Airworthiness Directives; Empresa Brasileira de Aeronautica S.A. (EMBRAER) Model EMB-145, -145ER, -145MR, -145LR, -145XR, -145MP, and - 145EP Airplanes

Federal RegisterOct 4, 2006

Ask Donna

What actually matters in this document.

Text

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

14 CFR Part 39

[Docket No. FAA-2005-23145; Directorate Identifier 2000-NM-215-AD;

Amendment 39-14777; AD 2006-20-08]

RIN 2120-AA64

Airworthiness Directives; Empresa Brasileira de Aeronautica S.A.

(EMBRAER) Model EMB-145, -145ER, -145MR, -145LR, -145XR, -145MP, and -

145EP Airplanes

AGENCY: Federal Aviation Administration (FAA), Department of

Transportation (DOT).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The FAA is superseding an existing airworthiness directive

(AD), which applies to all EMBRAER Model EMB-145, -145ER, -145MR, -

145LR, -145XR, -145MP, and -145EP airplanes. That AD currently requires

repetitive inspections to detect cracking or failure of the rod ends of

the aileron power control actuator (PCA), and corrective actions if

necessary. This new AD requires the same repetitive inspections of

additional parts at new inspection intervals for certain airplanes;

provides new corrective actions; and provides an optional terminating

action for the requirements of this AD. This AD results from the

issuance of mandatory continuing airworthiness information by the

Brazilian airworthiness authority. We are issuing this AD to detect and

correct cracking or breaking of the rod ends and connecting fittings of

the aileron PCA, which could result in reduced controllability of the

airplane.

DATES: This AD becomes effective November 8, 2006.

The Director of the Federal Register approved the incorporation by

reference of certain publications listed in the AD as of November 8,

2006.

The Director of the Federal Register approved the incorporation by

reference of EMBRAER Alert Service Bulletin 145-27-A054, Change 01,

dated February 17, 1999, on March 29, 1999 (64 FR 13892, March 23,

1999).

ADDRESSES: You may examine the AD docket on the Internet at http://

dms.dot.gov or in person at the Docket Management Facility, U.S.

Department of Transportation, 400 Seventh Street, SW., Nassif Building,

Room PL-401, Washington, DC.

Contact Empresa Brasileira de Aeronautica S.A. (EMBRAER), P.O. Box

343--CEP 12.225, Sao Jose dos Campos--SP, Brazil, for service

information identified in this AD.

FOR FURTHER INFORMATION CONTACT: Todd Thompson, Aerospace Engineer,

International Branch, ANM-116, Transport Airplane Directorate, FAA,

1601 Lind Avenue, SW., Renton, Washington 98057-3356; telephone (425)

227-1175; fax (425) 227-1149.

SUPPLEMENTARY INFORMATION:

Examining the Docket

You may examine the airworthiness directive (AD) docket on the

Internet at http://dms.dot.gov or in person at the Docket Management

Facility office between 9 a.m. and 5 p.m., Monday through Friday,

except Federal holidays. The Docket Management Facility office

(telephone (800) 647-5227) is located on the plaza level of the Nassif

Building at the street address stated in the ADDRESSES section.

Discussion

The FAA issued a notice of proposed rulemaking (NPRM) to amend 14

CFR

[[Page 58488]]

part 39 to include an AD that supersedes AD 99-05-04, amendment 39-

11087 (64 FR 13892, March 23, 1999). The existing AD applies to all

EMBRAER Model EMB-145, -145ER, -145MR, -145LR, -145XR, -145MP, and -

145EP airplanes. That NPRM was published in the Federal Register on

December 7, 2005 (70 FR 72726). That NPRM proposed to continue to

require repetitive inspections to detect cracking or failure of the rod

ends of the aileron power control actuator (PCA), and corrective

actions if necessary. That NPRM also proposed to require the same

repetitive inspections of additional parts at new inspection intervals

for certain airplanes to detect cracking or failure of the rod ends of

the aileron power control actuator (PCA); provide new corrective

actions; and provide an optional terminating action for the proposed

requirements.

