DEPARTMENT OF ENERGY
[FE Docket No. PP-197]
Notice Extending the Public Scoping Period Public Service Company
of New Mexico
AGENCY: Department of Energy.
[[Page 13554]]
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: The Department of Energy (DOE) announces the extension of the
scoping period for the environmental impact statement (EIS) that is
being prepared in connection with an application for a Presidential
permit filed by Public Service Company of New Mexico. An EIS is being
prepared because DOE has determined that the issuance of the
Presidential permit would constitute a major Federal action that may
have a significant impact upon the environment within the meaning of
the National Environmental Policy Act of 1969 (NEPA).
DATES: The scoping period on the EIS is extended until April 14, 1999.
ADDRESSES: Written questions and comments should be submitted to: Mrs.
Ellen Russell, NEPA Document Manager, Office of Fossil Energy (FE-27),
U.S. Department of Energy, 1000 Independence Avenue, SW, Washington DC
20585-0350; Telephone (202) 586-9624; Facsimile: 202-287-5736; or
electronic mail at Ellen.R[email protected].
For general information on the Department's NEPA process, please
contact: Carol Borgstrom, Director, Office of NEPA Policy and
Assistance (EH-42), U.S. Department of Energy, 1000 Independence
Avenue, SW, Washington DC 20585; Telephone: 202-586-4600; or leave a
message at 800-472-2756.
SUPPLEMENTARY INFORMATION: Public Service Company of New Mexico has
applied to DOE for a Presidential permit to construct an electric
transmission line across the U.S.-Mexico border. The proposed
transmission line would originate at the Palo Verde Nuclear Generating
Station Switchyard located west of Phoenix, Arizona, and extend to the
town of Santa Ana in the Mexican State of Sonora. On February 12, 1999,
DOE published a notice in the Federal Register, (64 FR 7173) announcing
its intent to prepare an EIS and to conduct public scoping meetings in
the vicinity of the proposed line. The public scoping period was to
continue until March 15, 1999. To ensure that the public has ample
opportunity to provide comments, DOE is extending until April 14, 1999,
the period during which it will receive comments for consideration in
establishing the scope and content of the EIS. DOE has separately
notified interested and affected stakeholders of the change in dates.
Comments received after April 14, 1999, will be considered to the
extent practicable. Further information on this proceeding is contained
in the previously published Notice of Intent.
Issued in Washington, DC, on March 15, 1999.
Anthony J. Como,
Manager, Electric Power Regulation, Office of Coal & Power Im/Ex,
Office of Fossil Energy.
[FR Doc. 99-6774 Filed 3-18-99; 8:45 am]
BILLING CODE 6450-01-P