Proposed Laboratory Personnel Management Demonstration Project; Department of the Navy (DoN), U.S. Naval Research Laboratory (NRL), Washington, DC

Federal RegisterFeb 23, 1999

Ask Donna

What actually matters in this document.

Text

SUMMARY: Title VI of the Civil Service Reform Act, 5 U.S.C. 4703,

authorized the Office of Personnel Management (OPM) to conduct

demonstration projects that experiment with new and different personnel

management concepts to determine whether such changes in personnel

policy or procedures would result in improved Federal Personnel

Management.

Section 342 of the National Defense Authorization Act for fiscal

year 1995 (Pub. L. 103-337, October 5, 1994) permits the Department of

Defense (DoD), with the approval of the OPM, to carry out personnel

demonstration projects at DoD laboratories designated as Science and

Technology (S&T) Demonstration Project Reinvention Laboratories. The

legislation requires that most requirements of 5 U.S.C. 4703 shall

apply to the Demonstration Project. Section 4703 requires OPM to

publish the proposed project plan in the Federal Register. This notice

meets that requirement.

DATES: Comment date: Written comments will be considered if received no

later than April 9, 1999. Hearing date: A public hearing will be held

by OPM on the proposed project plan on March 25, 1999 at the Best

Western, Oxon Hill, MD at 12:30 p.m., until testimony is completed.

ADDRESSES: Comment address: Send written comments to Judy White, U.S.

Office of Personnel Management, 1900 E Street, NW, Room 7460,

Washington, DC 20415-6000.

FOR FURTHER INFORMATION CONTACT: (1) on proposed demonstration project:

Ms. Betty A. Duffield, Director, Strategic Workforce Planning, Code

1001.2, 4555 Overlook Avenue, SW, Washington, DC 20375-5320, 202-767-

3421; (2) on proposed demonstration project and public hearings: Judy

White, U.S. Office of Personnel Management, 1900 E Street, NW, Room

7460, Washington, DC 20415-6000, 202-606-1526.

SUPPLEMENTARY INFORMATION: The DoD has submitted a proposed

demonstration project entitled ``Naval Research Laboratory Personnel

Management Demonstration Project'' for consideration under Chapter 47

of 5 U.S.C.

The purpose of this project is to demonstrate a flexible and

responsive personnel system that will enhance the Laboratory's ability

to attract, retain, and motivate a high-quality workforce. To this end,

the proposed project involves:

(1) Streamlined hiring processes,

(2) Broadbanding,

(3) Simplified position classification,

(4) A Contribution-based Compensation System (CCS),

(5) Extended probationary period for new employees, and

(6) Modified reduction-in-force (RIF) procedures.

A public hearing will be held by OPM on March 25, 1999 at the Best

Western, Oxon Hill, MD at 12:30 p.m. during which interested persons or

organizations may present their written or oral views concerning the

proposed Demonstration Project. So that OPM may regulate the course of

the hearing and provide time for all who wish to present comments,

parties who want to testify at the hearing are asked to contact one of

the persons listed under FOR FURTHER INFORMATION CONTACT: for a

specific scheduled time. Priority will be given to scheduled parties;

others will be heard in the remaining available time. Each speaker's

presentation will be limited to 5 minutes. In other respects, the

hearing will be informal. The hearing record will be left open until

April 9, 1999 to allow additional written data, views and arguments

from the parties participating in the hearing.

Dated: February 12, 1999.

Office of Personnel Management.

Janice R. Lachance,

Director.

Table of Contents

I. Executive Summary

II. Introduction

A. Purpose

B. Problems with the Current System

C. Waivers Required

D. Expected Benefits

E. Participating Organizations and Employees

F. Project Design

III. Accessions and Internal Placement

A. Hiring Authority

1. Background

2. Delegated Examining

B. Legal Authority

C. Determining Employee and Applicant Qualifications

D. Noncitizen Hiring

E. Expanded Detail Authority

F. Extended Probationary Period

G. Definitions

1. Basic Pay

2. Maintained Pay

3. Promotion

4. Reassignment

5. Change to Lower Career Level

6. Pay Adjustment

7. Detail

8. Highest Previous Rate

9. Approving Manager

H. Pay Setting Determinations Outside the CCS

1. External New Hires

2. Internal Actions

a. Promotion

b. Pay Adjustment (Voluntary Change to Lower Pay) or Change to

Lower Career Level (except RIF)

(1) Examples of Voluntary Change to a Lower Career Level

(2) Example of Pay Adjustment (Voluntary Change to Lower Pay) or

Change to a Lower Career Level

c. Pay Adjustment (Involuntary Change to Lower Pay) or Change to

Lower Career Level Due to Adverse or Performance-based Action

d. Involuntary Change to Lower Career Level or Reassignment to a

Career Track with a Lower Salary Range, Other than Adverse or

Performance-based

e. RIF Action (including employees who are offered and accept a

vacancy at a lower career level or in a different career track)

f. Upward Mobility or Other Formal Training Program Selection

g. Return to Limited or Light Duty from a Disability as a Result

of Occupational Injury to a Position in a Lower Career Level or to a

Career Track with Lower Basic Pay Potential than Held Prior to the

Injury

h. Reassignment

i. Student Educational Employment Program

j. Hazard Pay or Pay for Duty Involving Physical Hardship

I. Priority Placement Program (PPP)

J. Expanded Temporary Promotions

IV. Sustainment

A. Position Classification

1. Career Tracks and Career Levels

a. Target Career Level

b. Occupational Series and Position Titling

c. Classification Standards

d. Fair Labor Standards Act (FLSA)

(1) Guidelines for FLSA Determinations

(2) Nonsupervisory and Leader Positions

(3) Supervisory Positions

2. Requirements Document (RD)

3. Delegation of Classification Authority

a. Delegation Authority

b. Position Classification Accountability

B. Integrated Pay Schedule (IPS)

1. Annual Pay Action

2. Overtime Pay

3. Classification Appeals

4. Advanced Research Scientists and Engineers (ARSAE)

5. Distinguished Contributions Allowance (DCA)

a. Eligibility

b. Nomination

c. Reduction or Termination of a DCA

d. Lump-Sum DCA Payments

e. DCA Budget Allocation

f. Concurrent Monetary Payments

[[Page 8965]]

C. CCS

1. General

2. CCS Process

3. Pay Pool Annual Planning

a. Element Weights and Applicability

b. Supplemental Criteria

4. Annual CCS Appraisal Process

5. Exceptions

6. Normal Pay Range (NPR)--Basic Pay Versus Contribution

7. Compensation

a. General Increases

b. Merit Increases

c. Locality Increases

d. Contribution Awards

8. Career Movement Based on CCS

a. Advancements in Level Which May be Approved by the Pay Pool

Manager

b. Advancements in Level Which Must be Approved by the Director

of Research (DOR)

c. Advancement to Level V of the Science and Engineering (S&E)

Professional Career Track

d. Regression to Lower Level

9. CCS Grievance Procedures

V. Separations

A. Performance-based Reduction-in-pay or Removal Actions

B. RIF

1. RIF Authority

2. RIF Definitions

a. Competitive Area

b. Competitive Level

c. SCD

(1) CCS Process Results Credit

(2) Credit From Other Rating Systems

(3) RIF Cutoff Date

3. Displacement Rights

a. Displacement

b. Retention Standing

c. Vacant Positions

d. Ineligible for Displacement Rights

e. Change to Lower Level Due to an Adverse or Performance-based

Action

3. Notice Period

4. RIF Appeals

5. Separation Incentives

6. Severance Pay

7. Outplacement Assistance

VI. Demonstration Project Transition

A. Initial Conversion or Movement to the Demonstration Project

1. Placement into Career Tracks and Career Levels

2. Conversion of Retained Grade and Pay Employees

3. WGI Buy-in

4. Conversion of Special Salary Rate Employees

B. CCS Startup

C. Training

1. Types of Training

a. NRL Employees

b. Supervisors and Managers

c. Support Personnel

D. New Hires into the Demonstration Project

E. Conversion or Movement from Demonstration Project

1. Grade Determination

2. Pay Setting

3. ARSAE

4. Determining Date of Last Equivalent Increase

VII. Demonstration Project Duration

A. General

B. 5-year Reexamination

VIII. Demonstration Project Evaluation Plan

A. Overview

B. Evaluation Models

C. Evaluation

IX. Demonstration Project Costs

A. Transition

B. Cost Containment and Controls

C. Implementation Costs

D. Method of Data Collection

X. Automation Support

A. General

B. Defense Civilian Personnel Data System (DCPDS)

C. Core Document (COREDOC)

D. RIF Support System (RIFSS)

E. CCS Data System (CCSDS)

Appendix A: Required Waivers to Laws and Regulations

Appendix B: Definitions of Career Tracks and Career Levels

Appendix C: Table of Occupational Series within Career Tracks

Appendix D: Classification and CCS Elements

Appendix E: Computation of the IPS and the NPR

Appendix F: RD Sample

Appendix G: OPM Intervention Impact Model

Appendix H: NRL Internal Evaluation

I. Executive Summary

Over the last 30 years, many studies of the DoD laboratories have

been conducted on laboratory quality and personnel. Virtually all of

these studies have recommended improvements in personnel policies,

organization, and management. In order to respond to the findings of

these studies, this proposed personnel demonstration project

encompasses streamlined hiring processes, simplified position

classification, the CCS, and modified RIF procedures.

The demonstration project described herein was designed by the NRL,

with the participation of and review by the DoN, the DoD, and the OPM.

The purpose of the demonstration project is to develop and implement a

personnel management system that will enable NRL to obtain, maintain,

and retain the highest quality workforce possible to accomplish its

mission in support of national defense. There are four primary

objectives of the demonstration project:

(1) Provide NRL increased authority to manage human resources,

(2) Enable NRL to hire and retain the best qualified employees,

(3) Enable NRL to compensate its employees equitably at a rate that

is more competitive with the labor market, and

(4) Provide a direct link between levels of individual contribution

and the compensation received.

Initially, the demonstration project will cover all NRL employees

except Senior Executive Service (SES) members, scientific and

professional (ST) employees (above GS-15), guards, and trade and craft

employees. The guards and trade and craft employees may be included at

a later time, after more experience is gained in the operation of the

CCS. The project will be reviewed and evaluated throughout its duration

by OPM, DoD, DoN, and NRL. In addition to evaluation topics, such as

goal attainment and employee and management acceptance, the project

will be assessed for cost containment. After 5 years, the project will

be evaluated to determine if it is to be made permanent, modified, or

terminated. Areas not specifically addressed will use provisions that

currently exist in 5 United States Code (U.S.C.) and 5 Code of Federal

Regulations (CFR).

II. Introduction

A. Purpose

The goal of this personnel demonstration project is to develop and

implement a human resources management system that will enable NRL to

obtain, maintain, and retain, into the 21st century, the highest

quality workforce possible to accomplish its mission in support of

national defense. NRL's mission is to conduct a broadly based

multidisciplinary program of scientific research and advanced

technological development directed toward new and improved materials,

equipment, techniques, systems, and related operational procedures for

the DoN. The human resources management system must enable NRL to

attract and retain the best scientists, engineers, and support

personnel available in the labor market.

The demonstration project has the following four primary

objectives:

a. Provide NRL management with increased authority to manage human

resources consistent with its operation under the Navy Working Capital

Fund (NWCF) as an industrially-funded activity;

b. Provide a recruitment process, within the context of merit

principles, that will enable NRL to hire the best qualified employees

at a reasonable cost and for competitive compensation;

c. Provide a compensation system that will enable NRL to compensate

its employees equitably at a rate that is commensurate with their

levels of responsibility and contribution, and is competitive with

those found in the labor market; and

d. Provide a direct link between levels of individual contribution

and the compensation received.

[[Page 8966]]

B. Problems With the Current System

The demonstration project addresses a set of issues regarding human

resources in the Federal laboratory system. These problems have been

extensively documented in a long series of reports by blue-ribbon

panels. These include the following: the Packard Report,* the Grace

Commission Report,** the Fowler Report,*** and other high-level

analyses of the state of Federal research capabilities. In all of these

reports, there is a common theme . . . that Federal laboratories need

more efficient, cost effective, and timely processes and methods to

acquire and retain a highly creative, productive, educated, and trained

workforce.

---------------------------------------------------------------------------

* White House Science Council, ``Report of the White House

Science Council, Federal Laboratory Review Panel,'' (Packard

Report), May 1983.

** Task Force on Research and Development (R&D), ``President's

Private Sector Survey on Cost Control, Task Force Report on R&D,''

(Grace Commission Report), 8 December 1983.

*** Defense Science Board, ``Report of the Defense Science Board

1987 Summer Study on Technology Base Management,'' (Fowler Report),

December 1987.

---------------------------------------------------------------------------

The NRL must be able to compete with the private sector for the

best talent and be able to make job offers in a timely manner with the

attendant compensation that attracts high quality employees. Once

hired, NRL must have the means to motivate and reward employees for

their innovative contributions to ensure that the creative process is

continually renewed. Compensation levels must be directly linked to the

levels of individual contributions. High contributors must be rewarded

both to encourage their continued contributions and to ensure their

retention at NRL. Similarly, lower contributing individuals should

receive less compensation, or, in some cases, be encouraged to seek

other employment.

C. Waivers Required

NRL proposes changes in the following broad areas to address its

problems in human resources management: accessions and internal

placements, sustainment, and separations. Appendix A lists the laws,

rules and regulations requiring waivers to enable NRL to implement the

proposed system.

D. Expected Benefits

The demonstration project is expected to result in:

(1) Maintaining the quality of the NRL workforce in the scientific

and engineering disciplines as well as administrative specialist and

professional and support professions;

(2) More timely processing of personnel actions;

(3) Increased retention of high-level contributors and wider

distribution of salaries; and

(4) Increased satisfaction with human resources management

processes by employees and managers.

E. Participating Organizations and Employees

Initially, the demonstration project would cover all NRL employees

except SES members, ST employees, guards, and trade and craft

employees. The guards and trade and craft employees may be included at

a later time, after more experience is gained in the operation of the

CCS. Figure 1 identifies the employees by group for major geographic

locations. NRL sites with less than 10 employees each are identified as

``Other'' in Figure 1.