Comments

We provided the public the opportunity to participate in the

development of this AD. We have considered the comments that have been

received on the NPRM.

Request To Add Airplane Models to the Applicability

ExpressJet requests that we include EMBRAER Model EMB-135 airplanes

in the applicability of the NPRM. ExpressJet states that its Model EMB-

135ER and -135LR airplanes that are currently subject to an 800-flight

hour inspection interval, if subject to the AD, would be subject to a

1,000-flight hour inspection interval. ExpressJet asserts that these

airplanes should be subject to the AD because they have the same

subject parts.

We do not agree. EMBRAER Model EMB-135 airplanes should not be

subject to this AD because they already have the required structural

modifications and reinforced aileron PCA-factory incorporated since the

first production Model EMB-135 airplane. Regarding the difference in

inspection intervals, we have confirmed with EMBRAER that there is no

technical reason for the different inspection interval for Model EMB-

135 airplanes from that of the airplanes subject to this AD. The

different inspection intervals for these airplanes are a result of

different maintenance program updating processes (Maintenance Review

Board Report updating process versus a design change approval process)

used for the different airplane models. EMBRAER has notified us that it

is currently in the process of issuing a temporary revision to the

EMBRAER EMB-135 Certification Maintenance Requirements that will change

the inspection interval for those airplanes from 800 flight hours to

1000 flight hours-the same inspection interval specified in this AD for

the subject airplanes. No change to the AD is necessary in this regard.

Request To Reference Parts Manufacturer Approval (PMA) Parts

Modification and Replacement Parts Association (MARPA) requests

that the language in the NPRM be changed to identify the new,

reinforced parts by part number (P/N). MARPA states that the ``new and

improved'' parts are not identified by P/N in the NPRM and asserts

that, if they are identified by P/N in the service bulletin, the

mandated installation of a certain P/N in the NPRM ``could constitute a

conflict with 14 CFR Section 21.303.'' MARPA also requests that a

qualifying statement, ``or other FAA-approved part,'' be appended.

MARPA states that this qualification would remove the possible

``conflict'' by explicitly stating that other qualified PMA parts are

permitted.

We infer that MARPA would like the AD to permit installation of any

equivalent PMA parts so that it is not necessary for an operator to

request approval of an alternative method of compliance (AMOC) in order

to install an ``equivalent'' PMA part. Whether an alternative part is

``equivalent'' in adequately resolving the unsafe condition can only be

determined on a case-by-case basis based on a complete understanding of

the unsafe condition. Our policy is that, in order for operators to

replace a part with one that is not specified in the AD, they must

request an AMOC. This is necessary so that we can make a specific

determination that an alternative part is or is not susceptible to the

same unsafe condition. Therefore, we do not agree with MARPA's requests

and have made no change to the AD in this regard.

The AD provides a means of compliance for operators to ensure that

the identified unsafe condition is addressed appropriately. For an

unsafe condition attributable to a part, the AD normally identifies the

replacement parts necessary to obtain that compliance. As stated in

section 39.7 of the Federal Aviation Regulations (14 CFR 39.7),

``Anyone who operates a product that does not meet the requirements of

an applicable airworthiness directive is in violation of this

section.'' Unless an operator obtains approval for an AMOC, replacing a

part with one not specified by the AD would make the operator subject

to an enforcement action and result in a civil penalty. We acknowledge

that there may be other ways of addressing this issue. Once we have

thoroughly examined all aspects of this issue, including input from

industry, and have made a final determination, we will consider whether

our policy regarding PMA parts in ADs needs to be revised. However, we

consider that to delay this AD action would be inappropriate, since we

have determined that an unsafe condition exists and that replacement of

certain parts must be accomplished to ensure continued safety.

Therefore, no change to the AD is necessary in this regard.

In response to MARPA's statement regarding a ``conflict with FAR

21.303,'' under which the FAA issues PMAs, this statement appears to

reflect a misunderstanding of the relationship between ADs and the

certification procedural regulations of part 21 of the Federal Aviation

Regulations (14 CFR part 21). Those regulations, including section

21.303 of the Federal Aviation Regulations (14 CFR 21.203), are

intended to ensure that aeronautical products comply with the

applicable airworthiness standards. But ADs are issued when,

notwithstanding those procedures, we become aware of unsafe conditions

in these products or parts. Therefore, an AD takes precedence over

design approvals when we identify an unsafe condition, and mandating

installation of a certain P/N in an AD is not at variance with section

Sec. 21.303.

