The Confederated Tribes of the Coos, (2010)

Tribal code

Ask Donna

What actually matters in this document.

Text

The Confederated Tribes of the Coos,

Lower Umpqua and Siuslaw Indians

Long Range Transportation Plan

May 2010

The Confederated Tribes of the Coos, Lower Umpqua and Siuslaw Indians

1245 Fulton Ave. Coos Bay, Oregon 97420

The Confederated Tribes of Coos, Lower Umpqua and Siuslaw Indians Tribal Council:

Warren Brainard ....................................................Chief

Bob Garcia, Chair.……………...........................Position No. 1

Beaver Bowen………….....................................Position No. 2

Mark Ingersoll, Vice-Chair.................................Position No. 3

Ron Brainard……...............................................Position No. 4

Wendy Williford ...............................................Position No. 5

Aaron McNutt…………………………………. Position No. 6

The Confederated Tribes of Coos, Lower Umpqua and Siuslaw Indians Project Staff:

Howard Crombie……….................................Director of Natural Resources

Jeff Stump………………..……………………GIS Specialist

ii

Table of Contents

Tribal History .............................................................................................................. 1

Tribal Enrollment ........................................................................................................ 2

Table 1: Location of Tribal Membership.......................................................... 2

Transportation Infrastructure and Land Use ............................................................... 2

Highway 101 .......................................................................................................... 3

Florence .................................................................................................................. 3

Figure 1 – Florence Area ................................................................................... 3

Figure 2 – Confederated Tribes’ Three Rivers Casino ...................................... 4

Highway 126 .......................................................................................................... 5

The Siuslaw River .................................................................................................. 5

Figure 3 – Siuslaw River Bridge ....................................................................... 6

The Bay Area .......................................................................................................... 6

The Oregon International Port of Coos Bay ........................................................... 6

Figure 4 –Charleston Marina and the Oregon Dunes ........................................ 7

Figure 5 – McCullough Bridge .......................................................................... 8

Southwest Oregon Regional Airport ...................................................................... 8

Cape Arago Highway ............................................................................................. 9

Other Infrastructure ................................................................................................ 9

Figure 6 - Umpqua River Bridge ....................................................................... 9

Transportation Planning ............................................................................................ 10

Indian Reservation Roads (IRR) Program ............................................................ 10

Transportation Goals ............................................................................................ 11

Recommendations ................................................................................................ 11

Short Term (2010-2014) ....................................................................................... 12

Mid Term (2015-2024) ......................................................................................... 12

Long Term (2025-2029) ....................................................................................... 13

Miscellaneous Recommendations: ....................................................................... 13

Appendix A – Maps .................................................................................................. 14

Appendix B – Sources ............................................................................................... 17

Appendix C – Inventory Detail ................................................................................. 18

iii

Tribal History

In 1855, a treaty was drafted by the federal government to allow for the peaceful acquisition

and settlement of the Confederated Tribes of Coos, Lower Umpqua and Siuslaw Indians’

(Confederated Tribes) ancestral lands. Being promised compensation for the loss of their

homelands and concerned for the continued safety of their members, the three Tribes agreed

to the Treaty of 1855, trusting the United States to make good on its commitment.

It was the draft 1855 treaty and activities around it that linked the three Tribes together

although they had been closely associated for centuries prior. In 1916, the Tribes established a

formal, elected tribal government which they have continuously maintained.

Belatedly, in February of 1941, the Bureau of Indian Affairs took a small parcel (6.12 acres)

into trust for the Confederated Tribes in the Empire District of Coos Bay, Oregon. This

privately donated “reservation” is the site of the Tribal Hall and served throughout the

Termination years (1956-1984) as a small, but significant symbol of unity for tribal members.

The Confederated Tribes unanimously voted to strongly oppose termination. However, they

were included, without their knowledge or consent, in the Western Oregon Termination Act

of 1954. To quote, “The blatant lack of participation in the process is most evident among the

Indians of Southwest Oregon. The Coos, Lower Umpqua and Siuslaw never passed a

resolution in favor of termination, and were adamantly opposed [to it]. In 1948, the Coos,

Lower Umpquas [sic] sent forty-eight delegates to the Siletz Reservation to express their

disapproval of termination; but were not allowed to make their case, as they had been locked

out of the meeting and [were] told the termination bill did not affect them”. The Confederated

Tribes refused to accede to the sale of their land and Tribal Hall, and maintained the acreage

in ambiguous status until Restoration in 1984.

The Termination Act of 1954 proved disastrous to the Confederated Tribes. Having lost all of

their resources to the federal government without the agreed upon compensation, what little

federal assistance they were receiving was terminated as a result of the Act. During the

period between 1955 and 1984, the Confederated Tribes had to rely on what little resources

they could muster in an attempt to provide services to members. Supplying even the most

basic services to tribal members was nearly impossible. The tribal government, although

terminated from federal relations, never disbanded and continued to press forward and plan

for the future.

On October 17, 1984, President Ronald Reagan restored the Tribes to federal recognition by

signing Public Law 98-481 and reaffirming the Tribes’ status as a sovereign nation. Along

with this recognition came very basic programs to provide once again the most essential

services and lay a preliminary foundation for future program growth.

