DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP00-14-000]
Buccaneer Gas Pipeline Company, L.L.C.; Notice of Intent To
Prepare an Environmental Impact Statement for the Proposed Buccaneer
Gas Pipeline Project, Request for Comments on Environmental Issues, and
Notice of Public Scoping Meetings and Site Visits
December 6, 1999.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) and the Minerals Management Service (MMS) will prepare an
environmental impact statement (EIS) that will discuss the
environmental impacts of the Buccaneer Gas Pipeline Project involving
construction and operation of facilities by Buccaneer Gas Pipeline
Company, L.L.C. (Buccaneer) in Alabama, the Gulf of Mexico, and
Florida.\1\ These facilities would consist of about 674 miles of
various diameter pipeline, 75,000 horsepower (hp) of compression, 14
metering and regulating (M&R) stations, and a liquids separation
facility. Due to the division of proposed facilities between onshore
and offshore areas, the FERC will focus on analysis of onshore issues.
The MMS will have primary responsibility for offshore analysis and will
coordinate with the Army Corps of Engineers regarding state waters
review. This EIS will be used by the Commission in its decision-making
process to determine whether the project is in the public convenience
and necessity. The application and other supplemental filings in this
docket are available for viewing on the FERC Internet website
(www.ferc.fed.us). Clock on the ``RIMS'' link, select ``Docket #'' from
the RIMS Menu, and follow the instructions.
---------------------------------------------------------------------------
\1\ Buccaneer's application was filed with the Commission on
October 28, 1999, under section 7 of the Natural Gas Act and Part
157 of the Commission's regulations.
---------------------------------------------------------------------------
Similarly, the ``CIPS'' link on the FERC Internet website provides
access to the texts of formal documents issued by the Commission, such
as orders, notices, and rulemakings. From the FERC Internet website,
click on the ``CIPS'' link, select ``Docket #'' from the CIPS menu, and
follow the instructions. General information about the MMS and detailed
information regarding the Gulf of Mexico can be accessed at the MMS
Internet website (www.mms.gov).
If you are a landowner receiving this notice, you may be contacted
by a
[[Page 69249]]
pipeline company representative about the acquisition of an easement to
construct, operate, and maintain the proposed facilities. The pipeline
company would seek to negotiate a mutually acceptable agreement.
However, if the project is approved by the Commission, that approval
conveys with it the right of eminent domain. Therefore, if easement
negotiations fail to produce an agreement, the pipeline company could
initiate condemnation proceedings in accordance with state law. A fact
sheet addressing a number of typically asked questions, including the
use of eminent domain, is attached to this notice as appendix 1.\2\
---------------------------------------------------------------------------
\2\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies are available on the
Commission's website at the ``RIMS'' link or from the Commission's
Public Reference and files Maintenance Branch, 888 First Street,
NE., Washington, DC 20426, or call (202) 208-1371. For instructions
on connecting to RIMS refer to the last page of this notice. Copies
of the appendices were sent to all those receiving this notice in
the mail.
---------------------------------------------------------------------------
The FERC is the lead agency for the EIS. The MMS is a Federal
cooperating agency for this project because the MMS has jurisdiction by
law as well as special expertise regarding the potential environmental
impacts associated with that portion of the proposed pipeline that
would be installed on the Outer Continental Shelf.
Additionally, with this notice we are asking a number of Federal
and State agencies (see appendix 2) with jurisdiction and/or special
expertise with respect to environmental issues to cooperate with us in
the preparation of the EIS. These agencies may choose to participate
once they have evaluated the proposal relative to their agencies'
responsibilities.
The FERC is concurrently issuing a Notice of Intent to prepare an
EIS for the Gulfstream Project, Docket No. CP00-6-000. Both the
Buccaneer and Gulfstream Projects share a similar point of origin,
cross the Gulf of Mexico, and reach landfall near Tampa, Florida.
Furthermore, the two projects could potentially serve some of the same
markets in Central Florida, particularly in Polk County. For these
reasons we are asking your help on how to evaluate these projects. We
are also soliciting comments on the preparation of a single EIS on both
projects, or a separate EIS on each project. We will hold joint scoping
meetings at locations where we believe there is a reasonable amount of
overlap of the potentially affected parties. Maps showing the proposed
Buccaneer Project are in appendix 3 and maps showing the location of
both projects are included in appendix 4.
