Southwestern Power Administration, et al.; Electric Rate and Corporate Regulation Filings

Federal RegisterFeb 12, 1999

Ask Donna

What actually matters in this document.

Text

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EF99-4011-000, et al.]

Southwestern Power Administration, et al.; Electric Rate and

Corporate Regulation Filings

February 4, 1999.

Take notice that the following filings have been made with the

Commission:

1. Southwestern Power Administration

[Docket No. EF99-4011-000]

Take notice that on January 29, 1999, the Deputy Secretary, U.S.

Department of Energy, submitted to the Federal Energy Regulatory

Commission (FERC) for confirmation and approval on a final basis,

pursuant to the authority vested in the FERC by Delegation Order No.

0204-108, as amended November 10, 1993, 58 FR 59717, the following

Southwestern Power Administration (Southwestern) Integrated System rate

schedules:

Rate Schedule P-98B, Wholesale Rates for Hydro Peaking Power

Rate Schedule NFTS-98B, Wholesale Non-Federal Transmission Service

The Integrated System rate schedules were confirmed and approved on

an interim basis by the Deputy Secretary in Rate Order No. SWPA-39 for

the period January 1, 1999, through September 30, 2001, and have been

submitted to the FERC for confirmation and approval on a final basis

for the same period. The FY 1998 Power Repayment Study has confirmed

that rates prescribed by currently-approved Rate Schedules P-98A,

Wholesale Rates for Hydro Peaking Power, and NFTS-98, Wholesale Rates

for Non-Federal Transmission Service, are sufficient to meet repayment

criteria and do not require any adjustment. However, certain aspects of

the terms and conditions set forth in the rate schedules need to be

revised to clarify and accommodate market conditions experienced during

this past year.

The names of the rate schedules have been changed from P-98A and

NFTS-98 to P-98B and NFTS-98B to reflect the fact that revisions have

been made. Minor corrections and modifications were made throughout the

rate schedules for clarification purposes. The basis for determining

the rate for Real Power Losses has been revised in both rate schedules.

This change is required since the Energy Information Administration no

longer compiles the information which was the basis for determining the

rate for losses. In addition, the Capacity Overrun Penalty provisions

have been revised to provide a greater incentive to not overrun

Southwestern's Integrated System capacity. The penalty set forth in the

current rate schedules was insufficient to serve as a deterrent in

light of this past summer's price escalation. These changes will have

no impact on the amortization or status of repayment forecasted in the

power repayment studies and will not require rate changes. Revenues

based on current rates remain sufficient to meet repayment criteria.

Comment date: February 25, 1999, in accordance with Standard

Paragraph E at the end of this notice.

[[Page 7182]]

2. PSEG PPN Energy Company Ltd.

[Docket No. EG99-41-000]

Take notice that on January 29, 1999, PSEG PPN Energy Company Ltd.

(PSEG PPN), with its principal office at 608 St. James Court, St. Denis

Street, Port Louis, Mauritius filed with the Federal Energy Regulatory

Commission an amended application for determination of exempt wholesale

generator status pursuant to Part 365 of the Commission's regulations.

PSEG PPN is a company organized under the laws of Mauritius. PSEG

PPN will be engaged, directly or indirectly through an affiliate as

defined in Section 2(a)(11)(B) of the Public Utility Holding Company

Act of 1935, exclusively in owning, or both owning and operating a gas

and/or naphtha-fired combined cycle generating facility consisting of

one electric generating unit with a nameplate rating of approximately

347 megawatts and incidental facilities located in Tamil Nadu, India;

selling electric energy at wholesale and engaging in project

development activities with respect thereto. PSEG PPN amended its

original application to indicate that it has no current plans of

engaging in fuel delivery or brokering activities.

Comment date: February 25, 1999, in accordance with Standard

Paragraph E at the end of this notice. The Commission will limit its

consideration of comments to those that concern the adequacy or

accuracy of the amended application.

3. Western Power Trading Forum Complainant, v. California

Independent System Operator Corporation Respondent

[Docket No. EL99-30-000]

Take notice that on January 20, 1999, the Western Power Trading

Forum (Complainant) filed a complaint and request for expedited relief

under Sections 206 and 306, et seq., of the Federal Power Act, 16

U.S.C. Secs. 824e and 825e (1994), and Section 206 of the Commission's

Rules of practice and procedure, 18 CFR 385.206, alleging that the Grid

Management Charge of the California Independent System Operator

Corporation (ISO) is unjust, unreasonable, unduly discriminatory,

anticompetitive, excessive, and in violation of a prior ISO settlement

approved in Docket Nos. ER98-211-000, et al.

