ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 63

[FRL-6212-3]

RIN 2060-AG60

Approval of State Programs and Delegation of Federal Authorities

AGENCY: Environmental Protection Agency (EPA).

ACTION: Proposed amendments; notice of public hearing.

-----------------------------------------------------------------------

SUMMARY: The EPA is proposing to change the Agency's current procedures

for delegating to State, local, territorial, and Indian tribes as

defined in 40 CFR 71.2 or agencies (i.e., S/L's) the authority to

implement and enforce Federal air toxics emissions standards and other

requirements. Specifically, these regulatory amendments propose to

revise procedures and criteria for approving S/L rules, programs, or

other requirements that would substitute for Federal emissions

standards or other requirements for hazardous air pollutants (HAP)

established under section 112 of the Clean Air Act (Act). Section

112(l) of the Act authorizes us to approve S/L programs when S/L

alternative requirements are demonstrated to be no less stringent than

the rules we promulgate.

These amendments would increase the flexibility of our existing

regulations in 40 CFR part 63, subpart E that implement section 112(l)

of the Act. They would provide a greater number of approval processes

from which S/L's can choose, increase the flexibility S/L's have to

demonstrate equivalency for their alternative requirements, and provide

options that will expedite the approval process. In addition, the

policy guidance in this notice clarifies what S/L's must or can do to

obtain delegated authority under subpart E, including how they can

demonstrate equivalency for alternatives to Federal requirements.

These changes are in response to requests we received from State

and local air pollution control agencies to reconsider our existing

regulations in light of implementation difficulties they have

experienced or anticipated. We believe this effort is consistent with

the President's regulatory ``reinvention'' initiative, and it will

result in less burden to S/L's, regulated industries, and the Federal

Government without sacrificing the emissions reduction and enforcement

goals of the Act. These amendments reduce the potential for redundant

or conflicting air regulations on industry while they accommodate a

wider variety of S/L program needs.

This rulemaking addresses requirements that apply to S/L's, should

they choose to obtain delegation or program approval under section

112(l). (Obtaining delegation under section 112(l) is voluntary). This

rulemaking does not include any requirements that apply directly to

stationary sources of HAP or small businesses that emit HAP.

DATES: Comments. Comments must be received on or before March 15, 1999.

Public Hearing. Anyone requesting a public hearing must contact the

EPA no later than January 26, 1999.

ADDRESSES: Comments. Comments should be submitted (in duplicate, if

possible) to: Air and Radiation Docket and Information Center (6102),

Attention Docket Number A-97-29, Room M-1500, U.S. Environmental

Protection Agency, 401 M Street, S.W., Washington, D.C. 20460. The EPA

requests a separate copy also be sent to the contact person listed

below (see FOR FURTHER INFORMATION CONTACT). Comments and data may also

be submitted electronically by following the instructions listed in

Supplementary Information.

Public Hearing. If a public hearing is held, it will be held at the

EPA's Office of Administration Auditorium, Research Triangle Park,

North Carolina. Persons interested in attending the hearing or wishing

to present oral testimony should notify the contact person listed

below.

Docket. Docket No. A-97-29, containing information relevant to this

proposed rulemaking, is available for public inspection and copying

between 8:00 a.m. and 5:30 p.m., Monday through Friday, at the EPA's

Air and Radiation Docket and Information Center (6102), 401 M Street,

S.W., Washington, D.C. 20460; telephone (202) 260-7548. A reasonable

fee may be charged for copying.

FOR FURTHER INFORMATION CONTACT: Mr. Tom Driscoll, Integrated

Implementation Group, Information Transfer and Program Integration

Division (MD-12), U.S. Environmental Protection Agency, Research

Triangle Park, North Carolina 27711; telephone (919) 541-5135;

facsimile (919) 541-5509, electronic mail address

``[email protected].''

SUPPLEMENTARY INFORMATION:

Regulated Entities

Entities potentially affected when the EPA takes final action on

this proposed rule are S/L governments that voluntarily take delegation

of section 112 rules, emissions standards, or requirements. The final

action on this proposal will not regulate emissions sources directly.

These categories and entities include:

------------------------------------------------------------------------

Category Examples

------------------------------------------------------------------------

S/L governments.............. S/L governments that voluntarily request

approval of rules or programs to be

implemented in place of Act section 112

rules, emissions standards or

requirements or voluntarily request

delegation of unchanged section 112

rules.

------------------------------------------------------------------------

This list is not intended to be exhaustive, but rather provides a guide

for readers regarding entities likely to be regulated by final action

on this proposal. This list contains the types of entities that EPA is

now aware could potentially be regulated by final action on this

proposal. Other types of entities not included in the list could also

be regulated. The procedures and criteria for requesting and receiving

approval of these S/L government rules or programs or voluntarily

requesting delegation of section 112 rules are in Sec. 63.90 through

Sec. 63.97, excluding Sec. 63.96, of this subpart.

Electronic Access and Filing Addresses

This notice, the proposed regulatory texts, and other background

information are available in the docket and by request from the EPA's

Air and Radiation Docket and Information Center (see ADDRESSES), or

access through the EPA web site at: http://www.epa.gov/ttn/oarpg.

Electronic comments on the proposed National Emission Standard for

Hazardous Air Pollutants (NESHAP) may be submitted by sending

electronic mail (e-mail) to: [email protected]. Submit

comments as an ASCII file avoiding the use of special characters and

any form of encryption. Comments and data will also be accepted on a

diskette in WordPerfect 5.1 or 6.1 or ASCII file format. Identify all

comments and data in electronic form by the docket number

[[Page 1881]]

(A-97-29). No confidential business information should be submitted

through electronic mail. You may file comments on the proposed rule

online at many Federal Depository Libraries.

Outline

The information presented in this preamble is organized as follows:

I. Purpose and Summary

II. What is the subject and purpose of this rulemaking?

A. Reasons for revisiting section 112(l) regulations

B. Legal and policy framework for revising section 112(l)

regulations

III. Who is subject to this rulemaking?

IV. What process was used to arrive at the decisions in this

rulemaking?

V. How do the delegation options currently in subpart E work?

A. Four ways to obtain delegation under the current subpart E

B. General approval criteria for delegations under the current

subpart E

C. Specific approval criteria and administrative process

requirements for delegations under the current subpart E

D. Federal enforceability of approved requirements

E. Purpose of up-front approval for all subpart E delegation

options

F. EPA can withdraw approval if a S/L is inadequately

implementing or enforcing its approved rule or program

VI. What concerns have S/L's raised regarding the current subpart E

delegation options and what actions has EPA taken to address these

concerns?

A. S/L issues with subpart E

B. What actions have EPA taken to address S/L's concerns?

C. Summary of proposed regulatory changes to subpart E

D. Policy guidance provided in the preamble

E. Policy guidance provided outside the preamble

VII. How do the revised delegation processes work?

A. Sec. 63.93 substitution of authorities

B. Sec. 63.97 State program approval process

C. Sec. 63.94 equivalency by permit approval process

VIII. How do the revised delegation processes compare?

A. What section 112 programs or sources are covered by each

process?

B. What is required for up-front approval?

C. What is required to demonstrate that alternative requirements

are equivalent?

D. What is required for EPA approval of alternative

requirements?

E. When do EPA and the public have an opportunity to comment on

S/L submittal?

IX. How should a S/L decide which delegation process(es) to use?

A. Sec. 63.93 substitution of rules or authorities

B. Sec. 63.94 equivalency by permit

C. Sec. 63.97 State program approval

X. How will EPA determine equivalency for S/L alternative NESHAP

requirements?

A. Introduction

B. Equivalency of alternative levels of control and compliance

and enforcement measures

C. Using compliance evaluation studies in equivalency

demonstrations

D. Proposed process for determining equivalency under subpart E

E. Equivalency of alternative work practice standards

F. Equivalency of alternative General Provisions

XI. How will the section 112(r) accidental release program

provisions of subpart E change, and how will these changes affect

the delegation of the RMP provisions?

XII. Administrative requirements for this rulemaking

A. Public Hearing

B. Docket

C. Executive Order 12866

D. Enhancing the Intergovernmental Partnership Under Executive

Order 12875

E. Consultation and Coordination with Indian Tribal Governments

Under Executive Order 13084

F. Paperwork Reduction Act

G. Regulatory Flexibility Act

H. Unfunded Mandates Reform Act

I. Protection of Children from Environmental Health Risks and

Safety Risks Under Executive Order 13045

J. National Technology Transfer and Advancement Act

XIII. Statutory Authority

I. Purpose and Summary

One of the reasons Congress created section 112(l) of the Act was

to recognize that many S/L's already had programs or regulations in

place to reduce emissions of toxic air pollutants, and that some S/L's

might wish to implement their programs or regulations in place of

otherwise applicable section 112 standards. After promulgation of the

initial subpart E regulations, some S/L's voiced the view that subpart

E would be more useful if we could allow S/L's more flexibility in

implementing their programs in place of section 112 standards. Based on

these comments, we decided to investigate ways to provide more

flexibility, particularly through the use of a greater variety of

regulatory pathways, so long as the result would clearly be emissions

reductions equivalent to the Federal standard being replaced.

During the process of ``reinventing'' the subpart E regulations, we

have solicited and responded to commenters through several different

routes. First, we conducted two stakeholder meetings to assess the

concerns not only of S/L's, but also of industries indirectly affected

by the subpart E regulations and environmental/public interest groups.

We also benefited from the input of issue work groups comprised of

representatives from the States, EPA Regions, and other EPA offices. We

used input from the stakeholder meetings, as well as other meetings

with S/L's, to create a draft preamble and regulatory amendments which

contained changes resulting from several commenters' suggestions. We

placed this draft on the Internet and solicited comments, which then

resulted in additional changes which we believe will fulfill our goal

of making the delegation of the section 112 standards easier, without

sacrificing environmental protection.

Another way that we have involved stakeholders is through the

Sacramento Protocol effort. Officials from the California Air Resources

Board (CARB), the South Coast Air Quality Management District (SCAQMD),

and the EPA Headquarters and Region IX Offices collaborated to analyze

five SCAQMD rules to determine whether they would achieve the same

emissions reductions as the otherwise applicable section 112 standards.

We discuss the results of the Sacramento Protocol in section X., of

this preamble.

These proposed changes to the subpart E regulations will provide

more flexibility in both accepting delegation of the section 112

standards and implementing approved alternative standards. In order to

provide more flexibility to S/L's, we are proposing several broad-based

changes: (1) Allowing more approval options; (2) allowing use of

holistic demonstrations to evaluate the stringency of S/L rules; and

(3) providing more flexibility in monitoring, reporting, and

recordkeeping (MRR).

First, to provide more flexibility and clarity, we have taken

Sec. 63.94, ``Approval of a State program that substitutes for section

112 emissions standards,'' and split it into two sections: Sec. 63.94,

Equivalency by Permit (EBP) and Sec. 63.97, State Program Approval

(SPA). The SPA option addresses approval of a broad variety of

regulatory and enforcement vehicles. The EBP option could be used to

expedite the section 112(l) review process significantly in those cases

where just a handful of sources required to obtain permits under title

V of the Act are affected by delegation of a section 112 standard to a

S/L (for example where a source category consists of just a few sources

in a State).

We have included partial approval as another way to increase the

flexibility S/L's will have when accepting delegation of the section

112 standards. When using partial approval, a S/L would only accept

delegation for part of its program or its rule.

We also intend to add flexibility by allowing S/L's to implement

their

[[Page 1882]]

delegated standards through a greater variety of regulatory vehicles.

The original subpart E regulations only allowed implementation of

alternative rules through rulemaking or title V permits. However, we

are proposing to expand the options for the implementation of

alternative S/L rules by allowing S/L's to implement the delegated

standards through rulemaking, title V permits, S/L permits, general

permits, permit templates, and administrative orders.

In addition, we intend to increase the ability of S/L's to

demonstrate that their standards are equivalent to the otherwise

applicable section 112 standards by adopting a holistic approach to

evaluating S/L standards. In other words, we would evaluate S/L

standards as a whole to determine whether they would achieve equal or

better emissions reductions than the otherwise applicable section 112

standard.

Finally, we propose to increase the amount of flexibility S/L's

would have in comparing their compliance assurance measures to the

compliance assurance measures in the otherwise applicable section 112

standard. Section X.D.3. of this preamble contains a detailed

discussion of how we would compare the compliance assurance measures in

an alternative S/L standard to the compliance assurance measures in the

otherwise applicable section 112 standard. In general, we want to

guarantee that S/L compliance assurance measures will ensure the same

rate of compliance that our compliance assurance measures would ensure.

Furthermore, we are proposing to allow the process developed under the

Sacramento Protocol to be used as a supplement to the overall

evaluation of S/L standards.

II. What Is the Subject and Purpose of This Rulemaking?

A. Reasons for Revisiting Section 112(l) Regulations

Before the Act was amended in 1990 (1990 Amendments), many S/L's

developed their own programs for the control of air toxics (i.e., HAP)

from stationary sources. Some of these S/L programs have now been in

place for many years and, for some of the source categories regulated

by Federal emissions standards under section 112 of the Act, the S/L

programs may have succeeded in reducing air toxics emissions to levels

at or below those required by the Federal standards. For purposes of

this discussion, the Federal emission standards established under

section 112 authority are codified in 40 CFR part 63. These standards

are referred to as NESHAP.

These programs, developed to address specific S/L needs, often

differ from the Federal rules we develop under section 112. As a

result, S/L programs may result in controls or other requirements that,

on the whole, are more stringent than, equivalent to, or less stringent

than controls resulting from the corresponding Federal emissions

standards in terms of the emissions reductions they achieve.

The U.S. Congress was very aware of S/L air toxics programs in the

course of developing the 1990 Amendments to the Act. Seeking to

preserve these programs, Congress included provisions in section 112(l)

that allow us to recognize S/L's air toxics rules or programs in place

of some or all of the corresponding Federal section 112 requirements.

In other words, we may approve S/L rules or programs if they meet

certain criteria (such as demonstrating adequate resources, legal

authorities, level of control, and compliance and enforcement measures)

and allow them to substitute for part 63 NESHAP regulations established

under sections 112(d), 112(f), or 112(h) (or other section 112

requirements such as the Risk Management Program addressed in section

112(r) and 40 CFR part 68). In addition, section 112(l) allows us to

delegate to S/L's the authority to implement and to enforce part 63

NESHAP exactly as we promulgate them, that is, without any changes.

Thus, a S/L may obtain delegated authority to implement and enforce

a NESHAP in either of two circumstances: (1) when the S/L has taken

delegation for unchanged Federal standards, a process called

``straight'' delegation, or (2) when the S/L obtains approval for rules

or other requirements that substitute for the Federal NESHAP

requirements. Under section 112(l), submission of any rules or programs

by S/L's for approval and delegation is voluntary. If S/L's do not

obtain approval or delegation, we continue to have primary authority

and responsibility to implement and to enforce section 112 regulations.