Summary of the Proposed Project
Buccaneer proposes to construct and operate a new natural gas
pipeline system with a transportation capacity of approximately .9
billion cubic feet per day from the Mobile Bay area in Alabama to
markets in Florida. The State of Florida is experiencing a substantial
increase in demand for electric power that is tied to the growth of
population in the state. Specifically, Buccaneer seeks authority to
construct and operate the following:
About 411.2 miles of 36-inch-diameter pipeline from Mobile
County, Alabama, across the Gulf of Mexico to a point in Pasco County,
Florida.
About 121.5 miles of 36-inch-diameter pipeline in Pasco,
Polk, Osceola, and Orange Counties, Florida;
About 141.5 miles of 16- to 30-inch-diameter laterals in
Pasco, Polk, Hardee, Lake, Osceola, Orange, and Brevard Counties,
Florida;
14 M&R stations in Mobile County, Alabama and Pasco, Polk,
Hardee, Lake, Osceola, Orange, and Brevard Counties, Florida; and
A new 75,000 hp compressor station in Mobile County,
Alabama and a new Liquids Separation Facility in Pasco County, Florida.
The proposed facilities are summarized in tables 1, 2, and 3 below.
The general location of the project facilities is shown in appendix 3.
If you are interested in obtaining detailed maps of a specific portion
of the project send in your request using the form in appendix 6.
Land Requirements for Construction
Construction of onshore pipeline facilities for the Buccaneer Gas
Pipeline Project would affect a total of about 3,851 acres of land
including 3,610 acres required for pipeline construction and extra
workspace, 46 acres for construction of the aboveground facilities, and
195 acres for contractor, mobilization, and pipe storage yards. Over 70
construction access road locations have been identified. Total land
requirements for the onshore permanent right-of-way would be about
1,628 acres. The remaining 2,223 acres of onshore land affected by
construction would be restored and returned to its former use.
Approximately 184 miles (70 percent) of the proposed onshore
pipelines in Florida would be installed within or adjacent to various
existing utility rights-of-way. Buccaneer would typically use a 110-
foot-wide construction right-of-way width for the 36-inch- and 30-inch-
diameter pipelines. In general, the construction right-of-way width for
the 24-inch to 16-inch-diameter lateral pipelines would be from 100 to
75 feet in width. Additional extra temporary work areas may be
necessary for waterbody, highway and railroad crossings, additional
topsoil storage, and pipe storage and equipment yards.
Following construction and restoration of the right-of-way and
temporary work spaces, Buccaneer would generally retain a new 50-foot-
wide permanent easement. The remaining portion of the construction
right-of-way would be temporary and returned to landowners for their
use without restrictions after appropriate reclamation efforts are
successful.
Constructing the offshore portion of the Buccaneer Gas Pipeline
Project would affect about 1,825 acres of sea floor. Land requirements
for operation of the offshore permanent right-of-way would be about
9,866 acres (based on MMS-required 200-feet-wide operation right-of-way
width which is greater than the proposed construction right-of-way
width).
Table 1.--Proposed Mainline Pipelines for the Buccaneer Gas Pipeline Project
----------------------------------------------------------------------------------------------------------------
Segment
Facility/County or marine area Mileposts begin- length Diameter (inches) County, State
end (miles)
----------------------------------------------------------------------------------------------------------------
Alabama Mainline:
Mobile County.................. 0.00-4.14 4.14 36'' Mobile County.
Offshore....................... 4.14-16.66 12.52 36'' State Waters.
-----------
Subtotal................... 16.66 Alabama.
Gulf of Mexico Mainline:
[[Page 69250]]
Mobile......................... 16.66-50.91 34.25 36'' Gulf of Mexico.
Pensacola...................... 50.91-105.01 54.10 36'' Gulf of Mexico.
Destin Dome.................... 105.01-187.13 82.12 36'' Gulf of Mexico.
Apalachicola................... 187.13-214.79 27.66 36'' Gulf of Mexico.
Florida Middle Ground.......... 214.79-331.63 116.84 36'' Gulf of Mexico.
Tarpon Springs................. 331.63-393.43 61.80 36'' Gulf of Mexico.
-----------
Subtotal................... 376.77 Gulf of Mexico.
Florida Mainline:
Offshore....................... 393.43-411.12 17.69 36'' State Waters.
Pasco County................... 411.12-411.21 0.09 36'' Pasco County.
Pasco County................... 0.000-46.24 46.24 36'' Pasco County.
Polk County.................... 0.00-38.95 38.95 36'' Polk County.