Request To Address Defective PMA Parts

MARPA notes that the P/Ns cited in the NPRM reflect both original

equipment manufacturer (OEM) and PMA parts ``approved by identicality

under license to Parker Hannifin Company.'' The commenter believes that

the requirements of the AD should apply equally to the OEM and PMA

parts.

We do not agree that it is necessary to specify whether an

identified part is made by the OEM or by the holder of a PMA. The P/Ns

of the affected parts are the information that is necessary to comply

with the requirements of this AD and those P/Ns are clearly identified

in the AD. Therefore, no change has been made to the final rule in this

regard.

Request To Use Serviceable Parts

ExpressJet also asks that we revise the NPRM to allow use of

serviceable parts in lieu of new parts for replacement/installation of

an aileron PCA. ExpressJet states that it completed the requirements of

this AD some time ago and that they used parts that were serviceable,

but may not have been new.

We agree. It is our policy to allow operators to use serviceable

parts in lieu

[[Page 58489]]

of new parts if a serviceable part exists and that part is not subject

to the unsafe condition addressed by the AD and will adequately ensure

long-term continued operational safety by its use. Therefore, we have

changed this final rule to allow use of serviceable parts for the

replacement/installation of an aileron PCA.

Request To Add Service Information

ExpressJet asks that we add the service information identified in

the table below as acceptable methods of compliance for the

requirements of the paragraphs also specified in the table below.

ExpressJet notes that the technical content of these service bulletins

is the same as in the later revisions already cited in the NPRM as the

appropriate sources of service information for the requirements of

those paragraphs.

Service Information Requested for Inclusion in AD

------------------------------------------------------------------------

Add this service bulletin as an For the

acceptable method of requirements of Approved as an AMOC

compliance-- paragraph(s)-- to--

------------------------------------------------------------------------

EMBRAER Service Bulletin 145-27- Paragraph (j)..... None.

0062, Change 02, dated

September 12, 2000.

EMBRAER Service Bulletin 145-57- Paragraphs (k), AD 99-05-04.

0019, Change 01, dated March (l), and (n)(2).

30, 2000.

EMBRAER Service Bulletin 145-27- Paragraphs (k) and None.

0061, dated October 19, 1999. (n)(2).

EMBRAER Service Bulletin 145-27- Paragraphs (k) and AD 99-05-04.

0061, Change 01, dated October (n)(2).

29, 1999.

------------------------------------------------------------------------

We agree with ExpressJet's request. We have reviewed these service

bulletins and have determined that the technical content of each is

essentially the same as those already referenced in the NPRM for the

applicable actions. Therefore, we have added these service bulletins to

the applicable paragraphs as acceptable methods of compliance for the

applicable requirements of this final rule.

Conclusion

We have carefully reviewed the available data, including the

comments that have been received, and determined that air safety and

the public interest require adopting the AD with the changes described

previously. We have determined that these changes will neither increase

the economic burden on any operator nor increase the scope of the AD.

Costs of Compliance

The following table provides the estimated costs for U.S. operators

to comply with this AD.

Estimated Costs

--------------------------------------------------------------------------------------------------------------------------------------------------------

Number of U.S.-

Action Work hours Average labor Parts Cost per airplane registered Fleet cost

rate per hour airplanes

--------------------------------------------------------------------------------------------------------------------------------------------------------

Inspections (required by AD 99-05- 1 $65 None.................. $65, per inspection 661 $42,965, per

04). cycle. inspection cycle.

Inspections (new action for 1 65 None.................. $65, per inspection 661 $42,965, per

airplanes subject to EMBRAER cycle. inspection cycle.

Service Bulletin 145-27-0054).

Replacing the PCA connecting 24 65 $19,817............... $21,377.............. 661 $14,130,197.

fittings (new action).