Overall, the goal of section 112(l) is to allow S/L regulators to

implement and enforce their programs (or rules) to control emissions of

HAP from stationary sources, provided those programs achieve results

that are equivalent to the Federal program. We believe that Congress

intended S/L's to be the primary authorities responsible for carrying

out the mandates of the Federal air toxics program. Where S/L air

toxics regulations control emissions of HAP as stringently as NESHAP,

we believe that it is Congress's intention in section 112(l) to

integrate these programs with the Federal air toxics program as it was

revised in 1990. (S/L's may also have volatile organic compounds (VOC),

particulate matter (PM), or lead (Pb) regulations developed under

section 110 of the Act that indirectly control emissions of HAP and

that may, in some cases, be substituted for section 112 requirements.)

Section 112(l) allows the integration of Federal and S/L programs

in order to minimize the potential for ``dual regulation.'' Dual

regulation refers to a situation in which sources of HAP are subject

simultaneously to S/L and Federal requirements that overlap, conflict,

or are otherwise duplicative. By working together to minimize the

potential for dual regulation, we and our S/L co-regulators hope to

reduce unnecessary burden associated with (1) complying with section

112 air toxics control requirements, and (2) issuing permits and

otherwise implementing or enforcing those requirements. We consider

burden ``unnecessary'' when it does not materially contribute to

assuring that sources of HAP achieve the emissions reduction goals

established by our Federal section 112 requirements, or it does not

contribute toward assuring compliance with those requirements.

Under section 112(l)(2) of the Act, we are required to publish

``guidance'' that governs how S/L's may develop and submit, and how we

may approve, S/L air toxics rules or programs that meet the goals of

the Act and the Federal air toxics program. On November 26, 1993, we

finalized regulations that carried out this mandate. (See 58 FR 62262,

Approval of State Programs and Delegation of Federal Authorities, Final

rule). The November 26, 1993 regulations, which can be found in 40 CFR

part 63, subpart E, provide regulatory ``guidance'' regarding approval

of S/L rules or programs that can be implemented and enforced in place

of Federal section 112 rules as well as the delegation of our

authorities and responsibilities associated with those rules. Under

subpart E, such agencies may obtain approval from us to implement and

enforce provisions of their own air pollution control programs in lieu

of federally promulgated NESHAP and other section 112 requirements for

stationary sources. Once approved, S/L rules and applicable

requirements resulting from those rules are considered federally

enforceable and substitute for the Federal requirements that would

otherwise apply to those stationary sources. Overall, the subpart E

[[Page 1883]]

regulations assure that all sources of HAP that are subject to

regulation under section 112 achieve the emissions reductions that are

intended by the Federal emissions standards or other requirements.

The current subpart E provides several different processes (that we

also refer to as options) that a S/L may pursue to obtain delegation or

program approval. A S/L would pursue one or more of these delegation/

approval processes based on the particular programmatic needs and goals

of that agency. A S/L may ``mix and match'' the various processes

provided in subpart E to minimize the overall burden associated with

program approval and to obtain the desired delegation outcome. In

addition to providing the procedural requirements for delegation and

program approval, subpart E describes the necessary criteria and other

requirements a S/L rule or program must meet in order for us to approve

it.

After subpart E was promulgated, several S/L's raised concerns to

us about making these regulations more workable. Since August 1995, we

have been engaged in discussions with S/L representatives to understand

their concerns and to rethink how subpart E might be better structured

to accomplish its goals. These discussions have focused on and

benefited from experiences to date actually implementing the approval

processes included in subpart E. Based on these experiences and the

relative maturity of the air toxics and the title V operating permits

programs since promulgation of the subpart E rules in 1993, we believe

it is appropriate at this time to revise the subpart E regulations.

Thus, in this notice, we are proposing to amend the existing

subpart E regulations to make them easier to use. One goal of this

effort is to introduce additional flexibility into the subpart E

approval processes and criteria in order to accommodate a wider variety

of S/L program needs, without sacrificing the emissions reduction and

enforceability goals of the Act. Through this effort, we hope to

provide additional flexibility to S/L in how they accept delegation for

the section 112 program, including how they are required to establish

the equivalency of their alternative requirements. We believe this will

result in less overall burden to S/L in seeking approval for delegation

requests, to us in approving such requests, and to regulated industries

in complying with the array of S/L and Federal regulations to which

they are subject. In making it easier for S/L to obtain delegation (and

in minimizing disruption of S/L programs), we hope to achieve the

second critical goal of this effort to revise subpart E, to further

minimize the likelihood of dual regulation of stationary sources.

B. Legal and Policy Framework for Revising Section 112(l) Regulations

In proposing revisions to the subpart E regulations, we have

provided as much additional flexibility as we believe is appropriate,

both in light of the statute and given our need to assure the American

public that they are getting the same or better environmental

protection from the S/L requirements that would replace the Federal

section 112 requirements. We believe that the flexibility provided in

the subpart E delegation/approval processes cannot compromise the

environmental results or the enforceability of the otherwise applicable

Federal requirements.

Equivalency demonstrations that S/L's submit for specific

alternative section 112 requirements must show that the alternative

requirements achieve the emissions reductions required by the otherwise

applicable Federal requirements. They also must demonstrate equivalency

on an affected source basis.1 However, this does not mean

that S/L's must demonstrate ``line-by-line'' equivalency with the

section 112 requirements.

---------------------------------------------------------------------------

\1\ Affected source is a defined term in Sec. 63.2 of the part

63 General Provisions. It refers to the portion of a stationary

source that is regulated by a Federal section 112 emissions standard

or requirement.

---------------------------------------------------------------------------

As a legal matter, only the EPA has the authority to approve

alternative section 112 requirements that apply to a category of

sources for which we have promulgated Federal emissions standards. In

other words, we may not delegate to S/L's the authority to make

findings of equivalency between their programs' requirements and the

requirements of the otherwise applicable Federal standards.

In these rule revisions, we are proposing that the ``test'' for

equivalency between the S/L and Federal requirements should be the same

no matter which delegation/approval option a S/L chooses to pursue

among the options that allow alternative requirements to be substituted

for Federal requirements. By ``test'' we mean the criteria that we

would use to determine whether S/L requirements are as stringent as

ours in terms of the effect they would have on achieving the required

emissions reductions, assuring compliance, and enabling appropriate

enforcement actions.

Before discussing the proposed changes to subpart E, we thought it

would be useful to identify who is subject to this rulemaking, describe

the process that was used to arrive at the decisions in this package,

review background on the existing structure and content of subpart E,

and summarize the key S/L concerns that we have addressed in this and

previous actions.

III. Who Is Subject to This Rulemaking?

This rulemaking addresses requirements that apply to ``States,''

should they choose to obtain delegation or program approval under

section 112(l) of the Act. Submission of rules or programs by

``States'' for approval and delegation under section 112(l) is

voluntary. The definition of ``State'' in subpart E covers all non-

Federal authorities, including local air pollution control agencies,

statewide programs, Indian Tribes, and U.S. Territories. Because these

authorities are the primary intended audience for this regulation, from

this point on we use ``you'' or ``your'' to address our comments

directly to any or all of these authorities. In addition, we may also

refer to these authorities as S/L. Note, however, that any requests for

comment on these proposed amendments are directed to the public-at-

large, not just S/L.

Consistent with the existing subpart E regulations that govern

section 112(l) delegations and approvals, this rulemaking does not

include any requirements that apply directly to stationary sources of

HAP. We regulate HAP sources by developing NESHAP and other types of

requirements under section 112. The subpart E regulations that are the

subject of this rulemaking merely establish criteria and procedures for

determining the governmental agency that will have primary

responsibility within a jurisdiction for implementing and enforcing our

emissions standards (and other substantive section 112 requirements),

and they establish the processes by which you may implement regulations

that, while not identical to our emissions standards, achieve the same

or better results.

IV. What Process Was Used To Arrive at the Decisions in This

Rulemaking?

In August 1995, S/L air pollution control program officials,

presented to us their views as to why the current subpart E rule needs

to be revised. They indicated that subpart E does not provide

sufficient flexibility for you to use its delegation options, and that

the requirements for establishing that your programs result in

equivalent or better emissions reductions are too

[[Page 1884]]

burdensome. During the succeeding 2 years, we held numerous discussions

with representatives of S/L air pollution control program officials to

better understand their views and to develop options for addressing

their concerns while still assuring that the requirements of the Act

are met. After developing some approaches for responding to S/L air

pollution control program officials' concerns, we involved a wider

group of stakeholders, e.g., industry and public interest groups, to

alert them of our plans and to ask for their input. For example, we

held meetings with the Toxics/Permitting/New Source Review Subcommittee

of the Clean Air Act Advisory Committee in Washington, DC, with

stakeholders in Los Angeles, California on December 5 and 6, 1996, and

with stakeholders in Washington, DC on February 26, 1997 and July 9 and

10, 1997 to gather their input. We also undertook a study with CARB and

SCAQMD to analyze emission reductions of their rules compared with the

otherwise applicable section 112 standards.

V. How Do the Delegation Options Currently in Subpart E Work?

A. Four Ways To Obtain Delegation Under the Current Subpart E

The following discussion explains the delegation options currently

available to you under the existing subpart E regulations. Sections

VII. through X. of the preamble, below, explain how we are proposing to

modify and expand these delegation options to give you more choices in

how you may seek delegation for one or more section 112 emissions

standards or requirements.

Subpart E as currently written contains four ways for you to obtain

delegation. You may use any one or any combination of these options in

your request for approval of your rules, authorities, or programs. (If

you are accepting delegation of all Federal section 112 rules without

changes, streamlined delegation mechanisms are available. See the

original subpart E proposal preamble, 58 FR 29298, May 19, 1993, and

the direct final amendments in 61 FR 36295, July 10, 1996.) Under each

of these delegation options, you must demonstrate that each of your

rules, standards, or requirements (as appropriate) for an affected

source is no less stringent than the Federal rule, emissions standard,

or requirement that would otherwise apply to that same affected source.

The four ways to obtain delegation are listed.

1. Unchanged Federal Standards--``Straight'' delegation to

implement an unchanged Federal standard or requirement. Under this

process, you may receive delegation for Federal standards and

requirements that are unchanged from the promulgated requirements, as

well as delegation of authority for unchanged rules and standards that

we will issue in the future. These provisions are addressed in

Sec. 63.91 and in various guidance memoranda and documents, including

``Interim Enabling Guidance for the Implementation of 40 CFR Part 63,

Subpart E'' (EPA-453/R-93-040, November 1993).

2. Rule Adjustment--Delegation to implement a Federal standard

through approval of your rule (or rules) that adjusts a Federal rule in

minor ways that are already listed in subpart E, Sec. 63.92. Each

adjustment taken individually must be no less stringent than the

corresponding requirement in our standard. If your rule meets the

criteria listed in Sec. 63.92, you can receive approval to replace our

rule with yours very quickly.

3. Authority Substitution--Delegation to implement a Federal

standard through approval of your rule (or rules, or other authorities)

that adjusts a Federal rule in significant ways that are not predefined

in subpart E and are no less stringent. Taken as a whole, the

adjustments must result in rules (or other authorities) that are

equivalent to, or no less stringent than, the Federal standard in terms

of the emissions reductions that they require. These provisions are

addressed in Sec. 63.93.

4. Program Approval--Delegation to implement some or all Federal

emissions standards through development of terms and conditions in 40

CFR title V operating permits, rather than through approval of your

substantive rules. First, through an ``up-front'' approval, we ratify

your commitments to develop appropriate permit terms and conditions;

later, we review the proposed permits for sources affected by the

NESHAP. Through the title V permitting process you may change

requirements in the Federal emissions standards, provided that the

results of each change are equivalent to (i.e., unequivocally no less

stringent than) the corresponding Federal requirements and you

demonstrate the equivalency of your alternative requirements by

presenting the proposed permit terms and conditions in the ``form'' of

the Federal standard. By ``form'' of the Federal standard, we mean the

terms and units of measurement in which the requirements are expressed.

These provisions are addressed in Sec. 63.94.

B. General Approval Criteria for Delegations Under the Current Subpart

E

To obtain delegation under any of these approval processes, you

must demonstrate that you have met certain basic approval criteria that

are listed in Sec. 63.91 as well as any additional process-specific

approval criteria that are included in the sections that address the

delegation mechanisms that you choose to pursue. To obtain approval for

your rule or program, Sec. 63.91 requires you to demonstrate to us that

you have adequate legal authority and resources to implement and

enforce your rule or program upon approval. You must also demonstrate

that your rule or program assures that all sources within your

jurisdiction will comply with each applicable section 112 rule. In

addition, you must provide an expeditious implementation schedule, a

plan that assures expeditious compliance by all sources subject to the

rule or program, and a copy of each of your statutes, regulations, and

other requirements that contain the appropriate provisions granting

authority to implement and enforce your rule or program upon approval.

In general, title V program approval is sufficient to demonstrate that

you have satisfied subpart E's general approval criteria in Sec. 63.91,

at least for sources permitted under your title V program.

C. Specific Approval Criteria and Administrative Process Requirements

for Delegations Under the Current Subpart E

1. Sec. 63.91 ``Straight'' Delegation

Under the ``straight'' delegation option in Sec. 63.91, you may

implement Federal section 112 requirements without changes. You may use

this option when you want to accept delegation of an existing or a

future Federal section 112 standard as promulgated. The approval

process under Sec. 63.91 consists of notice and comment rulemaking in

the Federal Register. Upon approval of your request for delegation of

Federal section 112 rules as promulgated (there are some variations for

section 112(r) accidental release programs), we would publish the

approval in the Federal Register and incorporate it, directly or by

reference, in the appropriate subpart of part 63. In addition, you can

establish a mechanism for future delegation of section 112 standards as

promulgated (e.g., automatic or adoption by reference) that is suitable

for your State's method of adopting regulations. Future delegations of

promulgated section 112 rules would not have to go

[[Page 1885]]

through an additional Federal Register public notice and comment. This

mechanism can be similar to the process established under EPA's 1983

guidance in the ``Good Practice Manual for New Source Performance

Standards (NSPS) and NESHAP.''

Alternatively, you could choose to submit separate Sec. 63.91

requests for delegation of each specific 112 requirement. If no adverse

comments are expected, we can do direct final rulemaking to streamline

the delegation of these section 112 requirements. Under this option,

the Federal Register notice would state something like ``* * * unless

adverse comments are received, this action will be considered final in

21 days.''

For additional detail on how this and the other current subpart E

delegation options work, see ``Interim Enabling Guidance for the

Implementation of 40 CFR Part 63, Subpart E'' (EPA-453/R-93-040,

November 1993).

