie Power
80 FR 3231Energy DepartmentFederal Energy Regulatory CommissionEnergy Conservation Program: Test Procedure for Electric Motors; Extension of Comment Period
Federal Register · Proposed Rule · Feb 4, 2022
DATES: The comment period for the NOPR published on December 17, 2021 (86 FR 71710), is extended. … DOE has reviewed the requests and is extending the comment period to allow additional time for interested parties to submit comments.
87 FR 6436Energy DepartmentFederal Register · Notice · Aug 27, 2024
Staff will prepare a draft NEPA document which will be issued for public comment. The comment period will be specified in the notice of availability of the NEPA document. … Commission staff will consider all timely comments received during the comment period on the draft NEPA document and revise the document, as necessary, before issuing a final NEPA document.
89 FR 68607Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jul 23, 2020
Background and Authority The Energy Policy and Conservation Act, as amended (“EPCA”), 2 authorizes the U.S. … The DOE ACIM test procedure also incorporates by reference Air-Conditioning, Heating, and Refrigeration Institute (“AHRI”) Standard 810-2007 with Addendum 1, Performance Rating of Automatic Commercial
85 FR 44529Energy DepartmentFederal Register · Notice · Jun 26, 2024
proposing to study the feasibility of the proposed 1,351-megawatt (MW) Vandenberg Pumped Storage Project to be located at the Vandenberg Air Force Base in Santa Barbara County, California. … Reese, Acting Secretary. [FR Doc. 2024-13929 Filed 6-25-24; 8:45 am] BILLING CODE 6717-01-P
89 FR 53421Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jan 28, 2008
Please note that the scoping period will close on February 20, 2008. Comments may be submitted in written form or verbally. … • Air quality and noise. • Endangered and threatened species. • Hazardous waste. • Public safety.
73 FR 4858Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jun 8, 2016
Description: Joint Petition of WPX Energy Marketing, LLC and Citadel NGPE LLC for Temporary Waivers of Capacity Release Regulations, et al. and Request for Shortened Comment Period under RP16-989. … Description: Compliance filing per 154.203: Cameron Interstate Pipeline, LLC eTariff Clean-Up to be effective 6/1/2016. Filed Date: 5/31/16. Accession Number: 20160531-5427.
81 FR 36907Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Sep 7, 2023
Background On July 18, 2023, the Commission issued a Notice of Scoping Period Requesting Comments on Environmental Issues for The Port Arthur Liquified Natural Gas Amendment (Notice of Scoping). … , air quality, and public participation.
88 FR 61581Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Sep 1, 2021
CP21-78-000, the Commission opened a scoping period; and staff intends to prepare an EIS that will address the concerns raised during that scoping period as well as comments received in response to this … Commission staff will consider all timely comments received during the comment period on the draft EIS and revise the document, as necessary, before issuing a final EIS.
86 FR 49011Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Rule · Nov 7, 2006
The commenters assert that the authority to act on motions for extensions of time is not explicitly provided for in the revisions in § 375.303(g). … (4) Boilers, furnaces, piping, wiring, fixtures, and machinery for heating, lighting, signaling, ventilating, and air-conditioning systems, plumbing, vacuum cleaning systems, incinerator and smoke pipe
71 FR 65200Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Rule · May 16, 2025
adverse comments. … at 206 (cleaned up). And the Equal Protection Clause applies “without regard to any differences of race, of color, or of nationality.” Id. (cleaned up).
90 FR 20769Energy DepartmentFederal Register · Notice · Jun 8, 2023
The EA may be issued for an allotted public comment period. The Commission would consider timely comments on the EA before making its decision regarding the proposed project. … Commission staff will consider all timely comments received during the comment period on the draft EIS and revise the document, as necessary, before issuing a final EIS.
88 FR 37529Energy DepartmentFederal Energy Regulatory CommissionEnergy Conservation Program: Energy Conservation Standards for Consumer Furnace Fans
Federal Register · Proposed Rule · Nov 1, 2022
For this preliminary analysis, DOE has opted to provide a 60-day comment period. As stated, the November 2021 Early Assessment Review RFI included a 30-day comment period. … Therefore, for this preliminary analysis, DOE has determined that a 60-day comment period in conjunction with the prior 30-day comment period provides sufficient time for interested parties to review the
87 FR 65687Energy DepartmentTransmission System Planning Performance Requirements for Extreme Weather
Federal Register · Proposed Rule · Jun 27, 2022
In addition to the arctic air, the cold front brought periods of freezing precipitation and snow to large parts of Texas and the South Central region, starting February 10, and extending into the week … AD21-13, at 23 (filed Sept. 27, 2021) (finding interregional transfer capacity improves the resilience of the power system); Comments of Americans for a Clean Energy Grid, Docket No.
87 FR 38020Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Oct 21, 2022
Background On September 6, 2022, the Commission issued a Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed BSC Compression Replacement Project and Notice of Public … The primary issues raised by the commenters are air quality, climate change, environmental justice, and wetlands. All substantive comments will be addressed in the EA.
87 FR 64025Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Nov 14, 2023
Background On September 21, 2023, the Commission issued a Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed Golden Triangle Storage Expansion Project (Notice … All substantive comments will be addressed in the EA.
88 FR 78012Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Dec 8, 2022
Background On September 2, 2022, the Commission issued a Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed Carbon Capture and Sequestration System Amendment and … The primary issues raised by the commenters related to general opposition to or support for the Project; climate change, air quality, and greenhouse gas emissions; environmental justice; wetlands and water
87 FR 75248Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jan 23, 1998
A comment period will be allotted for review if the EA is published. We will consider all comments on the EA before we make our recommendations to the Commission. … You do not need intervenor status to have your comments considered. David P. Boergers, Acting Secretary. [FR Doc. 98-1588 Filed 1-22-98; 8:45 am] BILLING CODE 6717-01-M
63 FR 3560Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Proposed Rule · Jul 16, 2021
circulation and elements by which heat is transferred from air to refrigerant, thus cooling the air, without any element external to the cooler imposing air resistance.” 10 CFR 431.302. 10 … DOE actively encourages the participation and interaction of the public during the comment period in each stage of this process.
86 FR 37687Energy Department
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.