--------------------------------------------------------------------------------------------------------------------------------------------------------

Authority for This Rulemaking

Title 49 of the United States Code specifies the FAA's authority to

issue rules on aviation safety. Subtitle I, Section 106, describes the

authority of the FAA Administrator. Subtitle VII, Aviation Programs,

describes in more detail the scope of the Agency's authority.

We are issuing this rulemaking under the authority described in

Subtitle VII, Part A, Subpart III, Section 44701, ``General

requirements.'' Under that section, Congress charges the FAA with

promoting safe flight of civil aircraft in air commerce by prescribing

regulations for practices, methods, and procedures the Administrator

finds necessary for safety in air commerce. This regulation is within

the scope of that authority because it addresses an unsafe condition

that is likely to exist or develop on products identified in this

rulemaking action.

Regulatory Findings

We have determined that this AD will not have federalism

implications under Executive Order 13132. This AD will not have a

substantial direct effect on the States, on the relationship between

the national government and the States, or on the distribution of power

and responsibilities among the various levels of government.

For the reasons discussed above, I certify that this AD:

(1) Is not a ``significant regulatory action'' under Executive

Order 12866;

(2) Is not a ``significant rule'' under DOT Regulatory Policies and

Procedures (44 FR 11034, February 26, 1979); and

(3) Will not have a significant economic impact, positive or

negative, on a substantial number of small entities under the criteria

of the Regulatory Flexibility Act.

We prepared a regulatory evaluation of the estimated costs to

comply with this AD and placed it in the AD docket. See the ADDRESSES

section for a location to examine the regulatory evaluation.

List of Subjects in 14 CFR Part 39

Air transportation, Aircraft, Aviation safety, Incorporation by

reference, Safety.

Adoption of the Amendment

0

Accordingly, under the authority delegated to me by the Administrator,

the FAA amends 14 CFR part 39 as follows:

PART 39--AIRWORTHINESS DIRECTIVES

0

1. The authority citation for part 39 continues to read as follows:

[[Page 58490]]

Authority: 49 U.S.C. 106(g), 40113, 44701.

Sec. 39.13 [Amended]

0

2. The Federal Aviation Administration (FAA) amends Sec. 39.13 by

removing amendment 39-11087 (64 FR 13892, March 23, 1999) and by adding

the following new airworthiness directive (AD):

2006-20-08 Empresa Brasileira de Aeronautica S.A. (EMBRAER):

Amendment 39-14777. Docket No. FAA-2005-23145; Directorate

Identifier 2000-NM-215-AD.

Effective Date

(a) This AD becomes effective November 8, 2006.

Affected ADs

(b) This AD supersedes AD 99-05-04.

Applicability

(c) This AD applies to all EMBRAER Model EMB-145, -145ER, -

145MR, -145LR, -145XR, -145MP, and -145EP airplanes, certificated in

any category.

Unsafe Condition

(d) This AD results from the issuance of mandatory continuing

airworthiness information by the Brazilian airworthiness authority.

We are issuing this AD to detect and correct cracking or breaking of

the rod ends and connecting fittings of the aileron power control

actuator (PCA), which could result in reduced controllability of the

airplane.

Compliance

(e) You are responsible for having the actions required by this

AD performed within the compliance times specified, unless the

actions have already been done.

Restatement of Certain Requirements of AD 99-05-04

Initial and Repetitive Inspections

(f) Within 24 hours (1 day) after March 29, 1999 (the effective

date of AD 99-05-04), perform a detailed inspection to detect

cracking or failure of the rod ends of the PCA at the aileron and

wing connection points, in accordance with EMBRAER Alert Service

Bulletin 145-27-A054, Change 01, dated February 17, 1999; or EMBRAER

Service Bulletin 145-27-0054, Change 03, dated March 30, 2000, or

Change 04, dated February 14, 2005. Repeat the inspection in

accordance with the service bulletin thereafter at intervals not to

exceed 3 days or 25 flight hours, whichever occurs later, until the

initial inspection required by paragraph (h) of this AD is done.

