Documents
Briefs, oral arguments, agency decisions and the Federal Register.
10,000+ results
0.96s
Federal Register · Notice · Apr 10, 2009
DOE received no comments on the Daikin petition. … Most of the commenters to the March 2006 notice favored the proposed alternate test procedure, generally agreeing that an alternate test procedure is appropriate for an interim period while a final test
74 FR 16373Energy DepartmentFederal Register · Notice · Jan 21, 1998
Air Quality and Noise --Effect on local air quality and noise environment as a result of construction. … A 45-day comment period will be allotted for review of the Draft EIS. We will consider all comments on the Draft EIS and revise the document, as necessary, before issuing a Final EIS.
63 FR 3107Energy DepartmentFederal Energy Regulatory CommissionEnergy Conservation Program: Test Procedure for Set-Top Boxes
Federal Register · Proposed Rule · Jan 23, 2013
DOE requests comment on the proposed test room conditions for testing STBs, including the air temperature, air speed, and thermally non-conductive test surface requirements. F. Test Setup 1. … DOE requests comment on the proposed test room conditions for testing STBs, including air temperature, air speed, and thermally non-conductive test surface requirements.
78 FR 5076Energy DepartmentFederal Register · Notice · Jul 18, 2022
Description: Tariff Amendment: 2d Tariff Amendment and Request for Shortened Comment Period—EDF Spring Field to be effective 6/28/2022. Filed Date: 7/12/22. … Description: § 205(d) Rate Filing: Tariff Clean-Up Filing 20220601 to be effective 6/1/2022. Filed Date: 7/12/22. Accession Number: 20220712-5059. Comment Date: 5 p.m.
87 FR 42718Energy DepartmentFederal Energy Regulatory CommissionWest Valley Hydroelectric Project; Notice of Extension of Time To Submit Scoping Comments
Federal Register · Notice · Jul 13, 2005
The Commission has extended the scoping comment period for the West Valley Project, to allow time for all interested parties to review the transcripts for the scoping meetings held on June 15, 2005. … Major milestone Target date Scoping Comments due July 25, 2005. Additional Information Request (AIR) August 2005. AIR Response due from Applicant November 2005.
70 FR 40327Energy DepartmentFederal Energy Regulatory CommissionConvention on Supplementary Compensation for Nuclear Damage Contingent Cost Allocation
Federal Register · Notice · Jul 27, 2010
and Security Act of 2007 (“Act”). … The Department invites comments on how and what an appropriate and equitable time period should be used in order to determine the risk-informed formula. E.
75 FR 43945Energy DepartmentEnergy Conservation Program: Test Procedure for Direct Expansion-Dedicated Outdoor Air Systems
Federal Register · Proposed Rule · Dec 23, 2021
Review Under the Regulatory Flexibility Act C. Review Under the Paperwork Reduction Act of 1995 D. Review Under the National Environmental Policy Act of 1969 E. … Review Under Section 32 of the Federal Energy Administration Act of 1974 Under section 301 of the Department of Energy Organization Act (Pub.
86 FR 72874Energy DepartmentFederal Register · Notice · Sep 7, 2012
Please note that the scoping period will close on October 1, 2012. You may submit comments in written form or verbally. … A comment period will be allotted if the EA is published for review. We will consider all comments on the EA before we make our recommendations to the Commission.
77 FR 55208Energy DepartmentFederal Energy Regulatory CommissionWhiting Clean Energy, Inc., et al.; Electric Rate and Corporate Regulation Filings
Federal Register · Notice · Feb 6, 2002
Whiting Clean Energy, Inc., et al.; Electric Rate and Corporate Regulation Filings January 31, 2002. Take notice that the following filings have been made with the Commission. … Any comments should be submitted in accordance with Standard Paragraph E at the end of this notice. 1. Whiting Clean Energy, Inc. [Docket No.
67 FR 5581Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Mar 17, 1998
The Department of Energy is proposing to revoke the designations of these sites because of the low risks to the public and the environment at the sites, DOE's lack of [[Page 13040]] authority to clean … DATES: Public comments will be accepted on this proposed action. Comments should be submitted by April 16, 1998.
63 FR 13039Energy DepartmentFederal Register · Notice · Jul 11, 2011
Please note that the scoping period will close on August 15, 2011. … A comment period will be allotted if the EA is published for review. We will consider all comments on the EA before we make our recommendations to the Commission.
76 FR 40717Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jul 5, 1996
Land Use -- Effect on farming. -- Effect on residences and recreation areas. -- Effect on public lands Air Quality and Noise -- Effect on local and regional air quality and local noise … A 45-day comment period will be allotted for review of the Draft EIS.
61 FR 35208Energy DepartmentFederal Register · Notice · Dec 10, 2019
DATES: The 30-day public comment period extends from the date of publication of this notice in the Federal Register through January 9, 2020. … NEPA Process All comments on the Draft SRS DWPF Recycle Wastewater EA received during the public comment period will be considered in preparation of the Final SRS DWPF Recycle Wastewater EA.
84 FR 67438Energy DepartmentNational Defense Authorization Act Proposed ProceduresCentral Valley Project, California
Federal Register · Uncategorized Document · Jul 6, 1994
DATES: The comment period on the proposed procedures will begin with the publication of this notice in the Federal Register and will end August 10, 1994. … To be assured consideration, all written comments should be received by Western by the end of the comment period.
Energy DepartmentWestern Area Power AdministrationFederal Register · Notice · Dec 26, 1996
The 60-day public comment period for the Draft PEIS began on March 8, 1996, and ended on May 7, 1996. … During the comment period, public meetings were held in Los Alamos, Albuquerque and Santa Fe, New Mexico; North Las Vegas, Nevada; Oak Ridge, Tennessee; Kansas City, Missouri; Livermore, California; Washington
61 FR 68014Energy DepartmentFederal Register · Notice · Nov 17, 2010
DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Clean River Power 13, LLC; Project No. 13864-000; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions … On October 15, 2010, Clean River Power 13, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Barclay
75 FR 70223Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Proposed Rule · Apr 16, 2020
After the close of the comment period, DOE will review the public comments received and may begin collecting data and conducting the analyses discussed in this RFI. … DOE actively encourages the participation and interaction of the public during the comment period in each stage of this process.
85 FR 21104Energy DepartmentGrand River Dam Authority; Notice of Availability of Draft Environmental Assessment
Federal Register · Notice · Jan 12, 2017
Act FPA Federal Power Act FWS U.S. … Section 401 Section 401 of the Clean Water Act Section 7 Section 7 of the Endangered Species Act USGS U.S.
82 FR 3766Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Sep 28, 2012
Please note that the scoping period will close on October 24, 2012. … A comment period will be allotted when the EA is noticed. We will consider all comments on the EA before we make our recommendations to the Commission.
77 FR 59601Energy DepartmentFederal Energy Regulatory CommissionProcedural Rules for DOE Nuclear Activities and Occupational Radiation Protection
Federal Register · Proposed Rule · Aug 10, 2006
Review Under the Treasury and General Government Appropriations Act, 2001 K. Approval of the Office of the Secretary of Energy VI. Opportunity for Public Comment A. Written Comments B. … Week means a period of seven consecutive days.
71 FR 45996Energy Department
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.