Documents
Briefs, oral arguments, agency decisions and the Federal Register.
10,000+ results
0.67s
National Stakeholder Forum on Central Internet Database
Federal Register · Notice · Apr 22, 1999
FUSRAP sites that have not already been cleaned up, are currently managed by the Army Corps of Engineers). … 2:30--Adjourn Comments on the draft agenda should be sent to James D.
64 FR 19753Energy DepartmentFederal Register · Notice · Jun 29, 1998
--Consistency with local land use plans and zoning --Impact of construction and operation traffic Air Quality and Noise: --Air quality and noise impacts associated with construction and operation … A comment period will be allotted for review if the EA is published. We will consider all comments on the EA before we make our recommendations to the Commission.
63 FR 35209Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jan 7, 2008
Summary and Request for Comments I. Background and Authority Title III of the Energy Policy and Conservation Act (EPCA) sets forth a variety of provisions concerning energy efficiency. … An Interim Waiver remains in effect for a period of 180 days or until DOE issues its determination on the Petition for Waiver, whichever occurs first, and it may be extended by DOE for an additional 180
73 FR 1207Energy DepartmentEnergy Efficiency and Renewable Energy OfficeFederal Register · Proposed Rule · Mar 1, 2022
Review Under the Regulatory Flexibility Act C. Review Under the Paperwork Reduction Act of 1995 D. Review Under the National Environmental Policy Act of 1969 E. … After the webinar/public meeting and until the end of the comment period, interested parties may submit further comments on the proceedings and any aspect of the proposed rulemaking.
87 FR 11335Energy DepartmentNational Energy Technology Laboratory; Notice of Availability of a Funding Opportunity Announcement
Federal Register · Notice · Jan 14, 2004
ADDRESSES: Questions and comments regarding the content of the announcement should be submitted through the “Submit Question” feature of IIPS at http://e-center.doe.gov. … (3) Solid-oxide fuel cell systems are clean.
69 FR 2129Energy DepartmentEnergy Conservation Program: Energy Conservation Standards for Small Electric Motors
Federal Register · Proposed Rule · Apr 30, 2020
Payback Period Analysis G. Other Comments Received V. Analytical Results and Conclusions A. Energy Savings B. Cost Effectiveness C. Proposed Determination VI. … The comment period was re-opened in response to a request from an interested party, see NEMA, No. 4 at p. 1, until June 7, 2019. See 84 FR 25203 (May 31, 2019).
85 FR 24146Energy DepartmentFederal Register · Rule · Jan 17, 2024
DOE provides a comment period of the same length as the comment period on the direct final rule— i.e., 110 days. … Title IV of the Clean Air Act sets an annual emissions cap on SO 2 for affected EGUs in the 48 contiguous States and the District of Columbia (“DC”). (42 U.S.C. 7651 et seq. ) SO 2 emissions
89 FR 3026Energy DepartmentFederal Register · Notice · Aug 6, 2026
Reasonable Period of Time to Act on the Certification Request: One year (July 8, 2027). … If Georgia EPD fails or refuses to act on the water quality certification request on or before the above date, then the certifying authority is deemed waived pursuant to section 401(a)(1) of the Clean
91 FR 50824Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Oct 1, 2025
Reasonable Period of Time to Act on the Certification Request: One year (August 27, 2026). … If Virginia DEQ fails or refuses to act on the water quality certification request on or before the above date, then the certifying authority is deemed waived pursuant to section 401(a)(1) of the Clean
90 FR 47306Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jun 3, 2022
Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r). h. Applicant Contact: Ms. Courtenay R. … The Lloyd Shoals Project operates in a modified run-of-river mode to generate power during periods of peak demand.
87 FR 33773Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Proposed Rule · May 20, 2015
-day extension to the comment period, a public meeting, and a delay in compliance date for the test procedure. … Accordingly, DOE is granting approximately 30-day comment period extension and announcing a public meeting.
80 FR 28850Energy DepartmentFederal Register · Notice · Apr 13, 2026
Background On March 4, 2026, the Commission issued a Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed Viola Project (Notice of Scoping). … The Commission received a comment regarding concerns over air and noise emissions, as well as potential safety risks of a compressor station and pipeline within 1 mile of a residence.
91 FR 18841Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jan 6, 1999
A comment period will be allotted for review if the EA is published. We will consider all comment on the EA before we make our recommendations to the Commission. … After the comment period, the Commission will prepare an EA or a Draft EIS outlining its findings and recommendations.
64 FR 873Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Rule · Oct 23, 2013
Niche Residential Central Air Conditioners Small duct high velocity systems (SDHVs) and through-the-wall central air conditioners and heat pumps (TTWs) are residential central air conditioners and heat … DOE, therefore, finds that good cause exists to waive prior notice and an opportunity to comment for this rulemaking.
78 FR 62988Energy DepartmentAntrim County; Notice of Availability of Environmental Assessment
Federal Register · Notice · May 22, 2015
1.2.2 Clean Water Act 1.2.3 Endangered Species Act 1.2.4 Coastal Zone Management Act 1.2.5 National Historic Preservation Act 1.3 PUBLIC REVIEW AND COMMENT 1.3.1 Scoping … No recommendations were filed pursuant to section 10(j) of the FPA. 1.2.2 Clean Water Act Under section 401 of the Clean Water Act (CWA), a license applicant must obtain certification from the appropriate
80 FR 29667Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jun 6, 2008
The Final EIS was prepared to satisfy the requirements of the National Environmental Policy Act. The U.S. Army Corps of Engineers (COE), U.S. … Hard copies of the Final EIS have also been mailed to those who requested that format during the scoping and comment periods for the proposed Project.
73 FR 32318Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jan 14, 1999
Air Quality and Noise --Effect on local air quality and noise environment as a result of construction. … A 45-day comment period will be allotted for review of the Draft EIS. We will consider all comments on the Draft EIS and revise the document, as necessary, before issuing a Final EIS.
64 FR 2484Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Nov 23, 2010
DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13865-000] Clean River Power 14, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, … On October 15, 2010, Clean River Power 14, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Martin Creek
75 FR 71428Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Oct 14, 1998
necessity. --------------------------------------------------------------------------- \1\ Viking Gas Transmission Company's application was filed with the Commission under Section 7 of the Natural Gas act … A comment period will be allotted for review if the EA is published. We will consider all comments on the EA before we make our recommendations to the Commission.
63 FR 55113Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jul 25, 1997
Air Quality: Meteorological basis, ambient background, pollutant sources, and potential degradation. Radiation Background: Cosmic, rock, soil, water, and air. … A 45-day comment period on the draft EIS is planned, and public hearings to receive comments will be held approximately one month after distribution of the draft EIS.
62 FR 40062Energy Department
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.