BILLING CODE 6325-01-P

[[Page 8967]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.000

BILLING CODE 6325-01-C

[[Page 8968]]

A union representative elected from the following bargaining units

participated on the Staffing Design Team and was instrumental in the

development of the accession and internal placement interventions

proposed in this plan:

Federal Firefighters Association--Firefighters, Chesapeake Beach, MD

(as of 6/23/98 this function was transferred to another activity)

Washington Area Metal Trades Council--Trades and Crafts Employees,

Washington, DC

International Association of Machinists and Aerospace Workers--Guards,

Washington, DC

F. Project Design

In response to the authority granted by Congress to develop a

demonstration project, NRL's Director of Research (DOR) set up five

design teams to develop the project plan. Each team was led by a senior

NRL manager from outside the Human Resources Office (HRO), and was

responsible for developing project proposals in one of the five primary

functional areas of the project. Each team was comprised of two human

resources advisors, an Equal Employment Opportunity (EEO) advisor,

several midlevel supervisors or managers, an NRL Administrative Council

representative, and several employee representatives (including

bargaining unit representatives when appropriate).

III. Accessions and Internal Placements

A. Hiring Authority

1. Background

Private industry and academia are the principal recruiting sources

for scientists and engineers at NRL. It is extremely difficult to make

timely offers of employment to hard-to-find scientists and engineers.

Even when a candidate is identified, he or she often finds another job

opportunity before the lengthy recruitment process can be completed.

2. Delegated Examining

a. Competitive service positions within the NRL Demonstration

Project will be filled through Merit Staffing or under Delegated

Examining.

b. The ``Rule of Three'' will be eliminated. When there are no more

than 15 qualified applicants and no preference eligibles, all eligible

applicants are immediately referred to the selecting official without

rating and ranking. Rating and ranking will be required only when the

number of qualified candidates exceeds 15 or there is a mix of

preference and nonpreference applicants. Statutes and regulations

covering veterans' preference will be observed in the selection process

and when rating and ranking are required. If the candidates are rated

and ranked, a random number selection method using the application

control number will be used to determine which applicants will be

referred when scores are tied after the rating process. Veterans will

be referred ahead of non-veterans with the same score.

B. Legal Authority

For actions taken under the auspices of the NRL Demonstration

Project, the legal authority, Public Law 103-337, will be used. For all

other actions, NRL will continue to use the nature of action codes and

legal authority codes prescribed by OPM, DoD, or DoN.

C. Determining Employee and Applicant Qualifications

OPM's Qualification Standards Operating Manual for General Schedule

(GS) Positions will be used to determine an employee's or candidate's

basic eligibility. Employees and candidates must meet the qualification

requirements which are equivalent to those described in the OPM

Operating Manual at the level identified in Figure 2.

BILLING CODE 6325-01-P

[GRAPHIC] [TIFF OMITTED] TN23FE99.001

BILLING CODE 6325-01-C

Special DoN or DoD requirements not covered by the OPM

Qualification Standards Operating Manual for GS Positions, such as

Defense Acquisition Workforce Improvement Act (DAWIA) qualification

requirements for acquisition positions and physical performance

requirements for sea duty, work on board aircraft, etc., must be met.

D. Noncitizen Hiring

Where Executive Orders or other regulations limit hiring

noncitizens, NRL will have the authority to approve the hiring of

noncitizens into competitive service positions when qualified U.S.

citizens are not available. Under the demonstration project, as with

the current system, a noncitizen may be appointed only if it has been

determined there are no qualified U.S. citizens. In order to make this

determination, the position will be advertised extensively throughout

the nation using paid advertisements in major newspapers or scientific

journals, etc., as well as the ``normal'' recruiting methods. If a

noncitizen is the only qualified candidate for the position, the

candidate may be appointed. The selection is subject to approval by the

NRL approving manager. The demonstration project constitutes a

delegated examining agreement from OPM for the purposes of 5 CFR

213.3102(bb).

E. Expanded Detail Authority

Under the demonstration project, NRL's approving manager would have

the authority:

(1) To effect details up to 1 year to demonstration project

positions without the current 120-day renewal requirement; and

(2) To effect details to a higher level position in the

demonstration project up to 1 year without competition. Prior service

during the preceding 12 months under noncompetitive details to higher

level positions and noncompetitive time-limited promotions count toward

the 1-year total.

The Commanding Officer, NRL would approve details to demonstration

project positions in excess of 1 year without the 120-day renewal

requirement.

F. Extended Probationary Period

All current laws and regulations for the current probationary

period are retained except that nonstatus candidates hired under the

demonstration project in occupations where the nature of the work

requires the manager more than one year to assess the employee's job

performance will serve a 3-year probationary period. Employees with

veterans' preference will maintain their rights under current law and

regulation.

[[Page 8969]]

G. Definitions

1. Basic Pay

The total amount of pay received at the rate fixed through CCS

adjustment for the position held by an employee including any merit

increase but before any deductions and exclusive of additional pay of

any other kind.

2. Maintained Pay

An employee may be entitled to maintain his or her rate of basic

pay if that rate exceeds the maximum rate of basic pay for his or her

career level as a result of certain personnel actions (as described in

this plan). An employee's initial maintained pay rate is equal to the

lesser of (1) the basic pay held by the employee at the time an action

is taken which entitles the employee to maintain his or her pay or (2)

150 percent of the maximum rate of basic pay of the career level to

which assigned. The employee is entitled to maintained pay for 2 years

or until the employee's basic pay is equal to or more than the

employee's maintained pay, whichever occurs first. Exceptions to the 2-

year limit include employees on grade and pay retention

``grandfathered'' in upon initial conversion into the demonstration

project, former special rate employees receiving maintained pay as a

result of conversion into the project, and employees placed through the

priority placement programs. Employees will receive half of the across-

the-board GS percentage increase in basic pay and the full locality pay

increase while on maintained pay. Upon termination of maintained pay,

the employee's basic pay will be adjusted according to the CCS

appraisal process. If the employee's basic pay exceeds the maximum

basic pay of his or her career level upon expiration of the 2-year

period, the employee's pay will not be reduced; the employee will be in

the overcompensated range of basic pay category for CCS pay increase

purposes, see Figure 10.

Maintained pay shall cease to apply to an employee who:

(1) Has a break in service of 1 workday or more; or

(2) Is demoted for personal cause or at the employee's request.

The employee's maintained rate of pay is basic pay for purposes of

locality pay (locality pay is basic pay for purposes of retirement,

life insurance, premium pay, severance pay, advances in pay, workers'

compensation, and lump-sum payments for annual leave but not for

computing promotion increases). Employees promoted while on maintained

pay may have their basic pay (excluding locality pay) set up to 20

percent greater than the maximum basic pay for their current career

level or retain their ``maintained pay,'' whichever is greater.

3. Promotion

The movement of an employee to a higher career level within the

same career track or to a different career track and career level in

which the new career level has a higher maximum basic salary rate than

the career level from which the employee is leaving.

4. Reassignment

The movement of an employee from one position to another position

within the same career level in the same career track or to a position

in another career track and career level in which the new career level

has the same maximum basic salary rate as the career level from which

the employee is leaving.

5. Change to Lower Career Level

The movement of an employee to a lower career level within the same

career track or to a different career track and career level in which

the new career level has a lower maximum basic salary range than the

career level from which the employee is leaving.

6. Pay Adjustment

Any increase or decrease in an employee's rate of basic pay where

there is no change in the employee's position.

7. Detail

The temporary assignment of an employee to a different position for

a specified period when the employee is expected to return to his or

her regular duties at the end of the assignment. (An employee who is on

detail is considered for pay and strength purposes to be permanently

occupying his or her regular position.)

8. Highest Previous Rate

NRL will establish maximum payable rate rules that parallel the

rules in 5 CFR 531.202 and 531.203(c) and (d).

9. Approving Manager

The manager who has authority to approve the Request for Personnel

Action (RPA), SF-52.

H. Pay Setting Determinations Outside the CCS

1. External New Hires

a. This includes reinstatements. Initial basic pay for new

appointees into the demonstration project may be set at any point

within the basic pay range for the career track, occupation, and career

level to which appointed that is consistent with the special

qualifications of the individual and the unique requirements of the

position. These special qualifications may be consideration of

education, training, experience, scarcity of qualified applicants,

labor market considerations, programmatic urgency, or any combination

thereof which is pertinent to the position to which appointed. Highest

previous rate may be used to set the pay of new appointees into the

demonstration project. (The approving manager authorizes the basic

pay.) A recruitment or relocation bonus may be paid using the same

provisions available for GS employees under 5 U.S.C. 5753. Employees

placed through the DoD Priority Placement Program (PPP), the DoN

Reemployment Priority List (RPL), or the Federal Interagency Career

Transition Assistance Plan are entitled to the last earned rate if they

have been separated.

b. Transfers from within DoD and other Federal agencies will have

their pay set using pay setting policy for internal actions based on

the type of pay action.

2. Internal Actions

a. Promotion. When an employee is promoted, the basic pay after

promotion may be up to 20 percent greater than the employee's current

basic pay. However, if the minimum rate of the new career level is more

than 20 percent greater than the employee's current basic pay, then the

minimum rate of the new career level is the new basic pay. The

employee's basic pay may not exceed the basic pay range of the new

career level. Highest previous rate may be applied, if appropriate.

(The approving manager authorizes the basic pay.) Note: Most target

career level promotions will be accomplished through the CCS appraisal

and pay adjustment process (see section IV.C.8).

b. Pay Adjustment (Voluntary Change to Lower Pay) or Change to

Lower Career Level (except RIF). When an employee accepts a voluntary

change to lower pay or lower career level, basic pay may be set at any

point within the career level to which appointed, except that the new

basic pay will not exceed the employee's current basic pay or the

maximum basic pay of the career level to which assigned, whichever is

lower. Highest previous rate may be applied, if appropriate. (The

approving manager authorizes the basic pay.)

(1) Examples of Voluntary Change to a Lower Career Level. An

employee in an Administrative Specialist and Professional Career Track

position may decide he or she would prefer a Career Level II position

in the Administrative Support Career Track because it offers a

[[Page 8970]]

different work schedule or duty station. An employee in Level IV of the

Administrative Specialist and Professional Career Track who has a

family member with a serious medical problem and wants to be relieved

of supervisory responsibilities may request a change to Career Level

III.

(2) Example of Pay Adjustment (Voluntary Change to Lower Pay) or

Change to a Lower Career Level. An employee may accept a change to

lower pay or to a lower career level through a settlement agreement. A

Research Physicist who is in Level III and is being paid near the top

of Level III, is rated unacceptable in the critical element Research

and Development (R&D) Business Management. In settlement of a proposal

to remove this employee for unacceptable performance, an agreement is

reached which reduces the employee's pay to a rate near the beginning

of Level III.

c. Pay Adjustment (Involuntary Change to Lower Pay) or Change to

Lower Career Level Due to Adverse or Performance-based Action. When an

employee is changed to a lower career level, or receives a change to

lower pay due to an adverse or performance-based action, the employee's

basic pay will be reduced by at least 6 percent, but will be set at a

rate within the rate range for the career level to which assigned. (The

approving manager authorizes the basic pay.) Such employees will be

afforded appeal rights as provided by 5 U.S.C. 4303 or 7512.

d. Involuntary Change to Lower Career Level or Reassignment to a

Career Track with a Lower Salary Range, Other than Adverse or

Performance-based. If the change is not a result of an adverse or

performance-based action, the basic pay will be preserved to the extent

possible within the basic pay range of the new career level. If the pay

cannot be set within the rate range of the new career level, it will be

set at the maximum rate of the new career level and the employee's pay

will be reduced. If the change is a result of a position

reclassification resulting in the employee being assigned to a lower

career level or reassigned to a different career track with a lower

maximum basic salary range, the employee is entitled to maintained pay.

e. RIF Action (including employees who are offered and accept a

vacancy at a lower career level or in a different career track). The

employee is entitled to maintained pay.

f. Upward Mobility or Other Formal Training Program Selection. The

employee is entitled to maintained pay.

g. Return to Limited or Light Duty from a Disability as a Result of

Occupational Injury to a Position in a Lower Career Level or to a

Career Track with Lower Basic Pay Potential than Held Prior to the

Injury. The employee is entitled indefinitely to the basic pay held

prior to the injury and will receive full general and locality pay

increases. If upon reemployment, an employee was not given the higher

basic pay (basic pay received at the time of the injury), any

retirement annuity or severance pay computation would be based on his

or her lower basic pay (salary based on placement in a lower career

level). Even though the Department of Labor (DOL) would make up the

difference between the lower basic pay and the higher basic pay earned

at the time of injury, the DOL portion is not considered in the

retirement or severance pay computation.

h. Reassignment. The basic pay normally remains the same. Highest

previous rate may be applied, if appropriate. (The approving manager

authorizes the basic pay.)

i. Student Educational Employment Program. Initial basic pay for

new appointees may be set at any point within the basic pay range for

the career track, occupation, and career level to which appointed.

Basic pay may be increased upon return to duty (RTD) or conversion to

temporary appointment, in consideration of the student's additional

education and experience at the time of the action. Students who work

under a parallel work study program may have their basic pay increased

in consideration of additional education and/or experience. Basic pay

for students may be increased based on their CCS appraisal. (The

approving manager authorizes the basic pay.)

j. Hazard Pay or Pay for Duty Involving Physical Hardship.

Employees under the demonstration project will be paid hazardous duty

pay under the provisions of 5 CFR part 550, subpart I.

I. Priority Placement Program (PPP)

Current PPP procedures apply to new hires and internal actions.

J. Expanded Temporary Promotions

Current regulations require that temporary promotions for more than

120 days to a higher level position than previously held must be made

competitively. Under the demonstration project, NRL would be able to

effect temporary promotions of not more than 1 year without competition

to positions within the demonstration project. Prior service during the

preceding 12 months under noncompetitive time-limited promotions and

noncompetitive details to higher level positions count toward the 1-

year total.

IV. Sustainment

A. Position Classification

The position classification changes are intended to streamline and

simplify the process of identifying and categorizing the work done at

NRL. NRL will establish an Integrated Pay Scale (IPS) for all

demonstration project positions in covered occupations. The IPS will

replace the current GS and extend the pay scale to the equivalent of

the ES-4 level of the ``Rates of Basic Pay for the Members of the

Senior Executive Service (SES).''

1. Career Tracks and Career Levels

Within the IPS, occupations with similar characteristics will be

grouped together into four career tracks. Each career track consists of

a number of career levels, representing the phases of career

progression that are typical for the respective career track. The

career levels within each career track are shown in Figure 3, along

with their GS equivalents. The equivalents are based on the levels of

responsibility as defined in 5 U.S.C. 5104, and not on current basic

pay schedules. Appendix B provides definitions for each of the career

tracks and the career levels within them.