2. Sec. 63.92 Rule Adjustment

Under the rule adjustment option in Sec. 63.92, we can approve one

(or more) of your rules that is structurally very similar to, and is

clearly at least as stringent as, the Federal rule for which you want

to substitute your rule(s). Under this option, you may only make an

adjustment to the Federal rule that results in emissions limits and

other requirements that are clearly no less stringent, on an affected

source basis, than the Federal rule. There can be no ambiguity

regarding the stringency of any of the proposed adjustments. Section

63.92 includes a list of rule adjustments that may be approved under

this option--for example, lowering a required emissions rate or

subjecting additional emissions points within a source category to

control requirements. We consider all of these adjustments to result in

requirements that are more stringent than the corresponding Federal

requirements. In addition, your rule must have undergone public notice

and provided an opportunity for public comment in your jurisdiction

before you submit it to us for approval. If we find that the necessary

criteria are met, we would approve your rule with adjustments, and it

becomes federally enforceable in lieu of the otherwise applicable

section 112 rule. Upon approval, your rule would be published in the

Federal Register and incorporated directly or by reference into part

63, without additional notice and opportunity for comment.

3. Sec. 63.93 Substitution of Authorities

Under Sec. 63.93, substitution of authorities (which is commonly

referred to as the rule substitution option), we can approve

substitution of one (or more) of your rules or requirements for a

Federal rule, where your rule is structurally different from the

corresponding Federal rule. Under this section, we also may approve a

rule that is different from the Federal rule in ways that do not

qualify for approval under Sec. 63.92--that is, in ways that are not

``unambiguously no less stringent.'' This situation might arise when

you submit a rule that was written independently of the Federal rule or

when, for example, your rule achieves equivalent emissions reductions,

but with a combination of levels of control and compliance and

enforcement measures not addressed in or by the Federal rule. (Level of

control and compliance and enforcement measures are terms that are

defined in Sec. 63.90.) Any rules or other requirements that you submit

under this section must be enforceable under your State law.

Under the existing subpart E rule language, authorities that you

may submit for approval under this section include the following:

(1) S/L rules or other requirements enforceable under State law; or

(2) In the case of alternative work practice standards, specific

title V or part 71 permit terms and conditions for the source or set of

sources in the source category for which you are requesting approval

under subpart E. The permit terms and conditions must address control

requirements as well as compliance and enforcement measures.

Under Sec. 63.93, you must make a detailed demonstration that your

rule (or other authorities) would achieve equal or greater emissions

reductions (or other measure of control stringency where appropriate)

for each affected source regulated by the Federal section 112 rule.

Upon receipt of a complete request for approval of a substituted rule

(or other authorities), we would conduct a rulemaking to request public

comments on the proposed substitution. If we find that your

demonstration is satisfactory and the public comments do not dissuade

us, we would approve your rule, publish it in the Federal Register, and

incorporate it directly or by reference into part 63. Your approved

rule and/or requirements would be federally enforceable and they would

replace the otherwise applicable Federal rule in your jurisdiction for

the affected sources.

The approval criteria in Sec. 63.93(b)(2) require that, in any

request for approval under this section, you provide detailed

documentation that your authorities contain or demonstrate:

(1) Applicability criteria that are no less stringent than those in

the respective Federal rule. Applicability criteria is also a term that

is defined in Sec. 63.90;

(2) Levels of control and compliance and enforcement measures that

would achieve emissions reductions from each affected source that are

no less stringent than would result from the otherwise applicable

Federal standard;

(3) A compliance schedule that assures that each affected source is

in compliance no later than would be required by the otherwise

applicable Federal rule; and

(4) Additional criteria specified in Sec. 63.93(b)(4) that are not

repeated here.

To obtain approval under Sec. 63.93, you must demonstrate that you

have satisfied the approval criteria in Sec. 63.93(b) in addition to

the approval criteria in Sec. 63.91(b). As we mentioned earlier, you

may usually demonstrate that you have satisfied Sec. 63.91(b) if you

have an approved title V or part 71 operating permits program. In

addition, once you have demonstrated that you have satisfied the

Sec. 63.91(b) criteria under a Sec. 63.93 approval action, you

generally would not have to repeat the Sec. 63.91(b) demonstration when

you submit additional rules for approval in the future, provided that

your approved resources, authorities, and other program elements are

still adequate to implement and enforce the rules for which you are

seeking delegation, and provided that you are not seeking delegation

for rules that affect sources that your original program approval did

not address (e.g., area sources). Another example of a situation in

which you may need to resubmit Sec. 63.91(b) approval elements is when

you submit for approval an alternative compliance and enforcement

strategy that involves a more resource-intensive inspection program

than the one previously approved.

4. Sec. 63.94 Program Approval

Under the current program approval option in Sec. 63.94, we may

approve your program so that you can substitute alternative

requirements for one, some, or all section 112 emissions standards

through the title V or permitting process. Currently, this option is

available only for sources that will be permitted under title V.

For approval to implement and enforce your program in place of the

otherwise applicable Federal section 112 emissions standards, you must

[[Page 1886]]

make a number of legally binding commitments:

(1) First, you must commit to regulating every source that would

have been regulated by the Federal section 112 emissions standards for

which your program is intended to substitute;

(2) Second, you must provide assurance that the level of control

and compliance and enforcement measures in each 40 CFR title V permit

you issue for these sources is at least as stringent as those that

would have resulted from the otherwise applicable Federal emissions

standards;

(3) Finally, you must commit to expressing the 40 CFR title V

operating permits conditions in the ``form'' of the otherwise

applicable Federal standard. This means that you must commit to

translating your standards from the ``form'' you have used in your

rules to the Federal ``form'' so that operating permits conditions are

expressed in the same terms and units of measure and include the same

monitoring and test procedures as in the Federal rule or federally

approved alternatives. This means that you must use monitoring and

testing methods which we have approved for application under the

Federal rule.

To approve these commitments and identify the list of sources or

source categories for which you intend to use this option, we would do

a notice and comment rulemaking in the Federal Register. We refer to

this rulemaking as the ``up-front'' approval. Our approval of

alternative requirements for specific sources would take place during

the title V permit issuance process. Thus, beyond the ``up-front''

approval of your commitments and other legal authorities, under this

option we do not conduct rulemaking to approve your alternative,

source-specific requirements.

This mechanism, including the ``form'' of the standard approval

criterion in Sec. 63.94(b)(2)(D), was intended to provide us with an

opportunity for expedited review of your alternative requirements in

the form of title V permit terms and conditions during the permit

issuance process, instead of requiring us to examine and approve source

category rules through the authority (rule) substitution option in

Sec. 63.93. The title V permit issuance process includes opportunities

for public and EPA review, and for EPA objection, of the proposed

alternative S/L requirements; therefore, it can serve as the approval

mechanism in lieu of Federal rulemaking under this option. In addition,

the permit itself acts as the Federal enforcement mechanism under this

option. Upon our approval of the proposed permit, the alternative

requirements become federally enforceable and replace the otherwise

applicable Federal section 112 requirements for that particular

standard (or standards) for that particular source.

The program substitution option as currently written allows you to

substitute an entire program of alternative air toxics rules for all or

some of the Federal section 112 rules. This type of situation might

arise if you have a mature air toxics program with many regulations

affecting source categories regulated by Federal section 112 standards.

If we approve your program under this option, you can implement and

enforce alternative NESHAP requirements for specific emissions

standards that are identified in the ``up-front'' program approval.

These emissions standards and/or requirements may have been established

under sections 112(d), 112(f), 112(h), or other section 112 provisions.

D. Federal Enforceability of Approved Requirements

Our promulgated section 112 standard is the applicable and

federally enforceable standard until we approve your rule or program to

take its place following the procedures and criteria in subpart E. Your

rule or program requirements become the applicable and federally

enforceable standard starting on the date of approval of your rule,

program, or other requirement (or in the case of Sec. 63.94 program

approval, starting on the date of permit issuance). Under subpart E,

Sec. 63.91(a)(6), the date of approval is the date of publication in

the Federal Register. After the approval date, our promulgated standard

is no longer applicable or enforceable for the sources in your

jurisdiction.

Although you become the primary implementation and enforcement

authority when you accept delegation for a section 112 emissions

standard, we continue to have concurrent authority to enforce the

standard which, depending on the delegation mechanism you used, may be

either your approved rule or the unchanged Federal standard. In other

words, after we approve your rule or program, we still have the

authority to enforce the complete emissions standard, including any

``alternative'' requirements arising from your rule or program. This

authority is spelled out in section 112(l)(7) of the Act and Sec. 63.90

and Sec. 63.97 of the proposed rule. Nothing in these amendments

changes our interpretation of section 112(l)(7), or how it is

implemented through subpart E.

E. Purpose of Up-Front Approval for All Subpart E Delegation Options

No matter which subpart E delegation option(s) you pursue, you must

demonstrate that you have satisfied the general delegation/approval

criteria contained in Sec. 63.91(b). In addition, under the current

rule, to obtain delegation/approval under a particular option in

Sec. 63.92, Sec. 63.93, Sec. 63.94, or Sec. 63.95, you must demonstrate

that you have satisfied the additional approval criteria specified in

the relevant section.

The rulemaking we conduct under each subpart E delegation option to

codify our finding that you have satisfied the up-front approval

criteria serves several critical functions under section 112(l). First,

the process of approving the up-front portion of your program assures

that you have met the delegation criteria in section 112(l)(5) (as

codified in Sec. 63.91(b)), that is, that you have demonstrated

adequate authority and resources, an expeditious implementation

schedule, an adequate enforcement strategy, and that your program is

likely to satisfy the objectives of the Act. (To the extent that these

have already been satisfied through a title V program approval, you

need not resubmit information demonstrating that you meet the

Sec. 63.91(b) criteria. As we explain later, we believe that title V

program approval often is sufficient to demonstrate that you have met

the Sec. 63.91(b) criteria.)

Second, our section 112(l) approval of your program provides the

legal foundation by which section 112 requirements may be replaced by

your alternative requirements such that your requirements become the

federally enforceable requirements in lieu of the applicable Federal

requirements. By acting on your program as a whole, we are satisfying

certain prerequisites for removing the Federal requirements from the

list of applicable requirements to which sources are subject for

enforcement purposes (and that must be accounted for in sources' title

V permits). The up-front approval component under the subpart E

approval processes is necessary for you to apply your alternative

requirements to section 112-affected sources and have those

requirements be considered federally enforceable.

Third, the up-front approval step provides for an orderly way of

identifying which authorities have been delegated to you in relation to

specific Federal emissions standards or requirements. Delineation is

necessary for us, the public, and the regulated community to ascertain

readily what requirements apply to each affected

[[Page 1887]]

source. Without this process, there is no way to distinguish legally

and practicably which emissions standards or requirements apply to each

affected source and which agency has primary implementation and

enforcement authority for each affected source. (It is particularly

important to clarify which agency has primary enforcement authority for

Federal requirements as they apply to particular sources before those

requirements are incorporated into sources' title V permits.) This is

why we require you to specifically request in your submission for

approval the Federal section 112 authorities for which you are seeking

delegation. It would be assumed that all other existing (i.e.,

promulgated) or future Federal requirements not cited are not delegated

to you.

If, in the future, you would like to expand the coverage of your

approved program to include additional Federal requirements, you must

repeat the up-front approval step to identify those requirements, the

affected source categories, and any additional information that we need

to approve by rulemaking to allow you to implement and enforce your

alternative requirements for those categories. You would also be

required to certify that nothing in your program has changed in any way

that affects your ability to meet the Sec. 63.91(b) approval criteria.

This is not to say, however, that you must resubmit information

that you have already submitted and had approved under title V.

Previously, in the subpart E promulgation preamble (see 58 FR 62271-

72), we stated that ``the information which must be submitted by a

State under part 70 encompasses the information required under section

112(l)(5) for approval of State programs that seek only to implement

and enforce Federal standards exactly as promulgated,'' and ``for part

70 sources, part 70 approval also constitutes approval under section

112(l)(5) of the State's programs for delegation of section 112

standards that are unchanged from Federal standards as promulgated.''

This means that, for delegation requests under the existing subpart E

regulations where the Sec. 63.91(b) approval criteria are the only

criteria that you must satisfy, i.e., for ``straight'' delegation

situations, you can demonstrate that you have satisfied the

Sec. 63.91(b) criteria by demonstrating title V program approval (for

the sources for which you are accepting delegation that are covered by

your title V program). In the preamble to the existing subpart E rule,

we did not make clear that, under the existing subpart E regulations,

title V program approval could be considered sufficient to demonstrate

that you have satisfied the section 63.91(b) criteria for delegation

requests other than ``straight'' delegations.

F. EPA Can Withdraw Approval If a S/L Is Inadequately Implementing or

Enforcing Its Approved Rule or Program

Section 63.96 in subpart E addresses what happens if we find that

you are not implementing or enforcing your approved rule or program

according to the criteria you agreed to when you obtained delegation.

Section 63.96 lays out procedures and criteria that address program

corrections and program withdrawals. For example, at any time after we

approve your rule or program we may ask you to provide us with

information that shows how you are implementing and enforcing the rule

or program. If we have reason to believe that you are not adequately

implementing or enforcing your approved rule or program (or that the

approved rule or program is not as stringent as the otherwise

applicable Federal rule, emissions standard, or requirements, or that

you no longer have adequate authorities and resources to implement and

enforce), we would inform you in writing of our findings and the basis

for them. You then have an opportunity to correct the deficiencies and

to inform us of the corrective actions you have undertaken and

completed. If we find that your actions are not adequate to correct the

deficiencies, we would notify you that we intend to withdraw approval

of your previously approved rule or program (or part of it). The

withdrawal process includes opportunities for a public hearing and a

public comment period.

Based on public comments received, and your reaction to them, we

may notify you of changes or actions that we think are needed to

correct your rule or program deficiencies. If you do not correct these

deficiencies within 90 days, we would withdraw approval of your

federally enforceable rule or program. Upon withdrawal, your rule is no

longer federally enforceable and the Federal rule that it had replaced

again becomes the federally enforceable set of applicable requirements

for the subject sources. With the withdrawal notice, we would publish

an expeditious schedule for the sources subject to your previously

approved rule or program to come into compliance with the applicable

Federal requirements. You would need to revise the title V operating

permits for any sources that were subject to your previously approved

rule or program.

Section 63.96 also provides that you may submit a new rule or

program (or portion) for approval after we have withdrawn approval of

your rule or program (or portion). You may also voluntarily withdraw

from an approved rule or program (or portion) by notifying us and all

subject sources and by providing notice and opportunity for public

comment within your jurisdiction. If you voluntarily withdraw from

approval, we would publish an expeditious timetable for sources to come

into compliance with the applicable Federal requirements and you would

revise their title V operating permits to reflect the new requirements.

VI. What Concerns Have S/L's Raised Regarding the Current Subpart E

Delegation Options and What Actions Has EPA Taken To Address These

Concerns?

