SCC-L2, L.L.C. et al.; Electric Rate and Corporate Regulation Filings

Federal RegisterMar 4, 1999

Ask Donna

What actually matters in this document.

Text

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EC99-42-000, et al.]

SCC-L2, L.L.C. et al.; Electric Rate and Corporate Regulation

Filings

February 26, 1999.

Take notice that the following filings have been made with the

Commission:

1. SCC-L2, L.L.C., et al.

[Docket No. EC99-42-000]

Take notice that on February 24, 1999, SCC-L2, L.L.C., et al. (SCC-

L2), on behalf of itself and present and potential owners of interests

therein tendered an application for approval pursuant to Section 203 of

the Federal Power Act of a change in ownership.

Comment date: March 26, 1999, in accordance with Standard Paragraph

E at the end of this notice.

2. SCC-L3, L.L.C., et al.

[Docket No. EC99-43-000]

Take notice that on February 24, 1999, SCC-L3, L.L.C., et al. (SCC-

L3), on behalf of itself and present and potential owners of interests

therein tendered an application for approval pursuant to Section 203 of

the Federal Power Act of a change in ownership.

Comment date: March 26, 1999, in accordance with Standard Paragraph

E at the end of this notice.

3. Dominion Energy Services Company, Inc.

[Docket No. EG99-83-000]

Take notice that on February 24, 1999, Dominion Energy Services

Company, Inc. (DESCO) filed with the Federal Energy Regulatory

Commission an application for determination of exempt wholesale

generator status pursuant to Part 365 of the Commission's regulations.

DESCO, a Virginia corporation, is a wholly-owned subsidiary of

Dominion Energy, Inc. (DEI) also a Virginia corporation. DEI is a

wholly-owned subsidiary of Dominion Resources, Inc., a Virginia

corporation.

DESCO's application is based on its operation of the Kincaid

Generation Facility and the Morgantown Cogeneration Facility. The

Kincaid Generation Facility, located in Kincaid, Illinois, consists of

two 554 MW coal-fired cyclone boiler generating units with a total net

capacity of approximately 1108 MW, two main power transformers, four

system auxiliary transformers, four unit auxiliary transformers, coal

unloading and handling facilities and associated real and personal

property. The Morgantown Cogeneration Facility, located in Morgantown,

West Virginia, is a 60.8 MW topping cycle qualifying cogeneration

facility consisting of two circulating fluidized bed boilers and an

extraction/Condensing steam turbine generator.

Comment date: March 19, 1999, in accordance with Standard Paragraph

E at the end of this notice. The Commission will limit its

consideration of comments to those that concern the adequacy or

accuracy of the application.

4. SCC-L3, L.L.C.

[Docket No. EG99-84-000]

Take notice that on February 24, 1999, SCC-L3, L.L.C. (SCC-L3), a

Delaware limited liability company with its principal place of business

at Chicago, Illinois, filed with the Federal Energy Regulatory

Commission an application for determination of exempt wholesale

generator status pursuant to Part 365 of the Commission'S regulations.

The Facility that will be leased by SCC-L3 would consist of a 390

MW natural gas-fired simple cycle power plant in Union County,

Mississippi and related equipment. The proposed power plant is expected

to commence commercial operation during the second, or early in the

third, quarter 1999. All capacity and energy from the plant will be

sold exclusively at wholesale.

Comment date: March 19, 1999, in accordance with Standard Paragraph

E at the end of this notice. The Commission will limit its

consideration of comments to those that concern the adequacy or

accuracy of the application.

5. New Albany Power I, L.L.C.

[Docket No. EG99-85-000]

Take notice that on February 24, 1999, New Albany Power I, L.L.C.

(New Albany), a Delaware limited liability company with its principal

place of business at Union County, Mississippi, filed with the Federal

Energy Regulatory Commission an application for determination of exempt

wholesale generator status pursuant to Part 365 of the Commission's

regulations.