The career tracks and career levels were developed based upon

administrative, organizational, and position management considerations

at NRL. They are designed to enhance pay equity and enable a more

seamless career progression to the target career level for an

individual position or category of positions. This combination of

career tracks and career levels allows for competitive recruitment of

quality candidates at differing rates of compensation within the

appropriate career track, occupation, and career level. It will also

facilitate movement and placement based upon contribution, in

conjunction with the CCS described in paragraph IV.C. Other benefits of

this arrangement include a dual career track for S&E employees and

greater competitiveness with academia and private industry for

recruitment. Appendix C identifies the occupational series currently

within each of the four career tracks.

BILLING CODE 6325-01-P

[[Page 8971]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.002

BILLING CODE 6325-01-C

a. Target Career Level. Each position will have a designated target

career level under the demonstration project. This target career level

will be identified as the career level to which an incumbent may be

advanced without further competition within a career track. These

target career levels will be based upon present career ladders and the

results of a pending position management study. Target career levels

may vary based upon occupation or career track. Employees' basic pay

will be capped at the target career level until other appropriate

conditions (competition, availability of a high-grade billet, position

management approval, increase in or acquisition of higher level duties,

approval of an accretion of duties promotion, etc.) have been met, and

the employee has been promoted into the next higher level.

b. Occupational Series and Position Titling. Presently, NRL

positions are identified by occupational groups and series of classes

in accordance with OPM position classification standards. Under the

demonstration project, NRL will continue to use occupational series

designators consistent with those currently authorized by OPM to

identify positions. This will facilitate related personnel management

requirements, such as movement into and out of the demonstration

project. Other occupational series may be added or deleted as needed to

support the demonstration project. Interdisciplinary positions will be

accommodated within the system based upon the qualifications of the

individual hired.

Titling practices consistent with those established by OPM

classification standards will be used to determine the official title.

Such practice will facilitate other personnel management requirements,

such as the following: movement into and out of the demonstration

project, reduction in force, external reporting requirements, and

recruitment. CCS career level descriptors and Requirements Document

(RD) (see paragraph IV.A.2) information will be used for specific

career track, career level, and titling determinations.

c. Classification Standards. Under the proposed demonstration

project, the number of classification standards would be reduced from

over 70 to 4. (See Figure 2.) Each standard would align with one of the

four career tracks and would cover all positions within that career

track. Each career track has two or three elements that are considered

in both classifying a position and in judging an individual's

contributions for pay setting purposes. Each element has generic

descriptors for every career level. These descriptors explain the type

of work, degree of responsibility and scope of contributions that need

to be ultimately accomplished to reach the highest basic pay potential

within each career level. (See Appendix D.) To classify a position, a

manager would select the career level which is most indicative overall

of the type of duties to be performed and the contributions

[[Page 8972]]

needed. For example: A supervisor needs a secretarial position for a

branch. In reading the elements and descriptors for the Administrative

Support Career Track, the supervisor determines that the Level II

descriptors illustrate the type of work and contributions needed.

Therefore, the position would be classified as a Secretary, Level II.

d. Fair Labor Standards Act (FLSA). Demonstration project positions

will be covered under the FLSA and 5 CFR part 551. Determination of

their status (exempt or nonexempt) will be made based on the criteria

contained in 5 CFR Part 551. The status of each new position under the

demonstration project will be determined using computer assisted

analysis as part of an automated process for preparing the RD. Those

positions for which the computer is unable to make the final FLSA

determination will be ``flagged'' for referral to a human resources

specialist for determination.

(1) Guidelines for FLSA Determinations.

a. Supervisory Information: provided through an automated system in

a checklist format; results of this checklist have an impact on FLSA

determination.

b. FLSA Information: provided through an automated system in a

checklist format; results of this checklist in conjunction with the

supervisory information provide a basis for the FLSA determination.

c. If required, the section entitled ``Purpose of Position'' will

be used to assist in FLSA determination.

d. RD's requiring additional review before being finalized will be

forwarded to a human resources specialist to review the FLSA

determination.

(2) Nonsupervisory and Leader Positions. Figure 4 shows the exempt

or nonexempt status applicable to nonsupervisory and leader positions

in the indicated career track and career level. In those cases where

``Review'' is indicated, the FLSA status must be determined based on

the specific duties and responsibilities of the subject position.

(3) Supervisory Positions. FLSA determination for supervisory

positions must be made based on the duties and responsibilities of the

particular position involved. As a rule, if a position requires

supervision of employees who are exempt under FLSA, the supervisory

position is likely to be exempt also.

BILLING CODE 6325-01-P

[GRAPHIC] [TIFF OMITTED] TN23FE99.003

BILLING CODE 6325-01-C

2. RD

An RD will replace the Optional Form 8 and position description

used under the current classification system. The RD will be prepared

by managers using a menu-driven, automated system. The automated system

will enable managers to classify and establish many positions without

intervention by a human resources specialist. The abbreviated RD will

combine the position information, staffing requirements, and

contribution expectations into a 1- or 2-page document. Appendix F

provides a sample RD for an Electronics Engineer, Level II.

3. Delegation of Classification Authority

Classification authority will be delegated to managers as a means

of increasing managerial effectiveness and expediting the

classification function. This will be accomplished as follows:

BILLING CODE 6325-01-P

[[Page 8973]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.004

BILLING CODE 6325-01-C

[[Page 8974]]

a. Delegated Authority.

1. The NRL Commanding Officer (CO) will delegate classification

authority to the management levels shown in Figure 5, i.e., DOR,

Associate Directors of Research (ADORS), division superintendents or

equivalent levels, and the HRO Director (the HRO Director may further

delegate to selected HRO specialists).

2. The classification approval must be at least one level above the

first-level supervisor of the position.

3. First-line supervisors at any level will provide classification

recommendations.

4. HRO support will be available for guidance and recommendations

concerning the classification process. (Any dispute over the proper

classification between a manager and the HRO will be resolved by the

DOR.)

b. Position Classification Accountability. Those to whom authority

is delegated are accountable to the DOR. The DOR is accountable to the

CO. Those with delegated authority are expected to comply with

demonstration project guidelines on classification and position

management, observe the principle of equal pay for equal work, and

ensure that RD's are current. First-line supervisors will develop

positions using the automated system. All positions must be approved

through the proper chain of command.

B. IPS

Under the demonstration project, an IPS will be established which

will cover all demonstration project positions at NRL. This IPS will

extend from the basic pay for GS-1, step 1 (from the GS without

locality pay) to the basic pay for ES-4 (from ``Rates of Basic Pay for

Members of the Senior Executive Service (SES)'').

1. Annual Pay Action

NRL will eliminate separate pay actions for within-grade increases,

general and locality pay increases, performance awards, quality step

increases, and most career promotions, and replace them with a single

annual pay action (including either permanent or bonus pay or both)

linked to the CCS. This will eliminate the paperwork and processing

associated with multiple pay actions which average 3 per employee per

year.

2. Overtime Pay

Overtime will be paid in accordance with 5 CFR part 550, subpart A.

All nonexempt employees will be paid overtime based upon their ``hourly

regular rate of pay,'' as defined in existing regulation (5 CFR part

551).

3. Classification Appeals

An employee may appeal the occupational series, title, career

track, or career level of his or her position at any time. An employee

must formally raise the area of concern to supervisors in the immediate

chain of command, either verbally or in writing. If an employee is not

satisfied with the supervisory response, he or she may then appeal to

the DoD appellate level. If an employee is not satisfied with the DoD

response, he or she may then appeal to the OPM only after DoD has

rendered a decision under the provisions of this demonstration project.

Since OPM does not accept classification appeals on positions which

exceed the equivalent of a GS-15 level, appeal decisions involving

Career Level V for Advanced Research Scientists and Engineers (ARSAE)

will be rendered by DoD and will be final. Appellate decisions from OPM

are final and binding on all administrative, certifying, payroll,

disbursing, and accounting officials of the Government. Time periods

for case processing under 5 CFR subpart F, sections 511.603, 511.604,

and 511.605 apply.

An employee may not appeal the accuracy of the RD, the

demonstration project classification criteria, or the pay-setting

criteria; the propriety of a basic pay schedule; the assignment of

occupational series to the occupational family; or matters grievable

under an administrative or negotiated grievance procedure or an

alternative dispute resolution procedure.

The evaluation of classification appeals under this demonstration

project is based upon the demonstration project classification

criteria. Case files will be forwarded for adjudication through the HRO

and will include copies of appropriate demonstration project criteria.

4. Advanced Research Scientists and Engineers (ARSAE)

The NRL demonstration project includes a Career Level V for the

Science and Engineering (S&E) Professional Career Track. Career Level V

is created for ARSAE's.

Current legal definitions of SES and ST positions do not fully meet

the needs of NRL. The SES designation is appropriate for executive

level managerial positions whose classification exceeds the GS-15 grade

level. The primary knowledge and abilities of SES positions relate to

supervisory and managerial responsibilities. Positions classified as

STs are reserved for bench research scientists and engineers; these

positions require a very high level of technical expertise and they

have little or no supervisory responsibility.

NRL currently has positions (typically branch head, principal

investigator or team leaders) that have characteristics of both SES and

ST classifications. Most branch heads in NRL are responsible for

supervising other GS-15 positions, including non-supervisory research

engineers and scientists and, in some cases, ST positions. Most branch

heads are classified at the GS-15 level, although their technical

expertise warrants classification beyond GS-15. Because of their

management responsibilities, these individuals are excluded from the ST

system. Because of management considerations, they cannot be placed in

the SES. Management considers the primary requirement for branch heads

to have knowledge of and expertise in the specific scientific and

technology areas related to the mission of their branches.

Historically, the incumbents of these positions have been recognized

within the community as scientific and engineering leaders who possess

primarily scientific or engineering credentials and are considered

experts in their field. However, they must also possess strong

managerial and supervisory ability. Therefore, although some of these

employees have scientific credentials that might compare favorably with

ST criteria, classification of these positions as ST is not an option

because the managerial and supervisory responsibilities inherent in the

positions cannot be ignored.

Current GS-15 branch heads will convert into the demonstration

project at Career Level IV. After conversion they will be reviewed

against established criteria to determine if they should be

reclassified to Career Level V. Other positions possibly meeting

criteria for classification to Career Level V will be reviewed on a

case-by-case basis. The salary range is a minimum of 120 percent of the

minimum rate of basic pay for GS-15 with a maximum rate of basic pay

established at the rate of basic pay (excluding locality pay) for SES

level 4 (ES-4). Vacant positions in Career Level V will be

competitively filled to ensure that selectees are preeminent

researchers and technical leaders in the specialty fields who also

possess substantial managerial and supervisory abilities.

DoD will test Career Level V for a 5-year period. ARSAE positions

established in Career Level V will be subject to limitations imposed by

OPM and DoD. Career Level V will be established only in an S&T

Reinvention Laboratory which employs scientists,

[[Page 8975]]

engineers, or both. ARSAE incumbents of Career Level V positions will

work primarily in their professional capacity on basic or applied

research and secondarily perform managerial or supervisory duties. The

number of Career Level V, or equivalent, positions within the DoD will

not exceed 40. These 40 positions will be allocated by Assistant

Secretary of Defense (Force Management Policy) and administered by the

respective services. The number of ARSAE Career Level V positions will

be reviewed periodically to determine appropriate position

requirements. Career Level V position allocations will be managed

separately from SES, ST, and Senior Level (SL) positions. An evaluation

of the Career Level V concept will be performed during the fifth year

of the demonstration project.

Specific details regarding the control and management of all Level

V assets will be included in the demonstration project's operating

procedures. Level V is expected to afford NRL the ability to more

effectively and efficiently exercise managerial control at the local

level, while adhering to merit staffing, affirmative action, and equal

employment opportunity principles.

5. Distinguished Contributions Allowance (DCA)

The DCA is a temporary monetary allowance up to 25 percent of basic

pay (which, when added to an employee's rate of basic pay, may not

exceed the rate of basic pay for ES-4) paid on either a bi-weekly basis

(concurrent with normal pay days) or as a lump sum following completion

of a designated contribution period(s), or combination of these, at the

discretion of NRL. It is not basic pay for any purpose, i.e.,

retirement, life insurance, severance pay, promotion, or any other

payment or benefit calculated as a percentage of basic pay. The DCA

will be available to certain employees at the top of their target

career levels, whose present contributions are worthy of scores found

at a higher career level, whose level of contribution is expected to

continue at the higher career level for at least 1 year, and current

market conditions require additional compensation.

Assignment of the DCA rather than a change to a higher career level

will generally be appropriate for such employees under the following

circumstances: (1) When it is not certain that the higher level

contributions will continue indefinitely (e.g., a special project

expected to be of 1- up to 5-year duration), or (2) when employees have

reached the maximum rate of the target career level for the position

and when no further promotion or compensation opportunities are

available or externally imposed limits (such as high-grade

restrictions) make changes to higher career levels unavailable, and (3)

current market conditions compensate similar contributions at a greater

rate in like positions in private industry and academia and there is a

history of significant recruitment and retention difficulties

associated with such positions.

a. Eligibility.

(1) Employees in Levels III and IV of the S&E Professional Career

Track and those in Levels III, IV, and V of the Administrative

Specialist and Professional Career Track are eligible for the DCA if

they have reached the top CCS score for their target career level with

a recommendation for a higher Overall Contribution Score (OCS) for

their contributions, they have reached the maximum rate of basic pay

available for their target career level, the higher level contributions

are not expected to last indefinitely, and market conditions require

greater compensation for these contributions.

(2) Employees may receive a DCA for up to 3 years. The DCA

authorization will be reviewed and reauthorized as necessary, but at

least annually at the time of the CCS appraisal through nomination by

the pay pool manager and approval by the DOR. Employees in the S&E

Professional Career Track may receive an extension of up to 2

additional years (for a total of 5 years). The DCA extension

authorization will be reviewed and reauthorized as necessary, but at

least on an annual basis at the time of the CCS appraisal through

nomination by the pay pool manager and approval by the DOR.

(3) Monetary payment may be up to 25 percent of basic pay.

(4) Nominees would be required to sign a memorandum of

understanding or a statement indicating they understand that the DCA is

a temporary allowance; it is not a part of basic pay for any purpose;

it would be subject to review at any time, but at least on an annual

basis, and the reduction or termination of the DCA is not appealable or

grievable.

b. Nomination. In connection with the annual CCS appraisal process,

pay pool managers may nominate eligible employees who meet the criteria

for the DCA. Packages containing the recommended amount and method of

payment of the DCA and a justification for the allowance will be

forwarded through the supervisory chain to the DOR. Details regarding

this process will be addressed in standard operating procedures. These

details will include time frames for nomination and consideration,

payout scheme, justification content and format, budget authority,

guidelines for selecting employees for the allowance and for

determining the appropriate amount, and documentation required by the

employee acknowledging he or she understands the criteria and temporary

nature of the DCA.

c. Reduction of Termination of a DCA.