A. S/L Issues With Subpart E

On August 14, 1995, S/L air pollution control program officials

presented us with a list of issues and implementation difficulties that

they associate with subpart E's requirements. This list was compiled by

S/L representatives based on their actual experiences with subpart E

and on anticipated difficulties with forthcoming submissions for

approval. As we understand their concerns, some of their major issues

are that subpart E appears to require a ``line-by-line'' equivalency

demonstration between your requirements and ours, and that you must

present your alternative requirements in the ``form'' of the Federal

standard. ``Form'' of the standard refers to the terms, such as units

of measure, in which emissions limits and compliance and enforcement

measures are expressed. (For example, if a certain Federal emissions

standard requires an emissions limit of 5 pounds per hour of a HAP from

a particular piece of equipment, you would have to express an emissions

limit resulting from your programs' requirements in the same units,

i.e., pounds per hour, and the actual limit would have to be 5 or fewer

pounds per hour in order to be no less stringent than the Federal

standard.)

We think these concerns arise from language in Sec. 63.94 that

requires separate equivalency demonstrations for emissions limits,

compliance and enforcement measures (MRR), and compliance dates. These

provisions were included because we believed it would simplify and

speed our and the public's analysis that your program's alternative

requirements achieve the same or better results than our rules or

programs; without these provisions, we believe we would not have the

resources to perform this analysis during our 45-

[[Page 1888]]

day review period for each permit. Our understanding is that they

believe these provisions limit your flexibility to substitute your

requirements for the Federal requirements. They asked us to remove the

``form'' of the standard and line-by-line equivalency requirements from

subpart E. This is the key issue we addressed through these regulatory

amendments and clarifications to subpart E.

Another one of their concerns with subpart E as it is currently

structured pertains to the length of the approval process for a rule

substitution under Sec. 63.93. Section 63.93 allows us to take up to

180 days to review and act on your submittal, consistent with section

112(l)(5) of the Act, which allows us 180 days to approve or disapprove

a ``program.'' They expressed concern that the 180-day review period

may cause delays for the regulated community, and they requested that

we explore ways to expedite the approval process.

They also expressed concern that the program approval option in

Sec. 63.94 does not include a mechanism for you to accept delegation of

the Federal requirements for section 112 area sources that are not

required to obtain title V operating permits. You asked us to revise

subpart E so that a mechanism is available to delegate changed Federal

standards for both title V and non-title V sources.

They also asked us to clarify how you may substitute alternative

work practice standards (WPS) for federally promulgated WPS under

section 112(l). One of their concerns relates to the equivalency

criteria for ``nonquantifiable WPS,'' that is, those WPS for which the

expected emissions reductions or specific performance requirements

cannot be quantified.

They reiterated their concern about the potential for dual

regulation if you are unable to demonstrate equivalency and obtain

approval to implement and enforce your rules or programs in place of

ours. As we mentioned earlier, dual regulation describes the situation

where sources must comply simultaneously with overlapping, redundant,

inconsistent, or incompatible S/L and Federal requirements. While we do

not think this situation will occur very frequently, we agree that it

should be avoided wherever possible.

On October 30, 1997, the California Air Resources Board (CARB)

presented us with detailed comments on an initial draft of these

proposed rule revisions. In general, they suggested expanding the

universe of acceptable regulatory vehicles that you could use to

substitute for Federal standards. Our detailed response, including

clarification of what regulatory vehicles may and may not be used under

what circumstances, is contained in section VI.B.2. below.

B. What Actions Have EPA Taken To Address S/L's Concerns?

This section describes the rule changes and policy clarifications

that we are making, or have already made, in response to your comments

and suggestions.

1. Summary of Flexibility Added to Subpart E Prior to These Proposed

Amendments

Even before this rulemaking action, we took several steps to

address your concerns. As a first step, through a direct final Federal

Register notice that was published on July 10, 1996 (see 61 FR 36295,

``Approval of State Programs and Delegation of Federal Authorities,''

Direct final rule), we made various changes to the rule language in

subpart E. Because there were no adverse comments, the direct final

rule became effective on August 19, 1996. That rulemaking effected the

following changes:

(1) It deleted a duplicative requirement in Sec. 63.93 that sources

report the results of all required monitoring or testing at least every

6 months under an approved S/L rule or program. This requirement was

duplicative of reporting requirements already included in individual

NESHAP standards and the title V permit program regulations.

(2) It clarified the process for ``straight'' delegation of future

NESHAP standards through a single, advance program approval.

(3) It established the regulatory framework under which you can

obtain section 112(l) approval for S/L programs that create federally

enforceable limits on sources' potential to emit HAP.

(4) It delayed the requirement that you coordinate with the

Chemical Safety and Hazard Investigation Board (established by section

112(r)) until the board is convened.

In addition, since August 1995, we issued two policy memoranda to

clarify the flexibility that we believe already exists under Sec. 63.93

for making equivalency determinations between S/L and Federal rules.

(See, (1) ``Section 112(l) Submittal Equivalency Determination--

Recordkeeping Requirements, John S. Seitz, Director, Office of Air

Quality Planning and Standards (MD-10) to David Howekamp, Director, Air

and Toxics Division, Region IX, June 26, 1995.'' and (2)

``Clarification to the June 26, 1995 Memorandum, `Section 112(l)

Submittal Equivalency Determinations--Recordkeeping Requirements', John

S. Seitz, Director, Office of Air Quality Planning and Standards (MD-

10), Regional Air Division Directors, November 26, 1996.'' Both memos

are located in the docket.) These memoranda clarified our

interpretation of the ``holistic'' approval criteria in

Sec. 63.93(b)(2) as it is currently written. Essentially, we stated

that, in order to demonstrate the equivalency of your substitute rules

(or other requirements or authorities) with one of our NESHAP

standards, you must demonstrate that your rule would result in

equivalent emissions reductions. Provided you can demonstrate that the

level of control and MRR of your rule, when taken as a whole, result in

equivalent or better overall emissions reductions, and provided that

your requirements do not compromise Federal enforceability, the

existing subpart E regulations allow us to approve your compliance

measures even when they differ from our rules in form and stringency.

In other words, line-by-line equivalency with the Federal rule for MRR

is not required if your alternative rule as a package is demonstrated

to be as stringent as the Federal standard. However, we would not

approve a less stringent emission limit with very stringent MRR. Your

emission limits must be as stringent as the Federal emission limits. In

the November 26, 1996 memorandum, we further clarified that, under a

Sec. 63.93 approval, line-by-line equivalency is not required to obtain

approval. In addition, we stated our intention that the flexibility

discussed in the June 26, 1995 memorandum regarding the record

retention period be granted ``when evaluating any alternative

compliance measures, including recordkeeping and reporting

requirements, provided that Federal enforceability is not diminished in

this process.''

2. Summary of Flexibility Added to Subpart E Through These Proposed

Amendments

Through this action, we are proposing various regulatory changes to

subpart E to provide additional flexibility to you in how you may

accept delegation for the Federal section 112 program, including how

you are required to establish the equivalency of your alternative

requirements. These changes augment the flexibility already provided in

our July 10, 1996 rulemaking. In addition to proposing regulatory

changes, we are providing new policy guidance that clarifies: (1) Our

interpretations of the existing regulations and guidance documents; (2)

our expectations regarding the equivalency demonstration process; (3)

[[Page 1889]]

our expectations regarding equivalency demonstrations for alternative

work practice standards and General Provisions; and (4) the types of

situations that each subpart E delegation/approval option is designed

to address. That is, we have clarified when we think it is appropriate

for you to pursue a delegation request under each option according to

the circumstances in your jurisdiction.

Overall, the revised subpart E regulation and accompanying policy

guidance provide the following additional flexibility:

(1) more substitution options;

(2) holistic equivalency demonstration (covering both emissions

limits and MRR) showing that the S/L rules and requirements, seen as a

whole, are equivalent to the Federal MACT standards, rather than a

line-by-line equivalency determination and ``form of the standard''

requirement;

(3) same equivalency demonstration test for the rule substitution,

equivalency by permit (EBP), and SPA options (which are discussed at

length in the next section);

(4) expedited processes for approving alternative section 112

requirements under the new EBP and SPA processes;

(5) mechanisms for approving and implementing alternative section

112 requirements for area sources;

(6) increased options in regulatory vehicles for alternatives

(which are discussed later in this section);

(7) approval of some kinds of alternative work practice standards

without having to quantify their effect on emissions; and

(8) approval of alternative General Provisions (as found in 40 CFR

part 63, subpart A) based on a tiered classification scheme that allows

for different approval criteria depending on the nature of the General

Provisions requirement.

We have also added an option to this rule to partially approve S/L

rules or programs. We believe that if the majority of your rule or

program submitted for approval under section 112(l) meets the subpart E

criteria, then you should get approval of that portion of the rule or

program that meets the requirements. This option provides an additional

means to minimize the dual regulation effect that the original subpart

E rulemaking was designed to address. Therefore, a program that you

submit under this subsection may provide for partial or complete

delegation of the Administrator's authorities and responsibilities to

implement and enforce emissions standards and prevention requirements,

but may not include authority to set standards less stringent than

those promulgated by the EPA.

In their current form, subpart E provisions limit us to a binary

choice of either complete approval or complete disapproval. In other

words, if you make an adequate equivalency demonstration for your S/L

rule in its entirety, we would grant full approval of your rule or

program to be used in place of the corresponding Federal requirement.

However, if any part of the demonstration is found lacking, we would

disapprove the submittal in its entirety.

We believe that partial approval of your air toxics rules and

programs and accidental release prevention programs (ARPP) is

reasonable, is authorized by statute, and is a viable policy option.

Section 112(l)(1) of the Act specifically allows for either ``partial

or complete delegation'' of EPA's authorities and responsibilities. In

addition, this partial approval option will facilitate implementation

of section 112(l) in circumstances where it would make good sense, as

discussed further below.

Under this approval option, you would submit your S/L rule or

program for our approval. If we find that a separable portion of your

rule fails to meet any of the criteria of sections 63.92, 63.93, 63.94,

63.95, or 63.97, then we would not approve that portion of your rule or

program. We are proposing to define ``separable portion'' as a

section(s) of a rule or a portion(s) of a program which can be acted

upon independently without affecting the overall integrity of the rule

or program as a whole. We could still approve the remaining portion,

provided that we determine that such partial approval would not unduly

confuse the regulated sources or public nor confuse the delegation

process itself. The Federal rule would continue to apply in place of

the portion of your rule that was disapproved.

For example, we would consider the scenario where you only wished

to implement and enforce NESHAP standard(s) adopted by reference into

S/L law, but only as these standards apply to title V sources, as a

separable portion that we could delegate to you.

To add a twist to the example in above, if we determine that the

criminal enforcement provisions in your rule are not applicable to

covered area sources, then we would approve the rest of your submittal

and deny delegation of the rule as to criminal enforcement for area

sources.

Again, in this case, all criminal enforcement of area sources would

be our responsibility, and you would refer all such matters to the

appropriate Regional Office for investigation and resolution. You

should not have to resubmit the entire proposal with reference to the

criminal enforcement for area sources removed, merely so that we could

approve the whole package. We would also specify which portions of the

S/L rule or program are not approvable. This is another case where it

is much more efficient for both you and us for us to allow for partial

approval.

Another situation where partial approval could be used is where

your rule or program covers a subcategory or subcategories of the

source affected by a Federal standards, but not necessarily all sources

covered by that standard. These must be logical and compelling

subcategories (for example, hard but not decorative chrome plating, or

storage tanks of a particular size at several different types of

facilities).

There are cases where we believe that partial approval is

inappropriate. An example is the case where the test methods in the

alternative rule are inadequate. Since the test methods are linked to,

and are thus an integral part of, the specific level of control of a

standard, we cannot deem the test methods a ``separable portion.''

Consequently, we could not approve part of a submittal that specifies

the level of control and disapprove the part that specifies the test

methods associated with that level of control.

If you submit a rule or program with deficient MRR, then your rule

or program could be partially disapproved as to these areas of

deficiency. At some point, however, sources and governmental agencies

may become confused if there are too many separate provisions, some of

which are delegated and others not. If we determine that there are too

many areas of deficiency or if separating the responsibilities between

the Federal and State Government would be too cumbersome, then we may

disapprove your whole rule or program and ask that it be resubmitted in

a form that is closer to complete approval with only a few areas that

must be disapproved. We are under no duty to approve rules or programs

in part. We reserve the right to disapprove your rules and programs

entirely, if in our judgment, partial approval is not workable.

If you, in preconsultation with us, are aware of the deficiencies

in your submittal, you can merely leave the deficient parts out. In

this case, your submittal would include reference to any deficiencies.

As a practical matter, all parties will not be aware of all deficiency

issues that may arise in the course of a review. That is why partial

[[Page 1890]]

approval authority allows us to selectively approve the satisfactory

portions of the submittal and is therefore, a more efficient mechanism.

We are soliciting comments on appropriate uses of the partial approval

option.

We have received recent comments from CARB, who suggested expanding

the universe of acceptable regulatory vehicles that you could use to

substitute for Federal standards when regulatory adjustments therein

are fairly straightforward. The following are our positions on the use

of each of those specific suggestions:

(1) Proposed rules: Proposed rules cannot be used to substitute for

Federal standards, simply because proposed rules are subject to change,

and there is no process for us to review those changes after we have

approved substitution of your proposed rule.

(2) Permits: (a) Title V Permit Conditions: You may use title V

permit conditions to substitute for a Federal standard under any of the

options outlined in this rule, except for rule adjustment (Sec. 63.92).

However, as we explain in section 8.C. below, you may only use a

maximum of five title V permits to substitute for each Federal maximum

achievable control technology (MACT) standard, unless you choose to

develop General permits under the SPA option.

(b) General Permit Conditions: You may use General permit

conditions under title V for any number of sources under the SPA option

outlined in Sec. 63.97 of this rule. The great advantage of using

General permit conditions is that we would approve specific permit

terms and conditions up-front, through the subpart E approval process,

and you would not then need to go through rulemaking at the S/L level.

Of course, the General Permit must establish specific terms and

conditions for all emissions points and compliance measures covered by

the Federal MACT standard and any other applicable requirements.

(c) Permit Templates: As we understand it, a permit template is

different from a general permit in that the permit template would

contain an outline for what each permit should look like, but would not

contain specific permit terms and conditions for each emissions point.

Therefore we believe that you could use permit templates under the SPA

option, provided that we approve both the permit template and the

individual permits, in order to make the individual permits federally

enforceable. Because we would need to approve individual permits, we

believe, consistent with our equivalency by permit approach, that

permit templates should only be used for five or fewer sources in a

source category. However, we request comment on how we could allow use

of permit templates for more sources in a source category.

(d) Previously-Issued S/L Permit Conditions: As with title V

permits, you may substitute previously-issued S/L permit conditions for

a Federal standard for five or fewer sources in a source category.

These previously-issued permits do not have to be initially federally

enforceable to be submitted for approval, because our approval and

subsequent rulemaking will confer Federal enforceability on them.

Either the SPA option (Sec. 63.97) or rule substitution option

(Sec. 63.93) may be used to approve these permits, but not the rule

adjustment option (Sec. 63.92). The rule adjustment option only

pertains to minor pre-approved changes to Federal standards through S/L

rulemaking. In addition, if a previously-issued S/L permit is used to

substitute for a Federal standard, and is later modified, that

modification must be subject to both public and EPA review.