Comment date: March 5, 1999, in accordance with Standard Paragraph

E at the end of this notice.

4. Ocean Vista Power Generation, L.L.C.

[Docket No. ER99-1536-000]

Take notice that, on January 29, 1999, Ocean Vista Power

Generation, L.L.C. submitted a report of transactions that occurred

under its Market-Based Power Sales Tariffs during the quarter ending

December 31, 1998.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

5. Mountain Vista Power Generation, L.L.C.

[Docket No. ER99-1537-000]

Take notice that, on January 29, 1999, Mountain Vista Power

Generation, L.L.C. submitted a report of transactions that occurred

under its Market-Based Power Sales Tariffs during the quarter ending

December 31, 1998.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

6. Energy Services, Inc.

[Docket No. ER99-1538-000]

Take notice that on January 29, 1999, Energy Services, Inc.

tendered for filing its report of transactions for the quarter ending

December 31, 1998.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

7. Duke Energy Marketing Corp.

[Docket No. ER99-1539-000]

Take notice that on January 29, 1999, Duke Energy Marketing Corp.

(DEMC) tendered for filing its report of transactions for the quarter

ending December 31, 1998.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

8. Southwestern Public Service Company

[Docket No. ER99-1540-000]

Take notice that on January 29, 1999, New Century Services, Inc.,

on behalf of Southwestern Public Service Company (Southwestern),

submitted a Quarterly Report under Southwestern's market-based sales

tariff. The report is for the period of October 1, 1999 through

December 31, 1999.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

9. Consumers Energy Company

[Docket No. ER99-1541-000]

Take notice that on January 29, 1999, Consumers Energy Company

filed a report that it made no market based sales under its wholesale

power sales tariff for the quarter ending December 31, 1998.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

10. The Detroit Edison Company

[Docket No. ER99-1542-000]

Take notice that on January 29, 1999, The Detroit Edison Company

filed a summary of market based sales under its market-based rate

wholesale power sales tariff for the calendar quarter ending December

31, 1998.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

11. Virginia Electric and Power Company

[Docket No. ER99-1543-000 ]

Take notice that on January 29, 1999, Virginia Electric and Power

Company (Virginia Power) tendered for filing a summary of short-term

transactions made during the fourth quarter of calendar year 1998 under

Virginia Power's market rate sales tariff, FERC Electric Power Sales

Tariff, First Revised Volume No. 4.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

12. Bridgeport Energy, L.L.C.

[Docket No. ER99-1544-000]

Take notice that on January 29, 1999, Bridgeport Energy, L.L.C.

(Bridgeport Energy) tendered for filing a quarterly report of short-

term transactions made during the most recent quarter of calendar year

1998 under Bridgeport Energy's market-based rate tariff, approved by

the Commission in Bridgeport Energy, L.L.C., 83 FERC para. 61,307

(1998).

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

13. State Line Energy, L.L.C.

[Docket No. ER99-1545-000]

Take notice that on January 29, 1999, State Line Energy, L.L.C.

(State Line) submitted its quarterly report regarding transactions to

which it was a party during the period October 1, 1998 through December

31, 1998, pursuant to its Market Rate Schedule accepted by the

Commission in Docket No. ER96-2869-000.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

14. WKE Station Two Inc.

[Docket No. ER99-1546-000]

Take notice that on January 29, 1999, WKE Station Two Inc. tendered

for

[[Page 7183]]

filing its summary of activity for the quarter ending December 31,

1998.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

15. Boralex Stratton Energy, Inc.

[Docket No. ER99-1547-000]

Take notice that on January 29, 1999, Boralex Stratton Energy, Inc.

tendered for filing its Transaction Report for quarter ending December

31, 1998.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

16. Duquesne Light Company

[Docket No. ER99-1548-000]

Take notice that on January 29, 1999, Duquesne Light Company

(Duquesne) tendered for filing a report of short-term transactions that

occurred during the period ending December 31, 1998 under Duquesne's

FERC Electric Tariff, Original Volume No. 3.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

17. Western Kentucky Energy Corp.

[Docket No. ER99-1549-000]

Take notice that on January 29, 1999, Western Kentucky Energy Corp.

tendered for filing its summary of activity for the quarter ending

December 31, 1998.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

18. AG Energy, L.P.; Seneca Power Partners, L.P.; Sterling Power

Partners, L.P.; Power City Partners, L.P.