(1) A DCA may be reduced or terminated at any time the NRL deems

appropriate (e.g., when the special project upon which the DCA was

based ends; if performance or contributions decrease significantly; or

if labor market conditions change, etc.). The reduction or termination

of a DCA is not appealable or grievable.

(2) If an employee voluntarily separates from NRL before the

expiration of the DCA, an employee may be denied DCA payment. Authority

to establish conditions and/or penalties will be spelled out in the

written authorization of an individual's DCA.

d. Lump-Sum DCA Payments.

(1) When NRL chooses to pay part or all of an employee's DCA as a

lump sum payable at the end of a designated period, the employee will

accrue entitlement to a growing lump-sum balance each pay period. The

percentage rate established for the lump-sum DCA will be multiplied by

the employee's biweekly amount of basic pay to determine the lump sum

accrual for any pay period. This lump-sum percentage rate is included

in applying the 25-percent limitation.

(2) If an employee covered under a lump-sum DCA authorization

separates, or the DCA is terminated (see paragraph c), before the end

of that designated period, the employee may be entitled to payment of

the accrued and unpaid balance under the conditions established by NRL.

NRL may establish conditions governing lump-sum payments (including

penalties in cases such as voluntary separation or separation for

personal cause) in general plan policies or in the individual

employee's DCA authorization.

e. DCA Budget Allocation. The DOR may establish a total DCA budget

allocation that is never greater than 10 percent of the basic salaries

of the employees currently at the cap in the S&E Professional Career

Track, Career Levels III and IV, and the Administrative Specialist and

Professional Career Track, Career Levels III, IV, and V.

f. Concurrent Monetary Payments. Employees eligible for a DCA may

be authorized to receive a DCA and a retention allowance at the same

time, up to a combined total of 25 percent of

[[Page 8976]]

basic pay. A merit increase which raises an employee's pay to the top

rate for his or her target career level (thus making the employee

eligible for the DCA) may be granted concurrent with the DCA. Receipt

of the DCA does not preclude an employee from being granted any award

(including a contribution award) for which he or she is otherwise

eligible.

C. Contribution-Based Compensation System (CCS)

1. General

The purpose of the CCS is to provide an effective means for

evaluating and compensating the NRL workforce. It provides management,

at the lowest practical level, the authority, control, and flexibility

needed to develop a highly competent, motivated, and productive

workforce. CCS will promote increased fairness and consistency in the

appraisal process, facilitate natural career progression for employees,

and provide an understandable basis for career progression by linking

contribution to basic pay determinations.

CCS combines performance appraisal and job classification into one

annual process. At the end of each CCS appraisal period, basic pay

adjustment decisions are made based on each employee's actual

contribution to the organization's mission during the period.

A separate function of the process includes comparison of

performance in critical elements to acceptable standards to identify

unacceptable performance that may warrant corrective action in

accordance with 5 CFR part 432. Supervisory officials determine scores

to reflect each employee's contribution, considering both how well and

at what level the employee is performing. Often the two considerations

are inseparable. For example, an employee whose written documents need

to be returned for rework more often than those of his or her peers

also likely requires a closer level of oversight, an important factor

when considering level of pay.

The performance planning and rating portions of the demonstration

project's appraisal process constitute a performance appraisal program

which complies with 5 CFR part 430 and the DoD Performance Management

System, except where waivers have been approved. Performance-related

actions initiated prior to implementation of the demonstration project

(under DoN performance management regulations) shall continue to be

processed in accordance with the provisions of the appropriate system.

2. CCS Process

CCS measures employee contributions by breaking down the jobs in

each career track using a common set of ``elements.'' The elements for

each career track shown in Figure 6 and described in detail in Appendix

D have been initially identified for evaluating the contributions of

NRL personnel covered by this initiative. They are designed to capture

the highest level of the primary content of the jobs in each career

level of each career track. Within specific parameters, elements may be

weighted or even determined to be not applicable for certain categories

of positions. All elements applicable to the position are critical as

defined by 5 CFR part 430.

BILLING CODE 6325-01-P

[GRAPHIC] [TIFF OMITTED] TN23FE99.005

BILLING CODE 6325-01-C

For each element, ``Discriminators'' and ``Descriptors'' are

provided to assist in distinguishing low to high contributions. The

discriminators (2-4 for each element) break down aspects of work to be

measured within the element. The descriptors (one for each level for

each discriminator) define the expected level of contribution at the

top of the related career level for that element.

Scores currently range between 0 and 89; specific relationships

between scores and career levels are different for each career track.

(See Figure 7.) Basic pay adjustments are based on a comparison of the

employee's level of contribution to the normal pay range for that

contribution and the employee's present rate of basic pay.

BILLING CODE 6325-01-P

[[Page 8977]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.006

BILLING CODE 6325-01-C

[[Page 8978]]

Supervisors and pay pool panels determine an employee's

contribution level for each element. A contribution score, available to

that level, is assigned accordingly. For example, a scientist whose

contribution in the Technical Problem Solving element for S&E

Professionals is determined to be at Level II may be assigned a score

of 18 to 47. Eighteen reflects the lowest level of responsibility,

exercise of independent judgment, and scope of contribution; and 47

reflects the highest. For Level III contributions, a value of 44 to 66

may be assigned. Each higher career level equates to a higher range of

values up to a total of 89 points for S&E professionals. The maximum

score of (currently) 89 provides the potential for basic pay of

$118,000 plus locality pay up to a cap of $125,900. Each element is

judged separately and level of work may vary for different elements.

The scores for each element are then averaged to determine the Overall

Contribution Score (OCS).

The CCS process will be carried out within a pay pool that

typically consists of all employees in an NRL division. Pay pools

should have a minimum size of about 35 employees; the largest pay pool

may have about 300 employees. To facilitate equity and consistency,

element weights and applicability and CCS score adjustments are

determined by a pay pool panel, rather than by individual supervisors.

Basic pay adjustments, contribution awards, and DCA's may be

recommended by the pay pool panel or by individual supervisors. Pay

pool panels will consist of supervisory officials or other individuals

who are familiar with the organization's work and the contributions of

its employees. In most cases division heads (mostly SES members)

function as pay pool managers, with final authority to decide weights,

scores, basic pay adjustments, and awards.

3. Pay Pool Annual Planning

Prior to the beginning of each annual appraisal period, the pay

pool manager and panel will review pay pool-wide expectations in the

areas described below.

a. Element Weights and Applicability. As written, all elements are

weighted equally. If pay pool panels and managers decide that some

elements are more important than others or that some do not apply at

all to the effective accomplishment of the organization's mission, they

may establish element weights including a weight of zero which renders

the element not applicable. Element weights are not intended for

application to individual employees. Instead, they may be established

only for subcategories of positions, not to exceed a maximum of five

subcategories in each career track. Subcategories for S&E Professionals

might be: Bench Level S&E, Supervisor, Program Manager, and Support

S&E. Subcategories should include a minimum of five positions, when

possible. Weights must be consistent within the subcategory.

b. Supplemental Criteria. The CCS level descriptors are designed to

be general so that they may be applied to all employees in the career

track. Supervisors and pay pool panels may establish supplemental

criteria to further inform employees of expected contributions. This

may include (but is not limited to) examples of contributions which

reflect work at each level for each element, taskings, objectives, and/

or standards.

4. Annual CCS Appraisal Process (See Figure 8)

BILLING CODE 6325-01-P

[[Page 8979]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.007

BILLING CODE 6325-01-C

[[Page 8980]]

The NRL appraisal period will be 1 year, with a minimum appraisal

period of 90 days. At the beginning of the appraisal period, or upon an

employee's arrival at NRL or into a new position, the following

information will be communicated to employees so that they are informed

of the basis on which their performance and contributions will be

assessed: their career track and career level; applicable elements,

descriptors and discriminators; element weights; any established

supplemental criteria; OCS's which correspond to each employee's NPR

(see section IV.C.6); and basic acceptable performance standards. The

CCS Summary Form (Appendix D) will be used to facilitate and document

this communication. All employees will be provided this information;

however, employees in some situations may not receive CCS scores. These

situations are described in section IV.C.5, Exceptions. The

communication of information described by this paragraph constitutes

performance planning as required by 5 CFR 430.206(b).

Supervisor and employee discussion of organizational objectives,

specific work assignments, and individual performance expectations (as

needed), should be conducted on an ongoing basis. Either the supervisor

or the employee may request a formal review during the appraisal

period; otherwise, a documented review is required only at the end of

the appraisal period.

At the end of the appraisal period, employees will provide input

describing their contributions by preparing a Yearly Accomplishment

Report (YAR). Standard operating procedures will provide guidance for

paypools and employees on the content and format of YARs, and on other

types of information about employee contributions which should be

developed and considered by supervisors. This will include procedures

for capturing contribution information regarding employees who serve on

details, who change positions during the appraisal period, who are new

to NRL, and other such circumstances.

Supervisors will review the employee's YAR and other available

information about the employee's contributions during the appraisal

period and determine an initial CCS score for each element. In

addition, supervisors will determine whether the employee's performance

was acceptable or unacceptable in each element when compared against

the basic acceptable performance standards. The rating of the elements

(all that are applicable are designated critical as defined by 5 CFR

part 430) will serve as the basis for assignment of a summary level of

Acceptable or Unacceptable. If any element is rated unacceptable, the

summary level will be Unacceptable; otherwise the summary level will be

Acceptable. Unacceptable ratings must be reviewed and approved by a

higher level than the first-level supervisor.

If an employee changes positions during the last 90 days of the

appraisal period, the losing supervisor will conduct a performance

rating (i.e., rate each element Acceptable or Unacceptable and

determine the summary level) at the time the employee moves to the new

position. This will serve as the employee's rating of record. For

employees who report to NRL during the last 90 days of the appraisal

period, any close-out rating of Acceptable (or its equivalent) or

better from another Government agency will serve as the employee's

rating of record (the employee will be rated Acceptable). The

determination of CCS scores and application of related pay adjustments

for such employees is set forth in section IV.C.5, ``Exceptions''.

The pay pool panel will meet to compare scores, make appropriate

adjustments, and determine the final OCS for each employee. Final

approval of CCS scores and element and summary ratings will rest with

the pay pool manager (unless higher level approval is requested or

deemed necessary). Supervisors will communicate the element scores,

ratings and OCS summary level to each employee, and discuss the results

and plans for continuing growth. Employees rated Unacceptable will be

provided assistance to improve their performance (see paragraph V.A).

The CCS process will be facilitated by an automated system, the

CCSDS. During the appraisal process, all scores and supervisory

comments will be entered into the CCSDS. The CCSDS will provide

supervisors, pay pool panel members, and pay pool managers with

background information (e.g., YARS, employees' prior year scores and

current basic pay) and spreadsheets to assist them in comparing

contributions and determining scores. Records of employee appraisals

will be maintained in the CCSDS, and the system will be able to produce

a hard copy document for each employee which reflects his or her final

approved score.

5. Exceptions

All employees who have worked 90 days or more by the end of the

appraisal period will receive a performance rating of record. However,

in certain situations NRL does not consider the actual determination of

CCS scores to be necessary. In other situations, it may not be feasible

to determine a meaningful CCS score. Therefore, the determination of

CCS scores will not be required for the following types of employees:

a. Employees on intermittent work schedules;

b. Those on temporary appointments of 1 year or less;

c. Those who work less than 6 months in an appraisal period (e.g.,

on extended absence due to illness);

d. Those on long-term training for all or much of the appraisal

period;

e. Employees who have reported to NRL or to a new position during

the 90 days prior to the end of the appraisal period; and

f. Student Educational Employment Program employees.

If supervisors believe that the nature of such an employee's

contributions provide a meaningful basis to determine a CCS score, they

may appraise employees in the categories listed above, provided that

the employee has worked at least 90 days in an NRL position during the

appraisal period.

Those employees mentioned above who are not appraised under CCS

will not be eligible for merit increases or contribution awards. (This

will affect the calculation of service credit for RIF (see section

V.C.). All employees listed above will be given full general and

locality increases (as described in sections IV.C.7.a, ``General

Increases,'' and IV.C.7.c, ``Locality Increases''). All employees are

eligible for awards under NRL's Incentive Awards Program, such as ``On-

the-Spot'' and Special Act Awards, as appropriate.

6. Normal Pay Range (NPR)--Basic Pay Versus Contribution

The NRL CCS assumes a relationship between the assessed

contribution of the employee and a normal range of pay. For all

possible contribution scores available to employees, the NPR spans a

basic pay range of 12 percent. Employees who are compensated below the

NPR for their assessed score are considered ``undercompensated,'' while

employees compensated above the NPR are considered ``overcompensated.''

The lower boundary of the NPR is initially established by fixing

the basic pay equivalent to GS-1, step 1 of the General Schedule

(without locality pay), with a CCS score of zero. The upper boundary is

fixed at the basic pay equivalent to GS-15, step 10 of the General

Schedule (without locality pay), with a CCS score of 80. The distance

between these upper and lower boundaries for a given overall

contribution score is 12 percent of basic pay for all available CCS

scores. Using

[[Page 8981]]

these constraints, the interval between scores is approximately 2.37

percent through the entire range of pay. The lines were extended using

the same interval so that the upper boundary of the normal range of

basic pay accommodates the basic pay for SES Level IV. This currently

occurs at a contribution score near 90. (The actual end point will vary

depending on any pay adjustment factors, e.g., general increase.) The

formula used to derive the NPR may be adjusted in future years of the

demonstration project. See Appendix E for further details regarding the

formulation of the NPR.

Each year the boundaries for the NPR plus the minimum and maximum

rate of basic pay for each career level (except the maximum rate for

Level V of the S&E Professional Career Track) will be adjusted by the

amount of the across-the-board GS percentage increase granted to the

Federal workforce.

BILLING CODE 6325-01-P

[GRAPHIC] [TIFF OMITTED] TN23FE99.008

BILLING CODE 6325-01-C

At the end of each annual appraisal period, employees' contribution

scores will be determined by the CCS process described above, then

their CCS scores and current rates of basic pay will be plotted as a

point on a graph along with the NPR. The position of the point relative

to the NPR gives a relative measure of the degree of over- or

undercompensation of the employee, as shown in Figure 9. Points which

fall below the NPR indicate undercompensation; points which fall above

the NPR indicate overcompensation.

