Documents
Briefs, oral arguments, agency decisions and the Federal Register.
10,000+ results
0.55s
Application for Presidential Permit; New England Clean Power Link Project
Federal Register · Notice · Jul 9, 2014
DATES: Comments or motions to intervene must be submitted on or before August 8, 2014. … Procedural Matters: Any person may comment on this application by filing such comment at the address provided above.
79 FR 38869Energy DepartmentFederal Register · Notice · Oct 18, 2018
Description: Joint Application for Authorization Under Section 203 of the Federal Power Act, et al. of Clean Energy Future—Lordstown, LLC, et al. Filed Date: 10/11/18. … Comments Due: 5 p.m. ET 11/1/18. Docket Numbers: ER19-90-000. Applicants: Clean Energy Future—Lordstown, LLC.
83 FR 52826Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Proposed Rule · Jul 29, 2022
(“FACA”) and the Negotiated Rulemaking Act (“NRA”) to negotiate proposed test procedures and amended energy conservation standards commercial unitary air conditioners and heat pumps (“CUACs and CUHPs” … This publication provides the required public notice and provides for a public comment period.
87 FR 45703Energy DepartmentFederal Register · Notice · Aug 31, 2007
However, comments received during the public comment period will be considered as input in the risk assessment process. … A 45-day comment period will be allotted for review of the draft EIS. We will consider all comments on the draft EIS and revise the document, as necessary, before issuing a final EIS.
72 FR 50356Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · May 23, 1996
Air quality and noise. … A comment period will be allotted for review if the EA is published. We will consider all comments on the EA before we recommend that the Commission approve or not approve the projects.
61 FR 25863Energy DepartmentFederal Register · Notice · Oct 3, 1997
In general, passive decontamination techniques, such as high-efficiency particulate air vacuuming, damp cloth wiping, and hand washing/scrubbing, were applied first. … Fiore, Acting Deputy Assistant Secretary for Environmental Restoration.
62 FR 51844Energy DepartmentGranby Pumping Plant-Windy Gap Transmission Line Rebuild Project, Grand County, CO
Federal Register · Notice · Aug 10, 2007
To be assured of consideration, all comments or suggestions regarding the appropriate scope must be received by the end of the scoping period. … Impacts on air, soil, and water resources (including air quality, surface water impacts, and groundwater impacts); 8. Visual impacts; and 9.
72 FR 45040Energy DepartmentWestern Area Power AdministrationFederal Register · Notice · Dec 1, 1998
submitted during an additional public comment period from August 28, 1998 through October 12, 1998. … Further, Section 308 of the Fiscal Year 1999 Energy and Water [[Page 66138]] Development Appropriations Act (Public Law 105-245) specifies that ``None of the funds in this Act may be used to dispose
63 FR 66136Energy DepartmentFederal Register · Proposed Rule · May 13, 2013
Public Participation: Members of the public are welcome to observe the business of the meeting and, if time allows, may make oral statements during the specified period for public comment. … Members of the public will be heard in the order in which they sign up for the Public Comment Period.
78 FR 27866Energy DepartmentFederal Register · Notice · Apr 14, 2015
Authority and Background Section 307(b) of the Energy Conservation and Production Act (ECPA, Pub. … DOE took into consideration the information it received during the public comment period, and published the final methodology in 2012. 2 This methodology, hereafter referred to as the “established
80 FR 19974Energy DepartmentEnergy Efficiency and Renewable Energy OfficeFederal Register · Notice · Apr 6, 2021
Please keep the comment tracking number that http://www.regulations.gov provides after you have successfully uploaded your comment. Submitting comments via email. … Background and Authority The Energy Policy and Conservation Act, as amended (“EPCA”), 1 authorizes the U.S.
86 FR 17803Energy DepartmentFederal Register · Notice · Sep 28, 2007
A Final General Conformity Determination was also prepared by the FERC to assess the potential air quality impacts associated with construction and operation of the proposed Phoenix Expansion Project and … The OPS' authority is found under the Natural Gas Pipeline Safety Act of 1968 (49 U.S.C. 1671 et seq. ) and the Hazardous Liquids Pipeline Safety Act of 1979 (49 U.S.C. 2001 et seq.).
72 FR 55194Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · May 12, 2015
TVA's combined cycle gas plant includes the replacement of two coal fired units to assist TVA's compliance with the Environmental Protection Agency's Mercury and Air Toxics Standards. … Depending on the comments received during the scoping process, we may also publish and distribute the EA to the public for an allotted comment period.
80 FR 27157Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Mar 9, 2021
Background and Authority The Energy Policy and Conservation Act, as amended (“EPCA”), 1 authorizes the U.S. … section must be reasonably designed to produce test results which reflect energy efficiency, energy use or estimated annual operating cost of a covered product during a representative average use cycle or period
86 FR 13530Energy DepartmentNotice of Availability of the Sutter Power Project Draft Environmental Impact Statement
Federal Register · Notice · Nov 6, 1998
Western and CEC will accept written and oral comments during the public review period. … Other concerns raised include air quality impacts, land use issues, impacts to agricultural operations, and the need for rezoning the site.
63 FR 59986Energy DepartmentWestern Area Power AdministrationEnvironmental Management Site-Specific Advisory Board, Northern New Mexico
Federal Register · Notice · Aug 31, 2010
Public Comment Period 1:45 p.m. Old Business • Written Reports • Other Items 2 p.m. … Presentation on Air Monitoring at Los Alamos National Laboratory (LANL), Andrew Green 4:15 p.m. Storm Water Management at LANL 5 p.m. Dinner Break 6 p.m. Public Comment Period 6:15 p.m.
75 FR 53280Energy DepartmentCost Recovery Mechanisms for Modernization of Natural Gas Facilities
Federal Register · Rule · Apr 22, 2015
of 2011, 49 U.S.C.S. 60101 (2012) (Pipeline Safety Act). 5. … Clean Air Task Force Columbia Gas Transmission, LLC Deep Gulf Energy LP El Paso Municipal Customer Group Elizabeth Balogh Energy XXI Ltd.
80 FR 22366Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Nov 19, 2015
Description: ISO New England Inc. submits Installed Capacity Requirement, Hydro Quebec Interconnection Capability Credits and Related Values for the 2019/2020 Capacity Commitment Period. … Description: § 205(d) Rate Filing: Amendment to Oregon Clean Energy ISA No. 3876, Queue No. Y1-069 to be effective 5/9/2014. Filed Date: 11/12/15. Accession Number: 20151112-5153.
80 FR 72430Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jul 1, 2014
Score B (0-25) for Clean Energy System The Cleanness of the microgrid system is measured by the percent reduction in the annual marginal CO 2 emissions resulting from microgrid operation, as compared … data will be for the period of June 1, 2010 to May 31, 2011.
79 FR 37303Energy DepartmentFederal Register · Notice · Jul 2, 2004
A comment period will be allotted for review if the EA is published. We will consider all comments on the EA before we make our recommendations to the Commission. … • Air and Noise Quality: —Effects on local air quality and noise environment from construction and operation of proposed facilities.
69 FR 40366Energy DepartmentFederal Energy Regulatory Commission
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.