[Docket Nos. ER99-1551-000; ER99-1552-000; ER99-1553-000 and ER99-1554-

000]

Take notice that on January 27, 1999, AG-Energy, L.P., Seneca Power

Partners, L.P., Sterling Power Partners, L.P. and Power City Partners,

L.P. tendered for filing a report of no transactions under their

market-based rate tariffs during the fourth quarter of 1998, pursuant

to the Commission's letter order in Docket No. ER98-2782-000, issued

June 17, 1998.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

19. New England Power Pool

[Docket No. ER99-1556-000]

Take notice that on January 29, 1999, the New England Power Pool

(NEPOOL) Executive Committee tendered for filing the Forty-First

Agreement Amending New England Power Pool Agreement, amending

provisions relating to the pricing of 10-Minute Spinning Reserve

service and the determination of Installed Capability Responsibilities.

The NEPOOL Executive Committee states that the changes are to comply

with the Commission's December 17th Order in Docket No. OA97-237-000 et

al., and to make the Installed Capability provisions of the Restated

NEPOOL Agreement consistent with market rules recently filed in

compliance with that order.

The NEPOOL Executive Committee also states that copies of these

materials were sent to the participants in the New England Power Pool,

and to the New England state governors and regulatory commissions.

The NEPOOL Executive Committee requests that the Forty-First

Agreement be made effective as of April 1, 1999.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

20. Oklahoma Gas and Electric Company

[Docket No. ER99-1557-000]

Take notice that on January 29, 1999, Oklahoma Gas and Electric

Company (OG&E), tendered for filing a change to its FERC Electric

Tariff, Second Revised Volume No. 2. OG&E states that the change is to

deny Long-Term Firm Transmission Service under OG&E's transmission

tariff when such service is available through the Southwest Power Pool,

Inc., regional transmission service tariff.

OG&E requests an effective date for the tariff change of April 1,

1999.

Copies of this filing have been served on each of the affected

parties, the Oklahoma Corporation Commission and the Arkansas Public

Service Commission.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

21. Southern Energy Kendall, L.L.C.

[Docket No. ER99-1558-000]

Take notice that on January 29, 1999, Southern Energy Kendall,

L.L.C. (Southern Kendall), tendered for filing the following agreement

as a service agreement under its Market Rate Tariff accepted by the

Commission in the Docket No. ER98-4116-000, Master Electric Power

Purchase and Sale Agreement by and between Southern Energy New England,

L.L.C., and Southern Energy Kendall, L.L.C.

Southern Kendall respectfully requests waiver of the 60-day prior

notice requirement to allow the service agreement to become effective

as of December 31, 1998.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

22. Central and South West Services, Inc.

[Docket No. ER99-1562-000]

Take notice that on January 29, 1999, Central and South West

Services, Inc., as agent for Central Power and Light Company, West

Texas Utilities Company, Public Service Company of Oklahoma, and

Southwestern Electric Power Company (collectively, the CSW Operating

Companies) submitted a quarterly report under the CSW Operating

Companies' market-based sales tariff. The report is for the period

October 1, 1998 through December 31, 1998.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

23. CSW Power Marketing, Inc.

[Docket No. ER99-1563-000]

Take notice that on January 29, 1999, CSW Power Marketing, Inc.

(CSW Power) submitted a quarterly report under CSW Power's market-based

sales tariff. The report is for the period October 1, 1998 through

December 31, 1998.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

24. PP&L, Inc.

[Docket No. ER99-1564-000]

Take notice that on January 29, 1999, PP&L, Inc. filed a summary of

activity conducted under its market-based rates tariff, FERC Electric

Tariff, Revised Volume No. 5, during the quarter ending December 31,

1998.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

25. Duke Power, a Division of Duke Energy Corporation

[Docket No. ER99-1565-000]

Take notice that on January 29, 1999, Duke Power (Duke), a division

of Duke Energy Corporation, tendered for filing quarterly transaction

summaries for service under Duke's Rate Schedule MR, FERC Electric

Tariff First Revised Volume No. 3, for the quarter ending December 31,

1998.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

26. Louisville Gas and Electric

[Docket No. ER99-1570-000]

Take notice that on January 29, 1999, Louisville Gas and Electric

Company (LG&E) tendered for filing its report of wholesale transactions

made pursuant to its market-based Generation Sales Service (GSS) Tariff

that occurred

[[Page 7184]]

during the quarter ending December 31, 1998.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

