Ohio Regulatory Program Amendment
Federal RegisterMar 30, 1994
Ask Donna
What actually matters in this document.
Text
DEPARTMENT OF THE INTERIOR
30 CFR Part 935
Ohio Regulatory Program Amendment
AGENCY: Office of Surface Mining Reclamation and Enforcement (OSM),
Interior.
ACTION: Proposed rule; reopening and extension of public comment
period.
-----------------------------------------------------------------------
SUMMARY: OSM is reopening the public comment period for proposed
Program Amendment Number 62 Revised (PA 62R) to the Ohio permanent
regulatory program (hereinafter referred to as the Ohio program) under
the Surface Mining Control and Reclamation Act of 1977. The amendment
was initiated by Ohio and is intended to make the Ohio program as
effective as the corresponding Federal regulations. The amendment
concerns the removal of siltation structures prior to two years after
the last augmented seeding upon a demonstration that alternative
measures are the best technology currently available for sediment
control.
This document sets forth the times and locations that the Ohio
program and proposed amendment to that program will be available for
public inspection, the dates and times of the reopened comment period
during which interested persons may submit written comments on the
proposed amendment, and the procedures that will be followed regarding
the public hearing, if one is requested.
DATES: Written comments must be received on or before 4 p.m. on April
14, 1994. If requested, a public hearing on the proposed amendment will
be held at 1 p.m. on April 11, 1994. Requests to present oral testimony
at the hearing must be received on or before 4 p.m. on April 6, 1994.
Any disabled individual who has need for a special accommodation to
attend a public hearing should contact the individual listed under FOR
FURTHER INFORMATION CONTACT.
ADDRESSES: Written comments and requests to testify at the hearing
should be mailed or hand delivered to Richard J. Seibel, Director,
Columbus Field Office, at the address listed below. Copies of the Ohio
program, the proposed amendment, and all written comments received in
response to this document will be available for public review at the
addresses listed below during normal business hours, Monday through
Friday, excluding holidays. Each requester may receive, free of charge,
one copy of the proposed amendment by contacting OSM's Columbus Field
Office.
Office of Surface Mining Reclamation and Enforcement, Columbus Field
Office, 4480 Refugee Road, suite 201, Columbus, Ohio 43232, Telephone:
(614) 866-0578.
Ohio Department of Natural Resources, Division of Reclamation, 1855
Fountain Square Court, Building H-3, Columbus, Ohio 43224, Telephone:
(614) 265-6675.
FOR FURTHER INFORMATION CONTACT:
Richard J. Seibel, Director, Columbus Field Office, Telephone: (614)
866-0578.
SUPPLEMENTARY INFORMATION:
I. Background
On August 16, 1982, the Secretary of the Interior conditionally
approved the Ohio program. Background information on the Ohio program,
including the Secretary's findings, the disposition of comments, and a
detailed explanation of the conditions of approval, can be found in the
August 10, 1982, Federal Register (47 FR 34688). Subsequent actions
concerning the conditions of approval and program amendments are
identified at 30 CFR 935.11, 935.12, 935.15, and 935.16.
II. Discussion of the Proposed Amendment
By letter dated March 4, 1993 (Administrative Record No. OH-1841),
the Ohio Department of Natural Resources, Division of Reclamation
(Ohio) submitted proposed Program Amendment Number 62 (PA 62). In this
amendment, Ohio proposed to revise three rules in the Ohio
Administrative Code (OAC) to authorize the removal of siltation
structures prior to two years after the last augmented seeding upon a
demonstration that alternative measures are the best technology
currently available for sediment control. Ohio proposed that this
demonstration must be specific and be contained in or amended into the
permit, and will be reviewed on a case-by-case basis by the Chief of
the Ohio Department of Natural Resources, Division of Reclamation (the
Chief). As part of and in support of PA 62, Ohio also submitted
Administrative Record information discussing Ohio's intended
implementation of this proposal.
OSM announced its receipt of proposed PA 62 in the Federal Register
(58 FR 17372) on April 2, 1993. The public comment period ended on May
3, 1993. The public hearing scheduled for April 27, 1993, was not held
because no one requested an opportunity to testify.
By letter dated September 20, 1993, (Administrative Record No. OH-
1931), OSM provided its comments to Ohio on the March, 4, 1993,
submission of PA 62. OSM found that, in order for OSM to approve PA 62,
Ohio must demonstrate that vegetation established earlier than the end
of the first two years will control sediment no less effectively than a
siltation structure. Further, Ohio must supply the policy or review
criteria by which the State will review proposals from permittees that
certain erosion-control methods other than siltation structures are the
best technology currently available.