(e) Enforcement Orders: A S/L level enforcement order, such as a

board order in California, could be allowed, only so long as the

enforcement order contains enough specific detail to meet our

requirements for demonstrating equivalency (for example, the

enforcement order should contain a level of detail comparable to the

detail contained in a title V permit). In addition, you must provide

legal assurance that the enforcement order will automatically be

translated to a permit after it expires. We are seeking comments on the

use of enforcement orders as a mechanism to demonstrate equivalency

with federal standards.

(3) Subcategorization: In CARB's comments, they suggest that

different approval options could be used for different subcategories of

sources within a source category regulated by a Federal MACT standard.

We agree, within certain limits. You must create logical and compelling

subcategories of sources that are clear and simple to delineate and

understand, such as area versus major sources, new versus existing

sources, or different source types within a Federal source category or

NESHAP (for example, hard versus decorative chromium electroplating).

In addition, our proposed revisions to Sec. 63.91 allow for partial

approval of S/L rules (see discussion in section VII.C.2. below), which

we would envision as being similar to subcategorization.

(4) Direct Final Rulemaking: You have requested that we use direct

final rulemaking, rather than the usual procedures of separate proposed

and final rules, in approving substitute S/L authorities. You say using

direct final rulemaking would greatly expedite the approval process.

Direct final rulemakings are generally only used when adverse comments

are not expected. That determination must be made on a rule-by-rule

basis, so a generic provision in subpart E that requires the use of

direct final rulemakings in a wide variety of circumstances would be

inappropriate. However, on a rule-by-rule basis, we will continue to

evaluate the appropriateness of direct final rulemaking.

(5) Title V Approval in lieu of Rulemaking: You have requested that

we allow use of the title V permit approval process as a way of

avoiding up-front S/L rulemaking for all options under subpart E. We

believe we can only provide this mechanism under Sec. 63.94 (the

equivalency by permit option). A proposed title V permit is approved if

EPA does not act on it within 45 days; therefore the possibility exists

that a S/L could substitute its requirements for a Federal standard

without adequate EPA review. The equivalency by permit process is

limited to five or fewer sources, which provides greater assurance to

us that we will be able to review all permit changes within 45 days.

3. Sacramento Protocol

One issue you have raised is the length of time and the amount of

effort required to demonstrate equivalency with Federal requirements.

In July 1997, we entered into a delegation and program integration

initiative, called the Sacramento Protocol, with the CARB and the South

Coast Air Quality Management District (SCAQMD) to determine whether

identified State and District air pollution control requirements are

technically equivalent to the requirements found in five Federal

NESHAPs, and whether the demonstration of equivalency could be

developed quickly. The five Federal NESHAPs selected for the initiative

were:

Chromium Electroplating

Secondary Lead Smelting

Aerospace Manufacturing

Gasoline Distribution

Wood Furniture Manufacturing

The Sacramento Protocol team developed a process to evaluate the

requirements of the five NESHAP. The first step in the process was to

prepare tables that compared the SCAQMD/CARB requirements and the

NESHAP requirements. After review of the tables,

[[Page 1891]]

EPA identified questions and potential issues for which we needed more

information. We went to Southern California to observe inspections of

sources in these categories, which allowed the team members to

evaluate, ``in the field,'' the differences between the S/L and Federal

requirements. The inspections also provided us an opportunity to

evaluate SCAQMD permits and their associated conditions, the permit

evaluation process, inspection staff capability, the inspection

process, source compliance status, and local rule structure.

As a part of the inspections, the team expanded and added further

detail to the regulation comparison tables. After completing the

comparisons between the S/L requirements and the NESHAP requirements,

the team made one of four conclusions regarding each of the NESHAP

requirements in relation to the corresponding S/L requirements. First,

the team found many of the CARB and SCAQMD requirements to be directly

equivalent to the NESHAP requirements. Second, a similar number of CARB

and SCAQMD requirements could be made equivalent to the NESHAP

requirements by making changes or revisions to the applicable permits

or rules. Third, for some NESHAP requirements, the end result of the

comparison appeared equivalent, but there remained some uncertainty

about the determination. Consequently, the team recommended specific

conditions to ensure equivalency and, with these conditions, viewed the

requirements as technically equivalent. However, in recognition that

the equivalency decisions reached in this effort may set a precedent

for future decisions, the team believed that these issues should be

referred to CARB and EPA management for final resolution. Fourth, for

some requirements the team ``agreed to disagree.'' The disagreements

centered on differences of opinion about the equivalency of a

substitute requirement or on the necessity of a particular NESHAP

requirement.

Most of this work, including completing the equivalency

demonstration, was completed within 2 months. We believe the Sacramento

Protocol initiative clearly shows that equivalency demonstrations can

be evaluated in a timely fashion if they contain all the elements

needed in a regulation comparison table. Other ways to streamline this

process include keeping the EPA Regional Offices apprised of your

intentions, and contacting the EPA Regional Offices prior to the

submittal of an equivalency demonstration when you know that there may

be significant issues with your submittal.

The Sacramento Protocol initiative was also beneficial in providing

us with experience in evaluating S/L equivalency demonstrations and in

teaching us more about how the rule substitution process works. We also

believe that we learned where we could provide additional flexibility

for alternative requirements. As part of this learning experience, we

decided that our position on work practice standards could be modified

(see section X.E. below). We also worked with CARB and SCAQMD in

determining how rule effectiveness studies and frequent inspection

programs could be substituted for some MRR requirements. For more

information concerning the Sacramento Protocol, you may obtain a copy

of ``The Sacramento Protocol Final Report'' by contacting Mr. Tom

Driscoll at the address and telephone number referenced earlier. This

report is also on EPA's TTN website, also referenced earlier.

C. Summary of Proposed Regulatory Changes to Subpart E

As we previously discussed, subpart E as currently promulgated

provides four ways to receive delegation for section 112 regulations:

(1) Sec. 63.91 delegation of unchanged Federal standards;

(2) Sec. 63.92 rule adjustment;

(3) Sec. 63.93 authorities substitution; and

(4) Sec. 63.94 program substitution.

In this proposed rulemaking we are proposing that there be five

ways to receive delegation:

(1) Sec. 63.91 delegation of unchanged Federal standards;

(2) Sec. 63.92 rule adjustment;

(3) Sec. 63.93 substitution of authorities;

(4) Sec. 63.94 equivalency by permit (EBP); and

(5) Sec. 63.97 program approval.

Table 1 compares the current structure of subpart E in terms of the

content of each section to the structure we are proposing in these

regulatory amendments. The primary changes we are proposing are to

replace the current program substitution process in Sec. 63.94 with the

new EBP process and to add the new SPA process to

Sec. 63.97.2 One way to think of these amendments is that we

divided the former program substitution process into two separate, but

related, new approval options: the EBP process, which is similar in

effect to the existing program substitution process except that it may

be used only for a small number of sources per source category, and the

SPA process, which covers a large number of sources and is similar to

the rule substitution process. These process options are discussed and

compared in detail in sections VIII. and IX. of this preamble. In

addition, we are proposing a number of minor changes to other sections

to support these more significant regulatory amendments.

---------------------------------------------------------------------------

\2\ Although we would prefer to have all the delegation process

options appear in sequential sections of subpart E, we have

intentionally skipped over sections 63.95 and 63.96 in order to

avoid disrupting existing citations to these sections in other

regulatory text and guidance materials. We believe that, on the

whole, the approach we are proposing will be less confusing and less

burdensome to implement.

---------------------------------------------------------------------------

1. Proposed Changes to Sec. 63.90

For Sec. 63.90 we are proposing to add and modify a number of

subpart E's definitions. We are proposing to revise the definition for

``level of control'' to say, ``Test methods and associated procedures

and averaging times are integral to the level of control'' in order to

make explicit that test methods and associated procedures and averaging

times must be considered in assessing the emissions limitation portion

of the level of control and that they are not part of compliance and

enforcement measures. We are also proposing to revise the definition of

``compliance and enforcement measures'' to delete reference to test

methods and procedures.

[[Page 1892]]

Table 1.--Structure of Subpart E Before and After Proposed Regulatory Changes

----------------------------------------------------------------------------------------------------------------

Section No. in 40 CFR part 63, Title and content of section in Title and content of section in

subpart E existing regulations proposed new regulations

----------------------------------------------------------------------------------------------------------------

63.90........................... Program Overview...................... Program Overview

63.91........................... Criteria Common to all approval Criteria Common to all approval

options. options

63.92........................... Approval of a S/L rule that adjusts a Approval of a S/L rule that adjusts a

section 112 rule. section 112 rule

63.93........................... Approval of S/L authorities that Approval of S/L authorities that

substitute for a section 112 rule. substitute for a section 112 rule

63.94........................... Approval of a S/L program that Approval of S/L permit terms and

substitutes for section 112 emissions conditions that substitute for

standards. section 112 emissions standards

63.95........................... Additional approval criteria for Additional approval criteria for

Federal accidental release prevention Federal accidental release prevention

programs. programs

63.96........................... Review and withdrawal of approval..... Review and withdrawal of approval

63.97........................... [Reserved]............................ Approval of a State program that

substitutes for section 112

requirements

63.98........................... [Reserved]............................ [Reserved]

63.99........................... Delegated Federal authorities......... Delegated Federal authorities

----------------------------------------------------------------------------------------------------------------

We are proposing to add a definition for ``alternative

requirements'' because this term is used throughout the amendments to

subpart E. We are requesting comment on whether this definition is

useful and whether it is complete in its current wording. We have also

revised the definition for ``program'' to make it more appropriately

reflect how this term is used throughout the subpart E regulations as

they exist, and as we are proposing to amend them.

We are also proposing to add a definition to that subsection for

the term ``partial approval,'' and to amend the existing definition of

``approval'' in Sec. 63.90(a) to make it consistent with the proposed

definition of ``partial approval.'' We are seeking comment on these

changes. In addition, we are adding new definitions for ``minor * *

*,'' ``intermediate * * *,'' and ``major changes to a test method,''

and ``minor * * *,'' ``intermediate * * *,'' and ``major changes to

monitoring'' to help explain which General Provisions discretionary

authorities may be delegated to S/L's under Sec. 63.91 (see section

VI.C.2. below).

Finally, we are proposing to add a new paragraph to Sec. 63.90 to

address how tribal governments may apply for delegation pursuant to the

Tribal Air Rule in 40 CFR part 49.

2. Proposed Changes to Sec. 63.91

In Sec. 63.91(b), we clarify that you may cite or refer to

documents that you are required to submit for an approval under this

subpart when these documents are readily accessible to us and to the

public. This would save you the trouble of having to submit hard copies

of documents that we already have or that we may obtain in other ways,

for example, electronically.

We have also added a paragraph to address what S/L's must do to

update their section 112(l) approvals when we amend, repeal, or revise

previously promulgated Federal section 112 requirements that affect

sources. Section 63.91(c)(3) would require that if we revise a MACT

standard upon which you have based an equivalency demonstration for a

S/L rule, program, or permit, then you must revise that equivalency

demonstration within 90 days. We also propose to apply the same review

procedures to a revised equivalency demonstration as we would use for

an initial submittal under section 112(l). We request comment on these

requirements. We also request comment on whether you believe there is a

need for us to notify you, at the time when we revise a MACT standard,

of the need for you to submit a revised equivalency demonstration.

As discussed above in section VI.B.2, we are providing a mechanism

for partial approval of a S/L rule or program. We propose to edit

Sec. 63.91(a) and to insert Sec. 63.91(d)(2) to provide for such a

partial approval of a S/L's air toxics and ARPP authorities. The EPA is

seeking comments on this proposed edit and specifically on the approach

described.

Section 63.91(b)(1) currently requires you to provide a written

finding that you have the legal authority necessary to implement and

enforce your S/L rule and to assure compliance by all sources. At a

minimum, you must: (1) have enforcement authorities that meet the

requirements of 40 CFR 70.11; (2) have authority to request compliance

information; (3) have authority to inspect sources and records; and (4)

retain enforcement authority, if you, the S/L, delegate authorities to

a local agency, unless the local agency has authorities that meet

section 70.11. Section 63.91(b)(6) currently contains similar language

that requires you to satisfy criteria (1) and (4) above. We originally

included Sec. 63.91(b)(6) to ensure that a S/L did not receive approval

for rules or programs if it lacked sufficient enforcement authority.

We now believe, however, that Sec. 63.91(b)(1) ensures the

sufficiency of S/L enforcement authorities and that Sec. 63.91(b)(6) is

an unnecessary and redundant provision. Consequently, we propose to

delete Sec. 63.91(b)(6), and seek comments on the proposed deletion of

this duplicative requirement.

Under the Part 63 General Provisions, the EPA Administrator has the

authority to approve certain types of alternatives, or to make other

decisions under the General Provisions and the subparts. Questions have

been raised as to whether you may make the same discretionary decisions

when S/L are delegated the General Provisions. Section 63.91, as

promulgated in 1993, did not delineate which discretionary authorities

are delegated to you when you take ``straight'' delegation of the

General Provisions. Therefore Sec. 63.91(e)(1) to (e)(3) of this

proposal clarify which discretionary authorities may be delegated to

you through ``straight'' delegation of the General Provisions.

These provisions address your authority to make source-specific

decisions only, not source-category wide decisions. If you wish to make

discretionary decisions on a source-category-wide basis under the

General Provisions, then, as with other part 63 requirements, you would

need to use one of the other section 112(l) delegation processes to

substitute your own rule or program for a Federal rule or rules.

These new provisions provide clarity about those specific General

Provisions

[[Page 1893]]

authorities that would be nationally significant or would alter the

stringency of an underlying standard and thus, would not be delegated

to you. We believe that clarifying the delegation policy of the General

Provisions' authorities will help promote national consistency.

These new provisions are intended to be generally consistent with

previous policies developed for both New Source Performance Standards

(NSPS) under part 60, and for changes to State implementation plans

(SIP). Past guidance issued for NSPS discretionary changes has

permitted delegation to S/L's of all the Administrator's authorities

except those that require Federal rulemaking, or those for which

Federal oversight is critical to ensuring national consistency in the

application of Standards. (However, such delegations generally do not

give S/L's the authority to issue interpretations of Federal law that

are subsequently binding on the Federal Government). Current SIP

policy, as reflected in ``White Paper Number 2 for Improved

Implementation of the Title V Operating Permits Program 3,''

permits you to alter SIP requirements so long as the alternative

requirements are shown to be equally stringent and are within a pre-

approved protocol (and so long as public review is provided and EPA

approval is obtained).

---------------------------------------------------------------------------

\3\ Memorandum from Lydia Wegman, Deputy Director, OAQPS, to

Regional Air Division Directors, March 5, 1996.