7. Compensation

Presently, employee pay is established, adjusted, and/or augmented

in a variety of ways, including general pay increases, locality pay

increases, special rate adjustments, within-grade increases (WGI's),

quality step increases (QSI's), performance awards, and promotions.

Multiple pay changes in any given year (averaging 3 per employee) are

costly to process and do not consider comprehensively the employee's

contributions to the organization. Under the demonstration project, NRL

will distribute the budget authority from the sources listed above into

4 pay categories: (1) General increase, (2) locality increase, (3)

merit increase, and (4) contribution awards. From these pay categories,

a single annual pay action would be authorized based primarily on

employees' contributions. Competitive promotions will still be

processed under a separate pay action; most career promotions will be

processed under the CCS.

In general, the goal of CCS is to pay in a manner consistent with

employee contribution or, in other words, migrate employees' basic pay

closer to the NPR. One result may be a wider distribution of pay among

employees for a given level of duties.

After the CCS appraisal process has been completed and the

employees' standing relative to the NPR has been determined, the pay

pool manager, in consultation with the pay pool panel or other pay pool

supervisory and staff officials, will determine the appropriate basic

pay change and contribution award, if appropriate, for each employee.

Standard operating procedures will provide guidance to assist pay pool

managers in making pay determinations. In most cases, the pay pool

manager will approve basic pay changes and awards. In some cases,

however, approval of a higher level official will be required. Figure

10 summarizes the eligibility criteria and applicable limits for each

pay category.

BILLING CODE 6325-01-P

[[Page 8982]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.009

BILLING CODE 6325-01-C

The Contribution-based Compensation System Data System (CCSDS) will

calculate each employee's OCS and his or her standing in relation to

the NPR. The system will provide a framework to assist pay pool

officials in selecting and implementing a payout scheme. It will alert

management to certain formal limits in granting pay increases; e.g., an

employee may not receive a permanent increase above the maximum rate of

basic pay for his or her career level until a corresponding level

change has been effected. Once basic pay and award decisions have been

finalized and approved, the CCSDS will prepare the data file for

processing the pay actions, and maintain a consolidated record of CCS

pay actions for all NRL demonstration project employees.

a. General Increases. General increase budget authority will be

available to pay pools as a straight percentage of employee salaries,

as derived under law. Pay pool panels or managers may reduce or deny

general pay increases for employees whose contributions are in the

overcompensated category. (See Figure 10.) Such reduction or denial may

not place an employee in the undercompensated category. An employee

receiving maintained pay (except one receiving maintained pay for an

occupational injury who receives a full general pay increase) will

receive half of the across-the-board GS percentage increase in basic

pay until the employee's basic pay is within the basic pay range

assigned for their current position or for 2 years, whichever is less.

NRL employees on pay retention at the time of demonstration project

implementation or as a result of placement through the DoN RPL, DoD PPP

or the Federal Interagency Career Transition Assistance Plan will

receive half of the across-the-board GS percentage increase until the

employee's maintained pay is exceeded by the maximum rate for the

employee's career level or the maintained pay is ended due to a

promotion. General increase authority not expended is available to

either the merit increase or contribution award pay categories or both.

b. Merit Increases. Merit increases will be calculated after the

determination of employees' general increases. Merit increases may be

granted to employees whose contribution places them in the ``normal''

or ``undercompensated'' categories. (See Figure 10.) In general, the

higher the range in which the employee is contributing compared to his

or her basic pay, the higher the merit increase should be. However, the

following limitations apply: a merit increase may not place any

employee's basic pay (1) in the ``overcompensated'' category (as

established by the NPR for the upcoming year, which has been adjusted

by the amount of the new general increase); (2) in excess of SES Level

IV; (3) in excess of the maximum rate of basic pay for the individual's

career level (unless the employee is being concurrently advanced to the

higher career level); or (4) above any outside-imposed dollar limit

(e.g., high-grade ceiling). Merit increases for employees in the NPR

will be limited to 6 percent of basic pay, not to exceed the upper

limit of the NPR for the employee's score. In addition, merit increases

for employees in the undercompensated range may not exceed 6 percent

above the lower rail of the NPR, or 20 percent of basic pay without DOR

approval.

The NRL merit increase category will include what is now WGI's,

QSI's, and career ladder promotions. This category will be set each

year near 2.4 percent of total NRL basic pay rates (including the

general increase rate approved for the coming year). This is close to

the average of NRL's expenditures for step increases and promotions

over the last 3 years. This percentage has been used by other

demonstration projects in the past. The 2.4 percent figure will be

adjusted as necessary to facilitate cost containment over the life of

the demonstration project.

The amount of budget authority available to each pay pool will be

determined annually by the DOR. Because statistical variations will

occur in year-to-year personnel growth, any unexpended merit increase

authorities may be carried over for use in the next cycle or

transferred to the Contribution Awards Category. Any unexpended merit

increase authority must be used no later than the payout for the next

rating cycle.

c. Locality Increases. All employees will be entitled to the

locality pay

[[Page 8983]]

increase authorized by law for their official duty station. In

addition, the locality-adjusted pay of any employee may not exceed the

rate for level IV of the Executive Schedule, except that, for employees

in Career Level V of the S&E Professional Career Track, the locality-

adjusted pay cap is level III of the Executive Schedule ($125,900 from

``Rates of Pay for the Executive Schedule,'' effective since January

1998).

d. Contribution Awards. Authority to pay contribution awards (lump-

sum payments recognizing significant contributions) will be initially

available to pay pools as a straight 1.5 percent of employees' basic

pay (similar to the amount currently available for performance awards).

The percentage rate may be adjusted in future years of the

demonstration project. In addition, unexpended general increase and

merit increase budget authorities may be used to augment the award

category. Contribution awards may be granted to those employees whose

contributions place them in the ``normal'' or ``undercompensated''

category, and to employees in the ``overcompensated'' category who are

on maintained pay. Standard operating procedures will provide guidance

to pay pool managers in establishing and applying criteria to determine

significant contributions which warrant awards. An award exceeding

$10,000 requires DOR approval. (See Figure 10.) Any unexpended

contribution award authority must be used at the payout for the next

rating cycle. Pay pools may also grant time-off as a contribution

award, in lieu of or in addition to cash.

8. Career Movement Based on CCS

Movement through the career levels will be determined by

contribution and basic pay at the time of the annual CCS appraisal

process.

The NRL demonstration project is an integrated system that links

level of work to be accomplished (as defined by a career track and

career level) with individual achievement of that work (as defined by

an OCS) to establish the rate of appropriate compensation (as defined

by the career track pay schedule), and to determine progression through

the career track. This section addresses only changes in level which

relate directly to the CCS determination.

When an employee's OCS falls within 3 scores of the top score

available to his or her current career level, supervisors should

consider whether it is appropriate to advance the employee to the next

higher level (refer to IV.A.1.a for other criteria). If progression to

the next higher level is deemed warranted, supporting documentation

would be included with the CCS appraisal and forwarded through the

appropriate channels for approval. If advancement is not considered

appropriate at this time, the employee would remain in his or her

current career level. Future basic pay raises would be capped by the

top of the employee's current career level unless the employee

progresses to the next higher career level through a CCS-related

promotion, an accretion of duties promotion, or a competitive

promotion.

a. Advancements in Level Which May be Approved by the Pay Pool

Manager. Advancements to all levels except Levels IV and V of the S&E

Professional and the Administrative Specialist and Professional Career

Tracks may be approved by the pay pool manager (this may be changed in

future years of the demonstration project if there are changes in the

way high-grade positions are defined).

b. Advancements in Level Which Must be Approved by the DOR Level.

Advancement to (1) levels outside target career levels or established

position management criteria; (2) Levels IV and V of the S&E

Professional Career Track; and (3) Levels IV and V of the

Administrative Specialist and Professional Career Track require

approval by the DOR or his or her designee. These levels include

(presently) all of NRL's high-grade billets. Details regarding the

process for nomination and consideration, format, selection criteria,

and other aspects of this process will be addressed in the standard

operating procedures. In the event that unanticipated high-grade

turnover results in vacancies prior to the end of the appraisal period,

NRL may carry out this process at other times of the year.

c. Advancement to Level V of the S&E Professional Career Track.

Vacancies in the billets allotted to NRL in this level will be filled

as described in section IV.B.4.

d. Regression to Lower Level. (See Figure 9, ``Employee A''.) If an

employee is contributing less than expected for the level at which he

or she is being paid, the individual may regress into a lower career

level through reduction or denial of general increases and

ineligibility for merit increases. (This is possible because the NPR

plus the minimum and maximum pay rates for each career level will be

adjusted upwards each year by the across-the-board GS percentage

increase in basic pay.) If the employee's basic pay regresses to a

point below the pay overlap area between his or her level and the next

lower level, it will no longer be appropriate to designate him or her

as being in the higher level. Therefore, the employee will be formally

changed to the lower level. The employee will be informed of this

change in writing, but procedural and appeal rights provided by 5

U.S.C. 4303 and 7512 (and related OPM regulations) will not apply

(except in the case of employees who have veterans' preference). NRL is

providing for waivers of the statute and regulations for such actions.

Further, because a change to lower level under such circumstances is

not discretionary, the change may not be grieved under NRL's

administrative grievance procedures.

9. CCS Grievance Procedures

An employee may grieve the appraisal received under CCS using

procedures specifically designed for CCS appraisals. Under these

procedures, the employee's grievance will first be considered by the

pay pool panel, who will recommend a decision to the pay pool manager.

If the employee is not satisfied with the pay pool manager's decision,

he or she may file a second-step grievance with the next higher level

management official. This official will render a final NRL decision on

the grievance.

The following are not grievable: pay actions resulting from CCS

(receipt, non-receipt or amount of general increase, merit increase,

DCA or contribution award); reductions in level without reduction in

pay due to regression (see section IV.C.8.d); any action for which

another appeal or complaint process exists.

V. Separations

A. Performance-based Reduction in Pay or Removal Actions

This section applies to reduction in pay or removal of

demonstration project employees based solely on unacceptable

performance. Adverse action procedures under 5 CFR part 752 remain

unchanged.

When a supervisor determines during or at the end of the appraisal

period that the employee is not completing work assignments

satisfactorily, the supervisor must make a determination as to whether

the employee is performing unacceptably in one or more of the critical

elements. All CCS elements applicable to the employee's position are

critical as defined by 5 CFR part 430.

Unacceptable performance determinations must be made by comparing

the employee's performance to the acceptable performance standards

established for elements.

At any time during or at the end of the appraisal period that an

employee's

[[Page 8984]]

performance is determined to be unacceptable in one or more critical

elements, the employee will be provided assistance in improving his or

her performance. This will normally include clarifying (or further

clarifying) the meaning of terms used in the acceptable performance

standards (e.g., ``timely'' ``thorough research'' and ``overall high

quality'') as they relate to the employee's specific responsibilities

and assignments. An employee whose performance is unacceptable after he

or she has been given a reasonable opportunity to improve may be

removed or reduced in grade or level, in accordance with the provisions

of 5 U.S.C. 4303 and related OPM regulations. Employees may also be

removed or reduced in grade or level based on unacceptable performance

under the provisions of 5 U.S.C. 7512. All procedural and appeal rights

set forth in the applicable statute and related OPM regulations will be

afforded to demonstration project employees removed or reduced in grade

or level for unacceptable performance.

B. RIF

1. RIF Authority

Under the demonstration project, NRL would be delegated authority

to approve RIF as defined in Secretary of the Navy Instruction 12351.5E

and the use of separation pay incentives.

2. RIF Definitions

a. Competitive Area. A separate competitive area will be

established by geographic location for all personnel included in the

demonstration project.

b. Competitive Level. Positions in the same occupational career

level, which are similar enough in duties and qualifications that

employees can perform the duties and responsibilities including the

selective placement factor, if any, of any other position in the

competitive level upon assignment to it, without any loss of

productivity beyond what is normally expected.

c. Service Computation Date (SCD). The employee's basic Federal SCD

would be adjusted for CCS results credit.

(1) CCS Process Results Credit.

a. An employee's basic Federal SCD may be credited with up to 20

years credit based on the results of the CCS process. The CCS RIF

Assessment Category would be used to determine the number of RIF years

credited. The CCS RIF Assessment Category is the combination of the

employee's standing under the CCS relative to the NPR and any merit

increase, DCA, or contribution award. Figure 11 shows the RIF years

available for each CCS RIF Assessment Category.

------------------------------------------------------------------------

RIF years

Assessment category available

------------------------------------------------------------------------

0=Employees within the overcompensated range without any 0

portion of a general increase.............................

1=Employees receiving maintained pay or any portion of a 12

general increase but no merit increase or contribution

award.....................................................

2=Employees receiving a merit increase or contribution 16

award.....................................................

3=Employees receiving both a merit increase and 20

contribution award or with capped salary and receiving a

contribution award and/or a DCA...........................

Final RIF Credit: Average of the three most recent CCS Process Results

received during the 4-year period prior to the cutoff date

------------------------------------------------------------------------

Figure 11--CCS RIF Assessment Categories

b. If an employee has fewer than three CCS process results, the

value (RIF years available) of the actual number of process results on

record will be divided by the number of actual process results on

record. In cases where an employee has no actual CCS process results,

the employee will be given the additional RIF CCS process results

credit for the most common, or ``modal'' NRL demonstration project CCS

RIF Assessment Category for the most recent CCS appraisal period.

(2) Credit from Other Rating Systems. Employees who have been rated

under different patterns of summary rating levels will receive RIF

appraisal credit as follows:

--If there are any ratings to be credited for the RIF given under a

rating system which includes one or more levels above fully successful

(Level 3), employees will receive credit as follows: 12 years for Level

3, 16 years for Level 4, 20 years for Level 5; or

--If an employee comes from a system with no levels above Fully

Successful (Level 3), they will receive credit based on the

demonstration project's modal CCS RIF assessment category.

(3) RIF Cutoff Date. To provide adequate time to properly determine

employee retention standing, the cutoff date for use of new CCS process

results is set at 30 days prior to the date of issuance of RIF notices.

