CONFEDERATED TRIBES OF SILETZ INDIANS (2026)
Tribal code
Ask Donna
What actually matters in this document.
Text
CONFEDERATED TRIBES OF SILETZ INDIANS
LONG-RANGE TRANSPORTATION PLAN
FEBRUARY 2026
Prepared By:
6400 SE Lake Rd, Ste 200
Portland, OR 97222
TABLE OF CONTENTS
1
INTRODUCTION .................................................................................................................................... 1
Purpose of the plan ..................................................................................................................................... 1
Scope of services ......................................................................................................................................... 1
Planning process ......................................................................................................................................... 2
Study area .................................................................................................................................................... 2
LRTP findings ............................................................................................................................................... 3
Programmed Transportation Projects ................................................................................................ 5
Recommended Transportation Improvements ................................................................................ 5
Recommendations..................................................................................................................................... 7
Implementation ..................................................................................................................................... 7
BIA Public Road System ...................................................................................................................... 8
Maintenance .......................................................................................................................................... 8
Interagency Coordination .................................................................................................................... 8
Funding .................................................................................................................................................. 8
Plan Updating ....................................................................................................................................... 8
Transit ..................................................................................................................................................... 9
General Description................................................................................................................................... 10
Location ................................................................................................................................................ 10
Size ........................................................................................................................................................ 10
Current Land and Development Characteristics ........................................................................... 12
Demographics .......................................................................................................................................... 13
Population ............................................................................................................................................ 13
Employment ........................................................................................................................................ 15
Physical Characteristics ......................................................................................................................... 15
Topography ......................................................................................................................................... 15
Climate ................................................................................................................................................. 15
Construction Characteristics ............................................................................................................. 15
Land Use and Development Plans ....................................................................................................... 16
Existing Land Use ............................................................................................................................... 16
Development Objectives .................................................................................................................... 16
Development Plans ............................................................................................................................. 17
Implementation Measures .................................................................................................................... 18
Traffic Control and Enforcement ......................................................................................................... 18
Transportation Funding Sources.......................................................................................................... 18
Construction and Maintenance ......................................................................................................... 19
3
EXISTING TRANSPORTATION SYSTEM ............................................................................................. 20
Public Transportation ................................................................................................................................ 20
Transit ................................................................................................................................................... 20
Air Service ............................................................................................................................................ 22
Rail Service........................................................................................................................................... 22
Bicycle Routes...................................................................................................................................... 22
Public Road System ................................................................................................................................ 23
Tribal Transportation Program (TTP) Road System ...................................................................... 23
Road Classification ............................................................................................................................. 35
Surface Type ........................................................................................................................................ 36
Right-of-Way ....................................................................................................................................... 36
Traffic Control ..................................................................................................................................... 37
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
ii
Drainage and Bridges ......................................................................................................................... 37
Street Lighting ..................................................................................................................................... 38
Bicycle Routes...................................................................................................................................... 38
Traffic Data .............................................................................................................................................. 38
Circulation Characteristics ................................................................................................................ 38
Traffic Volumes ................................................................................................................................... 38
Speed Studies ...................................................................................................................................... 42
Crash Data ........................................................................................................................................... 42
Travel Demand.................................................................................................................................... 44
Road Maintenance .................................................................................................................................. 44
4
TRANSPORTATION ISSUES AND NEEDS .......................................................................................... 45
Transportation Needs ................................................................................................................................ 45
Traffic Safety ........................................................................................................................................ 45
Pedestrian Safety ................................................................................................................................. 46
Access Improvements ........................................................................................................................ 46
Maintenance ........................................................................................................................................ 47
Ongoing Transportation Planning ................................................................................................... 47
5
TRANSPORTATION PLAN .................................................................................................................. 48
Programmed Transportation Improvement Projects ............................................................................. 48
ODOT (2024-2027 STIP) ..................................................................................................................... 48
City of Lincoln City ............................................................................................................................ 48
Proposed Transportation Improvement Projects .............................................................................. 49
Short-Term Projects (0-6 years) ......................................................................................................... 58
Mid-Term Projects (7-12 years) ......................................................................................................... 65
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
iii
Long-Term Projects (13+ years)......................................................................................................... 66
Summary of Project Costs ..................................................................................................................... 67
TTP Road System Changes ................................................................................................................... 67
Prioritization and Implementation ...................................................................................................... 67
Maintenance ............................................................................................................................................. 68
Recommendations................................................................................................................................... 68
Implementation ................................................................................................................................... 69
BIA Public Road System .................................................................................................................... 69
Maintenance ........................................................................................................................................ 69
Interagency Coordination .................................................................................................................. 69
Funding ................................................................................................................................................ 70
Plan Updating ..................................................................................................................................... 70
Transit ................................................................................................................................................... 70
LIST OF TABLES
1-1
Proposed Transportation Improvement Projects ..................................................................... 5
2-1
Tribal Member Population Distribution .................................................................................. 14
3-1
TTP Road System Inventory ...................................................................................................... 30
3-2
Traffic Volumes ........................................................................................................................... 39
3-3
Crash Data.................................................................................................................................... 42
3-4
Crash Data at Selected Locations, US 101 and OR 229 .......................................................... 44
5-1
Proposed Transportation Projects and Estimated Costs ....................................................... 51
LIST OF FIGURES
1-1
Tribal Land Locations................................................................................................................... 4
2-1
Tribal Land Locations................................................................................................................. 11
3-1
TTP System: Overall ................................................................................................................... 24
3-2
TTP System: Overall: Lincoln City, Siletz, Waldport, Toledo .............................................. 25
3-3
TTP System: Lincoln City........................................................................................................... 26
3-4
TTP System: Siletz ....................................................................................................................... 27
3-5
TTP System: Toledo, Hatchery Area ........................................................................................ 28
3-6
TTP System: Portland, Salem, Eugene ..................................................................................... 29
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
iv
5-1
5-2
5-3
5-4
5-5
5-6
TTP System: Overall ................................................................................................................... 52
TTP System: Overall: Lincoln City, Siletz, Waldport, Toledo .............................................. 53
TTP System: Lincoln City........................................................................................................... 54
TTP System: Siletz ....................................................................................................................... 55
TTP System: Toledo, Hatchery Area ........................................................................................ 56
TTP System: Portland, Salem, Eugene ..................................................................................... 57
APPENDICES
Appendix A
Appendix B
Appendix C
Cost Estimating Data
TTP Inventory
Public involvement
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
v
1
INTRODUCTION
Purpose of the plan
In January 2025, the Confederated Tribes of Siletz Indians (CTSI) retained Akana to update their
June 2019 (Amended June 2023) Long Range Transportation Plan (LRTP) for the Siletz
Reservation. This 2026 Plan updates and builds upon the 2019 Plan, updating the existing Tribal
Transportation Program (TTP) system (formerly the Indian Reservation Road system),
addressing needs not met by the current system, and developing improvement projects to meet
those needs. Where information and wording from the 2019 Plan are still valid, they have been
incorporated into this updated Plan; and therefore, the 2019 Plan is hereby acknowledged and
referenced.
The main objectives of this LRTP are:
+
To establish a continuous transportation planning process for transportation systems on
the reservation
+
To develop surface transportation plans that are consistent with other modes of
transportation and the plans of other transportation agencies
+
To identify and address the transportation needs that support the Tribe’s socioeconomic
objectives
+
To include in the Plan access to new land parcels acquired by the Tribe
+
To periodically monitor the TTP Road Inventory for the Siletz Reservation to ensure that
the Tribe receives its fair share of Highway Trust Funds through the current BIA funding
allocation formula
Scope of services
The scope of services for the LRTP update includes:
+
Reviewing the existing transportation system and identifying those elements that are
important to the CTSI
+
Identifying the public roads that comprise the TTP System
+
Conducting studies and collecting data to assess transportation needs on the reservation
+
Performing transportation engineering and planning evaluations to identify existing and
future needs of the TTP System and other modes of transportation where appropriate
+
Developing a plan for improvements to the overall transportation system that are
necessary to meet the existing and future transportation needs within the study area
+
Identifying needed transportation system improvement projects, establishing their
priorities, and determining a reasonable implementation time frame
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | August 2025
1
+
Establishing the basis on which the Tribes can develop a Transportation Improvement
Program (TIP) addressing the highest priority, short-term needs
+
Coordinating and consulting with other state and local agencies
+
Establishing a community involvement program for public input, review and comment
Under the 2012 Moving Ahead for Progress in the 21st Century (MAP—21) federal surface
transportation bill, the TTP System was defined as a public highway, road, bridge, trail, or
transit system that is located on or provides access to tribal land and appears on the National
Tribal Transportation Facility Inventory (NTTFI). The TTP System was continued under the
current legislation Fixing America’s Surface Transportation (FAST) Act (December 2015). The
FAST Act was then replaced with the Infrastructure Investment and Jobs Act (IIJA) in 2021. The
funding available for transportation projects is still based on the 2012 inventories. FHWA Trust
funds can only be used for improvements to “public” roads or for those roads that will become
part of the public road system. The Plan cannot address private or special use roads or roads
that are not open to the general public to use without restrictions.
Planning process
During this planning effort, consultant staff met with tribal officials and BIA staff, and
contacted other local, county, and state agencies to obtain the most current information on
socioeconomic conditions, tribal needs, development trends, and traffic data. The major portion
of the planning effort was directed toward the identification of the tribal road system needs not
currently addressed and recommendations to alleviate those needs. This involved an evaluation
of traffic safety issues, an evaluation of the existing public road network to meet existing needs,
and an assessment of transportation needs to meet demands of future developments. Specific
new construction and improvement projects have been identified, and will improve traffic
safety and existing access, and will provide access to new reservation development,
complementing the area-wide transportation system, and promote economic development.
Local involvement in the transportation planning process occurred at several intervals. Initial
meetings with Tribal representatives were held in January and March of 2025 to obtain tribal
input on issues to be addressed in the plan and to identify resources for information needed to
prepare the plan. Transportation needs and priorities were discussed during these meetings as
well as identifying the TTP System serving tribal lands.
Study area
With the exception of the Portland, Salem, Eugene, and Douglas County properties, all other
tribal lands are in Lincoln County. In Lincoln County, the Tribe has land in the cities of Siletz,
Toledo, and Lincoln City. Most of the reservation lands are in scattered parcels east of the city of
Siletz.
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
2
As of August, 2025, the tribal land base includes just over 15,780 acres that are utilized for
residential, commercial, industrial, and public use. Of the total tribal land base, 4,556 acres are
in trust, and 4,010 are declared Reservation. Natural resource lands comprise 15,149 acres of the
total land base. Most of the natural resource lands are scattered parcels of forest lands east of
Siletz and other purchased forest lands in Douglas County that are utilized for timber
production. In addition to the natural resources land, the Tribe has a number of other property
holdings in Siletz, Lincoln City, Toledo, Salem, and Eugene.
Tribal land locations are shown in Figure 1-1.
LRTP findings
Based on field inspection and discussions with tribal officials and BIA staff, the following
findings have been documented:
+
The TTP system for the Siletz Reservation comprises 140.5 miles of roads, including 136.4
miles of existing roads and 4.1 miles of new proposed roads.
Tribal
11.0 miles
State
67.9 miles
BIA
4.3 miles
County
42.7 miles
City Ownership
13.8 miles
Other Ownership
0.7 miles
+
In general, those roads that serve developed areas are paved in fair to very good
condition.
+
The state road system serving the reservation consists of US 101, OR 34, and OR 229, all
of which are paved and in good to very good condition.
+
With few exceptions, signing on BIA and Tribal roads is generally good. US 101 is well
signed and most of OR 229 is reasonably well signed, except for a narrow 10-mile section
that lacks curve warning signs.
+
Striping and pavement markings are generally present in higher traffic volume areas,
although conditions vary.
+ Street lighting is very limited on reservation roads. Tribal subdivisions have street
lighting, and US 101 is lighted in urban areas.
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
3
MOODY
ROSS ISLAND
BRIDGE
CONN. NO. 4
RIVER
LAKE LABISH
EBONY
44TH
ROCKET
SKYLAB
METEOR
TOLEDO WASCO
MUSKET
SIDDALL
FLI
NT
LOC EVIE JEAN
K
GILL
49TH
MIDLAND
WHEELER
JUSTIN
AD
CONR
NT NIGHTHAWK
ON
FUHRER
BOHANNON
47TH
JANICE
GRABER
HARLAN
SHAWN
RUBY
SAPPHIRE
IGO
46TH
REIMANN
43RD
IND
45TH
INDIGO
42ND
39TH
WILMA LA PALMS
PRINCE
ND
NA
WAR
D
CTSI SALEM
HAYESVILLE
CONN. NO. 2
EASTV
ON
SIESTA
BROGAN
ORION
CORD
MEHAMA
ORBIT
BE
ANTELOPE
JAPO
NICA
GEMINI
SETTLERS
BOHANNON
BUCKSKIN
CE
Miles
MCKINLEY
CONGER
TYINN
SENECA
ARY
CAN
SI
S S LTC
TA OO
TI S
ON
WILSON
MILE
BUCK
GARFIELD
LANE
TENTH
FIVE
ER
RE ER
EK S OTT
LO ER
UG
Miles
H
BUCK
13TH
TH
ARTHUR
CITY VIEW
OAK PATCH
12
11TH
12TH
Transportation Framework Implementation Team (T-FIT)
and the 12TH
12TH
Oregon Department of Transportation, GIS unit as the data steward.,
700 13TH
Microsoft,
Vantor
CTSI EUGENE
HAYES
IV
ACORN PARK
EUGENE
PROPERTY
GARFIELD
13TH
BUCK
5
ALDERD
MOUN
ACORN PARK
FS
Transportation
H
K
IT R
OL
PAR
Framework
SM IVE
LW D
ROW
R
ER R
A
R
BENTON
SM
Earthstar
Geographics
SP
W
IImplementation
O
TH
BU
L
R
C TL
ON
COASTAL CSTI LANDS
NINTH
11TH
US
101
DOUGLAS
ER
§
¨
¦
£
¤
BROADWAY
TENTH
11TH
US HWY
101
Waldport
OREGON COAST
LANE
Washington State Department of
Transportation, Earthstar Geographics
0
10
20
I-5
Miles
TENTH
COLLIN
MAPLE
N
C.G.
LAGOO
£
¤
Eugene
Feet
COUNTY BOUNDARIES
CTSI LANDS
COMET
LAUNCH
BELLATRIX
COUNTRYSIDE
PATRICIA
BONANZA MANNING
DREW
JAN REE
LARIAT
HAYESVILLE
EVA
HAPPY
NN
IN DOR
G
RAN
HAYESVILLE
FERN
COLUMBINE
CAMAS KATRIN
SUNFLOWER
TREE
CHADWICK
TREESIDE
LANCASTER
MA
RAWHIDE
PATR
ICIA
DREW
C
IF
I
PA
C
CRESTON
JOANIE C
URRA
ROSE
NT
SATURN
HOMER
MILKY
MINNO
WAY
38TH
LILAC
RICHARD
E
AL
ESS
REBECCA
IND
COPPER CREEK
IAN
EARTH
SCH
OOL
43RD
43RD
CHEMAW
RD. CO A
NN. SALE
M
NO. 3
NILES
22N
D
ASTORIA
E
RIDG
SAL
E
MI
NDU
STR
IAL
CLAXTER
PRINC
SURVEYOR
KALE
ARMSTRONG
A
IEW
NESTOR
WB POST
IVY
Transportation
Framework
Implementation
Team
(T-FIT) and the
JASMINE
LUREE
DIAMOND
BUTTERCUP
Oregon
Department
of Transportation, GIS unit as theFUHR
data
steward.,
ER
IBIS
IBIS
JADE
NEW
DOW
JADE
WH
MEA RK
DOLORIS CASTLE
ITM
Vantor
0.5
JACKPINE
O
PA
AN
INDIG
A
ASTORI
38TH
PACIFIC
SALEM
Y
TIF
FAN
CRANE
OSPREY
RS
NS
EE
T
ASA
N
PLE
KENNEDY
TRACY
19TH
19TH
NORTHSIDE
18TH
CH
RIDGE
E
STADIUM
RD MAW CHEMAW CH
A
.
E
A RD. C
CO
ON RD. MAWA
NN
CO
C
NO. N.
.N
5
NO NN. ULA HEM
O.
.6
1
CO LI
AW
NN
A
. N RD
O. .
4
W
TAL
AW
A
CE
LA
N
QU
NDALE
ALLE
GOBERT
NOREN
CH
E
PA MA
TR W
IC A
K
PACIFIC
ROSS ISLAND
BRIDGE
CONN. NO. 1
KELLY
CORBETT
KEIZ
STA ER
TIO
N
KLICITAT
IL
LA
PA
14TH
IA
KALM
KAY
AK
KAF
IR
H
15T
ETT
NN
STI
DE
STADIUM
WATER
WATER
12TH
LOWELL
HARCOURT
CLARK
MAINE
THORMAN
AGGAS
R
KERSTIN
PAUL
ETTE
STEPHI
AL
TENTH
RICKMAN
CHEMAWA
SEVENTH
SEVENTH
TYLER
PRESTI
GE EIGHTH
BAILEY
SIXTH
FIFTH
RIVER
PACIFIC
GIBBS ST. FRONTAGE
CRESTWOOD
SH
PO OR
IN E
TE
FILBERT
NOLAN BISON
MARMOT
NAVIGATION
TIE
BIRCH
ORIOLE
STRAWBERRY
CONSTELLATION
RANGER
BAYNE
GERANIUM
INDIAN
EARTH
APOLLO
ASTRONAUT
Y
DUST
R
SUMMER
FARM
WIND
FIELD
FLAG
FLIGHT
A
TH
TE
IVY
CRYSTAL
BLAZING STAR
E
MOONLIT
WHEAT
WHEAT
PRAIRIE
BARLEY DREW
STAR
WINDFLOWER RACCOON
IGHT
STEPHENS
LE
IL
SV N.
YE N 1
HA CO O.
N
.1
NO
IN
AC
HY
M
KAR
LOR
CL
AX
MICHEL
SILVER
TIMM TIMM
LISA
FALCON
PHYLLIS RAVEN
HEE HEE
ILAHEE
ENTRANCE
TWIL
38TH
EVANSTON
.
NN
OT
ASC
M
BLOSSO
BLOSSOM
CO
NE
PLANET
CORVUS
MOON
H
M
HA
I-5
LE
VIL
AN
LAR
C
ME
§
¨
¦
S
YE
HA
E
S
OK
ON
PL
EA
BEVI SA
EW NT
IE
HAZELGREEN
SUMMER WIND
PACIFIC
MARION
HAYESVILLE
CONN.
NO. 2
FIRST
SECOND
CORBETT
PACIFIC
PACIFIC HIGHWAY WEST
KELLY AVE.NUE FRONTAGE
SECOND
TH
15
FORT STEVENS
ALDER CREEK
VILLAGE
PACIFIC OCEAN
PACIFIC OCEAN
K
Y
KENNED
18TH
L
IL
OK
RG
BU
SIE WOOD
N
DA
LARCH
SALEM
PROPERTY
BON
D
ALL
D
IAN
JULIA ANN
CE
CO
TTE
AME
WILL ER
RIV
O
D
LEO
ROIX
MC
ER
EV
NN
BO
OO
ST C
N
W
TI P
HA
CU MA
TO
IZ
LDW
CHELAN
A
VERD
VERDA
WI
OC
KE
COURTLYN
WIESSNER
IMS
ON
CAP
OD
Y
RL
13TH
CR
HAZELGREEN
LEMON
KEIZER
CE
GARDEN
LABISH
CHEMAWA
101
EH
STATE BOUNDARY
NO
FIDDLE
CREEK
LOWER
FIDDLE CREEK
BLU
STATE CAPITOL
JOY
DEARBORN
LAWLESS
BEE
MAY
DIXON
DUNLIN
RY
GA
INSET B
CHERRY
CITIES
HYSON
GABLE
KEIZER
OLD
CHEMAWA
CHEMAW
A RD
CONN. NO .
.2
A .
AW HG
EM TC
CH . IN
RD
PETTY
GROVE
CRANBERRY
Feet
BROADWAY
OS
TCO
SIL KOUT
LOO
OVERALL CSTI LANDS
KAMET
LA
Transportation Framework Implementation Team (T-FIT) and the
Oregon Department of Transportation, GIS unit as the data steward.,
500 Vantor
Washington State Department of Transportation, Microsoft,
I-5
OT
H
DOUGLAS
DEL
GROVER
§
¨
¦ LINN
BO
101
TO E
JET AHU
N
BENTON
SEE EUGENE
MAP
£
¤
OLIN
O
E
I-5
CSTI PORTLAND
A
LM
K
TA
§
¨
¦
20
LANE
SEE COASTAL
CSTI LANDS
INSET B
BRO
TA
20
DO
¤
£
¤£
O
LE
A
CHEMAWA
LE
E
APPL
EVE
ARLE
SUNSET
20
Waldport
BROOK
£
¤
MEADOW
Toledo
RIN
GREENWOOD
ADA
M
EN
RD
GA
O
E
L
ET
H
6T
LUCIND
DEARBORN
IVY
CHERRY
LINCOLN
BAILEY
DIETZ
MANB
Toledo
C
A
AW
BRANDON BRANDON BRANDON
MENLO
Newport
Siletz
TON
JUEDES
M
HE
GL
1
GROVER
ROSS ISLAND
CONN. NO. 2
SPI
SALEM
RIT
CH PROPERTY
ETC
O
IME
IN
SPRKIN
DE
A
SING
MAINE
CUMMINGS
229
KEN
POLK
LINDA
EUGENE
KELLY
FREEMAN
GT
CA
RD
KESTREL KESTREL
RG
£
¤
EVANS
20
AR
VE
CHURCHDALE
JAMES CLOVERLEAF
SHELBY
CHURCHDALE
MARION
LISA
W
AR
CLAGGETT
JANET
LINCOLN
VIE
CARILOR
BE
ROSE
PARK
WITTENBE
Salem
LOCKHAVEN
FA
YM
GIBBS
WHITAKER
IL
LAW
N
SANDY
SEE SALEM
MAP
Lincoln City
Newport
A
TR
Siletz
SEE COASTAL
CSTI LANDS
Î
Í
WHITAKER
POLK
CLACKAMAS
YAMHILL
CTSI PORTLAND
OFFICE
KIM
§
¨
¦
MT HOOD
M
229
HW
ER
GIBBS
Î
Í
SEEI-5
PORTLAND
MAP
1
GROV
BUR VD
BARBUR BL
BAR NTAGE
FRO
TILLAMOOK
MT HOOD
MULTNOMAH
WOODS
NO.