---------------------------------------------------------------------------

The Part 63 General Provisions include 15 specific types of

determinations for which the Administrator may make discretionary

decisions on a source-specific basis. When the General Provisions are

delegated to a S/L agency, such discretion may be appropriately

delegated to the S/L agency, provided the stringency of the underlying

standard would not be compromised and/or decisions such as an approved

change would not be nationally significant.

We have divided the General Provisions discretionary authorities

into two groups, based upon the relative significance of each

discretionary type of decision. Category I contains those authorities

which can be delegated. We believe that the EPA Regional Office does

retain the authority to request review of these decisions, although we

expect that this authority will be exercised infrequently. Category II

contains those authorities which cannot be delegated.

In general, we believe that where possible, authority to make

decisions which are not likely to be nationally significant or to alter

the stringency of the underlying standard, such as minor changes to

test methods, should be delegated to you. (Note, however, that the

authority to approve decreases in sampling times and volumes when

necessitated by process variables has typically been delegated in

conjunction with the minor changes to test methods, but these types of

changes are not included within the scope of minor changes defined in

Sec. 63.90.) Therefore, minimal EPA involvement is required. Section

63.91(e)(1)(ii) lists the authorities in category I, i.e., those

authorities which may be delegated.

Section 63.91(e)(3)(ii) lists the authorities in category II, which

includes those decisions which generally may result in a change to the

stringency of the underlying standard, which is likely to be nationally

significant, or which may require a Federal Register notice. These

authorities, therefore, will always be retained by the EPA, and may not

be delegated to you.

3. Proposed Changes to Sec. 63.92

We have retained the provisions of Sec. 63.92 without significant

changes.

4. Proposed Changes to Sec. 63.93

Proposed changes to Sec. 63.93 are discussed in detail in section

VII.4. of this preamble. The significant change we are proposing is to

delete Sec. 63.93(a)(4)(ii), which specifies certain authorities that

may be approved under this section. We believe this change will not

affect the usefulness of this section to you.

5. Proposed Changes to Sec. 63.94

Table 2 summarizes the flexibility offered under the new

equivalency by permit process compared with the existing program

substitution process.

6. Proposed Changes to Sec. 63.95

Proposed changes to Sec. 63.95 are discussed in detail in section

XI. of this preamble. The major changes being proposed include

revisions needed to make these requirements consistent with the part 68

requirements, which implement the ARPP. We are also proposing to

clarify the authority of S/L's to have more stringent standards,

including lists with additional chemicals or lower thresholds. Finally,

we propose that S/L's may continue to request delegation for a full or

partial program, for a defined universe of sources, so long as you

accept delegation of the entire section 112(r) program for that defined

universe.

7. Proposed Addition to Sec. 63.97

Table 3 summarizes the flexibility offered under the new SPA

process compared with the existing program substitution and rule

substitution processes.

D. Policy Guidance Provided in the Preamble

This preamble provides policy guidance on the following topics:

Table 2.--Comparison Between Flexibility Under Existing and Amended Subpart E for Equivalency by Permit Process

----------------------------------------------------------------------------------------------------------------

Element of equivalency by permit

approval process Existing rule requires . . . New rule would allow or require . .

----------------------------------------------------------------------------------------------.-----------------

Equivalency demonstrations for Permit terms and conditions Permit terms and conditions

alternative section 112 in the form of the Federal standard not necessarily in the form of the

requirements. (63.94). Federal standard.

Line-by-line equivalency for Holistic equivalency for

levels of control and compliance and levels of control and compliance

enforcement measures (63.94). and enforcement measures.

Up-front approval.................. Up-front approval on S/L Up-front approval on S/L

authorities, commitments, and authorities and eligible sources.

eligible source categories--180 days No S/L rulemaking needed to

with rulemaking.. establish commitments.

Expedited up-front approval

process-90 days with rulemaking.

[[Page 1894]]

Approval of alternative That a title V permit be That a title V permit be

requirements. used to substitute S/L requirements used to substitute S/L requirements

for Federal requirements.. for Federal requirements.

EPA review and approval

required for all alternative

requirements, before public review

of permit--90 days without

rulemaking.

EPA and public review and EPA and public review and

comment during the permit issuance comment during the permit issuance

process. Affirmative EPA approval process. Affirmative EPA approval

not required--45 days. not required--45 days.

Section 112 program applicability.. Permit terms to be Permit terms to be

substituted for emissions standards substituted for section 112 (d),

established under sections 112 (d), (f), or (h) emissions standards.

(f), or (h) or other section 112

provisions.

----------------------------------------------------------------------------------------------------------------

Table 3.--Comparison Between Flexibility Under Existing and Amended Subpart E for State Program Approval Process

----------------------------------------------------------------------------------------------------------------

Element of state program approval

process Existing rule requires . . . New rule would allow or require . .

----------------------------------------------------------------------------------------------.-----------------

Equivalency demonstrations for Permit terms and conditions Permit terms and conditions

alternative section 112 in the form of the Federal standard not necessarily in the form of the

requirements. (63.94). Federal standard.

Line-by-line equivalency for Holistic equivalency for

levels of control and compliance and levels of control and compliance

enforcement measures (63.94). and enforcement measures.

Up-front approval.................. Up-front approval on S/L Up-front approval on

authorities, commitments, and authorities, source categories,

eligible source categories--180 days generic requirements,

with rulemaking (63.94). implementation mechanisms--90 or

180 days with rulemaking.

Approval of alternative EPA/public review and EPA/public review and

requirements. approval required for all approval required for all

alternative requirements--180 days alternative requirements--180 days

with rulemaking (63.93). with rulemaking

Substitutions on a source Substitutions on a source

category basis. category basis.

Area source mechanisms............. Substitutions for area Substitutions for area

source requirements by rule (63.93) source requirements on a source

or title V permit when sources are category basis through S/L

permitted under title V (63.94). enforceable mechanisms other than

rules or title V permits.

Alternative requirements must be

approved by rulemaking--180 days.

Section 112 program applicability.. Substitutions for emissions Substitutions for emissions

standards established under section standards established under section

112 (d), (f), or (h) or other 112 (d), (f), or (h) or other

section 112 provisions (63.94). section 112 provisions.

----------------------------------------------------------------------------------------------------------------

(1) Our interpretations of existing regulations and guidance (e.g.,

the holistic equivalency demonstration test);

(2) Our expectations regarding your submittal under the equivalency

demonstration process;

(3) Our expectations regarding equivalency demonstrations for

alternative work practice standards and general provisions;

(4) How the delegation/approval options work and compare with each

other, and the S/L situations they are designed to address;

(5) Functions of the up-front approval process in subpart E

delegation options; and

(6) Use of title V program approval to demonstrate that

Sec. 63.91(b) criteria have been met.

E. Policy Guidance Provided Outside the Preamble

Currently, we are developing guidance which will clarify in much

greater detail than the discussions provided in this preamble regarding

what we are looking for from you when you submit alternative

requirements for an equivalency demonstration. As part of this

guidance, we intend to provide a model equivalency demonstration

package that contains all the elements that are required in an

equivalency demonstration for a rule substitution and examples of how

we would evaluate equivalency for specific hypothetical requirements.

We are also developing guidance on demonstrating equivalency of WPS

that would provide examples of quantifiable and nonquantifiable part 63

WPS standards, what we might approve as alternatives, and our rationale

for the approval. Finally, we are preparing General Provisions guidance

that expands on the guidance provided in this preamble and explains the

criteria for how we would determine equivalency with each part 63

General Provisions requirement. We are seeking comments from you about

what other kinds of guidance would be most helpful.

VII. How Do the Revised Delegation Processes Work?

A. Sec. 63.93 Substitution of Authorities

In section VI.C.3. of the preamble, we presented a detailed

discussion about the administrative process requirements and

equivalency criteria for obtaining delegation/approval under the

substitution of authorities process in Sec. 63.93. Because we believe

that the approval criteria included in Sec. 63.93 already allow for a

``holistic'' review of substituted rules and authorities, we do not

believe that any regulatory changes to these criteria are necessary.

Thus, this proposal has not changed the equivalency criteria in this

option. Because we are not proposing in this rulemaking to amend any

aspects of the approval process or criteria under sections 63.93(a) and

(b), the previous

[[Page 1895]]

discussion in section VI.C.3. is still relevant.

In the following discussion we clarify and request comment on what

types of authorities you may substitute for section 112 rules under

Sec. 63.93, and we explain our rationale for proposing to amend rule

language that deals with this topic.

Under Sec. 63.93 as written, we can approve one (or more) of your

rules that is structurally different from the Federal rule for which

you wish to substitute your rule(s), or we may approve a rule that is

different from the Federal rule in ways that do not qualify for

approval under Sec. 63.92. Sec. 63.93 as written also allows us to

approve certain authorities (other than rules) that substitute for a

section 112 rule when these differ in form from the Federal section 112

rule. Under the existing rule language in sections 63.93(a)(4)(i) and

(a)(4)(ii), authorities that you may submit for approval under this

section include:

(1) Rules or other requirements enforceable under S/L law that

would substitute for a section 112 rule; or

(2) Specific title V permit terms and conditions for the source or

set of sources in the category for which you are requesting approval

when (a) the permit terms would substitute for standards promulgated

under section 112(h); (b) we have determined that your work practice,

design, equipment, or operational requirements are adequate under the

provisions of the Federal standard; and (c) you have an approved

program under sections 63.94.

We have reevaluated these provisions in light of the other changes

we are proposing to the delegation processes under subpart E and we

think that certain changes to these provisions may be warranted. First,

we are proposing to delete the provisions of Sec. 63.93(a)(4)(ii) (that

deal with specific title V permit terms and conditions that would

substitute for standards promulgated under section 112(h)) because we

believe it is no longer necessary to have a provision in Sec. 63.93 for

approval of alternative section 112(h) requirements that differ in form

from the Federal standard. Specifically,

(1) section 63.94 as amended would no longer require up-front

approval of legally binding S/L commitments, so these commitments

should not be a prerequisite for obtaining approval under Sec. 63.93;

(2) Section 63.94 as amended would require the same equivalency

test as Sec. 63.93 (i.e., you would no longer be required to submit

permit terms and conditions in the form of the Federal standard and

make a line-by-line equivalency demonstration), so that Sec. 63.94's

equivalency criteria should not be a prerequisite for obtaining

approval under Sec. 63.93;

(3) Section 63.94 as amended would require you to specify in your

up-front approval each source or source category (with five or fewer

sources in a category) for which you will submit alternative

requirements for approval in the future (in general 4), but

this requirement is not necessary for obtaining approval under

Sec. 63.93; and

---------------------------------------------------------------------------

\4\ This is generally the case, except when you submit your

draft permit terms and conditions at the same time that you submit

your request to use the equivalency by permit process. Regardless of

the timing of when you submit your permit terms and conditions under

revised Sec. 63.94, the ``up-front approval'' step in this process

only covers your demonstration of resources and authorities under

title V/Sec. 63.91(b) and your identification of sources that you

will cover under this delegation process.

---------------------------------------------------------------------------

(4) Under our revised policy for demonstrating equivalency with

WPS, we are no longer requiring that alternative WPS be expressed in

the same form as the Federal standard. (See the discussion in section

XI.E. of this preamble for a complete discussion of our rationale.)

Under the proposed rule revisions, Sec. 63.93(a)(4) would read as

follows: ``Authorities submitted for approval under this section shall

include State rules or other requirements enforceable under State law

that would substitute for a section 112 rule.''

Second, Sec. 63.93(a)(4)(i) specifies that you may submit for

approval under this section rules or other requirements enforceable

under S/L law that would substitute for a section 112 rule. We request

comments from you and other interested stakeholders to help us

understand and clarify what enforceable authorities other than S/L

rules may practicably be substituted under this option (including

authorities that would substitute for section 112(r) requirements). As

a policy matter, we believe it is appropriate to limit our review and

approval under Sec. 63.93 to authorities that are applied on a source

category-wide basis, rather than to individual sources (except when you

only have one source in a source category).5 In our proposed

scheme of amended delegation options, Sec. 63.93's purpose is to allow

us to approve your alternative rules on a rule-by-rule basis when you

wish to substitute rules for a relatively limited number of source

categories (compared with the SPA process). Depending on the comments

that we receive, we may delete reference to ``other requirements'' from

the description of authorities that may be approved under this section,

change Sec. 63.93(a)(4) to read ``Authorities submitted for approval

under this section shall include State rules (i.e., rules that are

enforceable under State law for categories of sources) that would

substitute for a section 112 rule,'' and change the title of Sec. 63.93

to ``Approval of a State rule that substitutes for a section 112

rule.''

---------------------------------------------------------------------------

\5\ Also, under Sec. 63.93, each approval action covers both the

generic Sec. 63.91(b) approval criteria and the substantive

alternative requirements that you will implement and enforce in lieu

of the Federal requirements for a specified source category. You

cannot obtain approval under Sec. 63.93 unless you submit the

enforceable conditions for that source category with your Sec. 63.93

submittal.

---------------------------------------------------------------------------

We are also clarifying that we believe you can implement

alternative compliance and enforcement strategies, on a rule-by-rule

basis, within the context of the existing regulations in Sec. 63.93.

This approach is discussed in section X.C., ``Using compliance

evaluation studies in equivalency demonstrations.''

B. Sec. 63.97 State Program Approval Process

To address some of your concerns with the existing substitution

options in subpart E, we developed the SPA process which, in this

rulemaking, we are proposing to add to Sec. 63.97. Although Sec. 63.97

numerically follows Sec. 63.94 in which we address the new EBP process,

we have chosen to discuss the SPA process before the EBP process to

enhance the overall clarity of the next sections of the preamble.

1. Background

In your comments and suggestions to us, you requested that we

explore ways to approve your alternative requirements in a more

expeditious manner. You also asked us to add more flexibility to the

program substitution process so you are not restricted to putting

alternative requirements into title V permits. This would allow you to

address area sources that are not covered by your title V programs.

Finally, you asked us to eliminate the requirements for line-by-line

equivalency demonstrations and the ``form'' of the Federal standard in

Sec. 63.94 as it is currently structured. This would give you more

flexibility in how you can demonstrate that your requirements are at

least as stringent as the Federal requirements.

The new SPA process addresses these concerns. Compared with the

existing program approval process in Sec. 63.94, the SPA process

provides you with additional flexibility by eliminating the ``form'' of

the standard and modifying equivalency requirements. Compared with the

existing rule substitution process in Sec. 63.93, it has the potential

to minimize the time and burden

[[Page 1896]]

associated with approving your alternative requirements, especially in

situations where you have a well-developed program with many comparable

requirements that apply to sources subject to Federal emissions

standards. The SPA process would allow you to obtain approval up-front,

and at one time, for generic alternative requirements that you wish to

apply to more than one source category (e.g., S/L general provisions,

work practice standards, or equipment standards). The SPA process also

would allow you to bundle groups of regulations or requirements and

submit them at one time for more efficient processing, or you could

submit requirements arising from multiple S/L rules to substitute for

requirements in a single NESHAP or other Federal section 112

regulation. The SPA process would allow you to substitute your

alternative requirements for Federal area source requirements using S/

L-enforceable mechanisms other than source category-wide rules. And,

finally, the SPA process would allow you to substitute your alternative

requirements for Federal section 112 requirements arising from section

112(f), the residual risk program, section 112(k), the urban area

source program, section 112(m), the Great Waters program, and others.