By letter dated October 20, 1993 (Administrative Record No. OH-
1943), Ohio provided its initial response to OSM's September 20, 1993,
comments on PA 62. Ohio requested additional time to develop the
required information and requested technical assistance from OSM in
developing that information. Ohio and OSM staff met on February 11,
1994, (Administrative Record No. OH-1988) to discuss the available
information on pond removal and erosion control.
By letter dated March 1, 1994 (Administrative Record No. OH-1994),
Ohio resubmitted Program Amendment Number 62 Revised (PA 62R) which is
intended to resolve the two requirements in OSM's September 20, 1993,
letter. Ohio submitted additional documents in support of PA 62R by
letter dated March 10, 1994 (Administrative Record No. OH-1994). In
total, PA 62R consists of new proposed revisions to two Ohio rules,
revisions to an existing Ohio Policy/Procedure Directive, and five
technical study articles intended to correlate vegetative ground cover
with runoff and soil loss. Each of these three parts of PA 62R is
discussed briefly below:
A. Rule Revisions
(1) OAC 1501:13-4-05 paragraph (E)(1)(g) and 13-4-14 paragraph
(E)(1)(f): Ohio is further revising these two paragraphs to provide
that the plan in each permit application for protection of the
hydrologic balance shall describe the measures to be taken to prevent,
to the extent possible using the best technology currently available,
additional contributions of suspended solids to streamflow, or runoff
outside the permit area. The Chief may determine that vegetation is the
best technology currently available for this prevention upon a
demonstration by the permittee that vegetation is established and that
drainage from the area meets effluent limitations and does not
contribute suspended solids to streamflow. If the applicant proposes to
make such a demonstration after vegetation is established and to remove
siltation structures sooner than two years after the last augmented
seeding of a drainage area, the applicant shall state such intentions
in the timetable and plans for removal of sediment control structures
required by paragraphs (H)(1)(b)(iv) or (H)(1)(c)(iv) of OAC 1501:13-4-
05 or OAC 1501:13-4-14.
(2) OAC 1501:13-4-05 and 13-4-14 paragraph (H)(1)(b)(iv): Ohio is
further revising these two paragraphs to provide that the detailed
design plans for impoundment structures that meet or exceed size or
other criteria of MSHA shall describe the timetable and plans to remove
each structure, if appropriate. The applicant must include a statement
of intent if the applicant proposes to demonstrate that vegetation is
the best technology currently available and proposes to remove
siltation structures sooner than two years after the last augmented
seeding of the drainage area.
(3) OAC 1501:13-4-05 and 13-4-14 paragraph (H)(1)(c)(iv): Ohio is
further revising these two paragraphs to insert the same proposed
language as quoted above for paragraph (H)(1)(b)(iv) in order that the
language also apply to the detailed design plans for impoundment
structures that do not meet the size or other criteria of MSHA.
B. Revisions to Ohio Policy/Procedure Directive
As part of and in support of PA 62R, Ohio is proposing to revise
its existing Inspection and Enforcement Policy/Procedure Directive
Number 93-4 entitled ``Removal of Siltation Structures and Termination
of NPDES Monitoring.'' The proposed revisions to the Policy/Procedure
Directive concern the content of revised OAC 1501:13-9-04 paragraph
(G)(2)(e), the requirements for timing of augmented seeding, the
methods to be used to evaluate success of ground cover, and the use of
the form for requesting removal of siltation structures.
C. Supporting Study Articles
As part of and in support of PA 62R, Ohio has also submitted five
technical study articles intended to correlate vegetative ground cover
with runoff and soil loss:
(1) Hofmann, L., R.E. Ries, and J.E. Gilley. ``Relationship of
Runoff and Soil Loss to Ground Cover of Native and Reclaimed Grazing
Land.'' Agronomy Journal, Vol. 75, July-August 1983, P. 599-602.
(2) Hofmann, L. and R.E. Ries. ``Relationship of soil and plant
characteristics to erosion and runoff on pasture and range.'' Journal
of Soil and Water Conservation, Vol 46, Number 2, March-April 1991, p.
143-147.
(3) Ries, R.E. and L. Hofmann. ``Relationship of Ground Cover of
Short and Midgrass Communities to Soil Loss.'' North Dakota Farm
Research, Vol. 44, Number 2, September-October 1986, p. 29-31.
(4) USDA, Agricultural Research Service and The Ohio State
University, Ohio Agricultural Research and Development Center. ``Final
Report: Research on the Hydrology and Water Quality of Watersheds
Subjected to Surface Mining.'' USDI, Bureau of Mines Contract Report
Nos. J0166054 and J0166055, January 1984, 35 p.