GROVER
OREGON
MULTNOMAH
WASHINGTON
Portland
ND C
ONN
.
PROPOSED
CLARK
Feet
NINTH
ISLA
OSWEG
OREGON
R
ROS
S
WOODS
Transportation Framework
Implementation
2,500 Team (T-FIT) and
GO
COLUMBIA
VE
Lincoln City
STADIUM
RI
WE
OS
A
ND
LA
IS GE . 5
SS ID NO
O
R
R B N.
N
CO
CORBETT
AVE-HOOD
AVE
PACIFIC
N. NO. 2
OSWEGO HWY CON
. NO. 2
ND CONN
CLATSOP
BI
UAM
ARQ
W. M CHG.
INT . 1
N
CON
M
AC
CE
SS
ACCESS ACCESS
ACCESS
ACCESS
11TH
ALD
E
CRE R
VILL EK
AGE
PORTER
LA
ROSS IS
WARRENTON:
SEE COASTAL
CSTI LANDS
PORTER
MT HOOD
LU
CLATSOP
Y
LL
COWLITZ
CO
13TH
HOOKER
KE
Astoria
Warrenton
HOOKER
INSET A
WARRENTON
ROSS
ISLAND CONN. NO. 4
WASHINGTON
WAHKIAKUM
PACIFIC
WATER
CONFEDERATED TRIBES OF SILETZ INDIANS
FIGURE 1-1
CTSI LANDS
Programmed Transportation Projects
The (IIJA) Act requires designated local and regional agencies to develop a Transportation
Improvement Program (TIP), and states to develop a Statewide Transportation Improvement
Program (STIP) as a condition to securing federal funds for transportation projects. Projects
listed in the STIP are the only projects that will be approved by the Federal Highway
Administration (FHWA) and the Federal Transit Administration (FTA) to utilize federal funds.
Transportation improvement projects programmed by the State of Oregon, Lincoln County, and
the BIA/Tribe are summarized below. Please note that not all of these projects have committed
funding, and it is possible that some may not be carried forward for construction. Therefore, the
status of these projects can change from year to year.
ODOT (2024-2027 STIP)
+
US 101: Washington state line to California state line (MP 105.21 – MP 137.61): Install
National Electric Vehicle Infrastructure (NEVI) fast charging station at 50-mile intervals
along the US 101 between Washington and California state lines. Planning begun in 2024,
with Preliminary Engineering scheduled for 2025 and Construction in 2025. ODOT
Project Cost: $6,281,000 (total project cost).
Recommended Transportation Improvements
A total of 33 transportation improvement projects were identified in the planning process.
Proposed projects total $78,955,325 as shown in Table 1-1.
TABLE 1-1
PROPOSED TRANSPORTATION IMPROVEMENT PROJECTS
Project
No.
Improvement
Short-Term Projects (0-6 years)
Ongoing Transportation Planning
1
Activities
2
Maintenance
3
Transit
NE Neotsu Dr/US 101 Intersection
4
Improvements, Lincoln City
Swan Avenue, Section 810 Widening
7
Phase 2, City of Siletz
8
Mast Ave Extension, Lincoln City
10
11
Toledo Riverfront Property (TRP) Access
Road (BIA 5322) Reconstruction, Toledo
NE 50th Street (Section 30) Overlay,
Lincoln City
Type of Project
Estimated Cost
Planning
Preservation
Transit
$1,897,000
$772,000
$580,000
Safety
$500,000
Reconstruction
New Construction
$2,873,760
$964,400
Reconstruction
$939,400
Preservation
$247,520
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
5
TABLE 1-1
PROPOSED TRANSPORTATION IMPROVEMENT PROJECTS
Project
No.
12
13
14
16
17
18
19
21
22
23
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
Improvement
Unnamed Rd. Molalla to Ferry, City of
Siletz
Buford Avenue Reconstruction, City of
Siletz
NE Johns Road (Route No. 9998)
Reconstruction, Lincoln City
Unnamed Rd between SW Ferry and SW
Swan, City of Siletz
Chemawa Rd. and Indian School Rd.
Improvements, Salem
Blossom Dr. Improvements, Salem
Unnamed Rd E of Miller Subdivision, City
of Siletz
Portland Rd. Bypass, Salem
Salem Community Development, Salem
Salem Community Pedestrian Access,
Salem
Buford Avenue New Sidewalk
Construction, City of Siletz
Tribal Enterprise Parking Lot, City of
Siletz
Cemetery Way Realignment, City of
Siletz
James Frank Avenue Upgrade, City of
Siletz
SW Scarlet Extension, City of Siletz
SW Tenas Extension, City of Siletz
Commodities Rd.
Swan Extension
Loop Rd. East of Molalla St. off James
Frank Rd.
East Rd. to New Rd. Between Ferry and
Swan
New Rd. Between Ferry and Swan
Umpqua Extension
West Rd. to New Rd. Between Ferry and
Swan
Judd - Old River Rd. Cutoff
Banks Access 1 Rd.
Banks Access 1 Rd.
Type of Project
Estimated Cost
New Construction
$974,355
Reconstruction
$2,485,392
Reconstruction
$2,961,795
New Construction
$974,355
Reconstruction
Reconstruction
$345,000
$638,570
New Construction
New Construction
New Construction
$94,355
$4,985,344
$2,304,176
New Construction
$71,655
New Construction
$769,821
Reconstruction
$218,400
Reconstruction
$120,833
Reconstruction
New Construction
New Construction
New Construction
New Construction
$70,938
$974,355
$974,355
$11,050,804
$1,081,320
New Construction
$3,989,883
New Construction
New Construction
New Construction
$974,355
$5,315,060
$974,355
New Construction
New Construction
Reconstruction
Reconstruction
$974,355
$1,445,226
$5,547,786
$222,812
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
6
TABLE 1-1
PROPOSED TRANSPORTATION IMPROVEMENT PROJECTS
Project
No.
48
Improvement
Health Center Service Rd. - Sec. 30
Mid-Term Projects (7-12 years)
16
Blossom Drive Sidewalk, Salem
Neachesna Housing Phase 3 (BIA Route
24
920), Lincoln City
Toledo River Property Industrial Road
25
(BIA 5321), Toledo
Swan Avenue (T940) Widening, City of
26
Siletz
SE Sturdevant Road (BIA 532), Section
27
10 Reconstruction, Toledo
28
SE Bagley Street Upgrade, City of Siletz
Long-Term Projects (13-20 years)
SR 229 Safety Improvements (Pedestrian
29
Bridge), City of Siletz
30
SR 229 Highway Safety Improvements
James Frank Avenue Upgrade, City of
31
Siletz
Type of Project
Estimated Cost
New Construction
$1,534,666
New Construction
$786,386
New Construction
$3,884,899
New Construction
$2,045,307
Reconstruction
$160,016
Reconstruction
Reconstruction
$1,828,736
$845,963
Safety
Safety
$2,442,350
$500,000
Reconstruction
$3,529,400
TOTAL
$78,955,325
Recommendations
Based on the project findings, tribal development plans, and public safety needs, the following
recommendations are set forth:
Implementation
+
Long-Range Transportation Plan. The Siletz Tribal Council needs to formally adopt this
plan by resolution in order to receive Federal Lands Highway Program funds or other
funds for their transportation programs.
+
Transportation Improvement Program (TIP). The CTSI should maintain and update a
Transportation Improvement Program (TIP) on an annual basis. The federal
transportation legislation has many other programs besides the Federal Lands Highway
Program, and the Tribe should be able to access other funds in addition to the BIA
program funds. The Tribe’s TIP should be submitted to the State and Lincoln and
Douglas Counties, as well as the BIA.
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
7
BIA Public Road System
+
Recommendations call for the TTP System to be expanded to 140.5 miles of State, County,
BIA, and tribal, and other roads, including 4.1 miles of proposed new roads. It is
important that, as new roads are developed or existing roads reconstructed, right-of-way
descriptions should be prepared as part of design surveys and that the Tribe grant the
BIA or itself an easement for the right-of-way.
Maintenance
Periodic maintenance of BIA and tribal roads will be required in order to protect the initial
public investment in these roads. To this end, the Tribe has committed to a maintenance plan
that addresses the scheduling of major maintenance projects (chip seals, overlays, etc.) and
setting aside funds annually for ongoing or unforeseen maintenance activities (pothole repair,
drainage maintenance, sign replacement, striping, street cleaning, etc.).
Interagency Coordination
+
Wherever possible, the Tribe must coordinate and partner with other
jurisdictions/agencies to implement transportation improvement projects, for
transportation planning, and for transit as required by most federal funded
transportation programs. BIA funding can be used to match other federal funding
programs, which is a major advantage in partnering with other jurisdictions to
implement transportation projects.
+
If the Tribe or any other agency, such as HUD, constructs any new roads that are to be
placed on the BIA system, the BIA will be provided project documents for review during
their design phase to ensure that the roads will meet BIA and AASHTO design
standards.
Funding
+
Over the long term, Federal Lands Highway funding through the BIA will not provide
the level of funding required to meet all of the transportation needs of the Tribe. Under
the FAST Act legislation, other transportation funds are available to tribal governments
through federal and state programs. These sources can help augment BIA project costs or,
in some instances, fund projects which the BIA Branch of Roads cannot fund (or fund at
the appropriate time).
+
As more definitive plans are developed, cost estimates for the transportation
improvement projects should be reviewed and revised. Also, as the Tribal TIP is
periodically updated, costs should be adjusted for inflation. The TIP provides a
methodology for cost updating.
Plan Updating
+
The plan should be reviewed annually by the Tribe to assess changing needs and
priorities. Specifically, this process would evaluate maintenance priorities for the BIA and
tribal transportation systems, review priorities for new construction or upgrading
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
8
projects and their implementation schedule, provide interagency coordination to address
specific problems on county or state roads, and provide input into the annual BIA
budgeting process.
+
It is recommended that the Tribe undertake major revisions to this plan every five years.
+
Whenever the Transportation Plan is updated, a copy of the Plan and Tribal Resolution
adopting the Plan must be entered into the BIA Road Inventory Field Data System
(RIFDS) database as "Attachments." Also, if the Plan is amended at any time, a Tribal
Resolution identifying the amendment must be entered into the RIFDS database,
otherwise any new projects cannot be funded with TTP funds.
Transit
Continue to coordinate resources with regional transit providers to expand public transit
service along the US 101 corridor and in the Siletz, Toledo, Newport, and Lincoln City areas in
order to provide tribal members as well as the general public with expanded service along the
coast, to and from Siletz, and to the Willamette Valley area.
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
9
2 BACKGROUND DATA
General Description
Location
Approved by Congress in September 1980, the Siletz Reservation was originally composed of 39
separate parcels of land in Lincoln County, Oregon, in and near the City of Siletz. Siletz was the
site of the administrative headquarters for the original Siletz Reservation established by
Executive Order in 1855. Siletz remains the location for tribal government and administrative
services.
The City of Siletz lies approximately eight miles inland from the Pacific Ocean. The nearest
coastal communities include Lincoln City, a 25-mile drive to the north; Toledo, about six miles
south, and Newport, a 15-mile drive to the southwest. The Tribe also has land holdings in
several other communities. These include industrial land in Toledo; a casino, hotel, golf course,
and residential property in Lincoln City; and commercial property in Salem, which is located in
the Willamette Valley east of Siletz. The Tribe maintains satellite offices in Portland, Salem, and
Eugene to serve tribal members in these areas. In addition, the Tribe owns a large amount of
forest lands in Douglas County, north of the City of Reedsport.
Tribal land locations are shown in Figure 2-1.
Size
The tribal land base includes just over 15,780 acres that are utilized for residential, commercial,
industrial, and public use. Of the total tribal land base, 4,556 acres are in trust and 4,010 are
declared Reservation. Natural resource lands comprise 15,149 acres of the total land base. Most
of this is forest land that is utilized for timber production. In addition to the natural resources
land, the Tribe has a number of other land holdings. These include:
+
Siletz
36 acres Government Hill and Paul Washington Cemetery site
182 acres existing and proposed housing and tribal facilities
+
Lincoln City
43 acres Chinook Winds Casino/Hotel site
93 acres Chinook Winds Golf Course (fee status)
37 acres Lakeside Village residential parcel
3 acres site near Tanger Outlet Mall (Mast Avenue)
1 acre Tribal Cemetery
+
Toledo
72 acres Industrial land
+
Portland
1 acres offices (fee status)
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
10
MOODY
ROSS ISLAND
BRIDGE
CONN. NO. 4
RIVER
LAKE LABISH
EBONY
44TH
ROCKET
SKYLAB
METEOR
TOLEDO WASCO
MUSKET
SIDDALL
FLI
NT
LOC EVIE JEAN
K
GILL
49TH
MIDLAND
WHEELER
JUSTIN
AD
CONR
NT NIGHTHAWK
ON
FUHRER
BOHANNON
47TH
JANICE
GRABER
HARLAN
SHAWN
RUBY
SAPPHIRE
IGO
46TH
REIMANN
43RD
IND
45TH
INDIGO
42ND
39TH
WILMA LA PALMS
PRINCE
ND
NA
WAR
D
CTSI SALEM
HAYESVILLE
CONN. NO. 2
EASTV
ON
SIESTA
BROGAN
ORION
CORD
MEHAMA
ORBIT
BE
ANTELOPE
JAPO
NICA
GEMINI
SETTLERS
BOHANNON
BUCKSKIN
CE
Miles
MCKINLEY
CONGER
TYINN
SENECA
ARY
CAN
SI
S S LTC
TA OO
TI S
ON
WILSON
MILE
BUCK
GARFIELD
LANE
TENTH
FIVE
ER
RE ER
EK S OTT
LO ER
UG
Miles
H
BUCK
13TH
TH
ARTHUR
CITY VIEW
OAK PATCH
12
11TH
12TH
Transportation Framework Implementation Team (T-FIT)
and the 12TH
12TH
Oregon Department of Transportation, GIS unit as the data steward.,
700 13TH
Microsoft,
Vantor
CTSI EUGENE
HAYES
IV
ACORN PARK
EUGENE
PROPERTY
GARFIELD
13TH
BUCK
5
ALDERD
MOUN
ACORN PARK
FS
Transportation
H
K
IT R
OL
PAR
Framework
SM IVE
LW D
ROW
R
ER R
A
R
BENTON
SM
Earthstar
Geographics
SP
W
IImplementation
O
TH
BU
L
R
C TL
ON
COASTAL CSTI LANDS
NINTH
11TH
US
101
DOUGLAS
ER
§
¨
¦
£
¤
BROADWAY
TENTH
11TH
US HWY
101
Waldport
OREGON COAST
LANE
Washington State Department of
Transportation, Earthstar Geographics
0
10
20
I-5
Miles
TENTH
COLLIN
MAPLE
N
C.G.
LAGOO
£
¤
Eugene
Feet
COUNTY BOUNDARIES
CTSI LANDS
COMET
LAUNCH
BELLATRIX
COUNTRYSIDE
PATRICIA
BONANZA MANNING
DREW
JAN REE
LARIAT
HAYESVILLE
EVA
HAPPY
NN
IN DOR
G
RAN
HAYESVILLE
FERN
COLUMBINE
CAMAS KATRIN
SUNFLOWER
TREE
CHADWICK
TREESIDE
LANCASTER
MA
RAWHIDE
PATR
ICIA
DREW
C
IF
I
PA
C
CRESTON
JOANIE C
URRA
ROSE
NT
SATURN
HOMER
MILKY
MINNO
WAY
38TH
LILAC
RICHARD
E
AL
ESS
REBECCA
IND
COPPER CREEK
IAN
EARTH
SCH
OOL
43RD
43RD
CHEMAW
RD. CO A
NN. SALE
M
NO. 3
NILES
22N
D
ASTORIA
E
RIDG
SAL
E
MI
NDU
STR
IAL
CLAXTER
PRINC
SURVEYOR
KALE
ARMSTRONG
A
IEW
NESTOR
WB POST
IVY
Transportation
Framework
Implementation
Team
(T-FIT) and the
JASMINE
LUREE
DIAMOND
BUTTERCUP
Oregon
Department
of Transportation, GIS unit as theFUHR
data
steward.,
ER
IBIS
IBIS
JADE
NEW
DOW
JADE
WH
MEA RK
DOLORIS CASTLE
ITM
Vantor
0.5
JACKPINE
O
PA
AN
INDIG
A
ASTORI
38TH
PACIFIC
SALEM
Y
TIF
FAN
CRANE
OSPREY
RS
NS
EE
T
ASA
N
PLE
KENNEDY
TRACY
19TH
19TH
NORTHSIDE
18TH
CH
RIDGE
E
STADIUM
RD MAW CHEMAW CH
A
.
E
A RD. C
CO
ON RD. MAWA
NN
CO
C
NO. N.
.N
5
NO NN. ULA HEM
O.
.6
1
CO LI
AW
NN
A
. N RD
O. .
4
W
TAL
AW
A
CE
LA
N
QU
NDALE
ALLE
GOBERT
NOREN
CH
E
PA MA
TR W
IC A
K
PACIFIC
ROSS ISLAND
BRIDGE
CONN. NO. 1
KELLY
CORBETT
KEIZ
STA ER
TIO
N
KLICITAT
IL
LA
PA
14TH
IA
KALM
KAY
AK
KAF
IR
H
15T
ETT
NN
STI
DE
STADIUM
WATER
WATER
12TH
LOWELL
HARCOURT
CLARK
MAINE
THORMAN
AGGAS
R
KERSTIN
PAUL
ETTE
STEPHI
AL
TENTH
RICKMAN
CHEMAWA
SEVENTH
SEVENTH
TYLER
PRESTI
GE EIGHTH
BAILEY
SIXTH
FIFTH
RIVER
PACIFIC
GIBBS ST. FRONTAGE
CRESTWOOD
SH
PO OR
IN E
TE
FILBERT
NOLAN BISON
MARMOT
NAVIGATION
TIE
BIRCH
ORIOLE
STRAWBERRY
CONSTELLATION
RANGER
BAYNE
GERANIUM
INDIAN
EARTH
APOLLO
ASTRONAUT
Y
DUST
R
SUMMER
FARM
WIND
FIELD
FLAG
FLIGHT
A
TH
TE
IVY
CRYSTAL
BLAZING STAR
E
MOONLIT
WHEAT
WHEAT
PRAIRIE
BARLEY DREW
STAR
WINDFLOWER RACCOON
IGHT
STEPHENS
LE
IL
SV N.
YE N 1
HA CO O.
N
.1
NO
IN
AC
HY
M
KAR
LOR
CL
AX
MICHEL
SILVER
TIMM TIMM
LISA
FALCON
PHYLLIS RAVEN
HEE HEE
ILAHEE
ENTRANCE
TWIL
38TH
EVANSTON
.
NN
OT
ASC
M
BLOSSO
BLOSSOM
CO
NE
PLANET
CORVUS
MOON
H
M
HA
I-5
LE
VIL
AN
LAR
C
ME
§
¨
¦
S
YE
HA
E
S
OK
ON
PL
EA
BEVI SA
EW NT
IE
HAZELGREEN
SUMMER WIND
PACIFIC
MARION
HAYESVILLE
CONN.
NO. 2
FIRST
SECOND
CORBETT
PACIFIC
PACIFIC HIGHWAY WEST
KELLY AVE.NUE FRONTAGE
SECOND
TH
15
FORT STEVENS
ALDER CREEK
VILLAGE
PACIFIC OCEAN
PACIFIC OCEAN
K
Y
KENNED
18TH
L
IL
OK
RG
BU
SIE WOOD
N
DA
LARCH
SALEM
PROPERTY
BON
D
ALL
D
IAN
JULIA ANN
CE
CO
TTE
AME
WILL ER
RIV
O
D
LEO
ROIX
MC
ER
EV
NN
BO
OO
ST C
N
W
TI P
HA
CU MA
TO
IZ
LDW
CHELAN
A
VERD
VERDA
WI
OC
KE
COURTLYN
WIESSNER
IMS
ON
CAP
OD
Y
RL
13TH
CR
HAZELGREEN
LEMON
KEIZER
CE
GARDEN
LABISH
CHEMAWA
101
EH
STATE BOUNDARY
NO
FIDDLE
CREEK
LOWER
FIDDLE CREEK
BLU
STATE CAPITOL
JOY
DEARBORN
LAWLESS
BEE
MAY
DIXON
DUNLIN
RY
GA
INSET B
CHERRY
CITIES
HYSON
GABLE
KEIZER
OLD
CHEMAWA
CHEMAW
A RD
CONN. NO .
.2
A .
AW HG
EM TC
CH . IN
RD
PETTY
GROVE
CRANBERRY
Feet
BROADWAY
OS
TCO
SIL KOUT
LOO
OVERALL CSTI LANDS
KAMET
LA
Transportation Framework Implementation Team (T-FIT) and the
Oregon Department of Transportation, GIS unit as the data steward.,
500 Vantor
Washington State Department of Transportation, Microsoft,
I-5
OT
H
DOUGLAS
DEL
GROVER
§
¨
¦ LINN
BO
101
TO E
JET AHU
N
BENTON
SEE EUGENE
MAP
£
¤
OLIN
O
E
I-5
CSTI PORTLAND
A
LM
K
TA
§
¨
¦
20
LANE
SEE COASTAL
CSTI LANDS
INSET B
BRO
TA
20
DO
¤
£
¤£
O
LE
A
CHEMAWA
LE
E
APPL
EVE
ARLE
SUNSET
20
Waldport
BROOK
£
¤
MEADOW
Toledo
RIN
GREENWOOD
ADA
M
EN
RD
GA
O
E
L
ET
H
6T
LUCIND
DEARBORN
IVY
CHERRY
LINCOLN
BAILEY
DIETZ
MANB
Toledo
C
A
AW
BRANDON BRANDON BRANDON
MENLO
Newport
Siletz
TON
JUEDES
M
HE
GL
1
GROVER
ROSS ISLAND
CONN. NO. 2
SPI
SALEM
RIT
CH PROPERTY
ETC
O
IME
IN
SPRKIN
DE
A
SING
MAINE
CUMMINGS
229
KEN
POLK
LINDA
EUGENE
KELLY
FREEMAN
GT
CA
RD
KESTREL KESTREL
RG
£
¤
EVANS
20
AR
VE
CHURCHDALE
JAMES CLOVERLEAF
SHELBY
CHURCHDALE
MARION
LISA
W
AR
CLAGGETT
JANET
LINCOLN
VIE
CARILOR
BE
ROSE
PARK
WITTENBE
Salem
LOCKHAVEN
FA
YM
GIBBS
WHITAKER
IL
LAW
N
SANDY
SEE SALEM
MAP
Lincoln City
Newport
A
TR
Siletz
SEE COASTAL
CSTI LANDS
Î
Í
WHITAKER
POLK
CLACKAMAS
YAMHILL
CTSI PORTLAND
OFFICE
KIM
§
¨
¦
MT HOOD
M
229
HW
ER
GIBBS
Î
Í
SEEI-5
PORTLAND
MAP
1
GROV
BUR VD
BARBUR BL
BAR NTAGE
FRO
TILLAMOOK
MT HOOD
MULTNOMAH
WOODS
NO.