The Facility owned by New Albany, that will be leased to SCC-L3,

L.L.C., would consist of a 390 MW natural gas-fired simple cycle power

plant in Union County, Mississippi. The proposed power plant is

expected to commence commercial operation during the second, or early

in the third, quarter 1999. All capacity and energy from the plant will

be sold exclusively at wholesale.

Comment date: March 19, 1999, in accordance with Standard Paragraph

E at the end of this notice. The Commission will limit its

consideration of comments to those that concern the adequacy or the

accuracy of the application.

6. AES Ironwood, L.L.C.

[Docket No. EG99-86-000]

Take notice that on February 24, 1999, AES Ironwood, L.L.C.

(Applicant), who is developing a generating facility in south central

Pennsylvania, filed with the Federal Energy Regulatory Commission an

application for a determination of Exempt Wholesale Generator Status

pursuant to Part 365 of the Commission's regulations.

Applicant will own and operate a combined-cycle electric generating

facility located in southeastern Pennsylvania and will sell energy,

capacity and ancillary services exclusively at wholesale. The electric

generating facility has a design net generating capacity of

approximately 705 MW.

Comment date: March 19, 1999, in accordance with Standard Paragraph

E at the end of this notice. The Commission will limit its

consideration

[[Page 10461]]

of comments to those that concern the adequacy or accuracy of the

application.

7. Nordic Electric, L.L.C.

[Docket No. ER96-127-006]

Take notice that on February 23, 1999, the above-mentioned power

marketer filed a quarterly report with the Commission in the above-

mentioned proceeding for information only. This filing is available for

public inspection and copying in the Public Reference Room or on the

Internet at www.ferc.fed.us/Online/rims.htm for viewing and downloading

(call 202-208-2222 for assistance).

8. Agway Energy Services, Inc., Total Gas & Electric, Inc., and NRG

Power Marketing, Inc.

[Docket Nos. ER97-4186-005, ER97-4202-006 and ER97-4281-005]

Take notice that on February 24, 1999, the above-mentioned power

marketers filed quarterly reports with the Commission in the above-

mentioned proceedings for information only. These filings are available

for public inspection and copying in the Public Reference Room or on

the Internet at www.ferc.fed.us/online/rims.htm for viewing and

downloading (call 202-208-2222 for assistance).

9. Central Vermont Public Service Corporation

[Docket No. ER99-1677-000]

Take notice that on February 22, 1999, the above-referenced public

utility filed an amendment to its quarterly transaction report filed on

February 1, 1999 for the quarter ending December 31, 1998.

Comment date: March 15, 1999, in accordance with Standard Paragraph

E at the end of this notice.

10. Mid-Continent Area Power Pool

[Docket No. ER99-1894-000]

Take notice that on February 22, 1999, Mid-Continent Area Power

Pool filed an informational filing saying that Ameren Services Company

(Ameren), Illinois Power Company (Illinois Power), and Western

Resources, Inc. (Western) are Power and Energy Market (PEM)

Participants, with rights and obligations associated with use of the

PEM schedules pursuant to Article 9 of the MAPP Restated Agreement.

Comment date: March 15, 1999, in accordance with Standard Paragraph

E at the end of this notice.

11. Commonwealth Electric Company

[Docket No. ER99-1900-000]

Take notice that on February 22, 1999, the above-referenced public

utilities filed their quarterly transaction reports for the quarter

ending December 31, 1998.

Comment date: March 15, 1999, in accordance with Standard Paragraph

E at the end of this notice.

12. Delmarva Power & Light Company

[Docket No. ER99-1901-000]

Take notice that on February 23, 1999, Delmarva Power & Light

Company (Delmarva), tendered for filing an executed umbrella service

agreement with NYSEG Solutions, Inc., under Delmarva's market rate

sales tariff.

Comment date: March 15, 1999, in accordance with Standard Paragraph

E at the end of this notice.