1

Tribal Enrollment

The information in Table 1 was obtained from Tribal enrollment records and is current as of

June 2010. Tribal enrollment has increased nearly one-third since 2003. Membership within

Oregon grew by 107 new members while membership in other states grew by 135 members.

61.9% of Tribal members live in Oregon, 44.9% in the 5-county Service Area of Lincoln,

Lane, Coos, Curry and Douglas counties.

Table 1: Location of Tribal Membership

Location

2003

2010

Growth

Number

Percent

Number

Percent

Number

Percent

OREGON

484

68%

591

61.9%

107

22.1%

5-County Service Area

362

50%

429

44.9%

67

18.5%

Coos

165

23%

188

19.7%

23

13.9%

Curry

5

3%

5

0.5%

0

0%

Douglas

25

4%

34

3.5%

9

36%

Lane

146

20%

176

18.4%

30

20.6%

Lincoln

21

3%

26

2.7%

5

23.8%

Other OR Counties

122

17%

162

17.0%

40

32.8%

Other States

202

28%

337

35.3%

135

66.8%

Canada

-

-

4

-

4

-

Unknown

31

4%

23

2.4%

-8

-25.8%

Total Membership

717

238

33.2%

955

Transportation Infrastructure and Land Use

An important relationship exists between land use and transportation infrastructure. Changes

in land use create varying demands upon the existing transportation system and transportation

systems influence how land is utilized. The Confederated Tribes’ transportation system is

defined by their Ancestral Territory along the Pacific Ocean on the rugged Oregon Coast.

Their small and scattered land holdings are barely a fraction of the 1.6 million acre homeland

that stretched for seventy miles north and south along the Pacific Ocean and 50 miles inland

to the Coast Range of Mountains.

The four major cities within the ancestral territory are Florence, Reedsport, North Bend and

Coos Bay, Oregon. The Bay Area (Coos Bay, North Bend and Charleston) and Florence are

the two main Tribal population centers in the Ancestral Territory. Coos Bay, North Bend and

Florence are the largest cities by population, respectively, in the Ancestral Territory. The

Ancestral Territory includes parts of 3 counties: Lane, Coos and Douglas. These cities are

also traditional centers of Tribal activity. The cities each lie on a water body named for a

Tribe – Florence is on the Siuslaw River, Reedsport is on the Umpqua River and Coos

2

Bay/North Bend is on Coos Bay near Coos River. Outside the Ancestral Territory, a

significant number of Tribal members live in the Eugene-Springfield Area.

Highway 101

The Oregon Coast Highway, Highway 101, is the primary route connecting these coastal

cities together. This highway is a principal arterial and a State Highway on the National

Highway System (NHS) that runs the entire length of the Oregon Coast through most coastal

cities from the Washington State line to the California State line. The Pacific Coast Scenic

Byway, as it is also known, was recognized in 1991 as Oregon’s first State Scenic Byway and

in 1998 it was dedicated as a National Scenic Byway. An interesting tour of the Oregon Coast

Highway can be found online at http://www.sos.state.or.us/archives/exhibits/coast/index.html.

The 48 mile segment of Highway 101 between Florence and the Bay Area is the most

important route in terms of providing access to employment, services, recreation and cultural

resources for the Confederated Tribes. This stretch of highway provides access to the

Confederated Tribes’ Three Rivers Casino, the Siuslaw National Forest and the Oregon Dunes

National Recreation Area. It provides access to the Pacific Ocean as well as over a dozen

lakes, campgrounds and trails, as well as traditional hunting, gathering and fishing sites. Some

of the more significant lakes along this route include Woahink, Siltcoos, Tahkenitch, Eel,

Munsel and the Tenmile lakes.

Florence

Florence is a nationally recognized retirement community. The city’s unique natural Oregon

landscape and many nearby attractions help make it a tourist destination. Tourist attractions

include the Heceta Head lighthouse and Sea Lion Caves, Three Rivers Casino, Old Town

Florence and the port on the Siuslaw River.

Figure 1 – Florence Area

3

Florence is located in Lane County Oregon. Per the 2000 census it has a population of 7,453

with 48.9% of the population 60 years of age and over. The unemployment rate in Florence is

10.6% and over 75% of employees work in the service and retail sectors also according to the

2000 census. The major employers in Florence are the Confederated Tribes’ Three Rivers

Casino and Peace Health who each employee an estimated 475.

The Confederated Tribe’s newly constructed Three Rivers Casino near Florence is a key

tourist destination in Florence and serves as a major employer for the Confederated Tribes

and the local community. The Casino continues to grow and benefits from its location

adjacent to the city limits of Florence near the intersection of Highway 126 and Highway 101.

These routes provide crucial links to the market in Eugene-Springfield and to the general

tourist trade.

Due to the Casino’s importance to Tribal self-determination, further improvements to the

transportation infrastructure in and around the facility are being developed. The Severy

Access project is being developed to provide access to the northern portion of the Casino

parcel also referred to as the Hatch Tract. Dependent upon the design, the project could also

provide a much needed east-west link from the City of Florence to Lane County’s North Fork

Siuslaw Road east of the Three Rivers Casino. The Hatch Tract is the Confederated Tribes

single largest parcel of trust land.