GROVER
OREGON
MULTNOMAH
WASHINGTON
Portland
ND C
ONN
.
PROPOSED
CLARK
Feet
NINTH
ISLA
OSWEG
OREGON
R
ROS
S
WOODS
Transportation Framework
Implementation
2,500 Team (T-FIT) and
GO
COLUMBIA
VE
Lincoln City
STADIUM
RI
WE
OS
A
ND
LA
IS GE . 5
SS ID NO
O
R
R B N.
N
CO
CORBETT
AVE-HOOD
AVE
PACIFIC
N. NO. 2
OSWEGO HWY CON
. NO. 2
ND CONN
CLATSOP
BI
UAM
ARQ
W. M CHG.
INT . 1
N
CON
M
AC
CE
SS
ACCESS ACCESS
ACCESS
ACCESS
11TH
ALD
E
CRE R
VILL EK
AGE
PORTER
LA
ROSS IS
WARRENTON:
SEE COASTAL
CSTI LANDS
PORTER
MT HOOD
LU
CLATSOP
Y
LL
COWLITZ
CO
13TH
HOOKER
KE
Astoria
Warrenton
HOOKER
INSET A
WARRENTON
ROSS
ISLAND CONN. NO. 4
WASHINGTON
WAHKIAKUM
PACIFIC
WATER
CONFEDERATED TRIBES OF SILETZ INDIANS
FIGURE
FIGURE 1-1
2-1
CTSI
CTSI LANDS
LANDS
+
Salem
35 acres Commercial land
19 acres jointly owned with the Confederated Tribes of the Grand Ronde
Community of Oregon (This parcel is not included in the Transportation
Plan as the two tribes have not yet had discussions as to how to divide
the roads, since a road cannot be included in both Tribe’s IRR System
inventories. Such discussions are anticipated to occur before the next
major update to the Transportation Plan)
+
Eugene
0.8 acres Commercial land (offices)
With the exception of the Portland, Salem, and Eugene properties, and the purchased forest
land in Douglas County, all other tribal lands are in Lincoln County.
Current Land and Development Characteristics
The natural resource lands are composed of scattered sites mostly in the rugged coastal
mountain range where access can be very difficult. These lands are primarily allocated to timber
production. Other lands that have been allocated for development include the following.
Siletz
Government Hill functions as the historic and cultural center for
tribal activities. The site contains the tribal community center,
cultural center, a maintenance facility, cemetery, wellness center,
and powwow grounds. In the center of
Siletz, the Tribe has built an administration
center. Other tribal development includes
residential development in the Judd Road
area, multi-family housing on E. Logsden
Road, elders housing on SE Bagley St,
Tillamook St. housing, and single-family
housing (Oak Flats) on the west side of the city. The Tribe’s Child Care Facility is also in this
area on Buford Avenue along with the Tribe’s exercise facility, and Head Start facilities are
located on James Frank Avenue.
Lincoln City
The Tribe owns properties in the north Lincoln City area. The Chinook Winds Casino/
Hotel/Golf Course is the major tribal development. The hotel and casino occupy a 43-acre site
just off US 101 and a gaming office complex is located at the intersection of Logan and 44th St.
The Golf Course comprises 93 acres just east of there. An RV Park is also located across from the
casino. Approximately one mile east of the casino, adjacent to US 101, the Tribe owns the 37acre Lakeside Village parcel (Neachesna housing). The location is in a residential neighborhood
and has frontage on Devil’s Lake. The Tribe also owns a 3-acre residential site off US 101 just
south and east of the Lincoln City Outlets (Mast Ave property). It is anticipated that the Tribe
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
12
will develop this site for housing. A Head Start facility also is located in Lincoln City in rented
space off of tribal land.
Toledo
The Tribe owns a 72-acre site just east of the city of Toledo. The site is zoned for industrial use
and has frontage on the Yaquina River. The site was previously used for a lumber mill with log
storage areas. The mill was shut down a number of years ago, and most of the structures and
equipment have been removed. Currently, Western Cascade uses the property to truck in and
transfer lumber to rail cars for shipment.
Portland
The Tribe owns a property and building off Stark St. in SE Portland, which previously housed
the Tribe's Portland satellite office. The office has been relocated to SW Portland off 1st St. and
the old office is currently not in use. Head Start facilities are located in outer SE Portland as
well.
Salem
The Tribe owns four adjacent properties between I-5 and US 99E in the northern portion of the
city along Astoria Street. Currently, the Tribe has an RV Park situated on the southern portion
of the property and a flex-space office building on the northern portion on the corner of
Blossom Drive and Astoria Street. The Tribe’s Salem satellite office is located in this structure.
Salem Head Start facilities are located on Chemawa Rd. NE.
Eugene
The Tribe owns a parcel of land off 11th Avenue West, west of McKinley. The Tribe's Eugene
satellite office is located on the parcel.
Demographics
Population
Information provided by Siletz Tribal staff (2025) indicates a total tribal enrollment of 5,648 of
which 3,203 (57%) reside in Oregon in the 11-county service area (Lincoln, Tillamook, Benton,
Lane, Linn, Clackamas, Multnomah, Washington, Marion, Polk, and Yamhill Counties). Of
those in the 11-county service area, 1,831 (57%) are 18 years of age or older and of those, 483
(18%) are 55 years of age or older. There are 1,228 tribal members in Lincoln County and
another 17 in Tillamook County. Demographic data for the 11-county service area is shown in
the following table.
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
13
Table 2-1
Tribal Member Population Distribution
County/Service Area
Total all Ages
Total 18 -54
Total 55 & Older
TOTAL ENROLLMENT
5,648
3,295
1,104
Members Living on the Reservation/Trust Land
540
Total Members Residing in 11-County Service Area
3,203
1,831
580
Benton/Eugene
59
Lane/Eugene
328
Linn/Eugene
173
Total
560
Clackamas/Portland
196
Multnomah/Portland
312
Washington/Portland
125
Total
633
Marion/Salem
615
Polk/Salem
92
Yamhill/Salem
58
Total
765
Lincoln/Siletz
1,228
Tillamook/Siletz
17
Total
Total Members Residing Outside Service Area
1,245
2,386
In Oregon and Outside Service Area
529
Out of Oregon
1,834
Outside of Country
20
Missing Moccasins (Tribal members with no
59
contact information on file)
Source: Confederated Tribes of Siletz Indians Enrollment Department, March 2025
Of the approximate 1,209 members that live in Lincoln County (22% of total enrollment), 60%
live in Siletz; the remaining are in Lincoln City and scattered in other communities or other
regions of the county.
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
14
Employment
The Tribe currently has two major employment centers. The tribal government and
administrative services, and the tribal clinic are located in the Siletz Community. The Other
major employment center is located in the north portion of Lincoln City and includes the
Chinook Winds Casino/Hotel/Golf Course. Total employment in Siletz is 217, of which about
150 are Tribal members. The casino, hotel and golf course employ 799 people (March 2025). The
casino averages 13% Tribal member employment at Chinook Winds. The combined
employment of Chinook Winds Casino and the Tribal Administration make the Tribe the
largest employer in Lincoln City in 2018 with over 1100 employees.
Lincoln County unemployment rates have fluctuated from 3.8% in September 2018 to 5.6 in July
2025. There is a significant amount of seasonal employment in the tourist-based industries that
affect these fluctuations. Lincoln County continues to experience population growth, and
annual averages in employment continue to rise. While there has been growth in the nonmanufacturing sector of the economy, that more than offsets the declines in manufacturing
employment, pay levels in the new jobs do not match those in manufacturing.
Physical Characteristics
Topography
The reservation is located in Oregon's long narrow Coast Range that is characterized by hilly
and low mountainous land. Heavy rainfall in this area contributes to dense forest and
numerous perennial streams. The elevation of trust land in Siletz ranges from approximately
150 to 250 feet above sea level.
Climate
The climate of the area is influenced by the Pacific Ocean and characterized by mild winters and
cool summers. The warm season lasts for 3.4 months, from June 16 to September 30, with an
average daily high temperature above 64°F. The hottest month of the year in Siletz is July, with
an average high of 67°F and low of 52°F. The cool season lasts for 3.0 months, from November
21 to February 20, with an average daily high temperature below 52°F. The coldest month of the
year in Siletz is December, with an average low of 39°F and high of 49°F.
Average annual precipitation is in excess of 100 inches. It is not uncommon for winter storms to
drop 2-3 inches of rain in a 24-hour period and sometimes as much as 4 inches.
Construction Characteristics
There are no major physiographic factors that adversely affect road construction on the
reservation. However, proper attention to roadway drainage is necessary in design because of
the large amount of annual precipitation and resulting wetlands in some areas.
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
15
Land Use and Development Plans
Existing Land Use
Land use on the reservation is a mixture of rural residential, forest land, and commercial
property (casino/resort). Tribal administrative offices and the majority of the residential
development are located in Siletz; the majority of the commercial activity within the reservation
is located in Lincoln City. CTSI also has commercial property in Salem including a flex-space
building (part of the space is utilized for the Tribe’s Salem Field Office) and an RV Park.
Development Objectives
Based on a current, ongoing community planning effort and on the Tribe’s Comprehensive
Plan, community goals and objectives directed toward land use and development goals include:
Goal: Community Facilities
To provide the improvement of existing, or development of future, community facilities.
Goal: Housing
To assist in acquiring standard housing for tribal members.
Goal: Natural Resources
To protect, acquire, and develop, tribal natural resources.
Goal: Recreation
To further develop recreational activities for tribal members.
Goal: Transportation
To develop more efficient means of transportation with the Siletz Tribe.
Goal: Land
To increase and develop the Siletz Tribal Land Base.
Purchase land on the coast with particular emphasis on original reservation lands and
the Siletz area
Purchase more timber lands
Restore the lands that were improperly removed in 1865
Continue to purchase land and small enterprises along the coast
Buy or negotiate for Oak Flats property (was purchased and developed)
Get the Salem property developed (has been developed)
Purchase more timber property for hunting, berry picking and nature viewing
Buy all available land in Siletz
Purchase more property for future homes and businesses
Land for housing in service area
Purchase school property
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
16
Development Plans
A summary of current tribal development plans follows.
Housing
Additional housing is planned for two locations in Lincoln City. The Neachesna housing area
has expanded, including construction of a new road. Housing is also planned for the Mast
Avenue property.
The Tribe has also indicated that they are looking at housing needs of tribal members who live
outside of Lincoln County, primarily in the Willamette Valley area, but no specific sites have
been identified.
Tribal/Community Facilities
With the exception of the tribal field offices in Portland, Salem, and Eugene, tribal facilities have
been centered in Siletz. These include the Tribal Headquarters Buildings, Commodities Building
and Motor Pool, Fitness Center, Child Care Facility, and Wellness Center. A new recreation
center is currently under construction at the west end of Swan Ave. and is anticipated to be
completed in the fall of 2025.
Economic Development
The Tribe owns various land parcels in the Siletz commercial area, but specific development
plans are not known at this time. CTSI also has a large undeveloped parcel next to their RV Park
in Salem, just off the I-5 and US 99 interchange. The Tribe is developing a plan for a gaming
facility on the site in which all the Oregon tribes would participate, and the development will
require major transportation improvements. In addition to this property, CTSI and the Grand
Ronde Tribe jointly own a large commercial property just south of the Kaiser Station shopping
center at the I-5 interchange in Kaiser.
Historical/Cultural Sites
Government Hill is an important historical and cultural site for the Tribe. It is the focal point of
tribal activities and symbolizes cultural traditions. Most importantly, it is the site of the Paul
Washington Cemetery which is sacred to the Tribe. A 6,000
s.f. Tribal Community Center was constructed in the early
1980’s. Government Hill is also the site of the Powwow
Grounds, and an artifact storage and art studio was
constructed several years ago.
A 23,000 s.f., two-story Cultural Center/Museum, designed
specifically for preservation and archiving of cultural and
historic material as well as for research and study, is
planned for construction next to the new Recreation Center on Swan Ave. in Siletz.
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
17
Other historical cemeteries are in the general Siletz area, but at the present time none are on
reservation lands. The Tribe has a cemetery in Lincoln City that is in trust and one in Otis that is
in fee status. The Tribe also owns a cemetery off Moonshine Road that is owned in fee status.
No cultural or historical sites are affected by existing roads or proposed improvements. Any
new roads constructed in the future, however, will require archaeological clearances, including
surveys. Depending on the circumstances, a minimal records search could constitute a survey.
Implementation Measures
The Tribe’s current comprehensive plan (2005-2015 Comprehensive Plan, adopted July 22, 2005)
set out goals and objectives and is the official guide for decisions pertaining to development
over the 10-year planning period. The Siletz Tribal Code includes housing and other ordinances
to direct and control development on tribal lands.
For example, the Tribal Housing Ordinance (Siletz Tribal Code §13.200) extends jurisdiction
over all buildings and land intended for human dwelling on the reservation or on lands owned
or held in trust by the tribe. And, a Tribal Cultural Resource Lands and Sacred Sites Ordinance
(Siletz Tribal Code §9.001) provides procedures to inventory, protect, preserve and manage
cultural resource lands and sacred sites, and other historically or culturally significant sites,
lands, and resources.
Traffic Control and Enforcement
As detailed in the Tribes’ 2016 Annual Report, a city/tribal task force was successful in passing a
measure in the May 2016 primary election to create a special district for enhanced law
enforcement services from the county. The measure also provided a permanent tax rate to fund
half the cost of law enforcement. The Siletz Tribe pays the remaining half of costs through a
five-year agreement with Lincoln County commissioners.
Services began Nov. 1, 2016, provided by the Lincoln County Sheriff’s Office, and include
Traffic Law Enforcement and investigation; criminal law enforcement and investigation;
security on request for Tribal Court hearings and Tribal Council meetings; enforcement of
Tribal Court Orders (including protective orders, temporary restraining orders and permanent
injunctions); court appearances; transportation of arrested person to the Lincoln County jail;
records and evidence keeping; and participation with interagency law enforcement groups. The
enhanced services are the equivalent of two full-time patrol deputies performing enhanced law
enforcement services for 52 weeks annually.
Transportation Funding Sources
To assist the BIA and tribal government in preparing a consistent and realistic approach to road
construction and preservation, an understanding of the funding sources and the potential
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
18
application of these resources is necessary. Once the funds are identified, knowledge of their
distribution method is also beneficial.
Construction and Maintenance
Funding for construction and maintenance of the TTP Road System comes from the Federal
Lands Highway Program (TTP Funds and/or Discretionary Funds). With the passage of the
MAP—21 Act in July of 2012, the funding distribution formula was changed by statute. In 2021
the MAP-21 act was then superseded by the FAST Act (December 2016), though it left the
formula in place. The FAST Act was, in turn, replaced with the Infrastructure Investment and
Jobs Act (IIJA) in 2021, which continued to use the same formula. There are three basic
components to the formula: population, road miles, and the percentage of the tribe’s regional
share based on the average tribal share received from 2005 through 2011.
+
Population: Population is based on the most recent NAHASDA population for each tribe and
will count for 39% of the distribution formula.
+
Road Mileage: Road mileage is based on the FY 12 TTP road inventory and will count for 27%
of the distribution formula. Road miles will be based on roads owned by the Tribe and the
BIA and any “Grandfathered” road in the inventory prior to October 1, 2004. Grandfathered
roads apply only to the states of Alaska and Oklahoma.
+
Average Share 2005-2011: This average share will count for 34% of distribution formula. This
share is the tribe’s percentage of the BIA Regions Share based on the average Relative Need
Distribution Factor and Population Adjustment Factor received by the tribe from 2005 to
2011.
There is also a provision for Tribal Supplemental Funding for tribes that receive less than the FY
11 funding in order to attempt to keep tribes at their FY 11 funding level.
There was also a 4-year transition period of 20% each year. In essence, for FY 13, 80% of the
tribal share was based on the amount allocated to each tribe for FY 11 and 20% was based on the
new formula. For FY 14, the ratio was 60% on the old formula and 40% on the new formula. FY
15 was a 40% and 60% ratio, and FY 16 the ratio was 20% and 80%. Changes to the formula were
not proposed for MAP—21, the FAST Act, nor the IIJA.
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
19
3
EXISTING TRANSPORTATION SYSTEM
Public Transportation
Transit
Lincoln County Transit (LCT)
LCT is the primary transportation provider in the region, providing fixed route and dial-a ride
services to and from communities within the county, including transportation for disabled
persons and senior citizens. Lincoln County Transit serves several communities, including:
+
Yachats
+
Waldport
+
Newport
+
Toledo
+
Siletz
+
Depoe Bay
+
Lincoln City
+
Otis
+
Rose Lodge
Lincoln County Transit operates several bus routes – the East County, the North County, and
the South County routes. In addition to the three intercity routes, LCT also has a Lincoln City
Loop, a Newport Loop, a Coast to Valley Express Bus, and coordinates with the North by
Northwest Connector through the intercity routes. Dial-A-Ride services are also provided,
offering curb-to-curb coordinated and accessible transit services. All vehicles are ADA
accessible.
Fare for LCT is based on zones, where travel within each zone is $1 per ride.
LCT’s intercity routes provide access to CTSI through the East County and Blueline routes. East
County route allows for deviated service pickups that are scheduled at least 30 minutes in
advance and do not deviate more than ¾ mile off the scheduled route. Transit stops include
tribal locations such as the Siletz Clinic, the Rec Center, and Fire Station. This route has service
Monday through Sunday, with some locations on an as needed basis. For location with an as
needed basis, riders can call to request a pickup. LCT also serves the Chinook Winds Casino via
the North County route.
CTSI contracts with Lincoln County Transit for scheduled public transit service. Through a
federal Tribal Transit grant, the Tribe contracts with Lincoln County Transit to greatly expand
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
20
the services available to Tribal members (and other community members) in Siletz and along
the most frequently traveled corridors stretching from Toledo to Newport to Lincoln City. As
part of the agreement with the county, Tribal Members can ride for free on county buses by
showing their Tribal ID.
Veterans Transport Service
The Disabled American Veterans service organization operates a transportation network at each
VA medical center throughout the country to provide transportation to veterans who are unable
to get to VA appointments on their own.
Siletz Tribe
The Siletz Tribe offers transportation services for members in addition to LCT. The Siletz Tribal
Transit System (STTS) Committee is the transit advisory body for Tribal public transit
programs. Members of the committee include a representative from the Tribal GSA Program,
Elders Program, Clinic, Planning and Lincoln County Transit. The Veteran’s Coordinator is
also an invited member.
Through a network of tribally owned vans and buses, Tribal members receive transportation to
scheduled group activities, congregate meals for Elders, medical appointments and other
destinations for which other public or private transportation services are not readily available.
These services are available on an as-needed basis in Lincoln County and at each of the three
Tribal area offices (Portland, Salem, and Eugene). These services are scheduled through various
Tribal programs, including Elders, Health Services, Employment, Culture, and Education.
For Tribal non-emergency medical transportation, Siletz will provide transportation for enrolled
Siletz tribal members as a last resort. To determine eligibility and availability for transport
services, Siletz tribal members must call the transport hub at least 48 hours in advance.
Transportation provided by the Elders Title VI Program is to transport meals and to meet the
basic needs of Elders by transporting them on errands, should there be no other resources
available. To schedule transportation, Siletz elders are to contact their Area Rep. Based on
funding availability, when an Elder is able to use public transportation and it is more costeffective than hiring a transporter or for Program staff to transport, the Title VI program may
purchase bus tickets or a monthly pass so the Elder can conduct their personal business.
At Siletz, the Tribe has a 14-passenger shuttle bus used mostly for Elder transport. The bus,
which provides curb-to-curb service, has only two regularly scheduled transports monthly:
shopping and the quarterly Elders Council Meeting. Elders’ caregivers are allowed to ride on
the bus. Children are allowed only by agreement of the bus passengers.
The majority of transportation service is for medical care at the community clinic through
Indian Health Services. The clinic transports low income and elderly tribal members and
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
21
dependents (children only), using 3-4 paid drivers in vehicles leased from the U.S. Government.
Each tribal Field Office (Portland, Salem, and Eugene) has a shuttle bus for Elder transport.
Chinook Winds Casino
The Chinook Winds Tribal Casino runs six 18-21 passenger, handicap-equipped shuttle buses
which transport casino employees (tribal and non-tribal members) to Lincoln City via US 101
and SR 229 on three routes daily corresponding with shift changes at the casino. A separate
shuttle is used to transport casino customers to and from motels and businesses in Lincoln City
only.
Other Transit Service
Other regional transportation services include county fixed route service, dial-a-rides, and taxi
service. Some local community service organizations in Lincoln County support transportation
through their various programs, such as bus passes, gas vouchers, and personalized
transportation for those unable to use Dial-a-Ride.
Air Service
The Newport Municipal Airport provides for general aviation. The closest regional hub for
commercial air passenger service is located at Portland International Airport approximately a 3hour drive from Siletz. Three other general aviation airports are located within Lincoln County.