13. Virginia Electric and Power Company

[Docket No. ER99-1902-000]

Take notice that on February 23, 1999, Virginia Electric and Power

Company (Virginia Power), tendered for filing a Service Agreement for

Non-Firm Point-to-Point Transmission Service with American Municipal

Power-Ohio, Inc., under the Open Access Transmission Tariff to Eligible

Purchasers dated July 14, 1997. Under the tendered Service Agreement,

Virginia Power will provide non-firm point-to-point service to the

Transmission Customer under the rates, terms and conditions of the Open

Access Transmission Tariff.

Virginia Power requests an effective date of February 23, 1999, the

date of filing the Service Agreement.

Copies of the filing were served upon American Municipal Power-

Ohio, Inc., the Virginia State Corporation Commission and the North

Carolina Utilities Commission.

Comment date: March 15, 1999, in accordance with Standard Paragraph

E at the end of this notice.

14. Florida Power & Light Company

[Docket No. ER99-1903-000]

Take notice that on February 23, 1999, Florida Power & Light

Company (FPL), tendered for filing proposed service agreements with

Merrill Lynch Capital Services, Inc., for Short-Term Firm and Non-Firm

transmission service under FPL's Open Access Transmission Tariff.

FPL requests that the proposed service agreements are permitted to

become effective on February 1, 1999.

FPL states that this filing is in accordance with Part 35 of the

Commission's Regulations.

Comment date: March 15, 1999, in accordance with Standard Paragraph

E at the end of this notice.

15. Louisville Gas And Electric Co./Kentucky Utilities Company

[Docket No. ER99-1904-000]

Take notice that on February 23, 1999, Louisville Gas and Electric

Company/Kentucky Utilities (LG&E/KU), tendered for filing an executed

Service Agreement for Non-Firm Point-To-Point Transmission Service

between LG&E/KU and Merrill Lynch Capital Services, Inc., under LG&E/

KU's Open Access Transmission Tariff.

Comment date: March 15, 1999, in accordance with Standard Paragraph

E at the end of this notice.

16. Tampa Electric Company

[Docket No. ER99-1905-000]

Take notice that on February 23, 1999, Tampa Electric Company

(Tampa Electric), tendered for filing a revised Exhibit A to the

Contract for Interchange Service between Tampa Electric and Florida

Power Corporation (FPC). Tampa Electric included with the filing a

Certificate of Concurrence executed by FPC in lieu of an independent

filing.

Tampa Electric requests that the revised Exhibit A be made

effective on March 1, 1999 and therefore requests waiver of the

Commission's notice requirement.

Copies of the filing have been served on FPC and the Florida Public

Service Commission.

Comment date: March 15, 1999, in accordance with Standard Paragraph

E at the end of this notice.

17. Virginia Electric and Power Company

[Docket No. ER99-1906-000]

Take notice that on February 23, 1999, Virginia Electric and Power

Company (Virginia Power), tendered for filing the Service Agreement

between Virginia Electric and Power Company and H.Q. Energy Services

(U.S.), Inc. Under the Service Agreement, Virginia Power will provide

services to H.Q. Energy Services (U.S.), Inc., under the terms of the

Company's Revised Market-Based Rate Tariff designated as FERC Electric

Tariff (Second Revised Volume No. 4), which was accepted by order of

the Commission dated August 13, 1998 in Docket No. ER98-3771-000.

Virginia Power requests an effective date of February 23, 1999.

Copies of the filing were served upon H.Q. Energy Services (U.S.),

Inc., the Virginia State Corporation Commission and the North Carolina

Utilities Commission.

Comment date: March 15, 1999, in accordance with Standard Paragraph

E at the end of this notice.

[[Page 10462]]

18. Louisville Gas and Electric Co./Kentucky Utilities Company

[Docket No. ER99-1908-000]

Take notice that on February 23, 1999, Louisville Gas and Electric

Company/Kentucky Utilities (LG&E/KU), tendered for filing an executed

Service Agreement for Firm Point-To-Point Transmission Service between

LG&E/KU and Merrill Lynch Capital Services, Inc., under LG&E/KU's Open

Access Transmission Tariff.