27. Southern Company Services, Inc.

[Docket No. ER99-1588-000]

Take notice that on January 29, 1999, Southern Company Services,

Inc., acting on behalf of Alabama Power Company, Georgia Power Company,

Gulf Power Company, Mississippi Power Company and Savannah Electric and

Power Company (collectively referred to as Southern Companies),

submitted a quarterly report of short-term transactions that occurred

under the Market-Based Rate Power Sales Tariff (FERC Electric Tariff,

Original Volume No. 4) during the period October 1, 1998 through

December 31, 1998.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

28. Oeste Power Generation L.L.C.

[Docket No. ER99-1589-000]

Take notice that, on January 29, 1999, Oeste Power Generation,

L.L.C. submitted a report of transactions that occurred under its

Market-Based Power Sales Tariffs during the quarter ending December 31,

1998.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

29. Ormond Beach Generation, L.L.C.

[Docket No. ER99-1590-000]

Take notice that, on January 29, 1999, Ormond Beach Generation,

L.L.C. submitted a report of transactions that occurred under its

Market-Based Power Sales Tariffs during the quarter ending December 31,

1998.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

30. Public Service Electric and Gas Company

[Docket No. ER99-1591-000]

Take notice that on January 29, 1999, Public Service Electric and

Gas Company (PSE&G) filed a summary of transactions made during the

fourth quarter of calendar year 1998 under PSE&G's Market Based Rate

Tariff, Original Volume No. 6, accepted by the Commission in Docket No.

ER97-837-000.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

31. New England Power Company; AllEnergy Marketing Company, L.L.C.

[Docket No. ER99-1592-000]

Take notice that on January 29, 1999, New England Power Company and

AllEnergy Marketing Company, L.L.C. tendered for filing a Quarterly

Report of Transactions for the period ending December 31, 1998.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

32. Dayton Power and Light Company

[Docket No. ER99-1593-000]

Take notice that on January 29, 1999, Dayton Power and Light

Company (Dayton) tendered for filing a summary of its Fourth Quarter

market based sales.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

33. Northeast Utilities Service Company

[Docket No. ER99-1594-000]

Take notice that on January 29, 1999, Northeast Utilities Service

Company tendered for filing its quarterly market-based rate summary for

the quarter ending December 31, 1998.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

34. Oklahoma Gas and Electric Co.

[Docket No. ER99-1595-000]

Take notice that on January 29, 1999, Oklahoma Gas and Electric Co.

tendered for filing its transaction report for quarter ending December

31, 1998.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

35. Alta Power Generation, L.L.C.

[Docket No. ER99-1596-000]

Take notice that, on January 29, 1999, Alta Power Generation,

L.L.C. submitted a report of transactions that occurred under its

Market-Based Power Sales Tariffs during the quarter ending December 31,

1998.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

36. Sierra Pacific Power Company

[Docket No. ER99-1597-000]

Take notice that on January 29, 1999, Sierra Pacific Power Company

(Sierra), tendered for filing Service Agreements (Service Agreements)

with Enron Power Marketing, Inc., for Short-Term Firm Point-to-Point

Transmission Service under Sierra's Open Access Transmission Tariff

(Tariff), Sierra filed the executed Service Agreement with the

Commission in compliance with Sections 13.4 of the Tariff and

applicable Commission regulations. Sierra also submitted a revised

Sheet Nos. 148 and 148A (Attachment E) to the Tariff, which is an

updated list of all current subscribers.

Sierra requests waiver of the Commission's notice requirements to

permit and effective date of February 1, 1999, for Attachment E, and to

allow the Service Agreement to become effective according to its terms.

Copies of this filing were served upon the Public Utilities

Commission of Nevada, the Public Utilities Commission of California and

all interested parties.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

37. Virginia Electric and Power Company

[Docket No. ER99-1599-000]

Take notice that on January 29, 1999, Virginia Electric and Power

Company (Virginia Power), tendered for filing five (5) Service

Agreements for Long Term Firm Point-to-Point Transmission Service with

Virginia Power's Wholesale Power Group (Transmission Customer) under

the Open Access Transmission Tariff to Eligible Purchasers dated July

14, 1997. The tendered Service Agreements are:

(1) OASIS, #64224, dated January 1, 1999 to December 31, 1999,

effective date January 1, 1999;

(2) OASIS, #64225, dated January 1, 1999 to December 31, 1999,

effective date January 1, 1999;

(3) OASIS, #69744, dated June 1, 1999 to September 30, 2000, effective

date June 1, 1999;

(4) OASIS, #69745, dated June 1, 1999 to September 30, 2000, effective

date June 1, 1999; and,

(5) OASIS, #69746, dated June 1, 1999 to September 30, 2000, effective

date June 1, 1999.