Note 1: For the purposes of this AD, a detailed inspection is:

``An intensive examination of a specific item, installation, or

assembly to detect damage, failure, or irregularity. Available

lighting is normally supplemented with a direct source of good

lighting at an intensity deemed appropriate. Inspection aids such as

mirror, magnifying lenses, etc., may be necessary. Surface cleaning

and elaborate procedures may be required.''

Corrective Actions

(g) If any cracked or failed rod end is detected during any

inspection performed in accordance with paragraph (f) of this AD,

prior to further flight, replace the aileron PCA with a new or

serviceable part having the same part number, in accordance with

EMBRAER Alert Service Bulletin 145-27-A054, Change 01, dated

February 17, 1999; or EMBRAER Service Bulletin 145-27-0062, Revision

03, dated December 11, 2002, or Revision 04, dated March 8, 2004.

After the effective date of this AD, replace the aileron PCA only

with a new or serviceable part that is listed in the ``New P/N''

column in section 2. ``Material--Cost and Availability'' of EMBRAER

Service Bulletin 145-27-0062, Revision 03, dated December 11, 2002,

or Revision 04, dated March 8, 2004. Do the replacement in

accordance with the Accomplishment Instructions of the service

bulletin. Where the service bulletin specifies to send parts to the

parts manufacturer, that action is not required by this AD.

New Requirements of This AD

Repetitive Inspections

(h) At the applicable ``Initial Inspection'' compliance time in

Table 1 of this AD: Do a general visual inspection to detect

cracking or failure of the rod ends and connecting fittings in the

left- and right-hand PCAs at the aileron and wing structure

connection points, in accordance with Part I of the Accomplishment

Instructions of EMBRAER Service Bulletin 145-27-0054, Change 03,

dated March 30, 2000, or Change 04, dated February 14, 2005. Repeat

the inspection at the applicable ``Repeat'' interval in Table 1 of

this AD. Doing the initial inspection in accordance with paragraph

(h) of this AD terminates the repetitive inspections in paragraph

(f) of this AD.

Table 1.--Initial and Repetitive Inspection Intervals

------------------------------------------------------------------------

For airplanes that have PCAs

with part number (P/N)-- Do the initial Repeat the

inspection-- inspection--

------------------------------------------------------------------------

394900-1003 or 394900-1005.. Within 3 days after At intervals not to

the effective date exceed 25 flight

of this AD. hours or 3 days,

whichever occurs

later.

394900-1007................. Within 14 days after At intervals not to

the effective date exceed 100 flight

of this AD. hours or 14 days,

whichever occurs

later.

418800-1001, 418800-1003, Within 500 flight At intervals not to

418800-9003, 418800-1005, hours after the exceed 500 flight

418800-9005, 418800-1007, effective date of hours.

or 418800-9007; and that this AD.

have new reinforced PCA

fittings installed in

accordance with paragraph

(k) or (l) of this AD.

------------------------------------------------------------------------

Note 2: For the purposes of this AD, a general visual inspection

is ``A visual examination of an interior or exterior area,

installation, or assembly to detect obvious damage, failure, or

irregularity. This level of inspection is made from within touching

distance unless otherwise specified. A mirror may be necessary to

ensure visual access to all surfaces in the inspection area. This

level of inspection is made under normally available lighting

conditions such as daylight, hangar lighting, flashlight, or

droplight and may require removal or opening of access panels or

doors. Stands, ladders, or platforms may be required to gain

proximity to the area being checked.''

No Cracked or Failed PCA Rod Ends or Connecting Fittings

(i) If no cracked or failed PCA rod end or connecting fitting is

found during any inspection required by paragraph (h) of this AD:

Repeat the inspection required by paragraph (h) of this AD at the

applicable time specified in Table 1 of this AD.

Corrective Actions for Cracked or Failed Rod Ends

(j) If any cracked or failed rod end is found during any

inspection required by paragraph (h) of this AD: Before further

flight, replace the aileron PCA with a new or serviceable part as

listed in the ``New P/N'' column in section 2. ``Material--Cost and

Availability'' of EMBRAER Service Bulletin 145-27-0062, Change 02,

dated September 12, 2000; Revision 03, dated December 11, 2002; or

Revision 04, dated March 8, 2004. Do the replacement in accordance

with the Accomplishment Instructions of the service bulletin. Where

the service bulletin specifies to send parts to the parts

manufacturer, that action is not required by this AD.