3. Displacement Rights

(a) Displacement Process. Once the position to be abolished has

been identified, the incumbent of that position may displace another

employee within the incumbent's current career track and career level

when the incumbent has a higher retention standing and is fully

qualified for the position occupied by an employee with a lower

standing. If there are no displacement rights within the incumbent's

current career track and career level, the incumbent may exercise his

or her displacement rights to any position previously held in the next

lower career level, regardless of career track, when the position is

held by an employee with a lower retention standing. In the case of all

preference eligibles, they may displace up to the equivalent of 3

grades or intervals below the highest equivalent grade of their current

career level in the same or a different career track regardless of

whether they previously held the position provided they are fully

qualified for the position and the position is occupied by an employee

with a lower retention standing. Preference eligibles with a

compensable service connected disability of 30 percent or more may

displace an additional 2 GS grades or intervals (total of 5 grades)

below the highest equivalent grade of their current career level

provided they have previously held the position and the position is

occupied by an employee in the same subgroup with a later RIF service

computation date.

(b) Retention Standing. Retention standing is based on tenure,

veterans' preference, length of service, and contribution.

(c) Vacant Positions. Assignment may be made to any available

vacant position including those with promotion potential in the

competitive area.

(d) Ineligible for Displacement Rights. Employees who have been

notified in writing that their performance is considered to be

unacceptable or whose most recent CCS rating puts them in Assessment

Category O would not be entitled to displacement rights under RIF

procedures.

(e) Change to Lower Level due to an Adverse or Performance-based

Action. An employee who has received a written decision to change him

or her to a lower level due to adverse or performance based action will

compete from the position to which he or she will be or has been

demoted.

3. Notice Period

The notice period and procedures in 5 CFR subpart H, section

351.801 will be followed.

4. RIF Appeals

Under the demonstration project, employees affected by a RIF

action,

[[Page 8985]]

other than a reassignment, maintain their right to appeal to the Merit

Systems Protection Board if they feel the reason for the RIF is not

valid or if they think the process or procedures were not properly

applied.

5. Separation Incentives

NRL will have delegated authority to approve separation incentives

and will use the current calculation methodology of a lump sum payment

equal to an employee's severance pay calculation or $25,000, whichever

is less.

6. Severance Pay

Employees will be covered by the severance pay rules in 5 CFR part

550, subpart G, except that NRL will establish rules for determining a

``reasonable offer'' that parallel Title 5 rules.

7. Outplacement Assistance

All outplacement assistance currently available would be continued

under the demonstration project.

VI. Demonstration Project Transition

A. Initial Conversion or Movement to the Demonstration Project

1. Placement into Career Tracks and Career Levels

Conversion or movement of GS employees into the demonstration

project will be into the career track and career level which

corresponds to the employee's current GS grade and basic pay. If

conversion into the demonstration project is accompanied by a

simultaneous change in the geographic location of the employee's duty

station, the employee's overall GS pay entitlements (including locality

rate) in the new area will be determined before converting the

employee's pay to the demonstration project pay system. Employees will

be assured of placement within the new system without loss in pay. Once

under the demonstration project, employee progression through the

career tracks and career levels up to their target career level is

dependent upon contribution score, not upon previous methods (e.g.,

WGI's, QSI's, or career promotions as previously defined).

2. Conversion of Retained Grade and Pay Employees

NRL's workforce will be grouped into career tracks and associated

pay levels with designated pay ranges rather than the traditional grade

and step. Therefore, grade and pay retention will be eliminated. NRL

will grant ``maintained pay'' (as defined in section III.G.2,

``Maintained Pay''), which is related to the current meaning of

``retained pay'' but does not provide for indefinite retention of pay

except in certain situations. Employees currently on grade or pay

retention will be immediately placed on maintained pay at their current

rate of basic pay if this rate exceeds the maximum rate for their

career level and ``grandfathered'' in the appropriate career level.

Employees will receive half of the across-the-board GS percentage

increase in basic pay and the full locality pay increase until their

basic pay is within the appropriate basic pay range for their current

position without time limitation.

3. WGI Buy-in

The participation of all covered NRL employees in the demonstration

project is mandatory. However, acceptance of the system by NRL

employees is essential to the success of the demonstration project.

Therefore, on the date that employees are converted to the project pay

plan, they will be given a permanent increase in pay equal to the

earned (time spent in step) portion of their next WGI based on the

value of the WGI at the time of conversion so that they will not feel

they are losing a pay entitlement accrued under the GS system.

4. Conversion of Special Salary Rate Employees

Employees who are in positions covered by a special salary rate

prior to the demonstration project will no longer be considered a

special salary rate employee under the demonstration project. These

employees will, therefore, be eligible for full locality pay. The

adjusted salaries of these employees will not change. Rather, the

employees will receive a new basic rate of pay computed by dividing

their basic adjusted pay (higher of special salary rate or locality

rate) by the locality pay factor for their area. A full locality

adjustment will then be added to the new basic pay rate. Adverse action

will not apply to the conversion process as there will be no change in

total salary. However, if an employee's new basic pay rate after

conversion to the demonstration project pay schedule exceeds the

maximum basic pay authorized for the career level, then the employee

will be granted maintained pay under paragraph III.G.2 until the

employee's salary is within the range of the career level.

For example, an Electronics Engineer, GS-855-9, step 5, is paid

$44,715 per annum in accordance with special GS salary rates as of

January 1999 for Table Number: 0422. The employee is located in the

locality area of Washington-Baltimore, DC-MD-VA-WV. Under the

demonstration project, the computation of the engineer's new basic rate

of pay with a full locality adjustment and WGI buy-in is computed as

follows:

a. Basic adjusted pay divided by locality pay factor=new basic rate

of pay.

b. New basic rate of pay multiplied by the full locality adjustment

for current area=full locality adjustment amount for special rate

employees.

c. New basic rate of pay + WGI buy-in amount X locality pay factor

= demo special rate for conversion.

EXAMPLE:

a. $44,715 (basic adjusted pay) divided by 1.0787 (locality pay

factor) = $41,453 (new basic rate of pay).

b. $41,453 (new basic rate of pay) X 1.0787 (full locality

adjustment factor for current area) = $3,262 (full locality adjustment

amount).

c. $41,453 (new basic rate of pay) + $500 (example WGI buy-in

amount) = $41,953 (new conversion basic rate of pay) X 1.0787 (locality

pay factor) = $45,254 (demo special rate for conversion).

B. CCS Startup

CCS elements, descriptors, discriminators and standards have been

established as the appraisal criteria for the 1998-1999 cycle which

began June 1, 1998. Except for its compensation components, CCS is

consistent with DoN's two-level appraisal program, which was effected

in 1998. The CCS process will be used to appraise employees at the end

of the 1998-1999 cycle on September 30, 1999. The first CCS payout is

expected to occur at the beginning of the first full pay period in

January 2000.

C. Training

An extensive training program is planned for everyone in the

demonstration project including the supervisors, managers, and

administrative staff. Training will be tailored to fit the requirements

of every employee included in the demonstration project and will fully

address employee concerns to ensure everyone has a comprehensive

understanding of the program and to emphasize the benefits to

employees. In addition, leadership training will be provided to all

managers and supervisors as the new system places more responsibility

and decision making authority on them.

NRL training personnel will provide local coordination and

facilities, supplemented by contractor support as needed. The training

will be completed

[[Page 8986]]

prior to the anticipated project implementation date.

1. Types of Training

Training packages will be developed to encompass all aspects of the

project and validated prior to training the workforce. Specifically,

training packages will be developed for the following groups of

employees:

a. NRL Employees. All NRL demonstration project employees will be

provided an overview of the demonstration project and employee

processes and responsibilities.

b. Supervisors and Managers. All supervisors and managers under the

demonstration project will be provided training in supervisory and

managerial processes and responsibilities under the demonstration

project.

c. Support Personnel. Administrative support personnel, HRO

personnel, financial management personnel, and Management Information

Systems Staff will be provided training on administrative processes and

responsibilities under the demonstration project.

D. New Hires Into the Demonstration Project

The following steps will be followed to place employees (new hires)

entering the system:

a. The career track and career level will be determined based upon

the employee's education and experience in relation to the duties and

responsibilities of the position in which he or she is being placed,

consistent with OPM qualification standards.

b. Basic pay will be set based upon available labor market

considerations relative to special qualifications requirements,

scarcity of qualified candidates, programmatic urgency, and education

and experience of the new candidate.

c. Employees placed through the DoN RPL, the DoD PPP, or the

Federal Interagency Career Transition Assistance Plan who are eligible

for maintained pay will receive one half of the across-the-board GS

percentage increase in basic pay and the full locality pay increase

until the employee's basic pay is within the basic pay range of the

career track and career level to which assigned. Employees are eligible

for maintained pay as long as there is no break in service and if the

employee's rate of pay exceeds the maximum rate of his or her career

level.

E. Conversion or Movement From Demonstration Project

In the event the demonstration project is terminated or employees

leave the demonstration project through promotion, change to lower

grade, reassignment or transfer, conversion back to the GS system may

be necessary. The converted GS grade and GS rate of pay must be

determined before movement or conversion out of the demonstration

project and any accompanying geographic movement, promotion, or other

simultaneous action. An employee will not be converted at a level which

is lower than the GS grade held immediately prior to entering the Demo

project, unless, since that time, the employee has undergone a

reduction in career level. The converted GS grade and rate will become

the employee's actual GS grade and rate after leaving the demonstration

project and will be used to determine the pay action and GS pay

administration rules for employees who leave the project to accept a

position in the traditional Civil Service system. The following

procedures will be used to convert the employee's demonstration project

career level to a GS equivalent grade and the employee's demonstration

project rate of pay to the GS equivalent rate of pay.

1. Grade Determination

Employees will be converted to a GS grade based on a comparison of

the employee's current adjusted rate of basic pay to the highest GS

applicable rate range considering only those grade levels that are

included in the employee's current career level. The highest GS

applicable rate range includes GS basic rates, locality rates, and

special salary rates. Once a grade range is determined, the following

procedures will be used to determine the GS grade:

a. Identify the highest GS grade within the current career level

that accommodates the employee's adjusted rate of basic pay (including

any locality payment).

b. If the employee's adjusted rate of basic pay equals or exceeds

the applicable step 4 rate of the identified highest GS grade, the

employee is converted to that grade.

c. If the employee's adjusted rate of basic pay is lower than the

applicable step 4 of the highest grade, the employee is converted to

the next lower grade.

d. If under the above-described ``step 4'' rule, the employee's

adjusted project rate exceeds the maximum rate of the grade assigned

but fits in the rate range for the next higher applicable grade (i.e.,

between step 1 and step 4), then the employee shall be converted to the

next higher applicable grade.

e. For two-grade interval occupations, conversion should not be

made to an intervening (even) grade level below GS-11.

f. Employees in Level IV of the Administrative Specialist and

Professional Career Track will convert to the GS-13 level.

2. Pay Setting

Pay conversion will be done before any geographic movement or other

pay-related action that coincides with the employee's movement or

conversion out of the demonstration project. The employee's pay within

the converted GS grade is set by converting the employee's

demonstration project rate of pay to a GS rate of pay as follows:

a. The employee's demonstration project adjusted rate of pay

(including locality) is converted to a rate on the highest applicable

adjusted rate range for the converted GS grade. For example, if the

highest applicable GS rate range for the employee is a special salary

rate range, the applicable special rate salary table is used to convert

the employee's pay.

b. When converting an employee's pay, if the rate of pay falls

between two steps of the conversion grade, the rate must be set at the

higher step.

c. Employees whose basic pay exceeds the maximum basic pay of the

highest GS grade for their career level will be converted to the

highest grade in their career level. NRL will coordinate with OPM to

prescribe a procedure for determining the GS-equivalent pay rate for

employees whose rate of pay exceeds the maximum rate of basic pay for

their converted grade.

3. ARSAE

Employees in Career Level V of the S&E Professional Career Track

will convert to the GS-15 grade level. NRL will develop a procedure to

ensure that S&E employees entering Career Level V understand that if

they leave the demonstration project and their adjusted pay exceeds the

GS-15, step 10 rate, there is no entitlement to retained pay. Their GS-

equivalent rate will be deemed to be the rate for GS-15, step 10. For

those Career Level V employees paid below the adjusted GS-15, step 10

rate, the post-conversion rates will be set using the converted rates

in applying the highest previous rate rule.

4. Determining Date of Last Equivalent Increase

The last equivalent increase will be the date the employee received

a CCS pay increase, was eligible to receive a CCS pay increase, or

received a promotion, whichever occurred last.

[[Page 8987]]

VII. Demonstration Project Duration

A. General

Section 342 of the National Defense Authorization Act for fiscal

year 1995 (Public Law 103-337) does not require a mandatory expiration

date for this demonstration project. The project evaluation plan

addresses how each intervention will be comprehensively evaluated for

at least the first 5 years of the demonstration project. Major changes

and modifications to the interventions can be made through another

announcement in the Federal Register and would be made if formal

evaluation data warrant a change.

B. 5-Year Reexamination

At the 5-year point, the entire demonstration will be reexamined

for either: (a) permanent implementation, (b) modification and another

test period, or (c) termination of the project.

VIII. Demonstration Project Evaluation Plan

A. Overview

Chapter 47 of 5 U.S.C. requires that an evaluation be performed to

measure the effectiveness of the proposed project, and its impact on

improving public management. A comprehensive evaluation plan for the

entire laboratory demonstration program, originally covering 24 DoD

laboratories, was developed by a joint OPM/DoD Evaluation Committee in

1995. This plan was submitted to the Office of Defense Research &

Engineering and was subsequently approved (see Proposed Plan for

Evaluation of the Department of Defense S&T Laboratory Demonstration

Program, Office of Merit Systems Oversight and Effectiveness, June

1995). The primary focus of the evaluation is to determine whether the

waivers granted result in a more effective personnel system and

improvements in ultimate outcomes (i.e., laboratory effectiveness,

mission accomplishment, and customer satisfaction). In March 1996, the

Director of Defense Research & Engineering (DDR&E), who is responsible

for laboratory management, entered into an agreement with OPM's

Personnel Resources and Development Center (PRDC) to conduct the

external evaluation of the project from FY1996 to FY2001.