These are the Toledo State Airport in Toledo, the Gleneden State Airport south of Lincoln City,
and the Waldport State Airport south of Waconda Beach. General aviation facilities are
available in Corvallis, and Eugene is also served by nine airlines.
Rail Service
Amtrak passenger services are not immediately available in this area. The nearest Amtrak
facilities are in Salem, Albany, and Eugene, each about a 2-hour drive east of Siletz. Freight
service, via the Portland and Western Railroad is available at Toledo, a few miles south of Siletz.
The Portland and Western provides one round trip train per weekday and connects with the
Union Pacific at Albany and at Eugene. The rail line passes through the Tribe’s Toledo
Riverfront Industrial Site. One siding is available on the site for loading rail cars.
Bicycle Routes
US 101 is designated the “Oregon Coast Bike Route” as a bicycle tour route, although all state
routes are open to bicycle use. There are no bike routes in Siletz nor are there any designated
bike paths on any of the BIA routes. As the Tribe/BIA/others construct new public roads with
higher traffic volumes, consideration will need to be given to providing wider shoulders to
accommodate bike lanes.
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
22
Public Road System
Tribal Transportation Program (TTP) Road System
The current 2026 BIA RIFDS database shows the “Official” Siletz Reservation TTP System is
composed of 133.4 miles of State, BIA County, City, and Tribal roads. This is the system which
is the basis for the current funding formula. The existing system by jurisdiction is as follows:
State
County
City
BIA
Tribal
Other
67.9 miles
42.7 miles
12.3 miles
4.3 miles
5.5 miles
0.7 mile
The proposed 2026 TTP system, as shown in Figures 3-1 and 3-2 and Table 3-1, expands the TTP
system to a total of 140.5 miles, including 4.1 miles of proposed roads as follows:
State
County
City
BIA
Tribal
Other
67.9 miles
42.7 miles
13.8 miles
4.3 miles
11.0 miles
0.7 mile
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
23
CONFEDERATED TRIBES OF SILETZ INDIANS
TTP ROUTES
PORTLAND - SEE MAP 3-6
CLARK
WASHINGTON
CLACKAMAS
Portland
MULTNOMAH
COWLITZ
§
¨
¦
I-5
LINN
MARION
SALEM - SEE MAP 3-6
§
¨
¦
I-5
COLUMBIA
Salem
§
¨
¦
WASHINGTON
Eugene
I-5
EUGENE SEE MAP 3-6
OREGON
£
¤
YAMHILL
20
WAHKIAKUM
£
¤
LANE
20
POLK
COLUMBIA RIVER
§
¨
¦
I-5
BENTON
OVERALL SILETZ AREA- SEE MAP 3-2
CLATSOP
£
¤
20
TILLAMOOK
Astoria
PACIFIC
Warrenton
£
¤
TRIBAL
HEADQUARTERS
101
LINCOLN
Î
Í
Siletz
Toledo
229
Lincoln City
Newport
Waldport
PACIFIC OCEAN
Washington State Department of Transportation, Earthstar Geographics
0
CITIES
STATE CAPITOL
STATE BOUNDARY
5
10
Miles
COUNTY BOUNDARIES
CTSI LANDS
FIGURE 3-1
OVERALL CTSI TTP
CONFEDERATED TRIBES OF SILETZ INDIANS
TTP ROUTES
E LODGSDEN ROAD
22411
POLK
BENTON
HATCHERY AREA SEE MAP 3-5
OREGON
MOONSHINE ROAD
2307
TILLAMOOK
BANKS
PROPERTY SEE MAP 3-5
OR ROUTE 229
1229
SILETZ
SEE MAP 3-4
Siletz
20
TOLEDO
SEE MAP 3-5
LINCOLN
WALDPORT
SEE MAP 3-3
Toledo
Î
Í
LINCOLN CITY
SEE MAP 3-3
£
¤
229
£
¤
101
Lincoln City
£
¤
101
£
¤
101
US 101 HWY
1101
£
¤
101
Newport
£
¤
Waldport
101
PACIFIC OCEAN
£
¤
101
£
¤
101
Earthstar Geographics
0
3
Miles
CTSI Lands
US 101
1101
NON-TRIBAL/BIA ROUTE NAME/NUMBER
COUNTY BOUNDARIES
SWAN AVE
T940
TRIBAL/BIA ROUTE NAME/NUMBER
CITIES
CTSI TTP ROUTE
FIGURE 3-2
OVERALL: LINCOLN CITY, SILETZ,
WALDPORT, TOLEDO
AVE
EP
HY
R
CT
OYAG
E
NE
Z
NE V
ST
50
TH
NE F
AVE
NE
GA
VE
NE
HA
VE
NE
I AV
E
NW P
LINCOLN
AC
TERR IFIC SHORE
ACE
RESORT
NE
DR
MA
R
NW
E
£
¤
101
NEACHESNA HOUSING SUBDIVISION
....................
9020
EV
D
E
NE C AV
VILS LAKE RD
E
K
LA
S
IL
D
NE JOHNS
LOOP
EV
NE WEST DE
DR
RF
SU
NE
D
AY
R
NM
LN
LE
TT P
LI O
E Y LO
N
BA
AL
34
US
FS
OE
LITTLE
SWITZERL
AND RD
EB
U
LIM RNT
BL
N
E BARC
LAY
MEADO
WS RD
89
RD
E ECKMAN CREEK
WY
E JOHNSON
WAY
SE
CO SHA
VE DY
LN
TLINE
DR
SE ROLP SE HOSPITAL
H CT HILL
SW CREST
CIR
SW FOREST
PKY
SW FLANSBERG RD
SW WIL
SON DR
SW
BE WA
AC KO
H R ND
SW ANN ST
A
D
ELA PL
ER
AL
AN
E C EK RD
E
CR
SW KAM
AH
DR
SW SURF
PINES LN
S CRES
NW ALSEA
BAY DR
SW
BA LA
RR
E
DR
SW PAC
IFIC
COAST H
WY
PACIFIC OCEAN
LS
E
IN
RD
EA
BA
US
FS
RD
E
AN
CR DA
UD RD
EE RK N S EK
E
K Y
CR
RD
E
S LOOP
FS
ER
D
RD
E BALE
US
AST
L
EK
RE
YC
Miles
RIVER
E
ISL
SW D
AHL
AVE
1
Vantor
ER
SW IRIS LN
CT
SR 34 ALSEA HWY
S034
EC
N
ISKI L
0
SE LUCY LN
SE NELSON
WAYSIDE DR
ALSEA
SE KE
Vantor
2,500
Feet
D
EN
1,250
RD
GA
SE AY
LSEA
W
NE A
HWY
RT
PO
LD DR
WA S
T
H
NE
G
I
HE
OW
ILL ST
W
A
SE Y
A
SW W OP
LO
TH D
R
NS
ST
JOH
NE
NE 38TH
NE
ME
Y
WA
CTSI TTP ROUTE - PROPOSED
NA
NE 3
6
NE JOHNS RD.
9998
NE 41ST ST
CT NE 40TH ST
0TH
NE 4
T
DS
2N
Waldport
R
FAI
SW
CIR
CTSI TTP ROUTE
ET
NS AY
W
COUNTY BOUNDARIES
4
NE
NW PINE ST
SU
0
CTSI Lands
UN
SW SITKA
RIDGE CT
SE MAST AVE
U611
SWAN AVE
T940
ROUTE
W
AY
1
10
NW
£
¤
101
US 101
1101
IN
N
SW
P
VIE ACIFIC
WS
T
NW
NE W. DEVILS LAKE
RD. 2010
NW PORT
AVE
900
Feet
101
CITY OF WALDPORT£
¤
NE 14 ST
U612
CITIES
NW MAST AVE
NE W. DEVILS LAKE RD
2010
450
NW LEE
AVE
0
US101
1101
NW 40TH ST
NW 39TH ST
NW KEE
L
AVE
LINCOLN
NW JETT
Y AVE
£
¤
NW 40TH ST
U602
PL
RD
0TH
4
NW
US 101
1101
NE 43RD ST
N
H
JO
NE
NW 40TH PL
U604
101
VE
SA
NE D A
VE
IL
D
LA
K
KE BLV
101
T
NE 49TH ST
NE E
AVE
H ST
T
NE 45
0TH
S
N
NE 47TH ST
ILS LA
S
T
HS
47T
ST
NE 5
DR
OTSU
E NE
V
NE DE
NW
44
ST
48
TH
NE 47TH ST
U610
NE
NE
PL
TH
NE 50TH ST
T620
NE DEVILS LAKE BLVD
U603
CT
9TH
NE 4
VE
KA
NW
NW 44TH ST
U608
R
RD
MA
RA
MI
NE ZEPHYR CT.
T622
T
51S
NE
P
LOO
NW 51ST ST
NE
LO 46T
OP H
NW
MI
RA
NW
NW MIRAMAR DR
9988
LOO
P
4TH
PACIFIC OCEAN
DR
NW 50TH ST
P NW LOGAN RD
L
N
L
U601
LINCO
4
NW
NW PORT DR
U609
1ST
NW BELL CT
ST
51
NE
5
NW LO
GAN RD
NW KEEL
AVE
AVE
TTY AV
E
NW JE
LEE
NW
ND DR
RD CT
NE
101
NW 52
NE 53
GE
YA
VO P
NE LOO
£
¤
PACIFIC OCEAN
101
PL
£
¤
R
3RD D
NW 5
RT
SEE INSET CITY OF LINCOLN CITY, NORTH
NE PORT LN
PO
CITY OF LINCOLN CITY, NORTH
NE
CITY OF LINCOLN CITY OVERALL
NE NEPTUNE'S LN
CONFEDERATED TRIBES OF SILETZ INDIANS
TTP ROUTES
Earthstar Geographics
53
NON-TRIBAL/BIA TTP ROUTE NAME/NUMBER
TRIBAL/BIA TTP ROUTE NAME/NUMBER
NON-CTSI TTP ROUTE
FIGURE 3-3:
LINCOLN CITY, WALDPORT
CONFEDERATED TRIBES OF SILETZ INDIANS
TTP ROUTES
CITY OF SILETZ
DE
WA
RD
JUDD RD - OLD RIVER RD
CUTOFF
T555
R
NE
OLD
E
RIV
JUDD RD.
2
RD
ROGUE RIVER CT
4006
TOOTOOTNEY CT
4007
TOOTOOTNEY CT
NE BAGLEY ST
R ST
SE P
ALM
SE BAGLEY ST
PALM
E
ER S
T NE
ST
ER
SWAN AVE
T940
TAKELMA CT
CT
SHASTA
HEALTH CENTER
SERVICE RD.
T962
CEMETERY RD.
.
4008
TOLOWA CT
4002
LOWA
SE TO
CT
COMMODITIES
. ................ RD.
T994
RD
R
TRIBAL
HEADQUARTERS
996
RIV
E
LO
GS
SR 229 SILETZ HWY
1229
SW DARCY AVE
TZ
DE
N
SIL
ETZ
SW FERRY AVE.
U993
SW
SCARLET EXTENSION
T515
HEALTH CENTER
RD T960
SE SWAN AVE
SE TOLO
WA CT
NW GRINSTEAD ST
NW TENA'S CT
ED
RE
SE
229
SW BENSELL ST
SW EMERALD ST
RD
RD
SW SC
ARLET
ST
GSDE
N
UT
-SH
SE BAGLEY ST.
U991
E LO
TAKELMA CT
4001
EE
TENAS EXTENSION
T525
CHETCO CT.
4005
GW
UMPQUA EXTENSION
T520
R
UE
ROG
GWEE-SHUT RD
0900
RD
FERRY TO SWAN AVE.
960
SW FERRY AVE
Siletz
ELDER HOUSING RD.
T999
SE EG
BERT
AVE
W. RD TO NEW RD. BETWEEN
FERRY AND SWAN
T545
NEW RD. BETWEEN
FERRY AND SWAN
T540
CHETCO CT
PEDESTRIAN PATH
410
RY
SW SWAN AVE
T
RC
IVE
D
R
GOVERNMENT HILL RD
LL
.................
1
HI
.
T
N
ME
RN
VE
O
G
E
ET
A'S ST
W BUFORD AVE
NEW RD. E. OF
TILLAMOOK
965
E. LOGSDEN
2411
NE METCALF AVE
M
CE
SW TEN
TILLAMOOK
995
NE
SW MOLALLA ST
R
BUFORD AVE.
U992
SHASTA CT
4004
JUDD RD
MF HOUSING B
T998
KD
SW UMPQUA ST
TRIBAL
ENTERPRISE LOT
T505
TAKELMA CT.
4001
R
PA
E. RD TO NEW RD. BETWEEN
FERRY AND SWAN
T630
CT
LL
UMPQUA EXTENSION
T520
SE SWAN
AVE. U940
IL
LO
W
MI
SWAN AVE
T940
MF HOUSING A
T997
W
NE
NW JAMES FRANK AVE
UMPQUA CT
950
NW
JAMES FRANK RD.
999
MOLLALLA CT
910
NW A ST
BUFORD AVE.
992
NW B ST
NEW LOOP W. OF
UMPQUA 970
NW C ST
JAMES FRANK RD.
C409
RD
FRED TAYLOR RD
R
VE
RI
LE
SI
Microsoft, Vantor
0
375
750
Feet
CITIES
US 101
1101
NON-TRIBAL/BIA ROUTE NAME/NUMBER
CTSI LANDS
SWAN AVE
T940
TRIBAL/BIA ROUTE NAME/NUMBER
CTSI TTP ROUTE - LOT
CTSI TTP ROUTE
CTSI TTP ROUTE - PROPOSED
ROUTE
NON-CTSI TTP ROUTE
FIGURE 3-4:
CITY OF SILETZ
CONFEDERATED TRIBES OF SILETZ INDIANS
TTP ROUTES
BIG
CR ROC
EEK K
RD
HATCHERY AREA
SE
CITY OF TOLEDO
ON
M
AM
RD
SEE INSET HATCHERY
SE C
RD
BANKS PROPERTY
BRUSH CREEK RD.
T518
L
HP
ST
16T
RIDGE
IN
U
ELK CITY RD
RI
VE
R
SE
A
SE BU
TLER
B
RD
GE
YR
ID
Toledo
NN
R ST
SU
SE ELDER ST
SE FI
Q
HO
LL
SE GAITHER Y ST
WAY
TRP INDUSTRIAL RD
5321
YA
SE 7TH ST
SE
SE 8TH ST
SE 5TH ST
ST
SE 4TH ST
SE 2ND ST
LN
OIR
NE CHERRY
NE 8
T
RV
SE DOUGLAS ST
SE CEDAR ST
RD
SE 9TH ST
NE
ST
DR
1,500
Feet
E
NE N
RE
SE
LN
SE 3RD ST SE 3RD
NE
750
DIE
AN
NE 2ND ST
I
YL
0
H ST
GE
DR
NE
C
LOR
MAX ANY
PL ON
RID
NE
SS
GE
TH
10
R
BU
SK
R
RD
PL
NE
DIA
D
ON RD
NE WAG
OP LN
NE HILLT
NE 10TH
N RD
NE WAGO
RCA
NE
NE A
RD
OPE
T SL
EAS
E
N
PE
SLO
AST
SE E
SE OLSON RD
OPE RD
SE EAST SL
NE MEA
DOW
E
LO CLAR HILL DR
OP
K
DR
P N
RI ST
R
BY
RD
E. LOGSDEN
EK RD.
2411 CRE
R
EE
ST
TRP ACCESS RD
5322
T
SE KAU
LE D
NEL
OP
SE STURDEVANT RD.
532
DC
DO
20
Y LO
ERA
L
SE
OSS
FIR
SE DR
EST
RD
NE M
SE E
M
SE RIVER RD
SE
18T
H
N
SE
NE MOSSY LN
D
R
NT
EVA
RD
STU
SE 14TH ST
D
SE 10TH ST
VA
NT
R
SE HILLVALE LN
RD
E
CR
DE
GS
LO
PL
ST
U
SE 6TH ST
T
NE
LDER
SE A Y
WA
UR
DE
VA
N
LN
EN
OR
L
SE LAV
SE
ER
SE NE DR
CR FIR
ES
WA T
IER
LL
Y
CO
SE AVE
D
ER R
ST
SE ALDER
LANE DR
EST
HED
NE
SE PINE ST
RD
Vantor
HATCHERY
HATCHERY RD.
T528
S. NORTON HILL RD.
T542
NORTON
RD
E. LOGSDEN RD.
2411
LOGSDEN RD
S. NORTON HILL RD.
C416
HATCHERY ACCESS RD.
T529
BANKS ACCESS 1
T560
E. LOGSDEN RD.
2411
SIL
ET
SA
MS
0
1,250
2,500
Feet
CITIES
CTSI LANDS
CTSI TTP ROUTE
CTSI TTP ROUTE - LOT
Vantor
RD
VILLE
NASH
US 101
1101
NON-TRIBAL/BIA ROUTE NAME/NUMBER
SWAN AVE
T940
TRIBAL/BIA ROUTE NAME/NUMBER
ROUTE
NON-CTSI TTP ROUTE
ZR
IV
ER
LO
G
SD
EN
RD
BANKS ACCESS 2
T565
CR
EE
K
0
RD
300
600
Feet
Vantor
0
250
500
Feet
FIGURE 3-5:
TOLEDO, HATCHERY AREA
Microsoft, Vantor
SWAN AVE
T940
TRIBAL/BIA ROUTE NAME/NUMBER
STATE BOUNDARY
CTSI TTP ROUTE - LOT
155TH
154TH
HOOD
MACADAM AVE-I5 FWY
AVEKELL
Y AV
E
MACA
DAM
MACADAM
KELLY
I5
147TH
CORBETT
WATER
155TH
I405 FWY-I5 FWY
WATER
CORBETT
144TH 144TH
143RD
NAIT
O
NAITO PKY FRONTAGE
PKY PKY-NA
I
FRO
NTA TO
GE
NAITO
KELLY
AVE-ROSS
ISLAND BRG
NAITO
NAITO
PKY-ROSS
ISLAND BR
G
1ST
ALMADEN
FILLMORE
FILLMORE
CHAMBERS
GRANT
GARFIELD
8TH
BROADWAY
BROADWAY
PRIVATE
9TH
9TH ROAD
10TH
10TH
10TH
GRANT
HAYES
GARFIELD
ARTHUR
11TH 11TH 11TH 11TH
11TH
PR
12TH
IVA
FIELD
TE
RO EUGENE
12TH
AOFFICE
12TH 12TH 12TH
D
T701
PRIVAT
13TH
E ROAD
13TH
H
14TH
15 14T
Vantor
1
TH
4TH
14TH
PRIV
AT
ROA E
D
MCKINLEY
PRIVATE ROAD
CITY VIEW
PRIVATE
ROAD
PRIVATE
ROAD
ACORN
PARK
WILSON
WILSON
OAK PATCH
BUCK
7TH
8TH
W. 11TH ST.
U011
14TH
7TH
7TH
MCKINLEY
WILSON
CONGER
SENECA
TYINN
10TH
PRIVATE
ROAD
PRIVA
PRIVATE
TE
ROAD 13TH ACORN PARK
E ROAD
T
PRIVATE PRIVA
A
PR
TE
RIV
P
IVA
BUCK 13TH
ROAD
D
ROAD
ROA
RO TE
AD
PRIVAT 14TH
PRIVATE
E
ROAD
ROAD
FETTERS
15TH
15TH
PRIVATE
ROAD
PLUMTREE
PRIVATE
ROAD
13TH
PHANTOM
H
7T
HAYES
MARKET
PRIVATE ROAD
PRIVATE ROAD
PRIVATE
ROAD
BAILEY HILL
OBIE
DANI
LOGAN
OCEAN
WALLIS
JANISSE
PHANTOM
POWERS
NOLAN
CTSI TTP ROUTE - PROPOSED
INTERIOR
LANCASTER
39TH
38TH
BERTELSEN
DANEBO
RICHARD
D
OSCAR
38TH
38TH
LILAC
RT
LA
N
PO
AL
E
ND
NA
37TH
154TH
146TH
151ST
142ND
140TH
148TH
141ST
140TH
140TH
137TH
139TH
136TH
135TH
138TH
3RD
S
PU
M
CA
OOL
SCH
IAN
IND
NILES
153RD
143RD
133RD
NAITO PKY
FRONTAGE
4TH
ON
KS
JA
C
SA
M
CH
NB
AWA
RD
HEM
SB C
SB INTERSTA
TE
NB INTERSTAT 5
E5
E
RIDG
123RD
PA
RK
PY
LEM
D NB SA
AW
AR
PY
AW
A
RD
SB
SA
LE
M
RIDGE
EM
CH
SB
EM
RANDY PAPE BELTLINE
RADIANT
ST CROIX
EM
SA
L
D
22N
Y
STATE CAPITOL
6TH
BUCK
NON-TRIBAL/BIA ROUTE NAME/NUMBER
NON-CTSI TTP ROUTE
Vantor
§
¨
¦
7TH
ATE
PRIV AD
RO
US 101
1101
ROUTE
WHITAKER
E
AT
IV
PR AD
RO
CTSI TTP ROUTE
AD
CITIES
PRIVATE
ROAD PRIVAT
E
ROAD
11TH
PRIVATE ROAD
1,500
Feet
PRIVA
TE
ROAD
TE RO
PRIVA
0
PRIVATE
ROAD
PRIVATE ROAD
PRIVATE
ROAD
Vantor
12TH
13TH
E
PRIVAT
ROAD
RD
IBIS
WA
RIA
D
R
ND
O
AST
TLA
OR
NESTOR
LDS
CE
P
NB
ASTORIA ST.IVY
U930
IVY
PRIVATE
ROAD
NO
MER
STEPHENS
PORTLAND
HQ LOT
T500
I5 FWY-I405 FW
CE
PRIVATE
ROAD
STEWART
ER
COM
W
IL
CR LOW
EE
K
HAYESVILLE
STEWART
MM
REY
PHYLLIS
CO
7TH
SAM
PORTLAND BYPASS
937
GIBBS
I-5
E
VAT
PRI D
A
RO
EVANSTON
I5
PRIVATE ROAD
SALEM HOUSING
MICHEL
935
............