(5) USDA, Agricultural Research Service and The Ohio State
University, Ohio Agricultural Research and Development Center.
``Postmining Results in Muskingum County, Ohio: Research on the
Hydrology and Water Quality of Watersheds Subjected to Surface
Mining.'' USDI, Bureau of Mines Contract Report Nos. J0166054 and
J0166055, April 1983, 196 p.
III. Public Comment Procedures
OSM is reopening the comment period on the proposed Ohio program
amendment to provide the public an opportunity to reconsider the
adequacy of the proposed amendment in light of the additional materials
submitted. In accordance with the provisions of 30 CFR 732.17(h), OSM
is now seeking comment on whether the amendment proposed by Ohio
satisfies the applicable program approval criteria of 30 CFR 732.15. If
the amendment is deemed adequate, it will become part of the Ohio
program.
Written Comments
Written comments should be specific, pertain only to the issues
proposed in this rulemaking, and include explanations in support of the
commenter's recommendations. Comments received after the time indicated
under DATES or at locations other than the Columbus Field Office will
not necessarily be considered in the final rulemaking or included in
the Administrative Record.
Public Hearing
Persons wishing to comment at the public hearing should contact the
person listed under FOR FURTHER INFORMATION CONTACT by 4 p.m. on April
6, 1994. The location and time of the hearing will be arranged with
those persons requesting the hearing. If no one requests an opportunity
to testify at the public hearing, the hearing will not be held.
Filing of a written statement at the time of the hearing is
requested as it will greatly assist the transcriber. Submission of
written statements in advance of the hearing will allow OSM officials
to prepare adequate responses and appropriate questions.
The public hearing will continue on the specified date until all
persons scheduled to comment have been heard. Persons in the audience
who have not been scheduled to comment and who wish to do so will be
heard following those scheduled. The hearing will end after all persons
scheduled to comment and persons present in the audience who wish to
comment have been heard.
Public Meeting
If only one person requests an opportunity to comment at a hearing,
a public meeting, rather than a public hearing, may be held. Persons
wishing to meet with OSM representatives to discuss the proposed
amendment may request a meeting by contacting the person listed under
FOR FURTHER INFORMATION CONTACT. All such meetings shall be open to the
public and, if possible, notices of the meetings will be posted in
advance at the locations listed under ADDRESSES. A written summary of
each public meeting will be made a part of the Administrative Record.
IV. Procedural Determinations
Executive Order 12866
This proposed/final rule is exempted from review by the Office of
Management and Budget under Executive Order 12866.
Executive Order 12778
The Department of the Interior has conducted the reviews required
by section 2 of Executive Order 12778 and has determined that, to the
extent allowed by law, this rule meets the applicable standards of
subsections (a) and (b) of that section. However, these standards are
not applicable to the actual language of State regulatory programs and
program amendments since each such program is drafted and promulgated
by a specific State, not by OSM. Under sections 503 and 505 of SMCRA
(30 U.S.C. 1253 and 1255) and 30 CFR 730.11, 732.15 and 732.17(h)(10),
decisions on proposed State regulatory programs and program amendments
submitted by the States must be based solely on a determination of
whether the submittal is consistent with SMCRA and its implementing
Federal regulations and whether the other requirements of 30 CFR parts
730, 731, and 732 have been met.
National Environmental Policy Act
No environmental impact statement is required for this rule since
section 702(d) of SMCRA (30 U.S.C. 1292(d)) provides that agency
decisions on proposed State regulatory program provisions do not
constitute major Federal actions within the meaning of section
102(2)(C) of the National Environmental Policy Act, 42 U.S.C.
4332(2)(C).
Paperwork Reduction Act
This rule does not contain information collection requirements that
require approval by the Office of Management and Budget under the
Paperwork Reduction Act, 44 U.S.C. 3507 et seq.
Regulatory Flexibility Act
The Department of the Interior has determined that this rule will
not have a significant economic impact on a substantial number of small
entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq).
The State submittal which is the subject of this rule is based upon
counterpart Federal regulations for which an economic analysis was
prepared and certification made that such regulations would not have a
significant economic effect upon a substantial number of small
entities. Accordingly, this rule will ensure that existing requirements
previously promulgated by OSM will be implemented by the State. In
making the determination as to whether this rule would have a
significant economic impact, the Department relied upon the data and
assumptions for the counterpart Federal regulations.
List of Subjects in 30 CFR Part 935
Intergovernmental relations, Surface mining, Underground mining.
Dated: March 23, 1994.
Robert J. Biggi,
Acting Assistant Director, Eastern Support Center.
[FR. Doc. 94-7499 Filed 3-29-94; 8:45 am]
BILLING CODE 4310-05-M