Figure 2 – Confederated Tribes’ Three Rivers Casino

4

Highway 126

Highway 126 is another key component of the transportation infrastructure providing access

for Tribal Members, tourists and citizens to and from the community of Florence. Highway

126 is a state highway (OR 126) also on the National Highway System. This route is the

primary east-west route in Florence. It starts in Florence at Highway 101 at milepost 190.16

and travels east, past the entrance to the Three Rivers Casino, to Eugene and Interstate 5 and

continues over the Cascade Mountains to Eastern Oregon. This route is heavily traveled by

tourists and weekenders traveling west from the inland valleys and Eastern Oregon to the

Pacific Ocean, the Oregon Dunes, Siuslaw National Forest and the many other attractions

along Highway 101.

Critical to the operation of Highway 126 is the North Fork Siuslaw River Bridge. The bridge

is currently being replaced and the new bridge is being constructed just south of the current

bridge at milepost 1.17 just east of the City of Florence and the entrance to the Three Rivers

Casino. Also planned are improvements to North Fork road adjacent to the bridge. North Fork

Road provides secondary access to the casino and also provides access to the Tribes’ Munsel

Lake property. It is anticipated to take 4 years to complete the project due to environmental

issues associated with its location adjacent to the Siuslaw and North Fork Siuslaw rivers and

their wetlands. The construction contract was awarded in September 2007 for $14,482,800.82.

The Siuslaw River

The Siuslaw River itself is also an important transportation infrastructure element for the

Confederated Tribes as well as the community of Florence. Florence was almost entirely

dependent on its natural resource economy – mainly fishing and timber – throughout the first

half of the 20th century and the Siuslaw Indians have been dependent for untold generations

upon this river for subsistence as well as transportation.

The Port of Siuslaw is located on the Siuslaw River and is considered a critical harbor of

refuge. The Port is home to a United States Coast Guard (USCG) station and, according to the

U.S. Army Corps of Engineers (USACE), its bar had 1,351 commercial crossings in 2005.

The USACE also reported the economic impact of the Port of Siuslaw to the community in

2005 as $12.5 million.

In Florence, 5 miles up the Siuslaw River, the port manages various facilities including a

marina which has commercial docks, a waterfront boardwalk and a recreational marina.

Adjacent to the marina, the port also operates an RV park and campground which

accommodates the many fishermen who come to fish on the river, the ocean or the local lakes.

Crabbing, clamming, beachcombing and kayaking are also activities you’ll find within the

Siuslaw River watershed and its water trails.

Milepost 191 on Highway 101 is the southern city limits of Florence and where the Siuslaw

River Bridge begins. This bridge is eligible for the National Register of Historic Places and is

a steel double-leaf bascule drawspan. The historic bridges along Highway 101 between the

Bay Area and Florence are key transportation infrastructure elements to the Confederated

Tribes.

5

Figure 3 – Siuslaw River Bridge

The Bay Area

The Tribes’ other main population center is the Bay Area which includes the adjacent cities of

Coos Bay and North Bend. Another community, Charleston, is also part of the Bay Area but

is at the entrance to Coos Bay and is unincorporated and under the jurisdiction of Coos

County. The Bay Area is the largest metropolitan area in Coos County, on the Oregon Coast

and in the Tribes’ Ancestral Territory. Coos Bay has a population of 15,484 and North Bend

has a population of 9,683 according to the 2000 census. Charleston is home to the Oregon

Institute of Marine Biology, South Slough National Estuarine Research Reserve and US Coast

Guard (USCG) Life Boat Station. The Charleston Marina Complex provides moorage for

about 550 boats and is owned and operated by the Oregon International Port of Coos Bay.

Coos County’s economy, historically, was dependent upon its substantial natural resources,

primarily, timber, fish and coal. Sawmills, canneries and mines sprung up and ships were built

to transport their products out through the Port of Coos Bay. However today, these resources

are diminished and the industries associated with them are no longer as dominant a part of the

economy as they once were. The economy continues to transition and now is also dependent

upon other sectors such as health care, retail trade and the service industry including tourism.

The Oregon International Port of Coos Bay

The Oregon International Port of Coos Bay does, however, continue to influence the Bay

Area economy. Coos Bay is one of the largest coastal deep draft ports on the west coast behind only San Francisco and Seattle. Per the US Army Corps of Engineers (USACE), 2.3

million tons of cargo (mainly wood products) valued at $25.1 million travels through the port

annually which included 26 million pounds of fish and shellfish landings in 2005. The

USACE maintains the Coos Bay and Siuslaw River jetties and channel including the boat

basin access channel at Charleston.

6

The Oregon International Port of Coos Bay is also involved in development projects which

stand to significantly impact economic development in the region. The Port agreed in

December 2008 to purchase and operate approximately 94 miles of rail line abandoned by the

Central Oregon & Pacific Railroad (CORP) in September 2007 due to safety concerns. The

Port has agreed to pay the 16.6 million dollars for the rail line. It is anticipated the Port will

then proceed to repair the line and sub-contract with a short-line rail operator to run the

railroad.

Another big project the Port is involved with is the proposed deep-water Liquefied Natural

Gas (LNG) terminal at Coos Bay. The Jordan Cove Energy Project as it is called is in the

planning stage and would require State and Federal Energy Regulatory Commission (FERC)

permitting and approval. The project involves the construction and operation of an LNG

terminal on Coos Bay which would receive the LNG via ships, store it and subsequently

deliver it via pipelines.