Corrective Actions for Cracked or Failed PCA Connecting Fittings

(k) If any cracked or failed PCA connecting fitting at the wing

or aileron side is found during any inspection required by paragraph

(h) of this AD: Before further flight, replace the PCA connecting

fitting with a new, reinforced fitting, in accordance with Part I of

the Accomplishment Instructions of

[[Page 58491]]

EMBRAER Service Bulletin 145-57-0019, Change 01, dated March 30,

2000, Change 02, dated May 3, 2001, or Change 03, dated February 11,

2004; and EMBRAER Service Bulletin 145-27-0061, dated October 19,

1999, Change 01, dated October 29, 1999, Change 02, dated September

12, 2000, Change 03, dated March 14, 2001, or Revision 04, dated

August 11, 2004.

PCA Connecting Fitting Replacement

(l) For airplanes with aileron PCAs with P/N 394900-1003,

394900-1005, 394900-1007, 418800-1001, 418800-1003, 418800-9003,

418800-1005, 418800-9005, 418800-1007, or 418800-9007: Except as

required by paragraph (k) of this AD, at the applicable time in

paragraphs (l)(1) and (l)(2) of this AD, replace the aileron PCA

connecting fittings with new, reinforced fittings, in accordance

with Part I of the Accomplishment Instructions of EMBRAER Service

Bulletin 145-57-0019, Change 01, dated March 30, 2000, Change 02,

dated May 3, 2001, or Change 03, dated February 11, 2004; and Part I

of the Accomplishment Instructions of EMBRAER Service Bulletin 145-

27-0061, Change 02, dated September 12, 2000, Change 03, dated March

14, 2001, or Revision 04, dated August 11, 2004.

(1) For airplanes with PCAs with P/N 394900-1003, 394900-1005,

or 394900-1007: At the later of the times in paragraphs (l)(1)(i)

and (l)(1)(ii) of this AD.

(i) Before the airplane accumulates 6,000 total flight hours.

(ii) Within 3 days or 25 flight hours after the effective date

of this AD, whichever occurs later.

(2) For airplanes with PCAs with P/N 418800-1001, 418800-1003,

418800-9003, 418800-1005, 418800-9005, 418800-1007, or 418800-9007:

Before the airplane accumulates 6,000 total flight hours, or within

600 flight hours after the effective date of this AD, whichever

occurs later.

(m) For airplanes with PCAs with P/N 418800-1001, 418800-1003,

418800-9003, 418800-1005, 418800-9005, 418800-1007, or 418800-9007:

At the applicable time specified in Table 1 of this AD following the

replacement specified in paragraph (l) of this AD, do a general

visual inspection of the replaced part using a method approved by

either the Manager, International Branch, ANM-116, Transport

Airplane Directorate, FAA; or the Departmento de Aviacao Civil (or

its delegated agent). Doing the inspections in accordance with

EMBRAER EMB-145 Aircraft Maintenance Manual Task 27-12-01-212-002-

A00, ``Inspect (Visual Inspection) Aileron PCA Rod Ends/Fitting Lugs

for Integrity and General Condition,'' is one approved method.

Thereafter, repeat the inspection at the applicable time specified

in Table 1 of this AD.

Optional Terminating Action

(n) Airplanes that meet all conditions in paragraphs (n)(1),

(n)(2), (n)(3), and (n)(4) of this AD are not subject to the

requirements of paragraphs (f), (h), (i), (j), (k), (l), and (m) of

this AD.

(1) The airplane is equipped with new aileron PCAs with P/N

418800-1001, 418800-1003, 418800-9003, 418800-1005, 418800-9005,

418800-1007, or 418800-9007.