Comment date: March 15, 1999, in accordance with Standard Paragraph

E at the end of this notice.

19. Ameren Services Company

[Docket No. ER99-1909-000]

Take notice that on February 23, 1999, Northern Indiana Public

Service Company (Northern), tendered for filing an executed Standard

Transmission Service Agreement for Non-Firm Point-to-Point Transmission

Service between Northern and Ameren Services Company(Transmission

Customer). Under the Transmission Service Agreement, Northern will

provide Point-to-Point Transmission Service to the Transmission

Customer pursuant to the Transmission Service Tariff filed by Northern

in Docket No. OA96-47-000 and allowed to become effective by the

Commission.

Northern requests that the Commission grant a waiver of the

Commission's notice requirements to allow the Standard Transmission

Service Agreement to become effective as of February 1, 1999.

Copies of this filing have been sent to the Indiana Utility

Regulatory Commission and the Indiana Office of Utility Consumer

Counselor.

Comment date: March 15, 1999, in accordance with Standard Paragraph

E at the end of this notice.

20. Tampa Electric Company

[Docket No. ER99-1910-000]

Take notice that on February 23, 1999, Tampa Electric Company

(Tampa Electric), tendered for filing service agreements with the

Florida Municipal Power Agency (FMPA) for firm point-to-point

transmission service and non-firm point-to-point transmission service

under Tampa Electric's open access transmission tariff.

Tampa Electric proposes an effective date of February 1, 1999, for

the service agreements, and therefore requests waiver of the

Commission's notice requirement.

Copies of the filing have been served on FMPA and the Florida

Public Service Commission.

Comment date: March 15, 1999, in accordance with Standard Paragraph

E at the end of this notice.

21. Commonwealth Edison Company

[Docket No. ER99-1911-000]

Take notice that on February 23, 1999, Commonwealth Edison Company

(ComEd), tendered for filing Non-Firm Service Agreements with PP&L

Energy Plus Co. (PP&L), Merrill Lynch Capital Services, Inc. (MLCS),

and Statoil Energy Trading, Inc. (SETI), under the terms of ComEd's

Open Access Transmission Tariff (OATT).

ComEd requests an effective date of February 23, 1999, for the

service agreements, and accordingly, seeks waiver of the Commission's

notice requirements.

Copies of this filing were served on PP&L, MLCS, and SETI.

Comment date: March 15, 1999, in accordance with Standard Paragraph

E at the end of this notice.

22. Ohio Edison Company and Pennsylvania Power Company

[Docket No. ER99-1912-000]

Take notice that on February 23, 1999, Ohio Edison Company tendered

for filing on behalf of itself and Pennsylvania Power Company, Service

Agreements with Statoil Energy Services, Inc., and Pepco Services, Inc.

(d/b/a Power Choice), under Ohio Edison's Power Sales Tariff. This

filing is made pursuant to Section 205 of the Federal Power Act.

Ohio Edison requests that the Commission waive the notice

requirement and allow the Service Agreements to become effective on

February 1, 1999.

Comment date: March 15, 1999, in accordance with Standard Paragraph

E at the end of this notice.

23. Virginia Electric and Power Company

[Docket No. ER99-1913-000]

Take notice that on February 23, 1999, Virginia Electric and Power

Company tendered for filing amended tariff sheets under its open access

transmission tariff.

Virginia Power requests that these tariff revisions be allowed to

become effective on February 24, 1999.

Comment date: March 15, 1999, in accordance with Standard Paragraph

E at the end of this notice.

24. SCC-L1, L.L.C.

[Docket No. ER99-1914-000]

Take notice that on February 23, 1999, SCC-L1, L.L.C. (SCC-L1),

tendered for filing an application for Commission acceptance of SCC-L1

Rate Schedule FERC No. 1; the granting of certain blanket approvals,

including the authority to sell electricity at market-based rates; and

the waiver of certain Commission regulations. SCC-L1's application also

seeks Commission acceptance and approval of two power purchase

agreements with Enron Power Marketing, Inc., and an Interconnection

Agreement with the Tennessee Valley Authority.