Figure 4 –Charleston Marina and the Oregon Dunes

7

The McCullough Bridge (Figure 5) is also a key infrastructure component in the Bay Area

and stretches out over a mile across the bay from the northern city limits of North Bend. Built

in 1936, the Bridge is a landmark and is arguably one of the most, if not the most, significant

structures architecturally on the entire Oregon Coast Highway. The 5,305 foot cantilever truss

has many architectural and decorative features and has been referred to as the gateway to the

Oregon Dunes which begin just north of the bridge.

Figure 5 – McCullough Bridge

Southwest Oregon Regional Airport

Another key transportation infrastructure element critical to the area’s economy is the

Southwest Oregon Regional Airport (SORA) in North Bend. The airport provides critical

access to air service for Confederated Tribes members and staff traveling for business. The

airport is the Oregon Coast’s only commercial airport which provides access to some of the

major tourist destinations in Coos County. These destinations include the Bandon Dunes Golf

Resort, the Coquille Indian Tribe’s Mill Casino and Hotel in Coos Bay and the Charleston

Marina near the mouth of Coos Bay. Another draw is the Oregon Dunes National Recreation

Area, just north of North Bend, which hosts an annual Dunefest celebration.

United Airlines (Skywest Express) provides service from the Southwest Oregon Regional

Airport to the San Francisco International and Portland International Airports. Many private

jets arrive at the airport too oftentimes carrying golfers destined for the Bandon Dunes Resort.

The USCG Air Station and USCG Sector Headquarters are also located at the Southwest

Oregon Regional Airport facility. The airport has just completed $31 million dollars in

upgrades to the facility including a new terminal. It is estimated that between 60,000 and

70,000 people currently pass through this airport.

8

Cape Arago Highway

Cape Arago Highway is a key transportation infrastructure element as it is a major east-west

and north-south route in the Bay Area. This route provides arterial access to the majority of

the Tribe’s Bay Area properties. Tribal Members and staff utilize this route regularly for

accessing housing at Qaxas Heights, their work at either Tribal Administration or Three

Rivers Casino and visiting/working at Baldich (Chiefs Island and Gregory Point) and Coos

Head.

Cape Arago Highway begins at milepost 235.41 of Highway 101 and then travels west along

Virginia Avenue. It then travels south on Broadway Avenue and west on Newmark Avenue in

North Bend. The City of Coos Bay then has jurisdiction of Cape Arago Highway between

Cape Arago Highway mileposts 2.24 and 4.49. The highway returns to State jurisdiction south

of the City of Coos Bay and crosses the South Slough at the South Slough Drawbridge at

milepost 8.33, another key infrastructure element.

Cape Arago Highway south of Coos Bay provides access to Charleston, the Charleston

Marina, the Oregon Institute of Marine Biology and South Slough National Estuarine

Research Reserve before it travels along the Pacific Ocean. It is the gateway to many of the

premiere cultural sites, trails and recreational destinations in Coos County. Bastendorf Beach

County Park, Sunset Bay State Park and Shore Acres State Park are all located along Cape

Arago Highway and the highway ends at Cape Arago State Park at milepost 14.15. Gregory

Point, also located along Cape Arago Highway, is especially significant as it is one of the

critical few remaining Tribal cultural sites in Coos County. Coos Head, also located along

Cape Arago Highway, is being developed into an economic resource to diversify the tribal

economy.

Other Infrastructure

Another key transportation infrastructure element of Highway 101 is the Umpqua River

Bridge (figure 6) which was also built in 1936 by Conde McCullough. It is located at milepost

211.21 at the northern city limits of Reedsport. Highway 101 is critical for the Confederated

Tribes’ goal of economic self sufficiency as tourists regularly travel this scenic route along

the Pacific Ocean, and as tribal members and staff travel between administrative and

economic centers in Coos Bay and Florence.

Figure 6 - Umpqua River Bridge

9

Transportation Planning

The purpose of long-range transportation planning is to clearly demonstrate a tribe’s

transportation needs and to fulfill tribal goals by developing strategies to meet these needs. These

strategies should address future land use, economic development, traffic demand, public safety,

and health and social needs. The time horizon for long-range transportation planning should be 20

years to match state transportation planning horizons.

Indian Reservation Roads (IRR) Program

The bulk of the federal funding received to develop the Confederated Tribes transportation

infrastructure comes from the Indian Reservation Roads (IRR) program. The IRR program

funding is provided in the surface transportation act. The current act is the Safe, Accountable,

Flexible, Efficient, Transportation Equity Act: A Legacy for Users (SAFETEA-LU) and is

authorized for 5 years (FFYs 2005-2009).

The IRR program is jointly administered through a Memorandum of Agreement between the

Federal Highway Administration’s (FHWA) Federal Lands Highway Program (FLHP) and

the Bureau of Indian Affairs. The IRR Program Regulations are found in the Federal Register,

25 C.F.R. 170 (Final Rule of July 19, 2004), which provides the framework for participation

in the IRR Program.

The Confederated Tribes’ receive a “Tribal Share” of construction funding through their

participation in the IRR program. The Tribal Share is determined, in big part, by the Relative

Need Distribution Formula (RNDF) which utilizes the Road Inventory Field Data System

(RIFDS) database to evaluate a tribe’s needs. The RIFDS road inventory database is updated

annually and the Long Range Transportation Plan (LRTP) and Tribal Transportation

Improvement Program (TTIP) documents are required attachments.