(2) The airplane is equipped with new, reinforced PCA fittings

installed in production or in accordance with the Accomplishment

Instructions of EMBRAER Service Bulletin 145-57-0019, Change 01,

dated March 30, 2000, Change 02, dated May 3, 2001, or Change 03,

dated February 11, 2004; and EMBRAER Service Bulletin 145-27-0061,

dated October 19, 1999, Change 01, dated October 29, 1999, Change

02, dated September 12, 2000, Change 03, dated March 14, 2001, or

Revision 04, dated August 11, 2004; as applicable.

(3) The airplane is equipped with an aileron damper with P/N

41012130-103 or 41012130-104 that was installed in production or in

accordance with the Accomplishment Instructions of any service

bulletin listed in Table 2 of this AD.

Table 2.--Aileron Damper Installation Service Bulletins

------------------------------------------------------------------------

EMBRAER service bulletin Revision level Date

------------------------------------------------------------------------

145-27-0063.................. Original....... March 30, 2000.

145-27-0063.................. Change 01...... October 2, 2000.

145-27-0063.................. Change 02...... March 22, 2002.

145-27-0063.................. Change 03...... May 27, 2004.

145-27-0063.................. Revision 04.... October 13, 2004.

145-27-0063.................. Revision 05.... March 16, 2005.

------------------------------------------------------------------------

(4) The general visual inspections for structural integrity of

the aileron PCA and the aileron damper terminals and fittings at the

wing and aileron sides at intervals not exceeding 1,000 flight

hours, established in the EMBRAER Model EMB-145 Maintenance Review

Board document, are implemented.

Alternative Methods of Compliance (AMOCs)

(o)(1) The Manager, International Branch, ANM-116, Transport

Airplane Directorate, FAA, has the authority to approve AMOCs for

this AD, if requested in accordance with the procedures found in 14

CFR 39.19.

(2) Before using any AMOC approved in accordance with Sec.

39.19 on any airplane to which the AMOC applies, notify the

appropriate principal inspector in the FAA Flight Standards

Certificate Holding District Office.

(3) Alternative methods of compliance approved previously in

accordance with AD 99-05-04 are approved as alternative methods of

compliance with this AD.

Related Information

(p) Brazilian airworthiness directive 1999-02-01R6, dated June

21, 2004, also addresses the subject of this AD.

Incorporation by Reference

(q) You must use the EMBRAER service bulletins identified in

Table 3 of this AD, as applicable, to perform the actions that are

required by this AD, unless the AD specifies otherwise. If

accomplished, you must use the EMBRAER service bulletins identified

in Table 4 of this AD, to perform the aileron damper installation

provided in paragraph (n)(3) of this AD, unless the AD specifies

otherwise.

Table 3.--Required Service Bulletins Incorporated by Reference

------------------------------------------------------------------------

Revision/change

Service bulletin level Date

------------------------------------------------------------------------

EMBRAER Alert Service Change 01...... February 17, 1999.

Bulletin 145-27-A054.

EMBRAER Service Bulletin 145- Change 03...... March 30, 2000.

27-0054.

EMBRAER Service Bulletin 145- Change 04...... February 14, 2005.

27-0054.

EMBRAER Service Bulletin 145- Original....... October 19, 1999.

27-0061.

EMBRAER Service Bulletin 145- Change 01...... October 29, 1999.

27-0061.

EMBRAER Service Bulletin 145- Change 02...... September 12, 2000.

27-0061.

EMBRAER Service Bulletin 145- Change 03...... March 14, 2001.

27-0061.

EMBRAER Service Bulletin 145- Revision 04.... August 11, 2004.

27-0061.

[[Page 58492]]

EMBRAER Service Bulletin 145- Change 02...... September 12, 2000.

27-0062.

EMBRAER Service Bulletin 145- Revision 03.... December 11, 2002.

27-0062.

EMBRAER Service Bulletin 145- Revision 04.... March 8, 2004.

27-0062.

EMBRAER Service Bulletin 145- Change 01...... March 30, 2000.

57-0019.

EMBRAER Service Bulletin 145- Change 02...... May 3, 2001.

57-0019.

EMBRAER Service Bulletin 145- Change 03...... February 11, 2004.

57-0019.