Under the tendered Service Agreements, Virginia Power will provide

Long Term Firm Point-to-Point Transmission Service to the Transmission

Customer under the rates, terms and conditions of the Open Access

Transmission Tariff.

The Company requests an effective date of January 1, 1999 for

Service Agreements One (1) and Two (2) listed above, and June 1, 1999

for Service Agreements Three (3), Four (4) and Five (5) listed above.

Copies of the filing were served upon the Transmission Customer,

the Virginia State Corporation Commission and the North Carolina

Utilities Commission.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

[[Page 7185]]

38. Illinois Power Company

[Docket No. ER99-1600-000]

Take notice that on January 29, 1999, Illinois Power Company

(Illinois Power), 500 South 27th Street, Decatur, Illinois 62526,

tendered for filing Long-Term Firm Transmission Service Agreements

under which Illinois Power Bulk Power Marketing will take transmission

service pursuant to its open access transmission tariff. The agreements

are based on the Form of Service Agreement in Illinois Power's tariff.

Illinois Power has requested an effective date of January 1, 1999.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

39. Southern Energy Canal, L.L.C.

[Docket No. ER99-1601-000]

Take notice that on January 29, 1999, Southern Energy Canal, L.L.C.

(Southern Canal), tendered for filing the following agreement as a

service agreement under its Market Rate Tariff accepted by the

Commission in the Docket No. ER98-4115-000:

1. Master Electric Power Purchase and Sale Agreement by and between

Southern Energy New England, L.L.C. and Southern Energy Canal, L.L.C.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

40. Boston Edison Company

[Docket No. ER99-1602-000]

Take notice that January 29, 1999, Boston Edison Company (Edison)

of Boston, Massachusetts, tendered for filing a substitute Page 10 to

its Third Amendment to the Pilgrim Power Sale Agreement between Edison

and Montaup Electric Company (FERC Rate Schedule No. 69). According to

Edison the substitute Page 10 is to correct an error and thereby

clarify that certain costs were therein referenced for purposes of

illustration rather than limitation. The Third Amendment was originally

filed in Docket No. ER99-1023-000, which has been consolidated with

Docket Nos. EC99-18-000 and EL99-22-000.

Edison has asked that the corrected Page 10 be made effective on

the same date as the Third Amendment.

Edison states that it has served the change on all parties to the

official service list in Docket Nos. EC99-18-000, ER99-1023-000, and

EL99-22-000, Montaup Electric Company, and the Massachusetts Department

of Telecommunications and Energy.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

41. Northeast Utilities Service Company

[Docket No. ER99-1603-000]

Take notice that on January 29, 1999, Northeast Utilities Service

Company (NUSCO), on behalf of The Connecticut Light and Power Company,

and Public Service Company of New Hampshire, tendered for filing

pursuant to Section 205 of the Federal Power Act and Section 35.13 of

the Commission's Regulations, a rate schedule change for sales of

electric energy to Littleton Electric Light Department (Littleton).

NUSCO states that a copy of this filing has been mailed to

Littleton.

NUSCO requests that the rate schedule change become effective on

April 1, 1999.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

42. PJM Interconnection, L.L.C.

[Docket No. ER99-1604-000]

Take notice that on January 29, 1999, PJM Interconnection, L.L.C.

(PJM), tendered for filing one executed service agreement with PECO

Energy Company for Network Integration Transmission Service.

Copies of this filing were served upon PECO Energy Company.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

43. Commonwealth Edison Company

[Docket No. ER99-1605-000]

Take notice that on January 29, 1999, Commonwealth Edison Company

(ComEd), tendered for filing a revised Firm Service Agreement with

Alliant Bulk Power (Alliant), under the terms of ComEd's Open Access

Transmission Tariff (OATT).

ComEd requests an effective date of January 1, 1999, for the

revised service agreement, and accordingly, seeks waiver of the

Commission's notice requirements.