A TTIP is a financially constrained prioritized list of the Tribes projects needing funding and

along with Long Range Transportation Plans and Priority Lists are adopted through formal

Tribal Government action. The BIA Area Offices collect and combine the TTIPs into Control

Schedules which are then developed into an Indian Reservation Road Transportation

Improvement Program (IRR TIP) by the BIA Division of Transportation for each State where

Indian reservation roads exist. An approved IRR TIP included in the State Transportation

Improvement Program (STIP) is the official document which authorizes obligation of

Highway Trust Funds for IRR construction projects.

Activities eligible for transportation planning funding under the IRR Program include, but are not

limited to, the following:

Planning activities for other modes of transportation such as mass transit, air, etc., and

intermodal connections.

Development of rural addressing and street maps. Researching right-of-way records

for transportation planning purposes.

Indian Reservations Roads (IRR) road inventory and/or bridge inventory

Measurement of traffic

Analysis of transportation need based on current and proposed land use

10

Trip generation studies

Calculation of road/intersection capacities

Development and use of management systems

Development/updating of Tribal long-term transportation plans

Project priority analysis

Development/updating of Transportation Improvement Programs (TIP)

Special transportation studies:

Bicycle paths

Pedestrian walkways

Access to other facilities (i.e., airports, waterways, rail stations, bus terminals, regional

refuse station, recreational facilities)

Scenic area pullouts, rest areas, and parking.

Transit planning

Development of maintenance maps

Bureau of Indian Affairs functional classification of roads

Transportation Goals

A safe and efficient Tribal transportation system responsive to the needs of the Tribe

and community.

A Tribal transportation system that supports and fosters economic development.

A Tribal Transportation program that provides for increased opportunities for Tribal

Members.

An expanded Tribal Government capacity to plan, develop and manage transportation

systems and facilities.

Recommendations

The first recommendation is to continue to conduct the annual transportation planning

performed through the Confederated Tribes’ P.L 93-638 contract with the Bureau of Indian

Affairs. The Confederated Tribe should continue to support those transportation planning

functions performed in-house which facilitate the further development of the Confederated

Tribes’ projects and the development of the funding sources needed to complete them. These

functions include:

update and review of the Long Range Transportation Plan

development of the Tribal Transportation Improvement Program

update to the Tribal transportation inventory database

The following short, mid and long term recommendations are a product of these planning

processes. They underscore the Confederated Tribes’ transportation planning capacity and the

importance of this planning.

11

Short Term (2010-2014)

(1) Location: Tribal Hall Trail – Tribal Hall

Description: Grading, drainage, addition of gravel surface and/or bituminous

overlay

Length: 0.20 miles

Reason: Trail, improved access to Tribal Village and parking

Project Type: Trail Improvement

Estimated Cost: $480,000

(2) Location: Main Base Road – Coos Head

Description: Reconstruction

Length: 0.35 miles

Reason: Upgrade route providing access to the Confederated Tribes’ planned

administrative facilities at Coos Head.

Project Type: Road Improvement

Estimated Cost: $750,000

(3) Location: Severy Access – Hatch and Severy Tract

Description: Grading, drainage, addition of gravel surface and bituminous overlay

Length: 0.5 miles

Reason: Access route to planned residential properties on the Hatch and Severy

Tracts

Project Type: New Construction

Estimated Cost: $1,200,000

Mid Term (2015-2024)

(4) Location: Munsel Lake Access – Munsel Lake Property

Description: New road construction

Length: 0.50 miles

Reason: Road will provide access to the Confederated Tribes’ pristine Munsel Lake

property which currently is only accessible by boat

Project Type: New construction

Estimated Cost: TBD

(5) Location: Neese Street – Tribal Hall

Description: Redesign

Length: 0.20 miles

Reason: City of Coos Bay owned gravel road adjacent to Tribal Hall requires

import, grading and paving

Project Type: Redesign

Estimated Cost: TBD

(6) Location: Base Access – Coos Head

Description: New road construction

Length: 0.50 miles

Reason: Road will provide access to the Confederated Tribes’ development

Project Type: New construction

Estimated Cost: TBD

12

(7) Location: Highway 126 – Three Rivers Casino

Description: Traffic Signal at intersection with Casino South

Length: 0.10 miles

Reason: A traffic signal will be needed to accommodate anticipated increase in

traffic on route providing access to Three Rivers Casino

Project Type: Road improvement

Estimated Cost: TBD

(8) Location: Radar Road – Administration Building

Description: Traffic signal at Ocean Boulevard and Radar Road

Length: 0.20 miles

Reason: Road provides access to administration building and current design presents

safety concerns

Project Type: Road improvement

Estimated Cost: TBD

Long Term (2025-2029)

(9) Location: Cape Arago Highway – Coos Head and Gregory Point

Description: Road widening and improvement from South Slough Bridge to Cape

Arago

Length: 5.6 miles

Reason: Road will provide access to Tribal cultural, governmental and recreational

activities

Project Type: Road Improvement

Estimated Cost: TBD

(10) Location: Highway 126 – Florence to Springfield

Description: Road widening and improvement for safety and increased capacity

Length: 5.6 miles

Reason: Narrow road with many curves and few passing lands poses safety

concerns, increases travel time between Florence and Eugene-Springfield deterring

travel.