------------------------------------------------------------------------

Table 4.--Aileron Damper Installation Service Bulletins Incorporated by

Reference

------------------------------------------------------------------------

EMBRAER Service Bulletin Revision level Date

------------------------------------------------------------------------

145-27-0063.................. Original....... March 30, 2000.

145-27-0063.................. Change 01...... October 2, 2000.

145-27-0063.................. Change 02...... March 22, 2002.

145-27-0063.................. Change 03...... May 27, 2004.

145-27-0063.................. Revision 04.... October 13, 2004.

145-27-0063.................. Revision 05.... March 16, 2005.

------------------------------------------------------------------------

EMBRAER Service Bulletin 145-57-0019, Change 03, dated February 11,

2004, contains the following effective pages:

------------------------------------------------------------------------

Change level

Page No. shown on page Date shown on page

------------------------------------------------------------------------

1-4.......................... 03............. February 11, 2004.

5-71......................... 02............. May 3, 2001.

------------------------------------------------------------------------

EMBRAER Service Bulletin 145-27-0063, Change 01, dated October 2,

2000, contains the following effective pages:

------------------------------------------------------------------------

Change level

Page No. shown on page Date shown on page

------------------------------------------------------------------------

1-4.......................... 01............. October 2, 2000.

5-24......................... 00............. March 20, 2000.

------------------------------------------------------------------------

(1) The Director of the Federal Register approved the

incorporation by reference of the documents identified in Table 5 of

this AD in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.

Table 5.--New Material Incorporated by Reference

----------------------------------------------------------------------------------------------------------------

EMBRAER Service Bulletin Revision/change level Date

----------------------------------------------------------------------------------------------------------------

145-27-0054.............................. Change 03................... March 30, 2000.

145-27-0054.............................. Change 04................... February 14, 2005.

145-27-0061.............................. Original.................... October 19, 1999.

145-27-0061.............................. Change 01................... October 29, 1999.

145-27-0061.............................. Change 02................... September 12, 2000.

145-27-0061.............................. Change 03................... March 14, 2001.

145-27-0061.............................. Revision 04................. August 11, 2004.

145-27-0062.............................. Change 02................... September 12, 2000.

145-27-0062.............................. Revision 03................. December 11, 2002.

145-27-0062.............................. Revision 04................. March 8, 2004.

145-27-0063.............................. Original.................... March 30, 2000.

145-27-0063.............................. Change 01................... October 2, 2000.

145-27-0063.............................. Change 02................... March 22, 2002.

145-27-0063.............................. Change 03................... May 27, 2004.

145-27-0063.............................. Revision 04................. October 13, 2004.

145-27-0063.............................. Revision 05................. March 16, 2005.

145-57-0019.............................. Change 01................... March 30, 2000.

145-57-0019.............................. Change 02................... May 3, 2001.

[[Page 58493]]

145-57-0019.............................. Change 03................... February 11, 2004.

----------------------------------------------------------------------------------------------------------------

(2) The Director of the Federal Register approved the

incorporation by reference of EMBRAER Alert Service Bulletin 145-27-

A054, Change 01, dated February 17, 1999, on March 29, 1999 (64 FR

13892, March 23, 1999).

(3) Contact Empresa Brasileira de Aeronautica S.A. (EMBRAER),

P.O. Box 343--CEP 12.225, Sao Jose dos Campos--SP, Brazil, for a

copy of this service information. You may review copies at the

Docket Management Facility, U.S. Department of Transportation, 400

Seventh Street SW., Room PL-401, Nassif Building, Washington, DC; on

the Internet at http://dms.dot.gov; or at the National Archives and

Records Administration (NARA). For information on the availability

of this material at the NARA, call (202) 741-6030, or go to http://

www.archives.gov/federal--register/code--of--federal--regulations/

ibr--locations.html.

Issued in Renton, Washington, on September 15, 2006.

Kalene C. Yanamura,

Acting Manager, Transport Airplane Directorate, Aircraft Certification

Service.

FR Doc. E6-15861 Filed 10-3-06; 8:45 am]

BILLING CODE 4910-13-P

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.