ISABELLE
PRIVATE
ROAD
EUGENE
I-5
FWY
BLOSSOM
§
¨
¦
HOOD AVE-I5
300
Feet
FWY
150
D
AME
0
M
O
BLOSS
1,200
Feet
UNN
BLOSSOME DR. NE
C700
TRIBAL OFFICE LOT
T510
WHITAKER
I5 FWY-HOOD AVE
D
BLV
BUR
BAR NTAGE
FRO
BLOSSOME DR. NE
U932
US
GROVER
ND BRG-I5
GIBBS
ROSS ISLAND
Y
LL
Y
FW
GIBBS
5
-I
KE
PORTLAND
SW FIELD OFFICE
YAMHILL
ROSS ISLA
G
BR
BUR
MP
CA
CTSI LANDS
WOODS
NAITO
PKY-RO
S
ISLAND S
BRG
OVER
MORRISON
Vantor
D
GROVER
SW 1ST AVE.
U505
SW GIBBS ST.
U500
ASTORIA
TAYLOR
N
LA
INDIAN SCHOOL RD.
U920
WHITAKER
600
ROS
BRG S ISLA
N
-NA
ITO D
PKY
ALDER
ALDER
YAMHILL
TA
YL
OR
IS
WOODS
R
I-5
0
TAYLOR
UNNAMED
GR
§
¨
¦
KEIZER
WOODS
BAR
EM
CH
D
AR
AW
SALMON
TERWILLIGE
NB
CHEMAWA RD. NE
U910
TAYLOR
MORRISON 151ST
SS
UNNAMED
L
YAMHIL
TAYLOR
SALMON
SW PORTLAND
OLD
CHEMAWA CH OLD
EM
AW
A
CHEMAW
A
OLD CHEMAWA
1,000
MAIN
Feet
MORRISON
ALDER
MACADAM
Y
AVE-I5 FW
OLD A
MAW
CHE
500
ALDER UNNAMED
RO
SALEM
0SALMON
SALMON
NAITO
PKY-ROSS
ISLAND BRG
Miles
TAYLOR
120TH
3
114TH
Washington State Department of
Transportation, Earthstar Geographics
SE 128TH
MORRISON U128
ALDER
ALDER
149TH
0
TH
114
131ST
ALDER
ALDER
156TH
MORRISON
SE
STARK ST.
WASHINGTON
U960
WASHINGTON
YAMHILL
SEE INSET SW PORTLAND
142ND
127TH
126TH
PORTLAND
FIELD OFFICE
T702
153RD
Portland
114TH
MULTNOMAH
ALDER
134TH
SEE INSET NE PORTLAND
UNNAMED
OAK
STARK
131ST
WASHINGTON
UNNAMED
R
OAK
2ND
§
¨
¦
VE
129TH
OR
I-5
PRIVATE
ROAD
PRIVATE
ROAD
RI
141ST
PORTLAND
NE FIELD OFFICE
130TH
TE
128TH
ET
122ND
M
OAK
119TH
LA
IVER
117TH
IL
NE PORTLAND
IA R
115TH
W
WACLARK
UMB
ASH
COL
PORTLAND
ANKENY
CONFEDERATED TRIBES OF SILETZ INDIANS
TTP ROUTES
FIGURE 3-6:
PORTLAND, SALEM, AND
EUGENE
Table 3-1
Siletz Reservation
Indian Reservation Road System Summary
2026
Road
Owner
Existing
BIA Rt.
I.D. No.
BIA
1
BIA
BIA
BIA
BIA
BIA
BIA
BIA
BIA
BIA
BIA
BIA
CTSI
CTSI
CTSI
CTSI
CTSI
CTSI
CTSI
CTSI
CTSI
CTSI
CTSI
CTSI
CTSI
CTSI
CTSI
Proposed
BIA Road
Rt. No.
Route Name
Govt. Hill Rd.
10
20
30
40
Judd Rd.
10
20
Gwee-Shut Rd.
Molalla Ct.
10
20
Neachesna Housing Subdivision
10
815
820
830
840
850
860
870
Swan Ave.
Umpqua Ct.
Takelma Ct.
Tolowa Ct. (multi-family housing)
Tootootney Ct.
TRP Industrial Rd
TRP Access Rd.
Total BIA System Roads
2
900
910
920
940
950
4001
4002
4007
5321
5322
T500
T505
T510
T515
T520
T525
T530
T535
T540
T545
T555
T560
T565
0935
0937
SW PDX HQ Lot
Tribal Enterprise Lot
Salem Tribal Office Lot
Scarlett Extension
Umpqua Extension
Tenas Extension
E. Rd. to New Rd. Between Ferry and Swan
Molalla Extension
New Rd. Between Ferry and Swan
W. Rd. to New Rd. Between Ferry and Swan
Judd - Old River Rd. Cutoff
Banks Access 1
Banks Access 2
10
20
Salem Housing
10
20
30
40
Portland Rd. NE Bypass
Length (miles)
Surface Type
Existing Proposed Proposed Paved Gravel Earth
1
2
3
BIA
Road Classification
4
5
6
7
8
9
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.4
0.1
0.5
0.4
0.1
0.5
0.4
0.1
0.5
0.4
0.1
0.5
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.8
0.1
0.1
0.1
0.1
0.2
0.4
0.2
4.2
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.8
0.1
0.8
0.1
0.1
0.1
0.1
0.2
0.4
1.2
0.4
1.2
0.2
3.0
0.0
0.1
0.0
0.0
0.8
0.4
0.0
0.0
0.0
0.1
0.6
0.6
0.1
0.1
0.1
0.1
0.1
0.4
0.1
0.2
0.6
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.2
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.4
0.1
0.2
0.1
0.2
0.1
0.1
0.1
0.0
0.0
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.4
0.1
0.2
0.1
0.1
0.1
0.1
0.1
0.2
0.1
0.1
0.1
0.1
0
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.2
0.2
3.1
0.1
0.1
0.1
1
BIA
Construction Need
2
3
4
0.2
3.0
0.1
0.0
1.2
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.4
0.1
0.2
0.1
0.2
0.1
0.1
0.1
0.6
0.1
0.1
0.1
0.2
0.1
0.1
0.1
0.0
Road
Owner
CTSI
CTSI
CTSI
CTSI
CTSI
CTSI
CTSI
CTSI
CTSI
CTSI
CTSI
CTSI
CTSI
CTSI
CTSI
CTSI
CTSI
CTSI
Existing
BIA Rt.
I.D. No.
T620
T622
T940
992
T994
T995
T996
T997
T998
T999
T960
T962
T701
T702
4004
4005
4006
4008
CTSI
CTSI
CTSI
CTSI
CTSI
4010
T532
T518
T524
T528
CTSI
T529
Proposed
BIA Road
Rt. No.
Route Name
0960
Ferry to SE Swan Ave.
0965
New Rd. E of Tillamook
0970
New Rd. W. of Umpqua
NE 50th St.
10
20
30
NE Zephyr Ct.
Swan Ave.
10
20
Buford Ave.
Commodities Rd,
10
20
25
30
40
Tillamook Rd.
10
20
30
Tribal Headquarters Roads
10
20
30
40
New Multi-family Housing A
New Multi-family Housing B
Elder Housing Rd.
Health Center Rd.
10
20
30
40
Health Center Service Rd.
10
20
30
Eugene Field Office Roads
10
20
Portland Field Office Rd.
Shasta Ct.
Chetco Ct.
Rogue River Ct.
Cemetery Rd.
10
20
30
Pedestrian path
SE Sturdevant Rd. (on TRP)
Brush Creek Rd.
S. Norton Hill Rd.
Hatchery Rd.
10 (bridge)
20
2006
Hatchery Access Rd.
Length (miles)
Surface Type
Existing Proposed Proposed Paved Gravel Earth
0.1
0.1
0.1
0.1
0.4
0.4
0.1
0.1
0.5
0.1
0.1
0.1
0.5
0.1
0.1
0.1
0.1
0.2
0.1
0.2
0.2
0.2
0.2
0.1
0.1
0.1
0.1
0.1
0.1
0.2
0.1
0.1
0.1
0.1
0.1
0.1
0.2
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
7
8
9
0.1
0.1
0.5
0.1
0.1
0.1
0.1
0.1
0.1
0.2
0.2
0.2
0.2
0.1
0.2
0.2
0.2
0.2
0.1
0.1
0.1
0.1
0.1
0.1
0.2
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.2
0.2
0.1
0.1
0.2
0.2
0.2
0.2
0.2
1.1
0.4
0.1
0.1
0.1
0.1
0.3
0.4
0.1
0.1
0.1
0.1
0.1
0.1
0.2
0.2
0.2
0.2
0.2
0.3
0.4
1.1
0.4
0.4
1.1
0.1
0.1
0.1
0.1
0.1
0.1
0.2
0.2
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.2
0.2
0.3
0.4
1
BIA
Construction Need
2
3
4
0.1
0.1
0.4
0.1
0.1
0.5
0.1
0.1
0.1
0.2
0.1
0.2
0.1
0.1
3
0.1
0.1
0.4
0.1
0.1
0.2
0.2
0.2
0.3
0.4
1.1
0.4
2
0.1
0.1
0.1
0.1
0.1
0.1
0.2
0.2
1
BIA
Road Classification
4
5
6
0
Road
Owner
Existing
BIA Rt.
I.D. No.
Lincoln Co.
Lincoln Co.
Lincoln Co.
Lincoln Co.
C406
C409
416
2411
Lincoln Co.
Lincoln Co.
2307
532
Proposed
BIA Road
Rt. No.
Length (miles)
Surface Type
Route Name
Existing Proposed Proposed Paved Gravel Earth
2.8
2.8
6.2
1.5
0.5
Total Tribal Roads
8.2
Old River Rd.
James Frank Ave.
Norton Rd.
E. Logsden Rd.
810
820
830 Bridge
840
850
860 Bridge
870
880 Bridge
890
900
910
Moonshine Rd.
SE Sturdevant Rd.
810
820
Total Lincoln County Roads
Douglas Co.
Douglas Co.
Marion Co.
C181
C049
C700
City of Siletz
City of Siletz
City of Siletz
City of Siletz
9990
U991
U992
U993
City of Siletz
U940
Booth Rd.
Fivemile Rd.
810
820
830
840
850
Lincoln City
Lincoln City
Lincoln City
Lincoln City
Lincoln City
Lincoln City
Lincoln City
U612
U601
U602
U604
U608
U607
U610
U605
2
0.0
7
0.0
8
0.3
9
1.4
BIA
Construction Need
1
2
3
4
0.0
8.3
0.0
2.8
0.6
0.3
4.3
0.6
0.3
0.6
2.1
5.2
2.1
5.2
2.1
5.2
2.1
5.2
2.3
2.2
2.3
2.2
2.3
2.2
2.3
2.2
5.1
5.1
5.1
5.1
0.4
1.8
2.5
3.9
0.4
2.5
3.9
0.4
1.8
2.5
3.9
0.4
1.8
2.5
3.9
0.8
1.6
33.1
0.8
1.6
27.0
0.8
1.6
27.9
0.8
1.6
33.1
4.3
1.8
0.0
0.0
0.6
0.3
4.3
0.3
4.3
6.1
0.0
0.0
0.0
0.3
4.9
0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.3
0.3
0.3
0.3
Total Douglas County Roads
2.9
0.0
3.3
0.0
2.8
9.3
2.9
0.0
3.3
0.0
2.8
9.3
2.9
0.0
3.3
0.0
2.8
9.3
0.0
2.9
0.0
3.3
0.0
2.8
9.3
0.0
0.0
0.0
Total Marion County Roads
0.1
0.2
0.3
0.0
0.1
0.2
0.3
0.0
0.0
0.0
0.0
0.0
0.0
Blossom Dr. NE
810
820
James Frank Ave.
SE Bagley St.
Buford Ave.
Ferry Ave.
810
Swan Ave.
810
820
830
Total City of Siletz Roads
Lincoln City
1
0.0
BIA
Road Classification
3
4
5
6
5.4
0.0
3.9
0.1
NE 14th St.
810
820
NW Logan Rd.
NW 40th St.
NW 40th Pl.
NW 44th St.
NW 44th Pl.
NE 47th St.
NW West Devils Lake Rd.
0.0
0.0
0.0
0.1
0.2
0.3
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.2
0.3
0.0
0.0
0.0
0.0
0.5
0.1
0.5
0.5
0.1
0.5
0.5
0.1
0.5
0.5
0.1
0.5
0.3
0.3
0.3
0.3
0.5
0.1
0.1
2.1
0.5
0.1
0.1
2.1
0.5
0.1
0.1
2.1
0.5
0.1
0.1
2.1
0.3
0.4
0.4
0.2
0.1
0.4
0.1
0.2
0.0
0.0
0.3
0.4
0.4
0.2
0.1
0.4
0.1
0.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.3
0.4
0.4
0.2
0.1
0.4
0.1
0.2
0.0
0.0
0.0
0.3
0.4
0.4
0.2
0.1
0.4
0.1
0.2
Road
Owner
Existing
BIA Rt.
I.D. No.
Lincoln City
Lincoln City
Lincoln City
U603
U609
U611
City of Salem
City of Salem
City of Salem
U930
U920
U932
Proposed
BIA Road
Rt. No.
Route Name
810
820 Bridge
830
NE Devils Lake Rd.
NW Port Dr.
SE Mast Ave.
810
820 (proposed north extension)
Total City of Lincoln City Roads
Astoria St.
Indian School Rd. NE
Blossom Dr. NE
Total City of Salem Roads
City of Portland
U960
City of Portland
U128
City of Portland
U500
City of Portland
U505
SE Stark Street
810
SE 128th Ave.
810
SW Gibbs St.
810
820
830
SW 1st Ave.
810
820
830
Total City of Portland Roads
City of Eugene
U011
West 11th Ave.
810
820 Bridge
830
ODOT
U910
S034
1101
1.1
0.3
0.2
0.1
4.8
0.5
0.8
1.0
2.3
Chemawa Rd. NE
SR 34 Alsea Highway
810
820 Bridge Lint Creek
830
840 Bridge
850
860 Bridge
870
880 Bridge Southworth Creek
890
US 101 Coast Highway
810
815
820 Bridge D River
825
830
835
840 Bridge Schooner Creek
845
850 Bridge Drift Creek
855
860 Bridge Siletz River
1
2
0.0
0.1
0.1
4.8
0.0
0.5
0.8
1.0
2.3
7
8
9
1
0.2
0.0
0.0
0.0
0.0
0.1
0.1
1.4
0.0
0.0
2.4
1.1
0.0
0.0
0.0
4.8
0.0
0.1
0.1
0.0
0.0
0.5
0.8
1.0
2.3
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.8
0.0
0.0
0.0
0.5
0.8
0.0
0.0
1.0
1.0
0.0
0.0
1.3
1.3
0.2
0.2
0.2
0.2
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
2.1
0.1
0.1
0.1
2.1
0.1
0.1
0.1
0.8
0.1
0.1
0.1
2.1
0.0
0.0
1.8
2.5
1.3
0.0
0.0
0.7
0.0
0.0
1.8
2.5
1.3
1.3
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.7
0.0
0.0
1.8
2.5
0
0.1
0.5
0.0
BIA
Construction Need
2
3
4
1.0
1.1
0.3
0.2
0.3
0.1
0.1
0.1
3
BIA
Road Classification
4
5
6
1.0
1.1
1.1
0.3
0.2
0.7
Total City of Eugene Roads
ODOT
ODOT
Length (miles)
Surface Type
Existing Proposed Proposed Paved Gravel Earth
1.0
1.0
0.7
0.0
0.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
1.8
2.5
0.2
0.2
0.2
0.6
0.6
0.6
0.6
1.1
1.1
1.1
1.1
0.7
0.7
0.7
0.7
2.3
2.3
2.3
2.3
2.0
2.0
2.0
2.0
2.3
2.1
2.3
2.1
2.3
2.1
2.3
2.1
1.0
2.2
1.0
1.0
2.2
1.0
1.0
2.2
1.0
1.0
2.2
1.0
1.0
1.0
1.0
1.0
0.9
0.9
0.9
0.9
Road
Owner
Existing
BIA Rt.
I.D. No.
Proposed
BIA Road
Rt. No.
Length (miles)
Surface Type
Existing Proposed Proposed Paved Gravel Earth
0.5
0.5
Route Name
865
870 Bridge Millport Slough
875
880
885 Bridge
890
895
900 Bridge Depoe Bay
905
910
915
920
925 Bridge Johnson Creek
930
935
940
ODOT
Private
Rd. District
1229
9988
9998
SR 229 Siletz Highway
810
815 Bridge Barhaven Creek
820
825 Bridge Skalada Creek
830
835 Bridge Root Creek
840
845 Bridge Cedar Creek
850
855
860 Bridge Euchre Creek
865
870 Bridge Siletz River
875
880 Bridge Siletz River
885
890
895 Bridge Siletz River
900
905 Bridge Little Depot Creek
910
915 Bridge Depot Creek
920
925 Bridge Depot Creek
930
Total ODOT Roads
1
0.5
2
3
BIA
Road Classification
4
5
6
7
8
9
1
BIA
Construction Need
2
3
4
0.5
2.5
1.8
2.5
1.8
2.5
1.8
2.5
1.8
1.1
1.0
1.1
1.0
1.1
1.0
1.1
1.0
0.3
1.7
3.4
0.7
0.3
1.7
3.4
0.7
0.3
1.7
3.4
0.7
0.3
1.7
3.4
0.7
3.0
1.9
1.3
3.0
1.9
1.3
3.0
1.9
1.3
3.0
1.9
1.3
5.6
5.6
5.6
5.6
7.0
7.0
7.0
7.0
0.4
0.4
0.4
0.4
2.6
2.6
2.6
2.6
3.7
0.3
3.7
0.3
3.7
0.3
3.7
0.3
1.2
1.2
1.2
1.2
2.4
2.4
2.4
2.4
0.6
0.3
0.6
0.3
0.6
0.3
0.6
0.3
5.7
5.7
5.7
5.7
0.9
0.9
0.9
0.9
0.5
0.5
0.5
0.5
0.1
67.9
0.0
0.0
0.1
67.9
0.0
0.0
29.9
0.1
38.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
67.9
0
0.0
0.0
0.0
0.1
0.1
0.1
0.1
Total Other Roads
0.3
0.3
0.7
0.0
0.0
0.3
0.3
0.7
0.0
0.0
0.0
0.0
0.3
0.3
0.7
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.3
0.3
0.7
0.0
0.0
0.0
TOTAL MILES
136.4
4.1
4.1
118.9
17.0
0.6
33.7
38.0
15.4
28.7
18.1
2.5
2.4
0.3
1.5
3.0 133.5
0.0
4.1
0.0
TOTAL MILES OF TTP SYSTEM
Existing Roads
Proposed Roads
140.5
136.4
4.1
TOTAL MILES OF BIA SYSTEM
Existing BIA Roads
Proposed New BIA Roads
4.3
3.1
1.2
TOTAL MILES OF CTSI SYSTEM
Existing CTSI Roads
Proposed New CTSI Roads
11.0
8.2
2.8
NW Miramar Dr.
NE Johns Rd.
810
820
New proposed roads recommended to be added to the NTTFI include the following:
SW Scarlett Extension
SW Tenas Extension
Umpqua Extension
Molalla Extension
Commodities Rd. addition
Swan Extension
Rd. W. of Umpqua
Health Center Service addition
New Rd. Between Ferry & Swan
W. Rd. to New Rd. Between Ferry & Swan
E. Rd. to New Rd. Between Ferry & Swan
Judd – Old River Cutoff
0.1 mile
0.1 mile
0.1 mile
0.1 mile
0.5 mile
0.1 mile
0.1 mile
0.1 mile
0.1 mile
0.1 mile
0.1 mile
0.2 mile
Road Classification
The BIA road classification system is a new system based on functional characteristics with 11
classes of urban and rural roads. These are as follows:
Class 1
Class 2
Class 3
Class 4
Class 5
Class 6
Class 7
Class 8
Class 9
Class 10
Class 11
Major Arterial (>10,000 ADT or more than 2 lanes of traffic) – These roads can
be either urban or rural.
Rural Minor Arterial (<10,000 ADT)
Local Streets (Serving residential areas) – These are primarily urban local roads
but can also apply to rural residential roads when housing is clustered together
and the road is primarily for residential use.
Rural Major Collector
Rural Local Road
City Minor Arterial
City Collector Street
Paths, Walkways, Trails (Routes for Trail Bikes, ATVs and Snowmobiles)
Parking Lots Adjacent Roads on the NTTFI
Airstrips
Overlap Routes (Where two roads occupy the same section)
Table 3-1 shows road classification by jurisdiction.
The BIA also classifies roads by Construction Need, an important factor in the allocation of
Highway Trust Funds. These codes are 0 through 4 and represent the following road status:
+
Construction Need 0: New roads and recently reconstructed roads that do not need to
generate funding. After five years, these roads are eligible to generate funding.
+
Construction Need 1: The BIA is responsible for all or part of the cost of the proposed project
for a road or segment of road. The BIA also has right-of-way or intends to get right-of-way
for these roads.
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
35
+
Construction Need 2: Improvement projects on roads for which another agency is responsible
for funding, not the BIA.
+
Construction Need 3: Roads where the BIA has maintenance responsibility, but which are not
to be improved, and tribes have by resolution stated that they are not to be improved. These
roads will be maintained in their current configuration and surface type, and they are not
used in the funding allocation formula.
+
Construction Need 4: These are proposed roads, all or part of which may be funded with TTP
funds.
The current BIA funding allocation formula utilizes the Construction Need codes to allocate
Highway Trust Funds (HTF) for construction of new roads and the reconstruction or upgrading
of existing roads. Roads that are designated Construction Need 1, 2, and 4 generate funds.
Construction Need 0 roads do not generate funds, because they are new or have been
reconstructed. BIA Construction Need 3 roads are not to be upgraded or reconstructed, only
maintained. These roads do not generate HTF monies. Beginning under the Map-21 legislation,
which was effective October 1, 2012, only BIA and Tribal roads generate funding, and the road
mileage is set at the FY 2012 “Official” mileage as contained in the BIA RIFDS database. This
was continued under both the FAST Act and IIJA.
It should be noted that the BIA can and often does provide funding for improvements to nonBIA public roads, such as county and state roads. In some instances, the BIA may provide funds
through a memorandum of agreement, and the ownership of the road will remain with the
other jurisdiction after construction. In other instances, the road may become part of the BIA
public road system. A summary of the Construction Need is also shown on Table 3-1.