SCC-L1 intends to engage in wholesale electric power and energy

purchases and sales as a marketer.

Comment date: March 15, 1999, in accordance with Standard Paragraph

E at the end of this notice.

25. American Electric Power Service Corporation

[Docket No. ER99-1916-000]

Take notice that on February 23, 1999, the American Electric Power

Service Corporation (AEPSC), tendered for filing 1) blanket service

agreements by the AEP Companies under the Wholesale Market Tariff of

the AEP Operating Companies (Power Sales Tariff), (2) letters of

assignment under the Power Sales Tariff and (3) a notice to terminate

the service agreement under the Power Sales Tariff with PanCanadian

Energy Services, Inc. The Power Sales Tariff was accepted for filing

effective October 10, 1997 and has been designated AEP Operating

Companies' FERC Electric Tariff Original Volume No. 5.

AEPSC respectfully requests waiver of notice to permit the service

agreements, assignments and notice of termination to be made effective

as specified in the submittal letter to the Commission with this

filing.

A copy of the filing was served upon the Parties and the State

Utility Regulatory Commissions of Indiana, Kentucky, Michigan, Ohio,

Tennessee, Virginia and West Virginia.

Comment date: March 15, 1999, in accordance with Standard Paragraph

E at the end of this notice.

26. Ameren Services Company

[Docket No. ER99-1918-000]

Take notice that on February 23, 1999, Ameren Services Company

(Ameren Services), tendered for filing a Network Operating Agreement

and a Service Agreement for Network Integration Transmission Service

between Ameren Services and the City of Marceline, Missouri (the City).

Ameren Services asserts that the purpose of the Agreement is to permit

Ameren Services to provide transmission service to the City pursuant to

Ameren's Open Access Tariff.

[[Page 10463]]

Ameren Services requests that the Network Service Agreement and

Network Operating Agreement filed herewith be allowed to become

effective as of February 1, 1999.

Comment date: March 15, 1999, in accordance with Standard Paragraph

E at the end of this notice.

27. American Electric Power Service Corporation

[Docket No. ER99-1921-000]

Take notice that on February 23, 1999, the American Electric Power

Service Corporation (AEPSC), tendered for filing a service agreement

with Cleveland Public Power by the AEP Companies under the Wholesale

Market Tariff of the AEP Operating Companies (Power Sales Tariff). The

Power Sales Tariff was accepted for filing effective October 10, 1997

and has been designated AEP Operating Companies' FERC Electric Tariff

Original Volume No. 5.

AEPSC respectfully requests waiver of notice to permit this service

agreement to be made effective on or prior to March 1, 1999.

A copy of the filing was served upon the Parties and the State

Utility Regulatory Commissions of Indiana, Kentucky, Michigan, Ohio,

Tennessee, Virginia and West Virginia.

Comment date: March 15, 1999, in accordance with Standard Paragraph

E at the end of this notice.

28. Somerset Power LLC

[Docket No. ER99-1922-000]

Take notice that on February 23, 1999, Somerset Power LLC tendered

for filing, pursuant to Section 205 of the Federal Power Act, a Notice

of Adoption and Succession to the interests of NRG Energy, Inc., under

an interconnection agreement between NRG Energy, Inc., and Montaup

Electric Company, FERC Rate Schedule No. 124, to be effective upon

closing of Somerset Power LLC's purchase of the Somerset Generating

Station, which is scheduled to occur on or before March 31, 1999.

Somerset Power LLC intends to sell electric power and ancillary

services at wholesale. Rate Schedule No. 124 sets forth the terms and

conditions for the interconnection of Somerset Power LLC's generation

facilities with the transmission system of Montaup Electric Company.

Comment date: March 15, 1999, in accordance with Standard Paragraph

E at the end of this notice.