2. The Proposed State Program Approval Process

The SPA process, which would be codified in new Sec. 63.97, is

intended to provide an additional process option for you to obtain

approval of alternative requirements. The proposed SPA process is a

two-step process that we believe could expedite our approval of your

alternative requirements, provide you with more flexibility to submit

your alternative requirements in the future as the Federal regulations

are promulgated, and provide a more ``holistic'' approach for

determining whether or not an alternative requirement assures

compliance with the Federal standard or other requirement. (For a

discussion on how we will determine equivalency, see section X.)

Under the proposed SPA process, you could seek approval for a

program to be implemented and enforced in lieu of specified existing or

future section 112(d), section 112(f), or section 112(h) emissions

standards. In addition, you may seek programmatic approval to

substitute your alternative requirements for requirements under

sections 112(k), 112(m), 112(n), and 112(c)(6), but only after we have

promulgated regulations implementing those programs. You may not seek

approval under this process to implement and enforce alternative

section 112(r) requirements (that address section 112's Risk Management

Program); alternative section 112(r) requirements may be submitted

under Secs. 63.92, 63.93, and 63.95 of subpart E.

The proposed SPA process consists of two steps. In the first step,

you submit to us, and we approve your up-front program. Up-front

approval involves assuring that you have adequate authorities and

resources to implement and enforce your proposed substitute provisions,

as well as informing us of which source categories your program covers.

The up-front program approval consists of mandatory and optional

elements. The optional elements allow you to customize the program

approval to suit your particular needs, and they allow you to speed the

flow of the subsequent steps. The up-front approval takes place via

notice and comment rulemaking in the Federal Register and, as proposed,

it may take a maximum of 90 or 180 days to complete, depending on the

complexity of your submittal. In the second step, you submit to us, and

we approve your specific alternative requirements. These alternative

requirements may be submitted in the form of rules, permits, or

requirements in other enforceable mechanisms for major and/or area

sources but, as in Sec. 63.93, they must be enforceable as a matter of

S/L law before you can submit them for approval. Also, as in

Sec. 63.93, in step two of the SPA process, we approve your alternative

requirements through notice and comment rulemaking in the Federal

Register, and this process, as proposed, may take up to 180 days to

complete. Following completion of the SPA process, your approved

alternative requirements must be incorporated correctly into title V

permits, where required.

Both steps one and two are critical steps in the SPA process. In

these steps, we approve your authorities to substitute your alternative

requirements for Federal requirements, and your alternative

requirements become federally enforceable. (Until we approve your

alternative requirements, the otherwise applicable Federal requirements

continue to apply.) It is important to note, however, that steps one

and two need not take place separately in time. You may submit your

program approval elements and your alternative requirements for

simultaneous approval, for section 112 requirements that are already

promulgated at the time of your submittal.

Alternatively, you may submit your alternative requirements at a

future date (or multiple future dates), after the up-front approval has

been completed, for section 112 requirements that are not already

promulgated or for which you do not choose to substitute requirements

at the time of your up-front approval. Each time you submit your

alternative requirements at a future date after your up-front program

submittal, we would repeat the approval process under step two. (It is

not necessary to repeat the Sec. 63.91(b) demonstration and approval if

the basis for your earlier program approval has not changed.)

Under the SPA process, as for all the subpart E delegation/approval

processes, we act on your program by taking public comment on your

program submittal and promulgating a rule amending part 63 to

incorporate your program. (This was discussed in the original subpart E

proposal preamble at 58 FR pages 29297-98.) Because we are required to

publish a Federal Register notice to approve your program, we believe

it is appropriate to allow for at least a 90-day period for the up-

front approval step for submittals that do not contain any alternative

requirements, and the full 180 day-period for the up-front approval

step for submittals that do contain alternative requirements. These

time periods are consistent with the time periods allowed or proposed

for comparable review and approval steps for the other substitution

options in subpart E.

However, to address your concerns about how long it takes to

receive subpart E approval, we are committed to processing these

approvals as expeditiously as possible (i.e., in less than 90 or 180

days if possible). We are particularly interested in receiving comments

on whether an approval can take place in less than 180 days in

situations where the submittal includes alternative requirements

(especially when the equivalency comparison is complex). We are also

interested in your thoughts about whether and how both steps of the SPA

process could be completed in a combined total of 180 days, even when

the alternative requirements are submitted at a future date after the

up-front program approval has been completed. One suggestion is to

delay rulemaking on the up-front program approval until future

rulemaking takes place for approval of the alternative requirements;

although up-front rulemaking would be delayed, we could still evaluate

your submittal and prepare for the future rulemaking. (To help you

develop your comments, we refer you to timelines describing how steps

in the approval process would play out during the 180-day period. These

are included in the document entitled ``Interim Enabling Guidance for

the Implementation of 40

[[Page 1897]]

CFR part 63, subpart E,'' EPA-453/R-93-040, November 1993. This

document is included in the docket.)

In addition, to address your concerns about how long it takes to

receive subpart E approval, we have shortened the up-front approval

period to 90 days when your submittal does not contain any alternative

requirements. To accommodate the administrative process steps that are

required to take place during this period, we shortened the individual

time periods that are allowed or required for us to publish the

proposed Federal Register notice (from 45 to 21 days), for the public

to comment (from 30 to 21 days), for you to respond to the public

comments (from 30 to 14 days), and for us to prepare and publish the

final Federal Register notice (to about 30 days). We request comment on

whether these proposed time periods are feasible, adequate, and

acceptable for this purpose, given that we are trying to balance our

desire to expedite the approval process with our interest in allowing

the public sufficient time to comment. We have carried over this

approach to the EBP up-front approval process as well, and we are also

requesting comments on the application of this approach in that

context.

Based on our experience reviewing your alternative requirements

under the existing subpart E, we strongly recommend that you take steps

under the up-front portion of the SPA process to streamline the review

process for your alternative requirements. The following discussion on

up-front approval elements and criteria suggests how your submittal

could contribute toward simplifying and streamlining the process.

Alternatively, we recommend that you work with your EPA Regional Office

in advance of any formal submittal under the SPA process to get early

feedback on the approvability of your submittal elements. At its

discretion, your Regional Office may offer you a preliminary assessment

of your submittal, and it can advise you on how your submittal may be

improved, so that the formal approval process proceeds smoothly and

expeditiously. Your Regional Office also may be willing to work with

you to find mutually acceptable ways to shorten the review process. For

example, you could discuss what you will include in your equivalency

submittal package, the equivalency demonstration criteria you will

follow, and the style and format of your supporting analyses and

documentation, so that the Regional Office is likely to consider your

step two submittal complete; or you could discuss ways to speed the

administrative aspects of the approval process. While we have

eliminated the requirement to express your alternative requirements in

the form of the Federal standard, expressing them this way would make

the review and approval of your requirements go more easily and

quickly.

a. Step one: Up-front approval. i. Up-front approval elements and

criteria--The up-front approval step serves several critical functions

under the SPA process. As discussed earlier in this preamble: (1) it

assures that you have met the delegation criteria in section 112(l)(5)

and Sec. 63.91(b); (2) it provides the legal foundation by which

section 112 requirements may be replaced by your alternative

requirements (whether they arise from an enforceable S/L rule or permit

terms and conditions) such that your requirements become the federally

enforceable requirements in lieu of the applicable Federal

requirements; and (3) it provides for an orderly way of identifying

which authorities have been delegated to you in relation to specific

Federal emissions standards or requirements. In addition, the SPA up-

front approval gives you the opportunity to implement alternative

compliance and enforcement strategies (such as through the compliance

evaluation study approach discussed in section XI.C. of this preamble).

You also could obtain approval to implement and enforce alternative

requirements that apply generically to more than one category of

sources, and you could specify which enforceable mechanisms you will

use to substitute alternative requirements for area sources. Our intent

is that our one-time, up-front review and approval of these program

elements will streamline the subsequent review of your (additional)

alternative requirements for section 112 rules.

As a first step, as in the existing Sec. 63.94, you would submit

certain elements of your program for up-front approval. The up-front

program submittal under the SPA process must include, at a minimum, the

following two elements:

(1) Sec. 63.91(b) demonstration. The first element is a

demonstration of how you have satisfied the criteria in Sec. 63.91(b)

that address the basic adequacy of your program to accept delegation to

implement and enforce Federal section 112 requirements. These criteria

ensure that you have adequate authorities and resources to implement

and enforce the substituted provisions, including the authorities and

resources to implement your area source program. Title V program

approval may be sufficient to demonstrate that you have satisfied the

Sec. 63.91(b) criteria for sources covered by your title V program; and

(2) Identification of source categories and/or Federal section 112

requirements. The second element is an identification of the source

categories and/or the Federal section 112 requirements for which you

will accept delegation and for which you intend to substitute

requirements at that time or in the future. (Note, however, that you

cannot substitute requirements for a Federal requirement until it is

promulgated.)

In addition, depending on the design and complexity of your program

and what you want to achieve by substituting your program under the SPA

process, you may submit for approval one or more of the following

elements:

(3) Generic program requirements. You may obtain approval in this

step for generic alternative requirements that you intend to apply to

one or more source categories, e.g., if you have a different approach

to implementing the startup, shutdown, and malfunction plan required in

Sec. 63.6(e) of the part 63 General Provisions, or if you have a

different approach generally from the Federal requirements for

recordkeeping and reporting, preconstruction review, or any number of

other ``general provisions.'' In addition to general provisions, which

are often administrative in nature, you could obtain generic approval

for substantive control regulations (e.g., design, equipment, or

performance standards) that apply to more than one source category and

reduce emissions of HAP.

You could do a generic equivalency demonstration for these

requirements at this early stage in the SPA process. This early

demonstration of equivalency would help to expedite our review and

approval of your subsequent submittals for promulgated Federal

regulations, and it would allow the public to comment on the general

applicability of these approaches.

(4) Enforceable mechanisms for area source requirements. The next

element is a description of the mechanism(s), that is enforceable as a

matter of S/L law, that will be used to make your alternative

requirements for area sources federally enforceable when they are

approved during step two. In addition, you must include a demonstration

that you have adequate resources and authorities to implement and

enforce these mechanisms (or the requirements they generate).

Under the SPA process you may use S/L enforceable mechanisms, such

as S/L operating permits programs other than title V programs, to

develop and submit

[[Page 1898]]

for approval alternative requirements for area sources. A thorough

discussion of this topic follows.

(5) Alternative compliance and enforcement strategies. In addition,

if you elect to implement protocols that establish alternative

compliance and enforcement strategies (such as performing compliance

evaluation studies, which are discussed in section XI.C., below), we

must approve your proposal through rulemaking in the up-front approval

step. This approval may require you to supplement your previous

Sec. 63.91(b) demonstration if you need additional resources,

authorities, or requirements to implement the alternative strategies.

The advantage of including information from elements (3) or (5) in

your up-front submittal is that it would allow significant aspects of

your equivalency demonstration for specific Federal section 112

requirements to be addressed and worked out generically and in advance

of our and the public's review of your alternative requirements during

the subsequent step two phase. Consequently, it can result in a

decrease in the time it would otherwise take to review and approve your

regulations or permits for one or more source categories. In fact, we

believe that the benefits from developing these up-front understandings

may be significant, and we think this is one of the major advantages of

pursuing the SPA option.

ii. Process for making area source requirements federally

enforceable--One way that the SPA process is more flexible than the

existing program substitution process in subpart E is that the SPA

process may be implemented more readily for area sources. (The existing

program substitution process in Sec. 63.94 may be implemented for area

sources, but only if you will be permitting those sources under your

title V program. We understand that, in the near term, most title V

programs in the country will not cover the part 63 area sources that we

deferred from permitting. Nothing in this discussion, however, is

intended to deter you from using title V programs to permit area

sources.) We are proposing that, as part of the up-front SPA approval

process, you may submit a plan to implement your programs for area

sources, in addition to your plan for major sources. In this plan you

would identify the legally enforceable mechanism(s) that you would use

to implement and enforce your area source requirements. These legally

enforceable mechanisms may be either source category rules or general

permits (or a similar type of approach) that are specific to a source

category and are issued through a non-title V S/L permitting (or

similar) program. In either case, in step two we could approve these

rules or permits, that are already enforceable as a matter of S/L law,

in the same way that we can approve major source rules, that is,

through notice and comment rulemaking in the Federal Register. Whether

you regulate area sources through source category-wide rules, general

permits, or another enforceable mechanism, these rules become federally

enforceable upon approval of the specific alternative requirements in

step two. We are requesting comment on types of S/L enforceable

mechanisms other than rules and permitting programs that you may wish

to use for this purpose and specific descriptions of how you would use

these mechanisms.

We are also requesting comment on the types of criteria that an

enforceable S/L mechanism must satisfy, if any, to be acceptable as a

source of alternative requirements that may be approved under section

112(l). For example, we are requesting comment on whether, as a

condition of obtaining approval for area source requirements submitted

through a non-rule mechanism, the public within a S/L jurisdiction

should have adequate notice and opportunity to submit written comment

to the S/L during the process of developing the enforceable terms and

conditions that would become the approved alternative requirements.

Such programs obviously must have authority to cover the sources in the

source category, and individual HAP, if any, for which you are

requesting Sec. 63.97 approval, and you must have authority and

resources to implement and enforce the program's requirements. These

criteria would be satisfied by the Sec. 63.91(b) component of the up-

front approval. We would like your comments on whether we should

establish any additional specific approval criteria for such programs

through these amendments to subpart E.

For the revised regulation, we plan to review and approve general

permits, rules, requirements, or permit templates developed under

authority of your enforceable mechanism for area sources (or your title

V authority for major or area sources). We intend that Sec. 63.97

substitutions of requirements be applied on a source category-wide

basis, rather than to individual sources (except when you only have one

source in a source category). Each general permit or other approved

mechanism would take the place of a source category rule submitted for

approval under this option. As we explain in section VIII.C., which

describes the equivalency by permit process, we believe the use of

permits for demonstrating alternative requirements must be limited to

be implemented practicably, because of the burden associated with

reviewing individual permits containing alternative section 112

requirements expressed in a form that is different from that in the

underlying standard. Otherwise, we believe this approach will overtax

your ability to administer your programs and our ability to review your

permits within the specified time limits. This, in turn, could delay

the program approval process and adversely impact sources generally.

Therefore, except when you have only one source in a source

category (or possibly in other limited circumstances described below),

you must submit for review and approval general permits, rules,

requirements, or permit templates for either major or area sources. You

may submit more than one such mechanism for each source category (or

class of sources in a source category, e.g., major sources) provided

the collection of submittals ensures that all of the otherwise

applicable Federal section 112 requirements in the emissions standard

and all sources for that source category are addressed. We are taking

comment on this approach.