Surface Type
As shown in Table 3-1, the proposed TTP system is composed of 118.9 miles of paved road, 17
miles of gravel road, and 0.6 mile of earth road. In general, State roads are in good to very good
condition. Other reservation roads are generally in fair to very good condition.
Right-of-Way
The BIA currently has easements for its existing roads. To use Trust Funds to develop projects
and undertake maintenance, the BIA, or any other jurisdiction, must have a right-of-way either
through an easement or through ownership. It is particularly important that as new roads are
developed, or as existing roads are reconstructed, to have right-of-way descriptions prepared as
part of the design surveys, and that the Tribe grant the BIA or itself an easement for that rightof-way.
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
36
Traffic Control
Signing
With a few exceptions, signing on BIA and Tribal roads is generally good. Health Center Rd.
and the Multifamily routes located at Judd Rd. and Gwee Shut Rd., which have recently been
constructed by the Tribe, do not have traffic control signing. Because of liability issues, STOP or
YIELD signs should be installed. As the Tribe develops new roads and streets, particularly in
residential areas, STOP and YIELD signs need to be installed at appropriate
intersections as specified in the Manual on Uniform Traffic Control Devices.
US 101 is well signed, and most of OR 229 is reasonably well signed, except for a 10-mile section
that is initially signed “Narrow Winding Road Next 10 Miles.” There are no other curve
warning signs within that section of highway.
Striping and Pavement Marking
Striping and pavement marking are generally present in the higher traffic volume areas,
although the condition varies. Re-striping and pavement marking should be included as part of
chip seal projects and as a part of normal maintenance. The Tribe has painting equipment and
has a program in place to repaint centerlines, fog lines, and stop bars on an every other year
basis.
Drainage and Bridges
The majority of Siletz Reservation lands and other tribal properties are located in and along the
Coast Range where annual rainfall averages about 65 inches. As a result, good drainage is
important in the design of roadways as well as in road maintenance. In general, drainage
appears to be adequate on most BIA roads. Also, most of the new roads or roads that will be
reconstructed in the Siletz area should be to urban standards with curbs, gutters and storm
sewers.
There are 11 bridges on SR 229 between Toledo and Kernville. Four of these bridges are located
on the portion of the Siletz Highway between Toledo and Siletz that was reconstructed during
the 1960’s. Seven are located between Siletz and Kernville. Several of these structures are
relatively new; however, others may need to be widened or replaced as sections of the highway
are improved. Also, several do not have guardrail on the approaches and need retrofitting to
meet ODOT standards. There are also a number of bridges on US 101. ODOT replaced the
Spencer Creek Bridge north of Newport in 2010 which had been the most critical need.
There are other bridges on OR 34, NW West Devils Lake Road (Lincoln County), on E. Logsden
Road (Lincoln County), Fivemile Road (Douglas County), and 11th Avenue (Eugene). There is
only one bridge on the Tribal Road System which is at the fish hatchery off of E. Logsden Road.
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
37
Street Lighting
Street lighting is very limited on roads in the Tribe’s NTTFI. Tribal subdivision roads have
street lighting, and US 101 is lighted in the urban areas. All new housing subdivisions and
commercial/industrial developments should include street lighting as a traffic safety feature.
Bicycle Routes
The use of bicycles is allowed along US 101 and OR 229. US 101 is an Oregon Coast Bike Route.
Traffic Data
Circulation Characteristics
Origin and destination of trips on the TTP System in the Siletz area are fairly well defined.
Tribal facilities that generate trips include the Administration Building (adjacent to SR 229), the
Tribal Clinic on Gwee Shut, the Tribal Community Center on Government Hill, the childcare
facilities and the Fitness Center, both on Buford Road. These facilities attract trips within the
community from the tribal housing area located east of Government Hill, the multifamily
housing along E. Logsden Road, elder housing on SE Bagley Street), and the single-family
developments on Umpqua Court and Molalla Court. The new wellness and recreation center,
currently under construction, on W. Swan Ave. is expected to generate additional trips.
The Siletz Highway (SR 229) is the major link between Siletz and the employment centers in
Toledo, Newport, and Lincoln City. Also, since Siletz has very little in the way of retail services,
residents of Siletz rely on the commercial centers of Newport and Lincoln City for purchase of
goods and services.
US 101 is also a critical link in the TTP System. Outside of Siletz, the Tribe’s only other major
developments are the casino complex and the golf course in Lincoln City just off of US 101.
These facilities are major tourist attractions in the region and, therefore, major trip generators.
The Neachesna housing development, east of the casino along US 101, also generates additional
trips.
SE Stark St. in Portland provides access to the Portland field office; Blossom Drive is the access
road for the Salem field office; and W. 11th Avenue in Eugene provides access to the Eugene
field office and connects downtown Eugene with Highway 126 to the coast. Anyone going to
the field offices uses these roads.
Traffic Volumes
Traffic volumes for state roads on the TTP System are available from the Oregon Department of
Transportation (ODOT). The 2018-2023 Annual Average Daily Traffic (AADT) data for US 101,
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
38
OR 229, and OR 34 are shown in Table 3-2, along with other available counts from other
jurisdictions. Also included are traffic volumes for US 20 at the intersection with OR 229 in
Toledo.
TABLE 3-2
Traffic Volumes
Hwy/Rd
Location
2023
2022
2021
2020
2019
2018
AADT
AADT
AADT
AADT
AADT
AADT
13704
13690
15198
13181
14600
14600
15385
15399
15862
13900
16000
15900
17266
17249
16424
14245
15800
15700
12937
12924
12921
11206
12400
12400
12282
12270
13818
11984
13300
13200
26386
25518
24599
21335
23700
23500
1808
1806
1881
1261
1400
1400
1309
1308
1362
1199
1300
1300
953
952
992
787
870
880
606
605
630
643
710
720
522
521
543
487
540
540
407
407
424
405
450
450
400
400
417
403
450
450
State Roads
MP 105.61 0.40 mile
US 101
south of Salmon River
Highway (OR 18)
MP 111.00 0.30 mile N
of East Devils Lake Rd
MP 112.80 0.02 mile S of
Logan Rd
MP 120.16 On Siletz
River Bridge
MP 126.45 North City
Limits of Depoe Bay
MP 140.34 0.02 mile N
of Corvallis-Newport
Highway (US 20)
MP –0.11 0.10 mile E of
OR 229
Oregon Coast Hwy
(US101)
MP 1.21 0.21 mile E of
Gorton Road
MP 2.44 At National
Forest Boundary
MP 4.25 0.2 mile W of
Siletz St.
MP 5.69 0.20 mile E of
Euchre Mountain Rd
MP 7.95 0.10 mile south
of Siletz River Dr
MP 13.67 0.02 mile
south of Mowery's
Landing Rd
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
39
TABLE 3-2
Traffic Volumes
Hwy/Rd
Location
MP 17.47 At Chitwood
Creek
MP 20.66 At Siletz
River, on Ojalla Bridge
MP 21.13 0.02 mile
south of Ojalla Rd
MP 23.48 North City
Limits of Siletz
MP 23.74 0.02 mile N of
Metcalf Rd
MP 23.77 0.01 mile S of
Metcalf Rd
MP 23.80 0.01 mile N of
W. Buford Ave
MP 23.83 0.02 mile S of
W. Buford Ave.
MP 24.10 South City
Limits of Siletz
MP 27.40 0.04 mile N of
Little Depot Creek
2023
2022
2021
2020
2019
2018
AADT
AADT
AADT
AADT
AADT
AADT
534
533
555
428
480
480
630
629
655
545
610
610
681
680
708
603
670
670
1110
1109
1155
1002
1100
1100
1714
1712
1783
2607
2900
2900
1883
1881
1959
2145
2400
2400
1872
1870
1948
4154
4600
4600
3358
3355
3495
4152
4600
4600
3470
3467
3611
3963
4400
4400
3630
3511
3657
4085
4500
4500
3728
3605
3755
4592
5100
5100
14470
13994
15201
13184
14600
14700
8879
8587
8262
7166
8000
8000
7303
7063
6679
5793
6400
6400
4227
4403
3704
4100
4100
2921
3043
2044
2300
2300
MP 31.18 0.06 mile N of
Corvallis-Newport
Hwy (US 20)
MP 5.49 0.10 mile W of
US 20
Toledo Frontage Rd
(West Jct)
MP 5.61 0.2 mile E of
Toledo Frontage Rd
(West Jct)
MP 5.80 0.06 mile E of
Siletz Hwy (SR 229)
MP 1.62 SE City Limits
OR 34
4231
of Waldport
MP 2.40 On Eckman
Slough Bridge
2924
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
40
TABLE 3-2
Traffic Volumes
Hwy/Rd
Location
MP 2.63 0.02 mi. E of
Eckman Creek Rd.
MP 5.21 @ Siuslaw
Forest Boundary
2023
2022
2021
2020
2019
2018
AADT
AADT
AADT
AADT
AADT
AADT
2631
2628
2737
1863
2100
2100
1685
1683
1753
1154
1300
1300
County Roads
E. Logsden Rd.
1123
Section 810
BIA Roads
Govt. Hill Rd.,
Sec. 10
@ Logsden Rd.
Judd Rd., Sec. 10
@ Gwee Shut Rd.
Gwee-Shut Rd.
@ Logsden Rd.
151
373
776
1907
City of Siletz
Buford Ave.
Swan Ave.
@ Tillamook
282
@ Tillamook
228
Section 820 E. of SR 229
1750
City of Lincoln City
NW 44th St.
@ NW Logan Rd.
3605
NW 44 Pl.
@ NW 44 St.
636
NW 40 St.
@ US 101
2925
NW 40 Pl.
@ NW 44 St.
2500
NW Logan Rd.
@ US 101
10732
@ US 101
1988
th
th
th
NE Devils Lake
Blvd.
th
th
City of Salem
Blossom Dr. NE
E of 38th St off 99E
1700
City of Eugene (counts 2006-2016)
W 11 Avenue
th
E of Beltline
23,900
E of Bertelsen
24,500
E of Bailey Hill
21,900
E of Oak Patch
33,000
E of City View
32,900
Sources: ODOT, City of Salem,
ODOT traffic data indicates that traffic volumes on SR 229 from Kernville to Siletz have slightly
increased from 2018-2023, with a slight decrease in 2020. At the US 101 junction at Kernville, in
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
41
2017 average daily traffic was approximately 1000 vehicles, and at the north city limits of Siletz
it was approximately 1000 vehicles a day. Between mileposts 7 and 13, in the center of this
section, volumes are around 300 per day. In 2023, at those same locations the average daily
traffic was 1808 and 1110, respectively. On OR 229 in the City of Siletz, traffic volumes slightly
increased until 2020 and have been decreasing since. In the same time-period (2018-2023), traffic
volumes on US 20 between Newport and Toledo remained consistent, with a decrease in
volume in 2020.
Speed Studies
The Tribe has taken speed readings in conjunction with traffic counts on various roads in the
Siletz community. The most noticeable problem is Logsden Road, incoming (westbound) traffic
to Siletz is exceeding the 35-mile speed limit 92% of the time. The average speed is 45 miles per
hour in this area with the 85th percentile at 52 mph. Installation of a speed reader sign, similar to
the one installed on SR 229 at the north end of town, could help to mitigate this problem.
Speeds on the State Highway through the center of Siletz appear to be fairly moderate. Average
speeds in the 25 mph zone are between 22 and 25 mph. The 85th percentile is between 28-30
mph, so the vast majority of vehicles are traveling less than 30 mph in the business district of
Siletz. Most of the other local roads also show minimal speed issues with the majority of
vehicles traveling at or below the 25 mph speed limits, and those exceeding the speed limits are
doing so at 7 or less mph.
Crash Data
The most recent available crash data for state roads on the TTP system is presented in Table 3-3.
TABLE 3-3
Crash Data at Selected Locations, US 101 and SR 229
2022
Crashes
2021
Crashes
2020
Crashes
3-Year Average
US 101 (Hwy 18-US 20)
139
191
114
148.0
OR18 – OR 229
41
39
45
41.7
OR 229 – US 20
98
88
69
85.0
OR 229 (US 101 – US 20)
20
14
9
14.3
US 101-Siletz
4
1
2
2.3
Siletz
0
1
0
0.3
Siletz – US 20
16
12
7
11.7
SR 34 (Waldport ECL – Alsea River)
4
8
8
6.7
Route/Location by Milepost
Source: ODOT State Highway Crash Rate Book, 2022
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
42
Data show that in the 3-year period from 2020-2023, a total of 43 crashes occurred on OR 229
between the US 101 junction at Kernville and US 20 at Toledo, 7 of which occurred between the
US 101 junction and Siletz. In the same three-year period, a total of 444 crashes occurred on US
101 between Highway 18 in Lincoln City and US 20 at Newport, the majority occurring in the
Lincoln City and Newport urban areas. A total of 20 crashes occurred on OR 34 from the
Waldport (East City Limits) east to the Alsea River bridge.
Available data for Lincoln County and select cities also were obtained from the ODOT 2022
Crash Rate Book (published October 2024). The summary showed that in 2020 a total of 642
collisions occurred in Lincoln County, of which fifteen involved fatalities.
An overall crash rate is calculated based on the number of collisions, the average annual traffic
volume (AADT), length of the section of road, and the number of vehicle miles traveled. The
most recent crash rates available for state highways were obtained from the 2023 Oregon
Department of Transportation Crash Rate Book. The report indicates that the 2023 Average
Collision Rate for all highways statewide is 0.89; in urban areas 1.07; and in rural areas 0.70.
ODOT classifies US 101 as a Principal Arterial-Other and OR 229 as a Rural Major Collector. The
statewide crash rate for Principal Arterial-Other is 1.32, and for Rural Major Collectors it is 1.53.
ODOT crash rate data for US 101 and OR 229 are shown in Table 3-4. Data show the section of
Siletz Highway from the US 101 junction to Siletz had a 2023 accident rate of 3.44 accidents per
million vehicle miles traveled. For the section between Siletz and Highway 20, the crash rate is
1.27 collisions per million vehicle miles. This section of highway has nearly twice the volume of
traffic than between the City of Siletz and US 101, it is above the statewide average, in both
urban and rural areas, but slightly less than the statewide average for a Rural Major Collector.
The majority of the portion of OR 229 between Kernville and Siletz closely parallels the Siletz
River and has many deficiencies that could contribute to crashes. There are numerous
horizontal and vertical curves associated with this alignment. Numerous horizontal curves are
posted for speeds ranging from 45 mph down to 20 mph. Lane width varies from 9 to 16 feet.
Much of the roadway lacks any paved shoulders as well as a gravel recovery area. The river
side of the roadway generally has steep side slopes down to the river. Some of these areas lack
guardrail, because there is no shoulder space to install guardrail. Other areas away from the
river have steep fill slopes and no recovery area adjacent to the pavement and lack guardrail.
Also, numerous areas with inadequate sight distance have been identified.
Accident data for US 101 between OR 18 north of Lincoln City and US 20 in Newport shows
that in the urban fringe and urban areas of US 101 have higher crash rates than the rural
sections of the highway. The Lincoln City and Newport areas have higher traffic volumes and
where there are more intersections/driveways per mile than in the rural sections.
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
43
Table 3-4
Crash Rate at Selected Locations, US 101 and SR 229
Crashes/Million Vehicle Miles
2023
MP Start
Location
Crashes
2023
2022
2021
2020
2019
US 101 (Coast Highway)
105.21 Hwy 18 - Lincoln City
0
0.91
0.94
105.43 Lincoln City
10
1.45
1.02
1.10
1.73
0.97
111.81 Lincoln City
27
1.97
2.27
2.26
2.50
2.78
118.70 Lincoln City - SR 229
6
0.91
0.31
0.51
0.60
120.02 SR 229 - Depoe Bay
12
0.53
0.88
0.44
0.55
0.54
128.57 Depoe Bay - Newport UA
6
0.46
0.99
1.21
1.13
0.70
136.53 Newport - Agate Beach
7
1.29
1.33
1.16
0.89
0.40
137.61 Agate Beach to US 20
51
2.35
2.76
2.78
2.40
2.90
SR 229 (Siletz Highway)
-0.21 US 101 - Siletz
5
3.44
2.75
0.66
1.73
0.79
0
23.48 Siletz
1.78
4.16
24.10 Siletz - US 20
12
1.27
1.74
1.26
0.65
1.01
Source: ODOT 2023 Crash Rate Book
Travel Demand
There is no travel demand studies for roads on the Tribe’s TTP System.
Road Maintenance
Maintenance of Bureau of Indian Affairs (BIA) and Tribal roads are currently the responsibility
of the jurisdiction that owns the road. The BIA Road System is the maintenance responsibility of
the BIA; Tribal Roads are the maintenance responsibility of the Tribe. The BIA is obligated by 25
CFR Part 170 to maintain that system to a safe and satisfactory level based on the availability of
funds and the road’s as-built condition. Road maintenance funds for these roads come from the
Highway Trust Funds. Road maintenance funds are used to provide an optimal level of road
maintenance based on the road condition at the least cost. Maintenance involves the
preservation and repair of the entire roadway within the right-of-way under BIA jurisdiction.
Under the IIJA Act, the Tribe’s Highway Trust funds available for general maintenance are 25%
or $500,000 of the tribal funding allocation, whichever is greater. 100% of these funds could be
used to provide chip seals for TTP roads, including both BIA routes and non-BIA routes, as long
as these maintenance functions have been identified in the tribal Transportation Improvement
Program (TIP). This is unchanged under the current IIJA. The Tribe will use Highway Trust
Funds for maintenance functions. Since it is difficult to predict the timing of maintenance needs
(pothole repair, drainage, crack sealing, signs, striping, etc.) over the long term, these activities
will be identified more specifically in the TIP as appropriate.
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
44
4
TRANSPORTATION ISSUES AND NEEDS
Transportation Needs
Because tribal land holdings are fragmented, the Tribe has transportation needs in distinctly
different locales. These include the cities of Siletz, Lincoln City, Salem, Portland, Eugene, and
Toledo as well as the OR 229 corridor that is the main access to tribal lands in and around Siletz.
This corridor is also their main connection to Lincoln City where most of the Tribe’s economic
development has occurred and where there are more tribal employment opportunities. Based
on discussions with tribal officials, a variety of transportation needs were identified that are
important to the social and economic growth of the tribal community. Tribal future needs will
be driven by new housing in the City of Siletz and Lincoln City, development of tribal-owned
property in Salem and Toledo, and safety issues on SR 229 and in the Siletz community.
The City of Siletz, as part of its 2009 Comprehensive Plan Update, conducted a Siletz
Community Survey in December 2008. The survey was mailed to 1,084 Siletz-area households;
82 responded. The primary needs identified were improvement of pedestrian and bike safety,
including:
+
Sidewalks/Crosswalks along Logsden Road and OR 229 through town
+
Improved pedestrian and bike access: Sidewalks on public roads/streets, bicycle paths,
bridge widened on both sides
+
Traffic Safety
During the development of the Tribe’s Local Road Safety Plan, a number of safety issues were
identified.
OR 229, between Siletz and Kernville, is a continual problem, with narrow travelway in places,
sharp turns, and no guardrail. While the State has made upgrades to the highway over the past
few years, high construction costs due to terrain issues have limited the ability to correct the
problems. Speed enforcement and guardrail in high-risk areas on the highway have been
identified as possible countermeasures, although in some areas the narrow roadway and steep
terrain does not leave any space for guardrail installation.
The OR 229-OR 20 Intersection in Toledo has been identified as an issue for a number of years
due to its “X” shaped configuration. This intersection would be extremely difficult to realign
because of wetlands on the northwest side of the intersection and topography problems on the
southeast side. It is also questionable whether there is enough space to make two Tintersections, particularly with the need for two left-turn refuge lanes. It is possible that there
may not be a practical solution to the alignment issue.
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
45
In Siletz, Swan Avenue narrows east of the tribal center complex, affecting emergency access,
especially if cars are parked on the road or traffic is heavy. Widening the roadway or parking
restrictions are potential countermeasures.
In the Lincoln City area, the Neotsu Road-US 101 intersection, which provides access to the
Tribe’s Neachesna housing area, has site distance problems which create a dangerous situation
for vehicles turning off of and onto the highway. This intersection has been identified in the
Tribe’s Long-Range Transportation Plan as a safety issue for many years. The Plan
recommendation has been to work with ODOT to undertake an engineering study to determine
what can be done to mitigate the safety problems. It also has been suggested that there needs to
be a US 101 corridor study from E. Devils Lake Rd. to Logan Rd. which would include the
Neotsu intersection. This section of roadway is essentially still two lanes with some intersection
improvements. Pedestrian safety is also a concern along this section of US 101. It has been
reported that the City of Lincoln City has applied for funding to initiate a study beginning at
Logan Rd.
Pedestrian Safety
Pedestrian safety in Siletz is a top priority for the Tribes, in particular in the area around the
grade school. Crossing James Frank Avenue at the school is unsafe due to parked cars and cars
dropping off/picking up students in front of the school. The Tribe would like to work with the
School District to provide a school crossing or some form of pavement marking for the area.
Other areas where sidewalks or improved pedestrian facilities are needed are along Logsden
Road, James Frank Avenue, Swan Avenue, Buford, and on OR 229 from Buford Avenue north.
Other safety risks exist on the Siletz River Bridge due to its narrowness and lack of
pedestrian/bike facilities. Suggested countermeasures include development of an overall
circulation plan for the Siletz area that provides better connection of pedestrian facilities,
sidewalks in high-risk areas, and crosswalks/pavement markings on Logsden Road at the
school.
At the Salem Area Office, the lack of direct transit service and inadequate pedestrian facilities
from Portland Avenue (where transit ends) and the field office create unsafe conditions.
Widening the roadway with the inclusion of sidewalks would provide adequate safety for
pedestrians.
Access Improvements
Currently, access to the golf course from Chinook Winds Casino requires using US 101. A new
road from Logan Rd (at NW 44th Street south of the RV park) east to NE 47th Street would allow
access without having to use the highway.
From a regional perspective, a major earthquake along the Cascadia Subduction Zone will likely
cause the Yaquina Bay Bridge to collapse thereby cutting off access south of the bridge. It has
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
46
been suggested that an emergency, inland route around Yaquina Bay be identified and
improved that could be used if or when such an event occurs.