Copies of this filing were served on Alliant.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

44. PP&L, Inc.

[Docket No. ER99-1606-000]

Take notice that on January 29, 1999, PP&L, Inc., tendered for

filing a Power Supply Agreement, dated January 25, 1999, with Allegheny

Electric Cooperative, Inc., of Lehigh County, Pennsylvania (AEC) under

PP&L's FERC Electric Tariff Revised Volume No. 5 and an amendment and

addendum to a Power Supply Agreement dated May 4, 1994 between PP&L and

AEC.

PP&L requests an effective date of February 1, 1999, for the Power

Supply Agreement dated January 25, 1999. PP&L requests an effective

date of April 1, 1998, for the amendment and addendum to the Power

Supply Agreement dated May 4, 1994.

PP&L states that copies of this filing have been supplied to AEC

and to the Pennsylvania Public Utility Commission.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

45. PP&L, Inc.

[Docket No. ER99-1607-000]

Take Notice that on January 29, 1999, PP&L, Inc., tendered for

filing a Power Supply Agreement, dated January 25, 1999, with Allegheny

Electric Cooperative, Inc., of Lehigh County, Pennsylvania (AEC) under

PP&L's FERC Electric Tariff Revised Volume No. 5, and an amendment and

addendum to a Power Supply Agreement dated February 13, 1995 between

PP&L and AEC.

PP&L requests an effective date of February 1, 1999, for the Power

Supply Agreement dated January 25, 1999. PP&L requests an effective

date of April 1, 1998, for the amendment and addendum to the Power

Supply Agreement dated February 13, 1995.

PP&L states that copies of this filing have been supplied to AEC

and to the Pennsylvania Public Utility Commission.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

46. PJM Interconnection, L.L.C.

[Docket No. ER99-1608-000]

Take notice that on January 29, 1999, PJM Interconnection, L.L.C.

(PJM), tendered for filing five signature pages of parties to the

Reliability Assurance Agreement among Load Serving Entities in the PJM

Control Area (RAA), and an amended Schedule 17, listing the parties to

the RAA.

PJM states that it served a copy of its filing on all parties to

the RAA, including each of the parties for which a signature page is

being tendered with this filing, and each of the state electric

regulatory commissions within the PJM Control Area.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

[[Page 7186]]

47. New England Power Pool

[Docket No. ER99-1609-000]

Take notice that on January 29, 1999, the New England Power Pool

(NEPOOL) Executive Committee tendered for filing new Market Rules and

Procedures not previously submitted to the Commission. The NEPOOL

Executive Committee has requested that the new Market Rules apply for

all NEPOOL market transactions occurring after the Second Effective

Date, which the Committee indicates is now projected to occur April 1,

1999.

The NEPOOL Executive Committee states that copies of these

materials were sent to the New England state governors and regulatory

commissions and the Participants in the New England Power Pool.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

48. New Century Services, Inc.

[Docket No. ER99-1610-000]

Take notice that on January 29, 1999, New Century Services, Inc., a

service company affiliate of Public Service Company of Colorado (PSCo),

Southwestern Public Service Company (SPS), and e prime, inc. (e prime),

has filed on their behalf the following: PSCo's Market-Based Wholesale

Power Sales Tariff; SPS's Market-Based Wholesale Power Sales Tariff

(SPS Tariff); a revised and restated version of the previously approved

e prime FERC Electric Rate Schedule No. 1; and a Statement of Policy

and Code of Conduct with Respect to the Relationship between the NCE

Operating Companies (PSCo and SPS, together with Cheyenne Light, Fuel

and Power Company) and their Wholesale Marketing Affiliates, including

e prime. NCS states that the SPS Tariff is not intended to supersede

SPS's existing market-based sales tariff.

NCS requests that the Commission make these filings effective on

January 30, 1999.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

49. The Cincinnati Gas & Electric Company; PSI Energy, Inc.

[Docket No. ER99-1611-000]

Take notice that on January 29, 1999, The Cincinnati Gas & Electric

Company and PSI Energy, Inc. (Cinergy Operating Companies) tendered for

filing their quarterly transaction report for the calendar quarter

ending December 31, 1998.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

50. Great Bay Power Corporation

[Docket No. ER99-1612-000]

Take notice that on January 29, 1999, Great Bay Power Corporation

(Great Bay), tendered for filing a service agreement between PP&L

EnergyPlus Co., and Great Bay for service under Great Bay's revised

Tariff for Short Term Sales. This Tariff was accepted for filing by the

Commission on July 24, 1998, in Docket No. ER98-3470-000.