29. Virginia Electric and Power Company

[Docket No. ER99-1923-000]

Take notice that on February 23, 1999, Virginia Electric and Power

Company (Virginia Power), tendered for filing a Service Agreement for

Firm Point-to-Point Transmission Service with American Municipal

Power---Ohio, Inc., under the Open Access Transmission Tariff to

Eligible Purchasers dated July 14, 1997. Under the tendered Service

Agreement, Virginia Power will provide firm point-to-point service to

the Transmission Customer under the rates, terms and conditions of the

Open Access Transmission Tariff.

Virginia Power requests an effective date of February 23, 1999, the

date of filing the Service Agreement.

Copies of the filing were served upon American Municipal Power--

Ohio, Inc., the Virginia State Corporation Commission and the North

Carolina Utilities Commission.

Comment date: March 15, 1999, in accordance with Standard Paragraph

E at the end of this notice.

30. FirstEnergy Corp., and Pennsylvania Power Company

[Docket No. ER99-1924-000]

Take notice that on February 23, 1999, FirstEnergy Corp., tendered

for filing on behalf of itself and Pennsylvania Power Company, Service

Agreements for Network Integration Service and Operating Agreements for

the Network Integration Transmission Service under the Pennsylvania

Electric Choice Program with PEPCO Services, Inc., and Columbia Energy

Power Marketing Corporation pursuant to the FirstEnergy System Open

Access Tariff. These agreements will enable the parties to obtain

Network Integration Service under the Pennsylvania Electric Choice

Program in accordance with the terms of the Tariff.

The proposed effective date under these agreements is February 18,

1999.

Comment date: March 15, 1999, in accordance with Standard Paragraph

E at the end of this notice.

31. South Carolina Electric and Gas Company

[Docket No. OA97-416-004]

Take notice that on February 17, 1999, South Carolina Electric and

Gas Company (SCE&G), tendered a letter certifying that it will prohibit

its wholesale merchant function from having access to its Control

Center in response the Commission's January 28, 1999, Order on

Standards of Conduct and Rehearing. (86 FERC ] 61,079 (1999)).

Comment date: March 12, 1999, in accordance with Standard Paragraph

E at the end of this notice.

32. Sabine Cogen L.P.

[Docket No. QF98-119-000]

Take notice that on February 18, 1999, Sabine Cogen L.P., whose

address is c/o AL Cogen, Inc., c/o Air Liquide America Corporation,

2700 Post Oak Boulevard, Suite 2100, Houston, Texas 77056, filed with

the Federal Energy Regulatory Commission a supplement to its

application for certification of a facility as a qualifying

cogeneration facility which was filed with the Commission on September

18, 1998.

The purpose of the resubmitted filing is to comply with the

Commission's request for supplemental information.

The Facility is a combined cycle facility whose principal

components are two combination turbine generators, each with an

associated waste heat recovery steam generator, and a single steam

turbine generator. The Facility will interconnect with the transmission

system of Entergy Gulf States, Inc.

Comment date: March 18, 1999, in accordance with Standard Paragraph

E at the end of this notice.

Standard Paragraphs

E. Any person desiring to be heard or to protest such filing should

file a motion to intervene or protest with the Federal Energy

Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426,

in accordance with Rules 211 and 214 of the Commission's Rules of

Practice and Procedure (18 CFR 385.211 and 385.214). All such motions

or protests should be filed on or before the comment date. Protests

will be considered by the Commission in determining the appropriate

action to be taken, but will not serve to make protestants parties to

the proceeding. Any person wishing to become a party must file a motion

to intervene. Copies of these filings are on file with the Commission

and are available for public inspection. This filing may also be viewed

on the Internet at http://www.ferc.fed.us/online/rims.htm (call 202-

208-2222 for assistance).

David P. Boergers,

Secretary.

[FR Doc. 99-5341 Filed 3-3-99; 8:45 am]

BILLING CODE 6717-01-P

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.