At the Eugene Area Office, the parking lot and access road need better definition. Better striping
and pavement markings would alleviate this problem.
Maintenance
The existing public road system on the Reservation represents a major public and tribal
infrastructure investment. As a result, it is critical to maintain this system at a reasonable
condition level in order to preserve and prolong the life of the road system and to protect the
initial public investment. It is far more cost effective to provide periodic maintenance to the
road system than to reconstruct roads that have deteriorated to an unsafe or unusable
condition. Ongoing maintenance projects include such items as road repairs, chip sealing, crack
sealing, resurfacing and grading of gravel roads, replacement of signs, drainage and culvert
maintenance.
Ongoing Transportation Planning
Ongoing transportation planning is also a critical need as this not only affects the overall
development of the reservation and needs to be kept current, but it also has a direct impact on
the level of funding the Tribes will receive through the BIA roads program. A number of
necessary planning functions are involved, including keeping the TTP Road Inventory up to
date in order to ensure that the Tribes receive their fair share of the Federal Highway Funds;
annual updating of the Transportation Improvement Program (TIP) to ensure that funds are
allocated to priority projects, and contracts are in place for design and construction; updating
the Long-Range Transportation Plan approximately every 5 years to appropriately address
changing needs and priorities and any new lands procured by the Tribes; and updating the
Local Roads Safety Plan.
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
47
5
TRANSPORTATION PLAN
Programmed Transportation Improvement Projects
The (IIJA) Act requires designated local and regional agencies to develop a Transportation
Improvement Program (TIP), and states to develop a Statewide Transportation Improvement
Program (STIP) as a condition to securing federal funds for transportation projects. Projects
listed in the STIP are the only projects that will be approved by the Federal Highway
Administration (FHWA) and the Federal Transit Administration (FTA) to utilize federal funds.
Transportation improvement projects programmed by the State of Oregon, Lincoln County, and
Lincoln City are summarized below. Please note that not all of these projects have committed
funding, and it is possible that some may not be carried forward for construction. Therefore, the
status of these projects can change from year to year.
ODOT (2024-2027 STIP)
+
OR 34: Upgrade the roadside barrier along this corridor to improve safety for the
travelling public. 2025 Construction. ODOT Project Cost $2,298,953.
+
US 101: Install National Electric Vehicle Infrastructure (NEVI) fast charging stations every
50 miles along US 101 between Washington and California state lines to provide electric
vehicle drivers with reliable and fast charging. 2025 Preliminary Engineering and
Construction. ODOT Project Cost: $6,281,000.
+
US 101: Complete design to increase pedestrian safety at several state highway
intersections in the NW part of the state, including at milepost 124.36. Enhancements will
include a mix of signs with flashing lights, intersection lighting and median islands. 2026
Right of Way, 2027 Utility Relocation. ODOT Total Project Cost: $523,454.
City of Lincoln City
+
North Lincoln City Circulation Study – Determine roadway connectivity for north
Lincoln city (bound by NW Logan Rd, US 101, and North UGB), including need for
improved east-west connectivity. Estimated Cost: $50,000.
+
West Devils Lake/Logan Coordinated Signal Timing – Optimize the existing traffic
signals at US 101/NE West Devils Lake Rd and US 101/NW Logan Rd by implementing
coordinated signal timing plans, upgrading traffic signal controllers, and installing
communication. Estimated Cost: $150,000.
+
Highway Improvements Segment 2 – Restripe US 101 from NW Logan road to NW 39th St
to include bike lanes. Retains five lanes. Estimated cost $30,000 ODOT/City.
+
Highway Improvements Segment 3 – Widen US 101 from NW 39th St to NW 25th St to
include bike lanes and landscaped sidewalks. Estimated cost: $28,800,000 ODOT/City.
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
48
+
Highway Improvements Segment 9 – Widen US 101 from SW 32nd St to SW Beach
Avenue to include bike lanes on both sides and a landscaped sidewalk on the east side.
Retains three lanes, and narrows to two lanes in constrained areas. Estimated Cost:
$31,200,000 ODOT/City.
+
NW Logan Bike Lane Gaps – Fill bike lane gaps on both side of NW Logan Rd from US
101 to north of NW 44th St. Estimated Cost: $550,000 City.
+
NE Devils Lake Blvd Trail Expansion – Phase 2 – Replace existing sidewalk on the west
side of NE Devils Lake Blvd from US 101 to NE 47th St with a shared-use path. Estimated
cost $600,000 City.
Proposed Transportation Improvement Projects
In order to address the transportation needs and objectives as outlined in Chapter 4, 44
transportation projects have been identified for the TTP System. The locations of the projects are
shown by project number on Figures 5-1 and 5-2, and the projects and estimated costs are
described below and summarized in Table 5-1. Overall, projects identified a total of about $79
million over the next 20 years. The Tribe only receives approximately $1.1 million each year for
planning (2% planning funds), construction and maintenance through the BIA roads program.
Thus, the ability to fund projects will impact the implementation schedule. Also, the Tribe will
need to look to other sources of funding and partnering with other units of government in order
to implement some of these projects.
It should be noted that at the time of Project Development, projects may vary somewhat from
the following descriptions. For example, road widths may be different due to changes in land
uses that can influence traffic volumes or the need for wider shoulders or sidewalks for
pedestrian use. These aspects need to be assessed during preliminary design. Also, the
suggested amounts of funding participation by various agencies will in many cases change as
funding becomes committed prior to project implementation.
A description of cost estimating data is provided in Appendix A, including estimating
methodology, design standards and unit costs. In the future, costs in Tables A-3, A-4, and A-5
can be updated using the Engineering News Record index. This periodical can be found at most
libraries. Another option is to consult with state and county transportation officials to determine
what rate of inflation they have been experiencing with construction projects in the region.
For projects dealing with existing roads, construction costs have been prorated to take into
account that a road already exists. Also, these types of projects may also have lower
engineering, environmental and contingency costs. Furthermore, bundling projects can produce
significant cost reductions, particularly in mobilization and in administrative/ engineering costs.
Based on tribal priorities, anticipated development schedules, and on the availability of
funding, projects have been placed into three categories:
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
49
+
+
+
Short-Term Projects – those that should be constructed in the next 6 years.
Mid-Term Projects – those that should be constructed from 7 to 12 years in the future.
Long-Term Projects – those not likely to be constructed for over the next 13-20 years.
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
50
TABLE 5-1
Estimated 2026 Construction Costs
Confederated Tribes of Siletz Indians Roads
ESTIMATED COSTS
Project No.
Road Owner
BIA Route ID
No.
Project Name
Length (mi.) Surface Type
Design
Guideline
Number
Total
Roadway
Width (feet)*
Terrain
Mobilization &
Site Preparation
Grading &
Drainage
Aggregate
Traffic
Control
Asphalt Paving
Misc./Utilities
Subtotal
Cont. Eng.
Legal, Env. @
40%
SHORT-TERM PROJECTS: 0-6 YEARS
NA
Ongoing Transportation Planning
1
NA
Maintenance
2
BIA/Tribal
Various
Annual Unspecified Maintenance
3
NA
NA
4
ODOT
US101
7
8
10
11
12
13
14
16
17
18
19
21
22
23
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
City
City
BIA
Tribal
Tribal
City
Private
Tribal
ODOT
County
Tribal
Joint/Tribal
Tribal
Tribal
Tribal
Tribal
Tribal
City
Tribal
Tribal
Tribal
Tribal
Tribal
Tribal
Tribal
Tribal
Tribal
Tribal
Tribal
Tribal
Tribal
U940
U611
5322
T620
T535
992
9998
960
U910
C700
965
937
935
935
992
T505
4008
9990
T515
T525
T994
T940
970
T530
T540
T520
T545
T555
T560
T565
T962
Transit Contract Services
Neotsu/US 101 Intersection Improvements: Matching
funds (Tribal contribution only)
Swan Avenue, Phase 2
Mast Avenue Extension
TRP Access Road
NE 50th Street
SW Molalla Extension
Buford Avenue Reconstruction
NE Johns Rd Reconstruction
SW Ferry Ave. to SW Swan Ave
Chemawa Rd. and Indian School Rd
Blossom Dr. NE
New Rd. East of Tillamook
Portland Rd. NE Bypass
Salem Community Development
Salem Community Pedestrian Access
Buford Avenue New Sidewalk Construction
Tribal Enterprise Parking Lot
Cemetery Way Realignment
James Frank Avenue Upgrade
SW Scarlet Extension
SW Tenas Extension
Commodities Rd.
Swan Extension
Loop Rd. East of Molalla St. off James Frank Rd.
East Rd. to New Rd. Between Ferry and Swan
New Rd. Between Ferry and Swan
Umpqua Extension
West Rd. to New Rd. Between Ferry and Swan
Judd - Old River Rd. Cutoff
Banks Access 1 Rd.
Banks Access 2 Rd.
Health Center Service Rd. - Sec. 30
MID-TERM PROJECTS: 7-12 YEARS
16
County/City U932/ C700 Blossom Drive Sidewalk
24
BIA
920
Neachesna Housing Phase 3
25
BIA
5321
Toledo River Property Industrial Rd
26
Tribal
T940
Swan Avenue Widening
27
BIA
T532
SE Sturdevant Rd. Reconstruction
28
City
U991
SE Bagley Street Upgrade
LONG-TERM PROJECTS: 13 YEARS +
29
ODOT
1229
SR 229 Safety Improve. (Pedestrian Bridge)
SR 229 Highway Safety Improvements (Tribal contribution
30
ODOT
1229
only)
31
City
C409
James Frank Road Upgrade
Total Cost
$
$
$
$
0.5
0.1
0.2
0.5
0.1
0.5
0.6
0.1
0.6
0.1
0.1
0.2
0.2
0.2
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Concrete
Concrete
U7
U7
32
32
24
32
24
32
32
32
32
26
24
20
20
Flat/Roll
Flat/Roll
Mountain
Rolling
Flat
Flat
Flat
Flat
Flat
Flat
Flat
Flat
Flat
Flat
Flat
Flat
Rolling
Flat
Flat
Flat
Flat
Flat
Flat
Flat
Flat
Flat
Flat
Rolling
Flat
Flat
Rolling
Concrete
Paved
Paved
Gravel
Paved
Paved
NA
U8
U8
R19
U11
U7
NA
34
34
20
30
32
Flat
Flat/Roll
Flat
Flat
Flat/Roll
Flat
NA
NA
8-10 ft.
0.1
0.1
0.1
0.1
0.9
0.1
0.4
0.1
0.5
0.1
0.1
0.3
0.8
0.1
0.3
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
0.5
0.8
0.4
0.1
0.4
0.1
315 ft.
U7
U6
R12
U7
32
30
28
24
32
22
36
32
U10
U7
U20
U7
26
32
54
32
U7
20
NA
0.8
Paved
U7
32
$
$
$
130,000 $
52,000 $
64,480 $
338,000
98,800
43,680
$
$
$
390,000
187,200
192,400
$
$
$
$
36,712
48,880
81,640
36,712
69,992
187,200
314,288
69,992
$
$
$
$
140,712
375,440
631,384
140,712
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
85,600
36,712
171,994
75,200
2,472
50,945
48,000
7,559
20,470
36,712
36,712
1,083,538
82,784
313,759
36,712
409,809
36,712
36,712
138,521
439,791
21,644
225,641
$
19,760
$
69,992
$ 352,891
$ 302,026
$
5,072
$
20,463
$
30,000
$
6,000
$
4,500
$
69,992
$
69,992
$ 4,099,369
$ 303,437
$ 1,121,939
$
69,992
$ 1,486,715
$
69,992
$
69,992
$ 578,570
$ 2,233,177
$
83,378
$ 359,773
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
10,400
140,712
690,114
104,250
9,919
3,214
13,000
7,500
4,100
140,712
140,712
754,357
50,167
169,794
140,712
270,127
140,712
140,712
112,875
339,589
14,749
202,596
$
$
$
$
$
$
59,280
207,688
104,000
20,800
104,000
24,336
$
$
$
$
$
$
$
$
$
$
$
$
114,140
796,120
398,320
62,400
398,320
187,304
$
$
$
$
56,680
396,032
197,600
26,000
197,600
93,184
$
$
$
$
$
$
$
$
546,000
260,000
241,280
130,000
198,120
527,280
890,240
198,120
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
15,600
198,120
965,732
103,740
NA
NA
60,000
13,250
16,600
198,120
198,120
1,822,852
99,915
467,573
198,120
666,649
198,120
198,120
160,255
935,147
25,230
287,638
$
$
$
160,940
1,120,080
560,560
$
$
560,560
263,744
$
$
$
62,400
31,200
33,800
$
$
$
$
21,632
58,240
98,280
21,632
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
15,600
21,632
115,019
10,400
NA
5,000
5,000
2,000
5,000
21,632
21,632
50,000
26,749
10,000
21,632
10,000
21,632
21,632
10,000
10,000
10,000
10,000
$
$
$
$
$
$
70,720
121,888
60,944
5,200
45,760
28,808
Flat
$
500,000
456,121
695,968
3,560,960
1,643,697
51,182
549,872
156,000
86,309
50,670
695,968
695,968
9,479,261
772,371
2,851,345
695,968
3,797,900
695,968
695,968
1,033,733
3,962,704
160,580
1,099,047
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
2,853,760
946,400
939,400
247,520
974,355
2,485,392
2,961,795
974,355
345,000
638,570
974,355
4,985,344
2,301,176
71,655
769,821
218,400
120,833
70,938
974,355
974,355
11,050,804
1,081,320
3,989,883
974,355
5,315,060
974,355
974,355
1,445,226
5,547,786
222,812
1,534,666
62,923,124
$
$
$
$
$
$
561,704
2,774,928
1,460,934
114,400
1,306,240
610,688
$
224,682 $
$ 1,109,971 $
$
584,374 $
$
45,760 $
$
522,496 $
$
244,275 $
$
786,386
3,884,899
2,045,307
160,160
1,828,736
854,963
9,560,451
1,744,536 $
1,744,536
$
2,442,350
$
$
$
$
$
$
$
$
572,000
46,800
95,680
46,800
228,800
578,240
99,736
228,800
$
$
$
$
$
$
$
$
2,038,400
676,000
671,000
176,800
695,968
1,775,280
2,115,568
695,968
$
$
$
$
$
$
$
$
815,360
270,400
268,400
70,720
278,387
710,112
846,227
278,387
$
$
$
$
$
$
309,161
228,800
1,265,209
1,048,081
33,719
470,250
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
50,000 $
$
228,800 $
228,800 $
1,669,143 $
209,320 $
768,280 $
228,800 $
954,600 $
228,800 $
228,800 $
33,512 $
5,000 $
5,580 $
13,400 $
182,448
278,387
1,424,384
657,479
20,473
219,949
62,400
34,524
20,268
278,387
278,387
1,571,544
308,949
1,138,538
278,387
1,517,160
278,387
278,387
411,493
1,585,082
62,232
435,619
$
$
$
$
$
$
99,944
133,120
139,510
13,312
$
1,897,000
670,000
102,000
580,000
Rolling
4.83%
9.91%
19.38%
27.12%
3.23%
8.01%
Flat
97,760
372,320
748,800
1,054,560
114,400
133,120 $
2,521,000
697,814
$
$
500,000
$
$
3,529,400
6,471,750
TOTAL $
78,955,325
$ 1,008,400
CONFEDERATED TRIBES OF SILETZ INDIANS
TTP ROUTES
PORTLAND - SEE MAP 5-6
3-6
CLARK
WASHINGTON
CLACKAMAS
Portland
MULTNOMAH
COWLITZ
§
¨
¦
I-5
LINN
MARION
SALEM - SEE MAP 5-6
3-6
§
¨
¦
I-5
COLUMBIA
Salem
§
¨
¦
WASHINGTON
Eugene
I-5
EUGENE SEE MAP 5-6
3-6
OREGON
£
¤
YAMHILL
20
WAHKIAKUM
£
¤
LANE
20
POLK
COLUMBIA RIVER
§
¨
¦
I-5
BENTON
5-2
OVERALL SILETZ AREA- SEE MAP 3-2
CLATSOP
£
¤
20
TILLAMOOK
Astoria
PACIFIC
Warrenton
£
¤
TRIBAL
HEADQUARTERS
101
LINCOLN
Î
Í
Siletz
Toledo
229
Lincoln City
Newport
Waldport
PACIFIC OCEAN
Washington State Department of Transportation, Earthstar Geographics
0
CITIES
STATE CAPITOL
STATE BOUNDARY
5
10
Miles
COUNTY BOUNDARIES
CTSI LANDS
3-1
FIGURE 5-1
OVERALL CTSI TTP
CONFEDERATED TRIBES OF SILETZ INDIANS
TTP ROUTES
E LODGSDEN ROAD
22411
POLK
BENTON
HATCHERY AREA SEE
SEEMAP
MAP5-5
3-5
OREGON
MOONSHINE ROAD
2307
TILLAMOOK
BANKS
PROPERTY SEE
SEE MAP
MAP 3-5
5-5
OR ROUTE 229
1229
SILETZ
3-4
SEE MAP 5-4
Siletz
20
TOLEDO
SEE MAP
MAP 5-5
3-5
SEE
LINCOLN
WALDPORT
SEE MAP
MAP 5-3
3-3
SEE
Toledo
Î
Í
LINCOLN CITY
SEE MAP
MAP 5-3
3-3
SEE
£
¤
229
£
¤
101
Lincoln City
£
¤
101
£
¤
101
US 101 HWY
1101
£
¤
101
Newport
£
¤
Waldport
101
PACIFIC OCEAN
£
¤
101
£
¤
101
Earthstar Geographics
0
3
Miles
CTSI Lands
US 101
1101
NON-TRIBAL/BIA ROUTE NAME/NUMBER
COUNTY BOUNDARIES
SWAN AVE
T940
TRIBAL/BIA ROUTE NAME/NUMBER
CITIES
CTSI TTP ROUTE
FIGURE 5-2
3-2
OVERALL: LINCOLN CITY, SILETZ,
WALDPORT, TOLEDO
AVE
EP
HY
R
CT
OYAG
E
NE
Z
NE V
ST
50
TH
NE F
AVE
NE
GA
VE
NE
HA
VE
NE
I AV
E
NW P
LINCOLN
AC
TERR IFIC SHORE
ACE
RESORT
NE
DR
MA
R
NW
E
£
¤
101
24
NEACHESNA HOUSING SUBDIVISION
....................
9020
EV
D
E
NE C AV
VILS LAKE RD
E
K
LA
S
IL
D
NE JOHNS
LOOP
EV
NE WEST DE
DR
RF
SU
NE
D
AY
R
NM
LN
LE
TT P
LI O
E Y LO
N
BA
AL
34
US
FS
OE
LITTLE
SWITZERL
AND RD
EB
U
LIM RNT
BL
N
E BARC
LAY
MEADO
WS RD
89
RD
E ECKMAN CREEK
WY
E JOHNSON
WAY
SE
CO SHA
VE DY
LN
TLINE
DR
SE ROLP SE HOSPITAL
H CT HILL
SW CREST
CIR
SW FOREST
PKY
SW FLANSBERG RD
SW WIL
SON DR
SW
BE WA
AC KO
H R ND
SW ANN ST
A
D
ELA PL
ER
AL
AN
E C EK RD
E
CR
SW KAM
AH
DR
SW SURF
PINES LN
S CRES
NW ALSEA
BAY DR
SW
BA LA
RR
E
DR
SW PAC
IFIC
COAST H
WY
PACIFIC OCEAN
LS
E
IN
RD
EA
BA
US
FS
RD
E
AN
CR DA
UD RD
EE RK N S EK
E
K Y
CR
RD
E
S LOOP
FS
ER
D
RD
E BALE
US
AST
L
EK
RE
YC
Miles
RIVER
E
ISL
SW D
AHL
AVE
1
Vantor
ER
SW IRIS LN
CT
SR 34 ALSEA HWY
S034
EC
N
ISKI L
0
SE LUCY LN
SE NELSON
WAYSIDE DR
ALSEA
SE KE
Vantor
2,500
Feet
D
EN
1,250
RD
GA
SE AY
LSEA
W
NE A
HWY
RT
PO
LD DR
WA S
T
H
NE
G
I
HE
OW
ILL ST
W
A
SE Y
A
SW W OP
LO
TH D
R
NS
ST
JOH
NE
NE 38TH
NE
ME
Y
WA
CTSI TTP ROUTE - PROPOSED
NA
NE 3
6
NE JOHNS RD.
9998
NE 41ST ST
CT NE 40TH ST
0TH
NE 4
T
DS
2N
Waldport
R
FAI
SW
CIR
CTSI TTP ROUTE
ET
NS AY
W
0
COUNTY BOUNDARIES
4
NE
NW PINE ST
SU
8
CTSI Lands
UN
SW SITKA
RIDGE CT
SE MAST AVE
U611
SWAN AVE
T940
ROUTE
W
AY
1
10
NW
£
¤
101
US 101
1101
IN
N
SW
P
VIE ACIFIC
WS
T
NW
NE W. DEVILS LAKE
RD. 2010
NW PORT
AVE
900
Feet
101
CITY OF WALDPORT£
¤
NE 14 ST
U612
CITIES
NW MAST AVE
NE W. DEVILS LAKE RD
2010
450
NW LEE
AVE
0
US101
1101
NW 40TH ST
NW 39TH ST
NW KEE
L
AVE
LINCOLN
NW JETT
Y AVE
£
¤
NW 40TH ST
U602
PL
RD
0TH
4
NW
US 101
1101
NE 43RD ST
N
H
JO
NE
NW 40TH PL
U604
101
VE
SA
NE D A
VE
IL
D
LA
K
KE BLV
101
T
NE 49TH ST
NE E
AVE
H ST
T
NE 45
0TH
S
N
NE 47TH ST
ILS LA
S
T
HS
47T
ST
NE 5
DR
OTSU
E NE
V
NE DE
NW
44
ST
48
TH
NE 47TH ST
U610
NE
NE
PL
TH
NE 50TH ST
T620
NE DEVILS LAKE BLVD
U603
CT
9TH
NE 4
VE
KA
NW
NW 44TH ST
U608
R
RD
MA
RA
MI
NE ZEPHYR CT.