B. Evaluation Models

Figure 12 shows a general model for the evaluation of the

demonstration program. It includes measurements for both intermediate

and ultimate outcomes. The intermediate outcomes are defined as the

results of specific personnel system changes and the associated waivers

of law and regulation expected to improve human resource (HR)

management. The ultimate outcomes (mentioned above) are improved

laboratory performance, mission accomplishment, and customer

satisfaction. While it is not possible to establish a direct causal

link between changes in the HR management system and organizational

effectiveness, it is hypothesized that the new HR system will

contribute to improved organizational effectiveness. The evaluators

will attempt to use measures of results determined by the laboratories

to assess ultimate outcomes. Consideration of the context, the degree

of implementation, and support of implementation are important in the

interpretation of results. Contextual considerations include the

effects of potential intervening variables, for example, downsizing,

changes in mission, and the state of the economy in general. Degree of

implementation is defined as the extent to which proposed changes are

given a fair trial, the degree to which they are used, and the extent

to which they conform to the concepts behind the changes. Support for

implementation includes the training and automated support systems and

can also be affected by the individual characteristics of those who are

implementing the program. The degree to which the project is

implemented and operated will be tracked to ensure the evaluation

results reflect the project as it was intended. Data will be collected

to measure changes in both intermediate and ultimate outcomes, as well

as any unintended outcomes that can occur as a result of any

organizational change. In addition, the evaluation will track the

impact of the project and its interventions on veterans and other EEO

groups, the Merit Systems Principles, and the Prohibited Personnel

Practices. Additional measures will be added to the model in the event

that changes or modifications are made to the demonstration plan.

An intervention impact model will be used to measure the

effectiveness of the various personnel system changes or interventions

implemented at NRL (see the example in Appendix G). The intervention

impact model specifies each personnel system change as an intervention,

expected effects of each intervention, corresponding measures, and data

sources for obtaining the measures. While this intervention impact

model makes an attempt to predict and measure outcomes of specific

interventions, causal attributions about the full impact of specific

interventions will not always be possible. Many of the initiatives are

expected to interact with each other and contribute to the same

outcomes. Furthermore, the impact of changes in the HR system may be

mitigated by contextual variables (e.g., the job market, legislation,

and internal support systems) as well as the individual characteristics

of those who are implementing the systems.

C. Evaluation

A modified quasi-experimental design will be used for the

evaluation of the S&T Laboratory Demonstration Program. Because most of

the eligible laboratories are participating, a 5 U.S.C. comparison

group will be constructed from the Civilian Personnel Data File (CPDF).

This comparison group will consist of workforce data from

Governmentwide research organizations in civilian Federal agencies with

missions and job series matching those in the DoD laboratories. This

comparison group will be used primarily in the analysis of broadbanding

costs and turnover rates.

The original ``China Lake'' project will serve as a second

comparison group which can be used as a benchmark representing a stable

broadbanding system. The two original Navy demonstration laboratories

(Naval Air Warfare Center--Weapons Division in China Lake, CA and Naval

Command Control and Ocean Surveillance Center in San Diego, CA) will

participate in the employee survey and will also provide workforce

data.

Since some of the interventions are used in a few laboratories and

not others, there will be additional comparison groups for specific

interventions. The staggered implementation of the demonstration

program across laboratories will also allow for time series analyses

using multiple baselines. NRL is expected to implement its

demonstration proposal in 1999 and will have several years of pre-

demonstration baseline data.

D. Method of Data Collection

Data from a variety of sources will be used in the evaluation.

Information from existing management information systems and from

personnel office records will be supplemented with perceptual data to

assess variables related to effectiveness. Multiple methods provide

more than one perspective on how the interventions are working.

Information gathered through one method will be used to validate

information gathered through another. Confidence in the findings will

increase as they are substantiated by the different collection methods.

[[Page 8988]]

Both quantitative and qualitative data will be used when evaluating

outcomes. The following data will be collected: (1) workforce data; (2)

personnel office and other data on quality and timeliness; (3) employee

attitude surveys; (4) a survey of HR officers on results orientation;

(5) research ratings for scientists and engineers to be used in

turnover analyses; (6) structured interviews and focus group data; (7)

local site historian logs and implementation information; and (8) core

results measures of laboratory performance.

The evaluation effort will consist of two phases, formative and

summative evaluation, covering at least 5 years to permit inter- and

intra-organizational estimates of effectiveness. The formative

evaluation phase will include baseline data collection and analysis,

implementation evaluation, and interim assessments. The formal reports

and interim assessments will provide information on the accuracy of

project operation, and current information on impact of the project on

veterans and EEO groups, Merit System Principles, and Prohibited

Personnel Practices. The summative evaluation will focus on an overall

assessment of project outcomes after 5 years. This will provide

information on how well the HR system changes achieved the desired

goals, which interventions were most effective, and whether the results

are generalizable to other Federal installations.

The external evaluation will be supplemented by an internal

evaluation conducted by NRL (see Appendix H) to meet individual

laboratory needs. Periodic reports and annual summaries will be

prepared to document the findings. The summative evaluation will focus

on an overall assessment of project outcomes after 5 years.

BILLING CODE 6325-01-P

[GRAPHIC] [TIFF OMITTED] TN23FE99.010

BILLING CODE 6325-01-C

IX. Demonstration Project Costs

A. Transition

There will be no grades or steps in the broadband classification

system as there are under the GS. NRL will provide GS employees with a

permanent pay change that is equivalent to the proportion of the WGI

earned at the time of implementation. For example, the employee 1 year

past the last WGI in a 3-year waiting period would receive a permanent

pay change equivalent to one third of the current value of the WGI.

Employees at step 10 or receiving a retained rate will not be eligible

for the prorated WGI. This permanent pay increase will occur at the

time the demonstration project is implemented. Supervisors will be able

to withhold these prorated WGI's if the employee's performance is below

the ``fully successful'' level at the time of implementation.

The first official annual appraisal cycle under the CCS will be the

1998-1999 appraisal cycle, with the payout occurring the first full pay

period in January 2000. Future CCS pay adjustments will be effective

the beginning of the first full pay period in January each year.

B. Cost Containment and Controls

It is required that the demonstration project be ``relatively cost

neutral.'' This is defined to mean that the NRL demonstration project

will not increase the average personnel costs above what would have

been expected under the previous 5 U.S.C. based system. Since NRL

operates under the NWCF which requires cost efficiency so that NRL's

technical programs can be marketed competitively, internal controls are

in effect to ensure that costs are controlled.

[[Page 8989]]

NRL's Research Advisory Committee (RAC), comprising the CO, the

DOR, the Chief Staff Officer, and the ADOR's will oversee the

administration of the demonstration project. Because the RAC is the

same management team that critically reviews the technical programs and

the cost to operate NRL, the costs associated with this system will

come under the same critical review. NRL is an innovative organization

shaped by its mission and operating environment, and it exists in a

highly dynamic and challenging climate. To be a vigorous and creative

performer in such an environment, NRL must possess high quality

personnel, challenging programs, and sound management practices.

Broadbanding and CCS are designed to encourage the creative performer

and to provide appropriate compensation. It does not automatically

provide increases for those who are already being paid commensurate

with their contribution level.

NRL has established pay pool managers at the division level or

equivalent. The CCS design includes a pay pool review panel responsible

for evaluating the contribution scores for their pay pool and making

adjustments, as required. The CCSDS will be designed to provide

assistance to the pay pool manager in selecting the appropriate basic

pay increase for an individual, based on that individual's contribution

score. The CCSDS will contain controls on the amount of permanent and

nonpermanent money available to the pay pool.

BILLING CODE 6325-01-P

[GRAPHIC] [TIFF OMITTED] TN23FE99.011

BILLING CODE 6325-01-C

Costs associated with implementing the demonstration project are

shown in Figure 13. These include automation of systems such as the

CCSDS, training, and project evaluation. The automation and training

costs are startup costs. Transition costs are one-time costs. Costs for

project evaluation will be ongoing for at least 5 years.

X. Automation Support

A. General

One of the major goals of the demonstration project is to

streamline the personnel processes to increase cost effectiveness.

Automation must play an integral role in achieving that goal. Without

the necessary automation to support the interventions proposed for the

demonstration project, optimal cost benefit cannot be realized. In

addition, adequate information to support decision making must be

available to managers if line management is to assume greater authority

and responsibility for human resources management.

Automation to support the demonstration project is required at two

distinct levels. At the DoN and DoD level, automation support [in the

form of changes to the DCPDS] is required to facilitate processing and

reporting of demonstration project personnel actions. At the NRL level,

automation support (in the form of local processing applications) is

required to facilitate management processes and decisionmaking.

B. Defense Civilian Personnel Data System (DCPDS)

Since DCPDS is a legacy system, efforts have been made to minimize

changes to the system, and, therefore, the resources required to make

the necessary changes. The following is a compendium of the proposed

DCPDS modifications. The detailed specifications for required changes

to DCPDS are provided in the System Change Request (SCR), Form 804.

C. Core Document (COREDOC)

The COREDOC application is a DoD system which will require

modification to accommodate the interventions in this demonstration

project. Specifically, there will be an RD that will replace the

position description in the basic application; career tracks and career

levels will replace GS grades; and a CCS Assessment Form that will

replace performance elements.

D. RIF Support System (RIFSS)

The RIFSS is an automated tool used by human resources specialists

to support RIF processing. Under the demonstration project, RIF rules

will be modified to increase the credit for contributions and limit the

rounds of competition. The AutoRIF application, developed by DoD, could

be used if it were modified to accommodate these process changes.

Detailed functional requirements for RIFSS are being established as

Appendix J.

E. CCSDS

This automated system is required as an internal control and as a

mechanism to equate contribution scores to appropriate rates of basic

pay. This system will allow pay pool managers to develop a spreadsheet

that will assist them in determining an appropriate merit increase or

contribution award or both based on the overall contribution score for

each individual. It will also be used as an internal control to ensure

that the permanent and nonpermanent money allotted to each pay pool is

not exceeded. It will further allow pay pool managers to visualize the

effects of giving large basic pay increases or awards to high

contributors, and the effects of withholding either the general or

merit increase or both of those who are low contributors, or in the

overcompensated range.

BILLING CODE 6325-01-P

[[Page 8990]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.012

[[Page 8991]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.013

[[Page 8992]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.014

[[Page 8993]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.015

[[Page 8994]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.016

[[Page 8995]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.017

[[Page 8996]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.018

[[Page 8997]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.019

BILLING CODE 6325-01-C

[[Page 8998]]

Appendix B: Definitions of Career Tracks and Career Levels

Career Track: S&E Professional

Includes professional positions in S&E occupations such as

physics, electronics engineering, chemistry, and student positions

associated with these professions.

Level I: This includes student trainees. The education and

employment must be part of a formal student employment program.

Specific, clear, and detailed instructions and supervision are given

to complement education. The level of education and experience

completed is a major consideration in establishing the level of on-

the-job training and work assignments.

Level II: This is the entry or developmental stage, preparing

S&E's for the full and independent performance of their work.

Performs supporting work in science or engineering requiring

professional training but little experience. Conducts activities

with objectives and priorities identified by supervisor or team

leader; assistance given on new or unusual projects; completed work

reviewed for technical soundness.

Level III: This is the advanced developmental, or typically,

target career level, of this career track. Conceives and defines

solutions to technical problems of moderate complexity; plans,

analyzes, interprets, and reports findings of projects; guides

technical and programmatic work of team members in comparable or

junior grades; completed work and reports are reviewed to evaluate

overall results.

Level IV: S&E's at this level are authorities within their

professional areas or key program administrators. Conducts or

directs technical activities or assists higher levels on challenging

and innovative projects or technical program development with only

general guidance on policy, resources and planning; develops

solutions to complex problems requiring various disciplines;

responsible for fulfilling program objectives.

Level V: ARSAE at this level are renowned experts in their

fields. Independently defines and leads most challenging technical

programs consistent with general guidance and/or independently

directs overall R&D program managerial and/or supervisory aspects;

conceives and develops elegant solutions to very difficult problems

requiring highly specialized areas of technical expertise;

recognized within DoD and other agencies for broad technical area

expertise and has established professional reputation in technical

community nationally and internationally. The primary requirement

for Level V positions is the knowledge of and expertise in specific

scientific and technology areas related to the mission of their

organization. However, the ability to manage and/or supervise R&D

operations or programs is also considered a necessity. May direct

the work of an organizational unit; may be held accountable for the

success of one or more specific programs or projects; monitors

progress toward organizational goals and periodically evaluates and

makes appropriate adjustments to such goals; supervises the work of

employees; or otherwise exercises important policy-making, policy-

determining, or other managerial functions.

Career Track: S&E Technical

Includes nonprofessional positions which support S&E activities

through application of various skills in areas such as the

following: engineering, computer, physical, chemical, biological,

mathematical sciences; and student trainees.

Level I: This includes trainees who develop technical support

knowledge gained through actual work experience. Performs repetitive

tasks using knowledge of standardized procedures and operations.

Receives specific, clear and detailed instruction and supervision.

Completed work is reviewed for technical soundness.

Level II: Technicians at this entry level require a practical

knowledge of standard procedures in a technical field. Skill in

applying knowledge of basic principles, concepts and methodology of

occupational and technical methods is required. Carries out

prescribed procedures and relies heavily on precedent methods. Work

is reviewed for technical adequacy and accuracy, and adherence to

instructions.

Level III: This is the advanced developmental level of this

career track, requiring extensive training or experience. Work

requires some adapting of existing precedents or techniques.

Receives outline of objectives desired and description of operating

characteristics and theory involved. Completed assignments are

reviewed for compliance with instructions, adequacy, judgment, and

satisfaction of requirements.

Level IV: Technicians at this level are considered to have

professional level knowledge of a specific field and may serve as a

member of a research team. Receives general guidance on overall

objectives and resources. Conceives, recommends, and tests new

techniques or methods. Completed work is reviewed for overall

soundness and compliance with overall project objectives; results

are usually accepted as authoritative.

Level V: Technicians at this level are experts within their

technical area, or are key program administrators. Develop solutions

to complex problems; responsible for fulfilling program objectives;

and receive general guidance on policy, resources and planning.

(This is a temporary career level, established for demonstration

project transition purposes only. No new positions will be

classified at this level.)

Career Track: Administrative Specialist and Professional

Professional and specialist positions in areas such as the

following: safety and health, personnel, finance, budget,

procurement, librarianship, legal, business, facilities management

and student positions associated with these professions.

Level I: Includes student trainees. The education and employment

must be part of a formal student employment program. Specific,

clear, and detailed instructions and supervision are given to

complement education. The level of education and experience

completed is a major consideration in establishing the level of on-

the-job training and work assignments.

Level II: This is the developmental stage preparing

Administrative Specialists and Professionals for the full and

independent performance of their work. Specific, clear and detailed

instruction and supervision are given upon entry; recurring

assignments are carried out independently. Situations not covered by

instructions are referred to supervisor. Finished work is reviewed

to ensure accuracy.

Level III: This is the advanced developmental, or typically,

target level, of this career track. Employee plans and carries out

assignments independently, resolving conflicts that arise,

coordinates work with others and interprets policy on own

initiative. Completed work is reviewed for feasibility,

compatibility with other work or effectiveness in meeting

requirements or expected results.