Project Type: Road Improvement

Estimated Cost: TBD

Miscellaneous Recommendations:

(11) The expansion of the Confederated Tribes’ reservation land and the redesignation of a

portion of federal forest land as Indian Trust Land will result in a significant increase

in the Confederated Tribes’ inventory of Indian Reservation Roads. A significant

increase in inventory of Indian Reservation Roads will require an equally significant

effort to evaluate the condition of the roads and incorporate them into the

transportation plan.

(12) Currently, a significant amount of the Confederated Tribes’ Indian Reservation Road

Inventory consists of non-BIA roads. Continue to develop cooperative relationships at

the state, county and local levels. Educate partners on the IRR system and how it

benefits the entire community. Address their concerns and as appropriate incorporate

their recommendations or projects into the Tribal Transportation Plan.

13

Appendix A – Maps

14

15

16

Appendix B – Sources

This document is derived from original research and review of existing literature and

information. The research included infield on-site visits for IRR inventory data collection.

Source materials for the review of existing documents included:

1. Confederated Tribes of Coos, Lower Umpqua and Siuslaw Indian Reservation

Roads inventory.

2. Confederated Tribes of Coos, Lower Umpqua and Siuslaw Indian Reservation

Transportation Plan 1993 and updated plan “Preliminary Draft 2000”.

3. Bureau of Indian Affairs Portland Area Office roadway construction Control

Schedule 2008 and 2009.

4. Radar Hill Land Purchase for housing (completed September 8, 1999)

environmental assessment. Also known as the Elks property purchase.

5. Coos Bay 2004 Draft Transportation Plan

6. Coos County Transportation Plan (September 1999)

7. Confederated Tribes of Coos, Lower Umpqua and Siuslaw Indians Reservation

Plan and Forest Land Restoration Proposal (Revised June 2002).

8. A variety of other local government publications.

17

Appendix C – Inventory Detail

Route Name

Route # Section # Need Owner

Length

(miles)