The service agreement is proposed to be effective January 27, 1999.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

51. Great Bay Power Corporation

[Docket No. ER99-1613-000]

Take notice that on January 29, 1999, Great Bay Power Corporation

(Great Bay), tendered for filing a service agreement between Duke

Energy Trading and Marketing, L.L.C., and Great Bay for service under

Great Bay's revised Tariff for Short Term Sales. This Tariff was

accepted for filing by the Commission on July 24, 1998, in Docket No.

ER98-3470-000.

The service agreement is proposed to be effective January 22, 1999.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

52. New England Power Pool

[Docket No. ER99-1614-000]

Take notice that on January 29, 1999, the New England Power Pool

Executive Committee filed for acceptance a signature page to the New

England Power Pool (NEPOOL) Agreement dated September 1, 1971, as

amended, signed by Horizon Energy Corporation d/b/a Exelon Energy

(Exelon Energy). The NEPOOL Agreement has been designated NEPOOL FPC

No. 2.

The Executive Committee states that the Commission's acceptance of

Exelon Energy's signature page would permit NEPOOL to expand its

membership to include Exelon Energy. NEPOOL further states that the

filed signature page does not change the NEPOOL Agreement in any

manner, other than to make Exelon Energy a member in NEPOOL.

NEPOOL requests an effective date of January 1, 1999, for

commencement of participation in NEPOOL by Exelon Energy.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

53. New England Power Pool

[Docket No. ER99-1615-000]

Take notice that on January 29, 1999, the New England Power Pool

(NEPOOL or Pool) Executive Committee tendered for filing a request for

termination of memberships in NEPOOL, with an effective date of

February 1, 1999, of CWS Energy Service, Inc. (CWS ESI). Such

termination is pursuant to the terms of the NEPOOL Agreement dated

September 1, 1971, as amended, and previously signed by CWS ESI. The

New England Power Pool Agreement, as amended (the NEPOOL Agreement),

has been designated NEPOOL FPC No. 2.

The Executive Committee states that termination of CWS ESI with an

effective date of February 1, 1999, would relieve this entity, at CWS

ESI's request, of the obligations and responsibilities of Pool

membership and would not change the NEPOOL Agreement in any manner,

other than to remove CWS ESI from membership in the Pool.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

54. Idaho Power Company

[Docket No. ER99-1616-000]

Take notice that on January 29, 1999, Idaho Power Company (IPC),

tendered for filing a Service Agreement under Idaho Power Company

Tariff Volume No. 6, Market Rate Power Sales, between Idaho Power

Company and Tillamook People's Utility District.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

55. Automated Power Exchange, Inc.

[Docket No. ER99-1617-000]

Take notice that on January 29, 1999, Automated Power Exchange,

Inc. (APX) filed its quarterly informational report. APX requested

confidential treatment of the filing. The report is for the period

October 1, 1998 through December 31, 1998.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

56. Atlantic City Electric Company

[Docket No. ER99-1618-000]

Take notice that on January 29, 1999, Atlantic City Electric

Company (Atlantic), tendered a filing modifications the Atlantic zonal

transmission rate for network and point-to-point service under the PJM

open access tariff. Atlantic's existing zonal rates do not include the

costs of its 69 kV facilities. Atlantic's filing includes the costs of

its 69 kV facilities in its

[[Page 7187]]

zonal rates because these facilities function as part of Atlantic's

integrated transmission system.

Atlantic requests that the Commission allow the modifications to

take effect on April 1, 1999.

Atlantic states that copies of this filing have been served upon

the customer and affected state commissions.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

57. PJM Interconnection, L.L.C.

[Docket No. ER99-1619-000]

Take notice that on January 29, 1999, PJM Interconnection, L.L.C.

(PJM), tendered for filing 64 executed service agreements network

integration transmission service under state required retail access

programs and for point-to-point transmission service under the PJM Open

Access Transmission Tariff.

Copies of this filing were served upon the parties to the service

agreements.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

58. Public Service Electric and Gas Company

[Docket No. ER99-1620-000]

Take notice that on January 29, 1999, Public Service Electric and

Gas Company (PSE&G) of Newark, New Jersey tendered for filing an

agreement for the sale of capacity and energy to Entergy Power

Marketing Corp. (Entergy), pursuant to the PSE&G Wholesale Power Market

Based Sales Tariff, presently on file with the Commission.

PSE&G further requests waiver of the Commission's Regulations such

that the agreement can be made effective as of December 29, 1998.