Level IV: At this level, Administrative Specialists and

Professionals are authorities within their professional areas or key

program administrators or supervisors. They conduct or direct

activities in an administrative and professional area with only

general guidance on policy, resources and planning; develop

solutions to complex problems requiring various disciplines; and are

responsible for fulfilling program objectives.

Level V: Administrative Specialists and Professionals at this

level are experts within their broad administrative area or

professional field who serve as leaders, heads of branches or

divisions, or key program administrators. Receives general guidance

on policy, resources and planning having an affect on public

policies or programs; responsible for fulfilling program objectives.

Results are authoritative and affect administrative programs or the

well-being of substantial numbers of people.

Career Track: Administrative Support

Includes clerical, secretarial and assistant work in

nonscientific and engineering occupations.

Level I: This includes student trainees as well as advanced

entry level which requires a fundamental knowledge of a clerical or

administrative field. Developmental assignments may be given which

lead to duties at a higher group level. Performs repetitive tasks,

specific, clear and detailed instruction and supervision; with more

experience utilizes knowledge of standardized procedures and

operations, assistance is given on new or unusual projects.

Completed work is reviewed for technical soundness.

Level II: This level requires a knowledge of standardized rules,

procedures or operations requiring considerable training. General

guidance is received on overall objectives and resources. Completed

assignments may be reviewed for overall soundness or meeting

expected results.

Level III: This is the senior level which requires knowledge of

extensive procedures and operations requiring extensive training.

Receives general guidance on overall resources and objectives.

Skilled in applying knowledge of basic principles, concepts, and

methodology of profession or administrative occupation and technical

methods. Results are accepted as authoritative and are normally

accepted without significant change.

[[Page 8999]]

Appendix C: Table of Occupational Series Within Career Tracks

Note: As new series are needed or current ones are discontinued,

this table will be updated.

S&E Professional--Includes all scientist and engineer work.

0101--Social Science Series

0180--Psychology Series

0401--General Biological Science Series

0403--Microbiology Series

0801--General Engineering Series

0804--Fire Protection Engineering Series

0806--Materials Engineering Series

0808--Architecture Series

0810--Civil Engineering Series

0819--Environmental Engineering Series

0830--Mechanical Engineering Series

0840--Nuclear Engineering Series

0850--Electrical Engineering Series

0854--Computer Engineering Series

0855--Electronics Engineering Series

0861--Aerospace Engineering Series

0892--Ceramic Engineering Series

0893--Chemical Engineering Series

0899--Engineering and Architecture Student Trainee Series

1301--General Physical Science Series

1306--Health Physics Series

1310--Physics Series

1313--Geophysics Series

1320--Chemistry Series

1321--Metallurgy Series

1330--Astronomy and Space Science Series

1340--Meteorology Series

1350--Geology Series

1360--Oceanography Series

1370--Cartography Series

1399--Physical Science Student Trainee Series

1515--Operations Research Series

1520--Mathematics Series

1550--Computer Science Series

1599--Mathematics and Statistics Student Trainee Series

S&E Technical--Includes S&E technical support work typically

requiring specialized training in the particular discipline.

0802--Engineering Technician Series

0809--Construction Control Series

0818--Engineering Drafting Series

0856--Electronics Technician Series

0895--Industrial Engineering Technician Series

1152--Production Control Series

1311--Physical Science Technician Series

1371--Cartographic Technician Series

1521--Mathematics Technician Series

Administrative Specialist and Professional--Includes analyst,

specialist, and professional work in nonscientific and engineering

occupations.

0018--Safety and Occupational Health Management Series

0028--Environmental Protection Specialist Series

0080--Security Administration Series

0170--History Series

0201--Personnel Management Series

0212--Personnel Staffing Series

0221--Position Classification Series

0230--Employee Relations Series

0233--Labor Relations Series

0235--Employee Development Series

0260--Equal Employment Opportunity Series

0299--Personnel Management Student Trainee Series

0301--Miscellaneous Administration and Program Series

0334--Computer Specialist Series

0340--Program Management Series

0341--Administrative Officer Series

0342--Support Services Administration Series

0343--Management and Program Analysis Series

0391--Telecommunications Processing Series

0505--Financial Management Series

0510--Accounting Series

0560--Budget Analyst Series

0690--Industrial Hygiene Series

0904--Law Clerk Series

0905--General Attorney Series

0950--Paralegal Specialist Series

1001--General Arts and Information Series

1020--Illustrating Series

1035--Public Affairs Series

1060--Photography Series

1071--Audiovisual Production Series

1082--Writing and Editing Series

1083--Technical Writer and Editing Series

1084--Visual Information Series

1101--General Business and Industry Series

1102--Contracting Series

1104--Property Disposal Series

1176--Building Management Series

1199--Business and Industry Student Trainee Series

122--Patent Attorney Series

1410--Librarian Series

1412--Technical Information Series

1420--Archivist Series

1601--General Facilities and Equipment Series

1640--Facility Management Series

1670--Equipment Specialist Series

1801--General Inspection, Investigation, and Compliance Series

1910--Quality Assurance Series

2001--General Supply Series

2003--Supply Program Management Series

2030--Distribution Facilities and Storage Management Series

2130--Traffic Management Series

Administrative Support--Includes clerical, secretarial and

assistant work in nonscientific and engineering occupations.

0019--Safety Technician Series

0086--Security Clerical and Assistance Series

0181--Psychology Aid and Technician Series

0203--Personnel Clerical and Assistance Series

0302--Messenger Series

0303--Miscellaneous Clerk and Assistance Series

0305--Mail and File Series

0312--Clerk-Stenographer and Reporter Series

0318--Secretary Series

0322--Clerk/Typist Series

0326--Office Automation Clerical and Assistance Series

0332--Computer Operation Series

0335--Computer Clerk and Assistant Series

0344--Management and Program Clerical and Assistance Series

0351--Printing Clerical Series

0361--Equal Opportunity Assistance Series

0390--Telecommunications Processing Series

0394--Communications Clerical Series

0399--Administration and Office Support Student Trainee Series

0503--Financial Clerical and Assistance Series

0525--Accounting Technician Series

0540--Voucher Examining Series

0544--Civilian Pay Series

0561--Budget Clerical and Assistance Series

0986--Legal Clerical and Assistance Series

1001--General Arts and Information Series

1087--Editorial Assistance Series

1105--Purchasing Series

1106--Procurement Clerical and Technician Series

1107--Property Disposal Clerical and Technician Series

1411--LIbrary Technician Series

2005--Supply Clerical and Technician Series

2102--Transportation Clerk and Assistant Series

2131--Freight Rate Series

Appendix D: Classification and CCS Elements

Part I. S&E Professionals

Part II. Administrative Specialist and Professional

Part III. Administrative Support

Part IV. S&E Technical

The CCS Summary Forms shown in this appendix are draft forms

intended to provide an understanding of what the forms will cover.

Under the demonstration project the forms will be generated by the

CCSDS. They may be

[[Page 9000]]

changed during the project to require additional information, to make

them easier to use, or for other reasons.

The contents of the CCS elements, descriptors, discriminators and

basic acceptable standards may similarly be changed during the life of

the demonstration project.

BILLING CODE 6325-01-P

[[Page 9001]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.020

[[Page 9002]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.021

[[Page 9003]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.022

[[Page 9004]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.023

[[Page 9005]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.024

[[Page 9006]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.025

[[Page 9007]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.026

[[Page 9008]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.027

[[Page 9009]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.028

[[Page 9010]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.029

[[Page 9011]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.030

[[Page 9012]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.031

[[Page 9013]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.032

[[Page 9014]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.033

[[Page 9015]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.034

BILLING CODE 6325-01-C

[[Page 9016]]

Appendix E: Computation of the IPS and the NPR

The NRL demonstration project will use an IPS which links basic pay

to contribution scores determined by the CCS process. The area where

basic pay and level of contribution are assumed to be properly related

is called the NPR. An employee whose CCS score and rate of basic pay

plot within the NPR is considered to be contributing at a level

consistent with pay. Employees whose pay plots below the NPR for their

assessed score are considered ``undercompensated,'' while employees

whose score and pay plot above the NPR are considered

``overcompensated.''

The purpose of this scoring and pay structure is to spread the full

range of basic pay provided by the GS, between GS-1, step 1 and GS-15,

step 10, into 80 intervals (scores and pay above those points are

related using the same parameters). Each interval is a fixed percentage

of the pay associated with the previous point.

For each possible contribution score available to employees, the

NPR spans a basic pay range of 12 percent. The lower boundary (or

``rail'') is established by fixing the basic pay equivalent to GS-1,

step 1, with a CCS score of zero. The upper boundary is fixed at the

basic pay equivalent to GS-15, step 10, with a CCS score of 80. The

distance between these upper and lower rails for a given overall

contribution score is then computed to ensure the range of 12 percent

of basic pay for each available CCS score.

The middle rail of the NPR is computed as 6 percent above the lower

rail. This point is used in connection with certain limits established

for pay increases (see section IV.C.7).

From the above considerations, five variables, or inputs, were

identified. They are as follows:

1. Variable A: GS-1, step 1 (lowest salary).

2. Variable B: GS-15, step 10 (highest salary).

3. Variable C: Current C-values.

4. Variable M: 6 percent (middle rail computation above the low

rail).

5. Variable H: 12 percent (high rail computation above low rail).

Other variables are as follows:

1. Variable N: Number of C-value steps at GS-15, step 10.

2. Variable P (step increase): Salary value for each C-value equal

to 1 + percentage increase.

From these variables, the following formula definitions were

developed:

Low rail = A*(PC)

Mid rail = (1+M)*A*(PC)

High rail = (1+H)*A*(PC)

Where P = (B/(A*(1+H)))(1/N)

As an example, a result of the above computation, using the 1999 GS

Salary Table, P (step increase) equals 1.023663611. Attachment (1) is a

complete list of CCS career level scores and basic pay ranges.

Attachment (2) contains graphic representations of these tables for

each career track.

Once the C-values (0-80) are determined, the CCS career levels and

scores are extended at the same percentage increments as were computed

for the step increase above. These C-values are extended to encompass

the equivalent of ES-4 effective January 1999. In the example, SES

Level ES-4 is equal to basic pay of $118,000 and is encompassed by the

C-value 89 ($107,119 to $119,974).

Attachment to Appendix E: 1999 Inputs

GS 1-Step 1: 13,362

GS 15-Step 10: 97,201

# C values: 80

Mid%: 6.00%

Hi%: 12.00%

------------------------------------------------------------------------

C Value Low Rail Mid Rail Hi Rail

------------------------------------------------------------------------

0......................................... 13362 14164 14965

1......................................... 13678 14499 15320

2......................................... 14002 14842 15682

3......................................... 14333 15193 16053

4......................................... 14672 15553 16433

5......................................... 15020 15921 16822

6......................................... 15375 16297 17220

7......................................... 15739 16683 17627

8......................................... 16111 17078 18045

9......................................... 16493 17482 18472

10........................................ 16883 17896 18909

11........................................ 17282 18319 19356

12........................................ 17691 18753 19814

13........................................ 18110 19196 20283

14........................................ 18538 19651 20763

15........................................ 18977 20116 21254

16........................................ 19426 20592 21757

17........................................ 19886 21079 22272

18........................................ 20356 21578 22799

19........................................ 20838 22088 23339

20........................................ 21331 22611 23891

21........................................ 21836 23146 24456

22........................................ 22353 23694 25035

23........................................ 22882 24255 25628

24........................................ 23423 24829 26234

25........................................ 23977 25416 26855

26........................................ 24545 26018 27490

27........................................ 25126 26633 28141

28........................................ 25720 27263 28807

29........................................ 26329 27909 29488

30........................................ 26952 28569 30186

31........................................ 27590 29245 30900

32........................................ 28243 29937 31632

33........................................ 28911 30646 32380

34........................................ 29595 31371 33146

35........................................ 30295 32113 33931

36........................................ 31012 32873 34734

37........................................ 31746 33651 35556

38........................................ 32497 34447 36397

39........................................ 33266 35262 37258

40........................................ 34054 36097 38140

41........................................ 34859 36951 39042

42........................................ 35684 37825 39966

43........................................ 36529 38720 40912

44........................................ 37393 39637 41880

45........................................ 38278 40575 42871

46........................................ 39184 41535 43886

47........................................ 40111 42518 44924

48........................................ 41060 43524 45987

49........................................ 42032 44554 47076

50........................................ 43026 45608 48190

51........................................ 44045 46687 49330

52........................................ 45087 47792 50497

53........................................ 46154 48923 51692

54........................................ 47246 50081 52915

55........................................ 48364 51266 54168

56........................................ 49508 52479 55449

57........................................ 50680 53721 56761

58........................................ 51879 54992 58105

59........................................ 53107 56293 59480

60........................................ 54363 57625 60887

61........................................ 55650 58989 62328

62........................................ 56967 60385 63803

63........................................ 58315 61814 65313

64........................................ 59695 63276 66858

65........................................ 61107 64774 68440

66........................................ 62553 66307 70060

67........................................ 64034 67876 71718

68........................................ 65549 69482 73415

69........................................ 67100 71126 75152

70........................................ 68688 72809 76930

71........................................ 70313 74532 78751

72........................................ 71977 76296 80614

73........................................ 73680 78101 82522

74........................................ 75424 79949 84475

75........................................ 77209 81841 86474

76........................................ 79036 83778 88520

77........................................ 80906 85760 90615

78........................................ 82821 87790 92759

79........................................ 84780 89867 94954

80........................................ 86787 91994 97201

81........................................ 88840 94171 99501

82........................................ 90943 96399 101856

83........................................ 93095 98680 104266

84........................................ 95298 101015 106733

85........................................ 97553 103406 109259

86........................................ 99861 105853 111844

87........................................ 102224 108358 114491

88........................................ 104643 110922 117200

89........................................ 107119 113547 119974

90........................................ 109654 116233 122813

91........................................ 112249 118984 125719

------------------------------------------------------------------------

BILLING CODE 6325-01-P

[[Page 9017]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.035

[[Page 9018]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.036

[[Page 9019]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.037

[[Page 9020]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.038

[[Page 9021]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.039

[[Page 9022]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.040

[[Page 9023]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.041

[[Page 9024]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.042

[[Page 9025]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.043

[[Page 9026]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.044

[[Page 9027]]

[GRAPHIC] [TIFF OMITTED] TN23FE99.045

[FR Doc. 99-4265 Filed 2-18-99; 12:23 pm]

BILLING CODE 6325-01-C

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.