T622
T
51S
NE
P
LOO
NW 51ST ST
NE
LO 46T
OP H
NW
MI
RA
NW
NW MIRAMAR DR
9988
LOO
P
4TH
PACIFIC OCEAN
DR
NW 50TH ST
P NW LOGAN RD
L
N
L
U601
LINCO
4
NW
NW PORT DR
U609
1ST
NW BELL CT
ST
51
NE
5
NW LO
GAN RD
NW KEEL
AVE
AVE
TTY AV
E
NW JE
LEE
NW
ND DR
RD CT
NE
101
NW 52
NE 53
GE
YA
VO P
NE LOO
£
¤
PACIFIC OCEAN
101
PL
£
¤
R
3RD D
NW 5
RT
SEE INSET CITY OF LINCOLN CITY, NORTH
NE PORT LN
PO
CITY OF LINCOLN CITY, NORTH
NE
CITY OF LINCOLN CITY OVERALL
NE NEPTUNE'S LN
CONFEDERATED TRIBES OF SILETZ INDIANS
TTP ROUTES
Earthstar Geographics
53
NON-TRIBAL/BIA TTP ROUTE NAME/NUMBER
TRIBAL/BIA TTP ROUTE NAME/NUMBER
NON-CTSI TTP ROUTE
FIGURE 5-3:
3-3:
LINCOLN CITY, WALDPORT
CONFEDERATED TRIBES OF SILETZ INDIANS
TTP ROUTES
CITY OF SILETZ
30
DE
WA
RD
JUDD RD - OLD RIVER RD
CUTOFF
T555
R
NE
OLD
E
RIV
JUDD RD.
2
RD
ROGUE RIVER CT
4006
TOOTOOTNEY CT
4007
45
TOOTOOTNEY CT
TRIBAL
HEADQUARTERS
996
CEMETERY RD.
.
4008
TOLOWA CT
4002
TAKELMA CT
CT
SHASTA
HEALTH CENTER
SERVICE RD.
T962
LOWA
SE TO
CT
COMMODITIES
. ................ RD.
T994
38
RD
RIV
E
LO
GS
SR 229 SILETZ HWY
1229
SW DARCY AVE
TZ
DE
N
SIL
ETZ
SW FERRY AVE.
U993
SW
SCARLET EXTENSION
T515
34
48
R
TENAS EXTENSION
T525
NE BAGLEY ST
R ST
PALM
E
SE P
ALM
SWAN AVE
T940
29
TAKELMA CT
4001
26
SE TOLO
WA CT
FERRY TO SWAN AVE.
960
RD
SE BAGLEY ST
ER
ED
ER S
T NE
ST
229
SE
RE
NW GRINSTEAD ST
SW SC
ARLET
ST
NW TENA'S CT
A'S ST
SW TEN
SW MOLALLA ST
SW UMPQUA ST
SW BENSELL ST
SW EMERALD ST
SE SWAN AVE
W. RD TO NEW RD. BETWEEN
FERRY AND SWAN
T545
SW FERRY AVE
28
GSDE
N
RD
16
E LO
ELDER HOUSING RD.
T999
SE EG
BERT
AVE
UT
-SH
44
CHETCO CT.
4005
HEALTH CENTER
RD T960
GWEE-SHUT RD
0900
EE
SW SWAN AVE
36
Siletz
SE BAGLEY ST.
U991
R
UE
ROG
GW
19
CHETCO CT
PEDESTRIAN PATH
410
RD
7
42
UMPQUA EXTENSION
T520
32
33
41
NEW RD. BETWEEN
FERRY AND SWAN
T540
13
T
RC
IVE
D
R
GOVERNMENT HILL RD
LL
.................
1
HI
.
T
N
ME
RN
VE
O
G
RY
37
W BUFORD AVE
NEW RD. E. OF
TILLAMOOK
965
E. LOGSDEN
2411
NE METCALF AVE
E
ET
12
TILLAMOOK
995
M
CE
43
BUFORD AVE.
U992
NE
E. RD TO NEW RD. BETWEEN
FERRY AND SWAN
T630
R
39
KD
UMPQUA EXTENSION
T520
SE SWAN
AVE. U940
R
PA
SWAN AVE
T940
TRIBAL
35 ENTERPRISE LOT
T505
SHASTA CT
4004
JUDD RD
MF HOUSING B
T998
LL
40
CT
MI
NW JAMES FRANK AVE
IL
LO
W
TAKELMA CT.
4001
MF HOUSING A
T997
W
NE
31
UMPQUA CT
950
NW
JAMES FRANK RD.
999
MOLLALLA CT
910
NW A ST
BUFORD AVE.
992
NW B ST
NEW LOOP W. OF
UMPQUA 970
NW C ST
JAMES FRANK RD.
C409
RD
FRED TAYLOR RD
R
VE
RI
LE
SI
Microsoft, Vantor
0
375
750
Feet
CITIES
US 101
1101
NON-TRIBAL/BIA ROUTE NAME/NUMBER
CTSI LANDS
SWAN AVE
T940
TRIBAL/BIA ROUTE NAME/NUMBER
CTSI TTP ROUTE - LOT
CTSI TTP ROUTE
CTSI TTP ROUTE - PROPOSED
ROUTE
NON-CTSI TTP ROUTE
FIGURE 3-4:
5-4:
CITY OF SILETZ
CONFEDERATED TRIBES OF SILETZ INDIANS
TTP ROUTES
BIG
CR ROC
EEK K
RD
HATCHERY AREA
SE
CITY OF TOLEDO
ON
M
AM
RD
SEE INSET HATCHERY
RD
BANKS PROPERTY
BRUSH CREEK RD.
T518
L
HP
ST
16T
RI
VE
R
SE
IN
A
SE BU
TLER
B
RIDGE
U
RD
GE
YR
ID
Toledo
NN
R ST
SU
SE ELDER ST
SE FI
TRP INDUSTRIAL RD
5321
Q
HO
LL
SE GAITHER Y ST
WAY
25
YA
SE 7TH ST
SE
SE 8TH ST
SE 5TH ST
ST
SE 4TH ST
SE 2ND ST
LN
OIR
NE CHERRY
NE 8
T
RV
SE DOUGLAS ST
SE CEDAR ST
RD
SE 9TH ST
NE
ST
DR
1,500
Feet
E
NE N
RE
SE
LN
SE 3RD ST SE 3RD
NE
750
DIE
AN
NE 2ND ST
I
YL
0
H ST
GE
DR
NE
C
LOR
MAX ANY
PL ON
RID
NE
SS
GE
TH
10
R
BU
SK
R
RD
PL
NE
DIA
D
ON RD
NE WAG
OP LN
NE HILLT
NE 10TH
N RD
NE WAGO
RCA
NE
NE A
RD
OPE
T SL
EAS
E
N
PE
SLO
AST
SE E
SE OLSON RD
OPE RD
SE EAST SL
NE MEA
DOW
E
LO CLAR HILL DR
OP
K
DR
P N
10
RI ST
R
BY
RD
E. LOGSDEN
EK RD.
2411 CRE
R
EE
ST
TRP ACCESS RD
5322
T
SE KAU
LE D
NEL
OP
SE STURDEVANT RD.
532
DC
DO
20
Y LO
ERA
L
SE
OSS
FIR
SE DR
EST
RD
NE M
SE E
M
SE RIVER RD
SE
18T
H
N
SE
NE MOSSY LN
D
R
NT
EVA
RD
STU
SE 14TH ST
D
SE 10TH ST
VA
NT
R
27
SE HILLVALE LN
RD
E
CR
DE
GS
LO
PL
ST
U
SE 6TH ST
T
NE
LDER
SE A Y
WA
DE
VA
N
N
RE
LO SE
LAVER
SE
SE NE DR
CR FIR
ES
WA T
IER
LL
Y
CO
SE AVE
D
ER R
UR
SE ALDER
LANE DR
EST
HED
ST
LN
ELK CITY RD
SE C
NE
SE PINE ST
RD
Vantor
HATCHERY
HATCHERY RD.
T528
S. NORTON HILL RD.
T542
NORTON
RD
E. LOGSDEN RD.
2411
LOGSDEN RD
S. NORTON HILL RD.
C416
HATCHERY ACCESS RD.
T529
BANKS ACCESS 1
T560
46
E. LOGSDEN RD.
2411
SIL
ET
SA
MS
0
1,250
2,500
Feet
CITIES
CTSI LANDS
CTSI TTP ROUTE
CTSI TTP ROUTE - LOT
Vantor
D
LLE R
VI
NASH
US 101
1101
NON-TRIBAL/BIA ROUTE NAME/NUMBER
SWAN AVE
T940
TRIBAL/BIA ROUTE NAME/NUMBER
ROUTE
NON-CTSI TTP ROUTE
ZR
IV
ER
LO
G
SD
EN
RD
BANKS ACCESS 2
T565
47
CR
EE
K
0
RD
300
600
Feet
Vantor
0
250
500
Feet
FIGURE 3-5:
5-5
TOLEDO, HATCHERY AREA
Microsoft, Vantor
TRIBAL/BIA ROUTE NAME/NUMBER
STATE BOUNDARY
CTSI TTP ROUTE - LOT
155TH
154TH
HOOD
MACADAM AVE-I5 FWY
AVEKELL
Y AV
E
MACA
DAM
MACADAM
KELLY
I5
147TH
CORBETT
WATER
155TH
I405 FWY-I5 FWY
WATER
CORBETT
144TH 144TH
143RD
NAITO
PKY-ROSS
ISLAND BR
G
NAIT
O
NAITO PKY FRONTAGE
PKY PKY-NA
I
FRO
NTA TO
GE
NAITO
KELLY
AVE-ROSS
ISLAND BRG
NAITO
NAITO
PKY-ROSS
ISLAND BRG
1ST
ALMADEN
FILLMORE
FILLMORE
CHAMBERS
GRANT
GARFIELD
8TH
BROADWAY
BROADWAY
PRIVATE
9TH
9TH ROAD
10TH
10TH
10TH
GRANT
HAYES
GARFIELD
ARTHUR
11TH 11TH 11TH 11TH
11TH
PR
12TH
IVA
FIELD
TE
RO EUGENE
12TH
AOFFICE
12TH 12TH 12TH
D
T701
PRIVAT
13TH
E ROAD
13TH
H
14TH
15 14T
Vantor
1
TH
4TH
14TH
PRIV
AT
ROA E
D
MCKINLEY
PRIVATE ROAD
CITY VIEW
PRIVATE
ROAD
PRIVATE
ROAD
ACORN
PARK
WILSON
WILSON
OAK PATCH
BUCK
7TH
8TH
W. 11TH ST.
U011
14TH
7TH
7TH
MCKINLEY
WILSON
CONGER
SENECA
TYINN
10TH
PRIVATE
ROAD
PRIVA
PRIVATE
TE
ROAD 13TH ACORN PARK
E ROAD
T
PRIVATE PRIVA
A
PR
TE
RIV
P
IVA
BUCK 13TH
ROAD
D
ROAD
ROA
RO TE
AD
PRIVAT 14TH
PRIVATE
E
ROAD
ROAD
FETTERS
15TH
15TH
PRIVATE
ROAD
PLUMTREE
H
7T
HAYES
MARKET
PRIVATE ROAD
PRIVATE
ROAD
BAILEY HILL
OBIE
13TH
PHANTOM
PRIVATE
ROAD
OCEAN
WALLIS
DANI
LOGAN
PHANTOM
POWERS
NOLAN
SWAN AVE
T940
INTERIOR
LANCASTER
39TH
38TH
BERTELSEN
DANEBO
RICHARD
D
OSCAR
38TH
38TH
LILAC
RT
LA
N
PO
AL
E
ND
NA
37TH
154TH
146TH
151ST
142ND
140TH
148TH
141ST
140TH
140TH
137TH
139TH
136TH
135TH
NAITO PKY
FRONTAGE
4TH
S
PU
M
CA
OOL
SCH
IAN
IND
NILES
CTSI TTP ROUTE - PROPOSED
NON-CTSI TTP ROUTE
153RD
143RD
133RD
138TH
123RD
ON
KS
JA
C
SA
M
EM
CH
AWA
RD
HEM
SB C
SB INTERSTA
TE
NB INTERSTAT 5
E5
E
RIDG
PA
RK
PY
LEM
D NB SA
AW
AR
PY
AW
A
RD
SB
SA
LE
M
RIDGE
EM
CH
SB
EM
D
STATE CAPITOL
PRIVATE ROAD
BUCK
NON-TRIBAL/BIA ROUTE NAME/NUMBER
6TH
7TH
ATE
PRIV AD
RO
US 101
1101
ROUTE
Vantor
§
¨
¦
E
AT
IV
PR AD
RO
CTSI TTP ROUTE
AD
CITIES
PRIVATE
ROAD PRIVAT
E
ROAD
11TH
PRIVATE ROAD
RD
IBIS
1,500
Feet
PRIVATE
ROAD
PRIVA
TE
ROAD
JANISSE
PRIVATE
ROAD
0
13TH
E
PRIVAT
ROAD
Vantor
12TH
PRIVATE ROAD
TE RO
PRIVA
NESTOR
LDS
CE
ASTORIA
WA
RIA
D
R
ND
O
AST
TLA
OR
ASTORIA ST.IVY
U930
IVY
PRIVATE
ROAD
NO
MER
P
NB
22N
CE
PRIVATE
ROAD
STEWART
ER
COM
STEPHENS
21
1,200
Feet
W
IL
CR LOW
EE
K
HAYESVILLE
STEWART
MM
REY
PHYLLIS
CO
7TH
SAM
PORTLAND BYPASS
937
WHITAKER
I-5
E
VAT
PRI D
A
RO
23
ISABELLE
PRIVATE ROAD
SALEM HOUSING
MICHEL
935
............
22
EVANSTON
PRIVATE
ROAD
EUGENE
RANDY PAPE BELTLINE
RADIANT
ST CROIX
NB
18
Y
BLOSSOM
GIBBS
PORTLAND
HQ LOT
T500
I5 FWY-I405 FW
16
I5
300
Feet
I-5
FWY
150
§
¨
¦
HOOD AVE-I5
0
M
O
BLOSS
FWY
TRIBAL OFFICE LOT
T510
I5 FWY-HOOD AVE
BLOSSOME DR. NE
C700
D
AME
BLOSSOME DR. NE
U932
WHITAKER
UNN
MP
US
GROVER
ND BRG-I5
D
BLV
BUR
BAR NTAGE
FRO
SW GIBBS ST.
U500
ROSS ISLA
GIBBS
YAMHILL
ROSS ISLAND
Y
LL
Y
FW
BUR
GIBBS
5
-I
KE
PORTLAND
SW FIELD OFFICE
GR
CA
CTSI LANDS
WOODS
NAITO
PKY-RO
S
ISLAND S
BRG
OVER
MORRISON
Vantor
G
BR
GROVER
SW 1ST AVE.
U505
WHITAKER
600
ROS
BRG S ISLA
N
-NA
ITO D
PKY
TAYLOR
D
INDIAN SCHOOL RD.
U920
R
SA
L
WOODS
ALDER
ALDER
YAMHILL
TA
YL
OR
N
LA
CHEMAWA RD. NE
U910
I-5
0
TAYLOR
UNNAMED
IS
17
§
¨
¦
KEIZER
WOODS
BAR
EM
CH
SALMON
TERWILLIGE
NB
D
AR
AW
TAYLOR
MORRISON 151ST
SS
UNNAMED
L
YAMHIL
TAYLOR
SALMON
SW PORTLAND
OLD
CHEMAWA CH OLD
EM
AW
A
CHEMAW
A
OLD CHEMAWA
1,000
MAIN
Feet
MORRISON
ALDER
MACADAM
Y
AVE-I5 FW
OLD A
MAW
CHE
500
ALDER UNNAMED
RO
SALEM
0SALMON
SALMON
3RD
Miles
TAYLOR
120TH
3
114TH
Washington State Department of
Transportation, Earthstar Geographics
SE 128TH
MORRISON U128
ALDER
ALDER
149TH
0
TH
114
131ST
ALDER
ALDER
156TH
MORRISON
SE
STARK ST.
WASHINGTON
U960
WASHINGTON
YAMHILL
SEE INSET SW PORTLAND
142ND
127TH
126TH
PORTLAND
FIELD OFFICE
T702
153RD
Portland
114TH
MULTNOMAH
ALDER
134TH
SEE INSET NE PORTLAND
UNNAMED
OAK
STARK
131ST
WASHINGTON
UNNAMED
R
OAK
2ND
§
¨
¦
VE
129TH
OR
I-5
PRIVATE
ROAD
PRIVATE
ROAD
RI
141ST
PORTLAND
NE FIELD OFFICE
130TH
TE
128TH
ET
122ND
M
OAK
119TH
LA
IVER
117TH
IL
NE PORTLAND
IA R
115TH
W
WACLARK
UMB
ASH
COL
PORTLAND
ANKENY
CONFEDERATED TRIBES OF SILETZ INDIANS
TTP ROUTES
FIGURE 3-6:
5-6
PORTLAND, SALEM, AND
EUGENE
Short-Term Projects (0-6 years)
Project No. 1: Ongoing Transportation Planning Activities. Ongoing transportation planning
is critical because it affects the overall development of the reservation and has a direct impact
on the level of funding the Tribes will receive through the BIA roads program. This project
includes:
•
•
•
•
•
TTP Road Inventory updating to ensure that the Tribes receive their fair share of the
Federal Highway Funds;
annual updating of the Transportation Improvement Program (TIP) to ensure that funds
are allocated to priority projects, and contracts are in place for design and construction;
updating the Long-Range Transportation Plan approximately every five years to
appropriately address changing needs and priorities and any new lands procured by the
Tribes;
updating the Local Roads Safety Plan;
and a traffic study of the roads around the grade school (including fire station).
The Tribe also uses BIA roads funding to support transportation planning staff who carry out
planning activities, project implementation, and transit functions. It is estimated that the cost of
ongoing planning activities will be $1,897,000 over the next 6 years. Planning costs have only
been identified for the short term as these budgets will change over the long term. When the
Plan is updated in the next 5-6 years, new budgets will be developed based on needs identified
at that time.
Project No. 2: Maintenance. The Tribe’s Road Maintenance Plan calls for a number of major
maintenance projects that need to be undertaken during the short term. Roads needing
maintenance treatments include: NW 50th Ave., Commodities Rd., Tillamook Subdivision,
Shasta Ct., and Sturdevant Rd. Specific treatments are spelled out in the Road Maintenance Plan
dated March 2025. Total estimated cost of these maintenance projects over the short term is
$670,000.
Also, in order to protect the public investment that has been made in the road system, periodic
maintenance is a necessity. Ongoing annual maintenance includes such activities as pothole
repair, drainage maintenance, sign replacement, street sweeping, striping, slurry sealing, snow
removal, and emergency repairs. These maintenance needs are hard to predict, so it is necessary
to have an annual maintenance fund established to facilitate road repairs, especially emergency
repairs, when they occur. Major maintenance, such as overlays and chip seals, are easier to
program and would be shown as specific projects in the LRTP. It is recommended that the Tribe
allocate $17,000 a year for road maintenance. Total estimated cost of this project over the short
term 6-year period is $102,000. Costs have only been identified for the short term as these
budgets will change over the long term. When the Plan is updated in the next 5-6 years, new
budgets will be developed based on needs identified at that time.
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
58
All maintenance costs, including annual maintenance and identified short-term maintenance
projects, are estimated to be $772,000 over the short term.
Project No. 3: Transit. The Tribe supports Lincoln Transit, the regional transit agency, and
contracts to that agency for transit service to and from Siletz. Annually, the Tribe uses BIA
roads funding to cover some of the cost of these contracted services or when local match
funding is needed for state or federal transit programs. Over the short term, it is estimated that
transit services will cost the Tribe $580,000. These costs have only been estimated over the short
term as service costs and transit funding programs can change significantly from year to year.
These future costs can be more accurately estimated when the LRTP is updated in 5-6 years.
Project No. 4: NE Neotsu Drive/US 101 Intersection Improvements (Route 1101). The
Neotsu/US 101 intersection has been a safety concern for some time as the intersection is not
signalized, making it difficult to access the west-bound lane of US 101 during periods of heavy
traffic. The intersection provides the main access to the Post Office, the Neotsu community and
the residential area served by Johns Road. generate a significant number of trips. As the Tribe
continues to develop the Neachesna housing area along Johns Road, additional trips will be
generated that will increase traffic at the intersection. ODOT has also expressed interest in
making safety improvements at the intersection.
At present, the intersection has not been studied, so the type and extent of improvements is
unknown. Since the project is undefined a reasonable cost estimate is not possible. The Tribe has
identified safety improvements at the intersection to be a tribal priority, and has allocated
$500,000, over the short term, to assist ODOT in studying the intersection to determine
appropriate improvements, in designing improvements, and for ultimate construction. These
funds could also be used as the local match if necessary to access particular state or federal
funding sources. As the TIP is revised in the next few years, adjustments can be made to the
timing of this project and a cost estimate developed. This project will require extensive
coordination between ODOT, Lincoln County, and the Tribe.
Project No. 7: SW Swan Avenue Widening, Phase 2 (Route U940). Swan Avenue provides
access from SR 229 to tribal housing on the west side of Siletz and tribal facilities on the east
side of SR 229. With the exception of improvements to the far west BIA section of the road and
just east of SR 229, Swan Avenue is in need of improvement to adequately serve the tribal
developments and other city residential development. The Tribe owns additional property
along this street and will be constructing additional tribal housing. Under this project, Section
810 of the City of Siletz portion of road west of SR 229 would be reconstructed to a 32-foot wide,
paved roadway with curb and gutter and sidewalks to match the adjoining sections (Urban
Design Guideline No. 7: Urban Local). Underground drainage facilities would also be provided.
Total estimated cost of the project is $2,853,760.
Project No. 8: Mast Avenue Extension (Route U611). The Tribe owns a 3-acre residential parcel
on Mast Avenue, which is off US 101 just south and east of the Tanger Outlet mall in Lincoln
Confederated Tribes of Siletz Indians | Long-Range Transportation Plan | February 2026
59
City. To develop the property
This text is long and has been trimmed here. Open the source document for the complete record.
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.