Copies of the filing have been served upon Entergy and the New

Jersey Board of Public Utilities.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

59. California Independent System Operator Corporation

[Docket No. ER99-1621-000]

Take notice that on January 29, 1999, the California Independent

System Operator Corporation (ISO), tendered for filing a Meter Service

Agreement for scheduling Coordinators between the ISO and Pacificorp

Power Marketing, Inc., for acceptance by the Commission.

The ISO states that this filing has been served on Pacificorp Power

Marketing, Inc., and the California Public Utilities Commission.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

60. Williams Generation Company--Hazelton

[Docket No. ER99-1622-000]

Take notice that on January 29, 1999, Williams Generation Company--

Hazelton tendered for filing its Power Marketer Reports for the fourth

quarter of 1998.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

61. Montaup Electric Company

[Docket No. ER99-1625-000]

Take notice that on January 29, 1999, Montaup Electric Company

tendered for filing its Quarterly Report of transactions for the

calendar quarter ending December 31, 1998.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

62. Kentucky Utilities Company

[Docket No. ER99-1626-000]

Take notice that on January 29, 1999, Kentucky Utilities Company

(KU) tendered for filing a report of transactions for the quarter

ending December 31, 1998.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

63. California Independent System Operator Corporation

[Docket No. ER99-1655-000]

Take notice that on January 29, 1999, the California Independent

System Operator Corporation (ISO), tendered for filing a Scheduling

Coordinator Agreement between the ISO and Pacificorp Power Marketing,

Inc., for acceptance by the Commission.

The ISO states that this filing has been served on Pacificorp Power

Marketing, Inc., and the California Public Utilities Commission.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

64. Western Resources, Inc.

[Docket No. ES99-23-000]

Take notice that on January 22, 1999, Western Resources Inc.

(Western Resources), tendered for filing an application under Section

204(a) of the Federal Power Act for authorization to issue and sell,

from time to time up to 1,950,000 additional common stock of Western

Resources, $5.00 par value (Additional Shares) under its Employee Stock

Purchase Plan. Western Resources further requests an exemption from the

Commission's competitive bidding and negotiated placement requirements.

Comment date: February 25, 1999, in accordance with Standard

Paragraph E at the end of this notice.

65. Colorado Springs Utilities; East Kentucky Power Cooperative,

Inc.; New York Power Authority; Omaha Public Power District

[Docket Nos. NJ97-9-004; NJ97-14-002; NJ97-10-002; and NJ97-2-004]

Take notice that between December 23-28, 1998, the above-named

utilities filed revised standards of conduct in response to the

Commission's November 25, 1998 Order on Standards of Conduct. 85 FERC

para. 61,286 (1998).

Comment date: February 19, 1999, in accordance with Standard

Paragraph E at the end of this notice.

66. Virginia Electric and Power Company

[Docket No. OA96-52-005]

Take notice that on January 19, 1999, Virginia Electric and Power

Company tendered for filing its refund compliance report in accordance

with Section 35.19a of the Commission's regulations. This compliance

report is being filed pursuant to the Commission's letter order issued

June 11, 1997 in the above-captioned docket.

Comment date: March 8, 1999, in accordance with Standard Paragraph

E at the end of this notice.

67. SBR Associates and Ogden Haverhill Associates

[Docket No. QF82-190-001]

Take notice that on January 29, 1999, SBR Associates and Ogden

Haverhill Associates filed an application requesting the

recertification of the qualifying status of a cogeneration and small

power production facility and, in the alternative, a request for

waiver. Included as part of the Application is a FERC Form 556.

A copy of this filing has been served on the Massachusetts

Department of Telecommunications and Energy and on the Massachusetts

Electric Company.

Comment date: February 18, 1999, in accordance with Standard

Paragraph E at the end of this notice.

Standard Paragraphs

E. Any person desiring to be heard or to protest said filing should

file a motion to intervene or protest with the Federal Energy

Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426,

in accordance with Rules 211 and 214 of the Commission's Rules of

Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such

motions

[[Page 7188]]

or protests should be filed on or before the comment date. Protests

will be considered by the Commission in determining the appropriate

action to be taken, but will not serve to make protestants parties to

the proceeding. Any person wishing to become a party must file a motion

to intervene. Copies of these filings are on file with the Commission

and are available for public inspection.

David P. Boergers,

Secretary.

[FR Doc. 99-3453 Filed 2-11-99; 8:45 am]

BILLING CODE 6717-01-P

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.