Description/Milepost #/Status

Casino South

10

10

0

2

0.2

Official

Casino East

20

10

0

2

0.3

Official

Casino North

30

10

4

2

0.3

AKA Severy Access/Official

Casino West

40

10

4

2

0.1

Official

Highway 101

101

5

2

3

0.2

M.P. 187.76 to 188.01/New

Highway 101

101

10

2

3

0.2

M.P. 188.01 to 188.2/New

Highway 101

101

15

2

3

0.1

M.P. 188.2 to 188.24/New

Highway 101

101

20

2

3

0.1

M.P. 188.24 to 188.26/New

Highway 101

101

25

2

3

0.3

M.P. 188.26 to 188.56/New

Highway 101

101

30

2

3

0.1

M.P. 188.56 to 188.62/New

Highway 101

101

35

2

3

0.1

M.P. 188.62 to 188.68/New

Highway 101

101

40

2

3

0.1

M.P. 188.68 to 188.73/New

Highway 101

101

45

2

3

0.1

M.P. 188.73 to 188.85/New

Highway 101

101

50

2

3

0.1

M.P. 188.85 to 188.91/New

Highway 101

101

55

2

3

0.1

M.P. 188.91 to 188.97/New

Highway 101

101

60

2

3

0.1

M.P. 188.97 to 189.03/New

Highway 101

101

65

2

3

0.1

M.P. 189.03 to 189.09/New

Highway 101

101

70

2

3

0.1

M.P. 189.09 to 189.14/New

Highway 101

101

75

2

3

0.1

M.P. 189.14 to 189.21/New

Highway 101

101

80

2

3

0.1

M.P. 189.21 to 189.26/New

Highway 101

101

85

2

3

0.2

M.P. 189.26 to 189.44/New

Highway 101

101

90

2

3

0.1

M.P. 189.44 to 189.51/New

Highway 101

101

95

2

3

0.1

M.P. 189.51 to 189.56/New

Highway 101

101

100

2

3

0.1

M.P. 189.56 to 189.61/New

Highway 101

101

105

2

3

0.1

M.P. 189.61 to 189.67/New

Highway 101

101

110

2

3

0.1

M.P. 189.67 to 189.73/New

Highway 101

101

115

2

3

0.1

M.P. 189.73 to 189.79/New

Highway 101

101

120

2

3

0.1

M.P. 189.79 to 189.85/New

Highway 101

101

125

2

3

0.1

M.P. 189.85 to 189.97/New

Highway 101

101

130

2

3

0.1

M.P. 189.97 to 190.03/New

Highway 101

101

135

2

3

0.1

M.P. 190.03 to 190.16/New

18

Highway 101

101

140

2

3

0.1

M.P. 190.16 to 190.23/New

Highway 101

101

145

2

3

0.1

M.P. 190.23 to 190.29/New

Highway 101

101

150

2

3

0.1

M.P. 190.29 to 190.39/New

Highway 101

101

155

2

3

0.1

M.P. 190.39 to 190.46/New

Highway 101

101

160

2

3

0.1

M.P. 190.46 to 190.53/New

Highway 101

101

165

2

3

0.1

M.P. 190.53 to 190.59/New

Highway 101

101

170

2

3

0.1

M.P. 190.59 to 190.72/New

Highway 101

101

175

2

3

0.1

M.P. 190.72 to 190.81/New

Highway 101

101

180

2

3

0.1

M.P. 190.81 to 190.84/New

Highway 101

101

185

2

3

0.3

M.P. 190.81 to 191.19/New

Highway 101

101

190

2

3

0.2

M.P. 191.19 to 191.35/New

Highway 101

101

195

2

3

0.4

M.P. 191.35 to 191.75/New

Highway 101

101

200

2

3

0.3

M.P. 191.75 to 192.08/New

Highway 101

101

205

2

3

0.1

M.P. 192.08 to 192.15/New

Highway 101

101

210

2

3

0.1

M.P. 192.15 to 192.28/New

Highway 101

101

215

2

3

0.3

M.P. 192.28 to 192.61/New

Highway 101

101

220

2

3

0.3

M.P. 192.61 to 192.91/New

Highway 101

101

225

2

3

0.6

M.P. 192.91 to 193.47/New

Highway 101

101

230

2

3

0.9

M.P. 193.47 to 194.41/New

Highway 101

101

235

2

3

0.6

M.P. 194.41 to 195.04/New

Highway 101

101

240

2

3

0.9

M.P. 195.04 to 195.98/New

Highway 101

101

245

2

3

0.7

M.P. 195.98 to 196.71/New

Highway 101

101

250

2

3

0.2

M.P. 196.71 to 196.97/New

Highway 101

101

255

2

3

1

M.P. 196.97 to 198.09/New

Highway 101

101

260

2

3

0.5

M.P. 198.09 to 198.57/New

Highway 101

101

265

2

3

8.2

M.P. 198.57 to 206.81/New

Highway 101

101

270

2

3

0.7

M.P. 206.81 to 207.56/New

Highway 101

101

275

2

3

1

M.P. 207.56 to 208.51/New

Highway 101

101

280

2

3

0.7

M.P. 208.51 to 209.3/New

Highway 101

101

285

2

3

0.3

M.P. 209.3 to 209.64/New

Highway 101

101

290

2

3

0.5

M.P. 209.64 to 210.31/New

Highway 101

101

295

2

3

0.3

M.P. 210.31 to 210.61/New

Highway 101

101

300

2

3

0.3

M.P. 210.61 to 211.00/New

Highway 101

101

305

2

3

0.4

M.P. 211.00 to 211.42/New

19

Highway 101

101

310

2

3

0.1

M.P. 211.42 to 211.52/New

Highway 101

101

315

2

3

1.2

M.P. 211.52 to 212.74/New

Highway 101

101

320

2

3

0.4

M.P. 212.74 to 213.40/New

Highway 101

101

325

2

3

0.2

M.P. 213.4 to 213.63/New

Highway 101

101

330

2

3

1.4

M.P. 213.66 to 215.04/New

Highway 101

101

335

2

3

0.7

M.P. 215.04 to 215.74/New

Highway 101

101

340

2

3

0.3

M.P. 215.74 to 216.00/New

Highway 101

101

345

2

3

1

M.P. 216.00 to 217.04/New

Highway 101

101

350

2

3

2.1

M.P. 217.04 to 219.17/New

Highway 101

101

355

2

3

0.7

M.P. 219.17 to 219.87/New

Highway 101

101

360

2

3

0.7

M.P. 219.87 to 220.58/New

Highway 101

101

365

2

3

0.8

M.P. 220.58 to 221.36/New

Highway 101

101

370

2

3

0.9

M.P. 221.36 to 222.28/New

Highway 101

101

375

2

3

0.4

M.P. 222.28 to 222.73/New

Highway 101

101

380

2

3

0.8

M.P. 222.73 to 223.17/New

Highway 101

101

385

2

3

0.1

M.P. 223.17 to 223.25/New

Highway 101

101

390

2

3

0.3

M.P. 223.25 to 223.59/New

Highway 101

101

395

2

3

0.6

M.P. 223.59 to 224.12/New

Highway 101