Your program for area sources need not apply to sources subject to

Federal standards for which you are not taking delegation under this

approval option. These sources would be subject to Federal standards or

your alternative requirements established under a different subpart E

option. However, your area source program must assure compliance with

all Federal section 112 emissions standards and requirements for which

you accept delegation under the SPA process.

Furthermore, to reduce the burden associated with implementing an

enforceable area source mechanism under subpart E, we are clarifying

that you may specify as part of your up-front subpart E program

approval that only the permit terms and conditions that are established

to substitute for Federal section 112 requirements need to undergo

public and EPA review and become federally enforceable through step 2

of the SPA process. We hope that this minimizes disruption to your

existing programs by allowing you to maintain the rest of your program

as is, or as S/L-enforceable only.

b. Step two: Approval of alternative section 112 requirements.

After or during the up-front approval, in step two of the SPA process,

you would submit to us the alternative requirements that you propose to

substitute for Federal section 112 requirements, and we would approve

or disapprove those requirements. We

[[Page 1899]]

would review and (dis)approve your alternative requirements for each

source category for which you wish to receive delegation to implement

alternative requirements. If we disapprove your substitution request,

you would proceed to implement the Federal rules. 6 For part

63 NESHAP or other Federal requirements that are already promulgated at

the time of your up-front submittal, step two may be combined with step

one, or it may occur after step one, depending on the status of your

existing rules or authorities. To be submitted for approval, your

alternative requirements must be enforceable as a matter of S/L law;

they may take the form of enforceable regulations, general permit terms

or conditions, administrative orders, board orders, or other legally

enforceable mechanisms in your jurisdiction. If the actual requirements

originate from policies instead of regulations, they may only be

submitted to us if they are included in an enforceable mechanism such

as a permit.

---------------------------------------------------------------------------

\6\ Under your approved up-front program, you would already have

been delegated the authority to implement and enforce those Federal

requirements.

---------------------------------------------------------------------------

Furthermore, the alternative requirements that you submit for a

particular NESHAP or other Federal requirement must apply to the entire

source category or subcategory. Under the SPA process, as under the

Sec. 63.93 process for substitution of rules, we will only review and

approve alternative requirements that do not require a source-specific

evaluation to determine their equivalency. This means that, if you are

using a permitting mechanism to make your requirements enforceable for

a source category, you could only submit general permits. (Earlier we

asked for comment on the feasibility and desirability of creating

limited exceptions to this policy.)

After we have determined whether your alternative requirements are

acceptable, the public would have 21 days to comment on your proposed

alternative requirements and our evaluation of them through a notice

and comment rulemaking published in the Federal Register. Then, after

considering the public comments and your responses to them, we would

act on your submittal by notifying you in writing as to whether we have

approved or disapproved your request for substitution. We would also

publish our findings in a final Federal Register notice. Because your

alternative requirements do not become federally enforceable or replace

the otherwise applicable Federal section 112 requirements until the

final Federal Register notice is published, we strongly recommend that

you begin your SPA approval process under step two in plenty of time to

receive approval before the first substantive compliance date for the

otherwise applicable Federal requirements. (By substantive compliance

date we mean a date by which the source is required to comply with

provisions to install and operate control equipment, make process

changes, or take other physical steps that reduce emissions of HAP to

the atmosphere.) For sources that need a long lead time to come into

compliance with your requirements or the otherwise applicable NESHAP

requirements, more than two years may be needed. We recommend that you

develop suitable timelines for implementing the SPA process steps with

your EPA Regional Office at the time of up-front approval, or as early

in the process as possible.

During the course of developing this proposed rulemaking, some of

you suggested that a 45-day review period (similar to the 45-day review

period for proposed title V operating permits) should be adequate for

acting on alternative section 112 requirements under the SPA process.

However, because of the potential complexity of equivalency

demonstrations, the application of approved alternatives to all sources

or groups of sources within the affected source category or subcategory

within your jurisdiction, and the need to do a rulemaking to approve

your source category-wide alternative requirements, we believe that 45

days is not adequate as the maximum allowable review period.

In developing the SPA process, we explored options under which we

could approve your alternative requirements in step two without the

need for additional Federal rulemaking, but the Act prohibits that. 42

U.S.C. Sec. 7697(d). See also, Administrative Procedures Act, 5 U.S.C.

Secs. 551, 553. Under the APA, Agency actions of general applicability

and future effect designed to implement the law are considered rules

and must undergo rulemaking. Approvals of your source category or

subcategory applicable alternative requirements, which will be

implemented and enforced in lieu of the Federal section 112 standards,

fall within the above description of a ``rule.'' Consequently, we must

undergo a rulemaking to grant such an approval.

c. Incorporation of alternative requirements into title V permits.

Following completion of step two of the SPA process, you would

incorporate the new federally applicable requirements into title V

permits for sources that are required to have such permits. This action

is important for several reasons relating to section 112(l)

substitutions of requirements. First, we and the public have an

opportunity to ensure that the approved alternative section 112

requirements are implemented correctly via the permit issuance process.

Second, the permit is a publicly available repository of the

requirements that apply to an affected source. We, you, the affected

source, and the public all have access to the same information about

what is required from that source.

Although we and the public have an additional opportunity to review

your alternative section 112 requirements during the permit issuance

process, this is not an opportunity to ``second guess'' the approval of

those requirements that took place during the step two review. The

purpose of the review during the permit issuance process is to ensure

that the terms and conditions of previously approved alternative

requirements are incorporated properly into the permit.

3. Changes to Previously Approved Alternative Requirements

After we have approved your alternative requirements (rules or

permit terms), if your alternative requirements then change in any way

that would change the approved section 112 provisions, you must

resubmit your rules or permits to us for reapproval in order for your

new alternative requirements to become federally enforceable in place

of the set of alternative requirements we previously approved.

Subsequently, if relevant, you must open and revise any federally

enforceable permits (or permit terms) that contain these alternative

section 112 requirements to bring them up to date with your revised,

approved alternative requirements. In other words, you must repeat step

two and revise your title V permits whenever your underlying

regulations, policies, or permits change so that your subpart E-

approved rules and permits correctly reflect your most current

requirements for those affected sources. As a matter of Federal

enforceability, until we approve your revised alternative requirements

under step two, sources remain subject to the applicable alternative

section 112 requirements that we approved previously. If your

alternative requirements originate from source category rules, you must

first submit those rules to us, as in step two, to obtain our approval

that the changed rules satisfy the equivalency demonstration criteria.

If your alternative requirements originate from policies that

result in permit terms and conditions, rather than from enforceable

rules, if you make any

[[Page 1900]]

changes to those policies, or if you implement those policies

differently from how they are expressed in the approved permit terms

and conditions, you must submit the revised permit terms and

conditions, as in step two, to obtain our approval that the changed

permit terms satisfy the equivalency demonstration criteria.

4. Criteria for Demonstrating Equivalency of Alternative Requirements

Under proposed Sec. 63.97(d), each individual submittal for

specific alternative requirements must:

(1) Identify the specific conditions that sources in the source

category must comply with under your requirements, including which of

these are alternative requirements that you want to implement and

enforce in lieu of the otherwise applicable Federal requirements. You

must submit copies of all S/L rules, regulations, permits,

implementation plans, or other enforceable mechanisms that contain the

entire set of requirements for which you are seeking approval,

including any alternative requirements, or if these documents are

readily available to us and the public, you may cite the relevant

portions of the documents or indicate where they are available;

(2) Identify how these conditions are the same as or different from

the relevant Federal requirements through a side-by-side comparison of

your requirements and ours. Your submittal must contain sufficient

detail for us to be able to make a determination of equivalency between

your alternative requirements and the Federal requirements;

(3) Provide detailed information that supports and justifies why

you believe that your alternative requirements, taken as a whole, are

no less stringent than the otherwise applicable Federal requirements,

that is, how they meet the equivalency criteria specified in

Sec. 63.93(b). For example, this equivalency demonstration must

demonstrate how your requirements will achieve equivalent or greater

emissions reductions compared to the Federal requirements for each

affected source.

We would then evaluate the specific alternative requirements by

using the equivalency ``test'' contained in Sec. 63.93(b). Section XI.

of the preamble contains a complete discussion on how we would conduct

an equivalency evaluation under the criteria of Sec. 63.93(b) to ensure

that the alternative requirements are no less stringent, taken as a

whole, than the otherwise applicable Federal requirements. (In the

future, we may supplement this discussion with additional guidance.)

C. Sec. 63.94 Equivalency by Permit Approval Process

1. Overview and Purpose of an Equivalency by Permit Process

Because of issues you raised about the current program substitution

process in Sec. 63.94, we are proposing to revise Sec. 63.94 to create

an equivalency by permit (EBP) approval process which does not include

a requirement for you to submit your alternative requirements in the

form of the Federal standard. The proposed EBP process would allow you

to substitute, for a limited number of sources, alternative

requirements and authorities that take the form of permit terms and

conditions instead of source category regulations. Under this three-

step process, you could seek approval to implement alternative section

112(d), section 112(h), or section 112(f) requirements that would be

enforced in lieu of part 63 emissions standards by submitting permit

terms and conditions that satisfy subpart E's equivalency demonstration

criteria. Once approved, these permit terms and conditions would be

included in a title V permit, through the appropriate title V permit

issuance process, to replace the otherwise applicable Federal

requirements. This process satisfies your request for a means of

obtaining delegation for a few sources without having to go through

rulemaking at the S/L level to establish source category-specific

regulations. It also allows you to substitute alternative requirements

on a source-specific basis for area sources when those sources are

permitted under title V.

The proposed EBP process accomplishes similar objectives to those

that the current Sec. 63.94 is intended to accomplish; however, the EBP

process provides flexibility beyond that now in Sec. 63.94 by allowing

a ``holistic'' approach for determining equivalency between your

alternative requirements and the Federal emissions standards. The

proposed EBP process differs from the current process in Sec. 63.94 in

that it does not require you to present your permit terms and

conditions in the form of the Federal standard in order to demonstrate

equivalency (although doing so may greatly reduce the time it takes to

approve your alternative requirements). Rather, it relies on the same

equivalency demonstration ``test'' that is currently in Sec. 63.93(b)

for rule substitutions and that we are proposing for the Sec. 63.97 SPA

process.

To balance this additional flexibility, we are proposing to add a

process step (i.e., step two, in which we review your draft permit

terms and conditions before they are included in proposed permits) and

limit the scope of applicability of the EBP process (i.e., allow the

EBP approach for 5 or fewer sources in a source category that is

affected by a NESHAP for which you want to substitute alternative

requirements). These ``checks and balances'' would ensure that the

results of EBP implementation are comparable to the results that would

be achieved through the other subpart E processes in terms of the types

of alternative requirements that could be approved, the opportunities

for public and EPA review of alternative requirements, and the overall

burden that would be associated with implementing this approach (for

you, for us, and for regulated sources). In addition, the checks and

balances would provide assurance that the proper emission reductions

are achieved. These concepts are explained further in the remainder of

this section of the preamble.

Essentially, the EBP process is appropriate when a source-specific

analysis is necessary to determine the effect of the alternative

requirements. In general, it is appropriate when you do not already

have S/L standards that apply to source categories regulated by part 63

emissions standards. For example, EBP could be appropriate for SIP-

approved rules that regulate HAP indirectly. Alternative requirements

may also arise from health-based or technology-based rules that

generate source-specific requirements based on a source's operations,

location, construction or modification activities, etc. Because each of

these situations requires a source-specific analysis, general permits

would not be appropriate under the EBP process.

The EBP process is similar to (but not the same as) the title V

permit streamlining process we developed for minimizing duplication

among multiple applicable requirements that apply to the same emissions

point at a source. (For guidance on permit streamlining, see our March

5, 1996 policy guidance document entitled ``White Paper Number 2 for

Improved Implementation of the Title V Operating Permits Program,''

commonly called White Paper 2, which can be found on our website at

http://www.epa.gov/ttn/oarpg/t5wp.html.) Through title V permit

streamlining, a source may elect to consolidate multiple applicable

requirements into a single set of applicable requirements that assure

compliance with each of the ``subsumed'' requirements to the same

extent as would be achieved by having

[[Page 1901]]

the source comply with each requirement independently. Through the EBP

process, you (as the permitting authority) may have Federal section 112

requirements replaced with your approved alternative requirements that

are no less stringent than the section 112 requirements that they

replace. Sources subject to the title V operating permits programs must

continue to meet the requirements of that program in addition to the

requirements of subpart E.

The EBP process differs from the rule substitution and the SPA

processes in that three steps are required under EBP to obtain our

approval for your alternative requirements. While all of the

substitution options require Federal rulemaking action to approve your

program elements (i.e., the Sec. 63.91(b) criteria and any other up-

front approval elements) and a step where we review and (dis)approve

your alternative requirements, the EBP process also requires a final

step where we review and (dis)approve how those alternative

requirements are incorporated into title V permit terms and conditions.

In the other substitution options, your alternative requirements are

approved by rulemaking and become federally enforceable after the

second step. In the EBP process, after approval of the S/L alternative

requirements, you must incorporate the approved permit terms and

conditions into Title V permits.

The EBP and SPA processes also differ in that the scope of

applicability for EBP is narrower than the scope for SPA. Under the SPA

process you submit and we approve alternative requirements that apply

to entire source categories; this approach may impact numerous sources

in many source categories. In contrast, under the EBP process, you

submit and we approve alternative requirements that apply to a small

number of individual sources in a category. These sources may or may

not comprise all the sources in that category in your jurisdiction. (If

they do not comprise all your sources in that category, you must accept

delegation for the remainder of your sources in the category under a

different subpart E delegation process.)

2. Steps in the Proposed Equivalency by Permit Process

a. Step one: Up-front approval. As a first step you would submit

certain elements of your program for up-front approval (as in the

existing Sec. 63.94 and the proposed SPA processes). The purpose of the

up-front submittal is for you to demonstrate that you have satisfied

the basic Sec. 63.91(b) criteria for obtaining delegation, demonstrate

that you have an approved title V permit program to implement the EBP

approach, and identify the sources in the source categories for which

you wish to use the EBP approach. (You may identify sources for which

part 63 emissions standards will be established in the future.)

In discussing the form that an EBP process could take, some of you

have suggested that an up-front approval would be redundant when you

already have an approved title V program. We disagree, at least in

part. As we already discussed for the SPA process, the State-specific

up-front approval for an EBP program serves critical functions under

section 112(l) including ensuring that you meet the Sec. 63.91(b)

criteria for delegation, providing a legal foundation for you to

replace the otherwise applicable Federal NESHAP requirements in your

permits with your alternative, federally enforceable requirements, and

delineating the specific sources and Federal emissions standards for

which you have accepted delegation. Also, as in the SPA process, the

up-front approval step allows us to verify that you have adequate

resources and authorities to implement your alternative section 112

requirements through your

This text is long and has been trimmed here. Open the source document for the complete record.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.