101

400

2

3

0.8

M.P. 224.12 to 224.89/New

Highway 101

101

405

2

3

1.5

M.P. 224.89 to 226.42/New

Highway 101

101

410

2

3

1.4

M.P. 226.42 to 227.79/New

Highway 101

101

415

2

3

0.7

M.P. 227.79 to 228.5/New

Highway 101

101

420

2

3

0.4

M.P. 228.5 to 228.88/New

Highway 101

101

425

2

3

0.5

M.P. 228.88 to 229.46/New

Highway 101

101

430

2

3

0.4

M.P. 229.46 to 229.87/New

Highway 101

101

435

2

3

2.3

M.P. 229.87 to 232.13/New

Highway 101

101

440

2

3

0.7

M.P. 232.13 to 232.8/New

Highway 101

101

445

2

3

0.2

M.P. 232.8 to 233.01/New

Highway 101

101

450

2

3

0.2

M.P. 233.01 to 233.17/New

Highway 101

101

455

2

3

0.3

M.P. 233.17 to 233.46/New

Highway 101

101

460

2

3

1

M.P. 233.46 to 234.48/New

Highway 101

101

465

2

3

0.1

M.P. 234.48 to 234.56/New

Highway 101

101

470

2

3

0.1

M.P. 234.56 to 234.69/New

Highway 101

101

475

2

3

0.4

M.P. 234.69 to 235.09/New

20

Highway 101

101

480

2

3

0.3

M.P. 235.09 to 235.41/New

Highway 101

101

485

2

3

0.6

M.P. 235.41 to 236.06/New

Highway 101

101

490

2

3

0.3

M.P. 235.09 to 235.41/New

Highway 101

101

495

2

3

0.6

M.P. 235.41 to 236.06/New

Highway 101

101

500

2

3

0.4

M.P. 236.06 to 236.49/New

Highway 101

101

505

2

3

1.1

M.P. 236.49 to 237.6/New

Highway 101

101

510

2

3

1.5

M.P. 237.6 to 239.08/New

Highway 101

101

515

2

3

1.5

M.P. 237.6 to 239.08/New

Highway 101

101

520

2

3

1.5

M.P. 239.08 to 239.25/New

Ocean Boulevard

1101

810

2

4

0.3

Official

Highway 126

1126

810

2

3

1.0

Official

Cape Arago Hwy

1240

10

2

3

0.8

Official

Cape Arago Hwy

1240

20

2

3

1

Official

Cape Arago Hwy

1240

30

2

3

0.5

Official

Cape Arago Hwy

1240

40

2

3

3.6

Official

Cape Arago Hwy

1240

50

2

3

1192 ft

Official

Cape Arago Hwy

1240

60

2

3

5.6

Official

Cape Arago Hwy

1240

810

2

3

5.6

Official

Newmark Avenue

1250

10

2

4

0.4

New

Newmark Avenue

1250

20

2

4

0.3

New

Newmark Avenue

1250

30

2

4

0.7

New

Empire Boulevard

1260

10

2

4

0.8

New

East Bay Drive

2010

10

2

5

3.3

Official

Kentuck Slough Road

2020

10

2

5

0.9

Official

Sixes River Road

2030

10

2

5

4.8

Official

North Fork Road

2040

10

2

5

3.0

Official

Miluk Village Access

2050

10

1

2

0.1

Official

Radar Road

3010

10

2

4

0.1

Official

Radar Road

3010

20

2

4

0.2

Official

Neese Street

3020

10

2

4

0.1

Official

Wallace Street

3030

10

4

4

0.1

Official

Woolridge Street

3040

10

4

4

0.1

Official

Flanagan Avenue

3050

10

2

3

0.3

Official

Tribal Hall Road

3060

10

1

2

0.1

Official

21

Tribal Hall Trail

3070

10

4

2

0.1

Official

Lakeshore Drive

3080

10

2

4

0.2

Official

Wasson Street

3090

10

2

4

0.5

Official

Virginia Avenue

3100

10

2

4

0.1

Official

Virginia Avenue

3100

20

2

4

0.1

Official

Connecticut Avenue

3110

10

2

4

0.1

Official

Oak Street

3130

10

2

4

0.1

Official

Kusa Avenue

3200

20

2

2

0.1

Official

Admin East Road

3210

10

1

2

0.1

New

Fulton Avenue

3220

10

2

4

0.2

New

Coalbank Lane

3300

10

2

5

0.3

New

N Flanagan Street

3310

10

2

5

0.1

New

Myrtle Avenue

3400

10

2

4

0.1

New

Kingwood Avenue

3410

10

2

4

0.1

New

N 6th Street

3420

10

2

4

0.1

New

Pine Street

4010

10

0

4

0.1

Official

Qaxas Street

4020

10

0

2

0.1

Official

Munsel Lake Road

4100

10

2

5

0.1

Official

Munsel Lake Road

4100

20

2

4

0.7

Official

Munsel Lake Road

4100

30

2

5

1

New

Munsel Lake Road

4100

40

2

4

0.4

New

Libby Lane

4700

10

2

5

5.8

New

Southwest Boulevard

4710

10

2

5

0.2

New

Southwest Boulevard

4710

20

2

4

1.0

New

Lockhart Avenue

4720

10

2

4

0.2

New

4th Street

4730

10

2

4

0.2

New

Johnson Street

4740

10

2

4

0.2

New

Main Base Road

4800

10

1

2

0.2

Official

Coos Head Road

5000

10

2

5

0.2

New

Base Access Road

5100

10

4

2

0.5

Official

Lighthouse Way

5200

10

2

5

0.1

New

Lighthouse Way

5200

20

2

2

0.1

New

Lighthouse Way

5200

30

2

2

0.1

New

Lighthouse Trail

5300

10

1

2

0.1

New

22

Lighthouse Trail

5300

20

1

2

0.1

New

Table field codes

Need field code:

0 – Transportation facilities which have been improved to their acceptable standard or

projects/facilities proposed to receive construction funds on an IRRTIP are not eligible for

future inclusion in the calculation of the CTC portion of the formula for a period of 5

years thereafter

1 – Existing BIA Roads needing improvements

2 – Construction need other than BIA roads needing improvement

3 – Substandard or other roads for which no improvements are planned

4 – Roads that do not currently exist and need to be constructed, Proposed Roads

Ownership field code:

1 – BIA including offices in the BIA

2 – Tribe

3 – State

4 – Urban

5 – County and Township

7 – Other Federal

8 – Other

23

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.