Osceola County................. 0.00-15.59 15.59 36'' Osceola County.
Orange County.................. 0.00-20.68 20.68 36'' Orange County.
-----------
Subtotal................... 139.24 Florida.
===========
Total Mainline ................ 532.67 .................. ..........................
----------------------------------------------------------------------------------------------------------------
Table 2.--Proposed Lateral Pipelines for the Buccaneer Gas Pipeline Project
----------------------------------------------------------------------------------------------------------------
Mileposts Length
Lateral begin-end (miles) Diameter (inches) County, State
----------------------------------------------------------------------------------------------------------------
Anclote.......................... 0.00-0.10 0.10 16'' Pasco County, FL.
Lakeland Interconnect............ 0.00-0.26 0.26 16'' Polk County, FL.
Tiger Bay........................ 0.00-37.99 37.99 30'' Polk County, FL.
Hines............................ 0.00-2.85 2.85 20'' Polk County, FL.
Polk............................. 0.00-1.52 1.52 20'' Polk County, FL.
Payne Creek...................... 0.00-14.04 14.04 20'' Polk County, FL.
14.04-14.88 0.84 20'' Hardee County, FL.
Leesburg......................... 0.00-9.52 9.52 24'' Polk County, FL.
9.52-46.60 37.08 24'' Lake County, FL.
Intercession City................ 0.00-0.28 0.28 16'' Osceola County, FL.
Cane Island...................... 0.00-0.13 0.13 16'' Osceola County, FL.
Stanton.......................... 0.00-0.78 0.78 16'' Orange County, FL.
Oleander......................... 0.00-19.21 19.21 30'' Orange County, FL.
19.21-25.21 6.00 30'' Brevard County, FL.
25.21-34.68 9.47 24'' Brevard County, FL.
Indian River..................... 0.00-0.29 0.29 18'' Brevard County, FL.
Cape Canaveral................... 0.00-1.11 1.11 18'' Brevard County, FL.
----------------------------------------------------------------------------------------------------------------
Total Laterals............... 141.47
----------------------------------------------------------------------------------------------------------------
Table 3.--Aboveground Facilities for the Buccaneer Gas Pipeline Project
----------------------------------------------------------------------------------------------------------------
Maximum
Facility Mainline/lateral Milepost volume County, State
MMcf/day
----------------------------------------------------------------------------------------------------------------
Alabama
Compressor Station 1............... Alabama Mainline...... 0.00 900 Mobile County
Buccaneer Meter Station............ Alabama Mainline...... 0.00 900 Mobile County
Florida
Liquids Separation Facility........ Pasco County Mainline. 0.00 900 Pasco County
Anclote M&R........................ Anclote Lateral....... 0.10 100 Pasco County
Lakeland Interconnect M&R.......... Lakeland Interconnect 0.26 100 Polk County
Lateral.
Tiger Bay M&R...................... Tiger Bay Lateral..... 37.44 120 Polk County
Hines M&R.......................... Hines Lateral......... 2.85 120 Polk County
[[Page 69251]]
Polk M&R........................... Polk Lateral.......... 1.52 120 Polk County
Payne Creek M&R.................... Payne Creek Lateral... 14.88 120 Hardee County
Leesburg M&R....................... Leesburg Lateral...... 46.60 170 Lake County
Intercession City M&R.............. Intercession City 0.28 60 Osceola County
Lateral.
Cane Islane M&R.................... Cane Island Lateral... 0.13 100 Osceola County
Stanton M&R........................ Stanton Lateral....... 0.78 80 Orange County
Oleander M&R....................... Oleander Lateral...... 34.68 220 Brevard County
Indian River M&R................... Indian River Lateral.. 0.29 100 Brevard County
Cape Canaveral M&R................. Cape Canaveral Lateral 1.11 100 Brevard County
----------------------------------------------------------------------------------------------------------------
MMcf/day = Million cubic feet per day.
M&R = meter and regulating station.
The EIS Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
to discover and address concerns the public may have about proposals.
We call this ``scoping.'' The main goal of the scoping process is to
focus the analysis in the EIS on the important environmental issues. By
this Notice of Intent, the Commission requests public comments on the
scope of the issues it will address in the EIS. All comments received
are considered during the preparation of the EIS. State and local
government representatives are encouraged to notify their constituents
of this proposed action and encourage them to comment on their areas of
concern.
The EIS will discuss impacts that could occur as a result of the
construction and operation of the proposed project under these general
headings:
Geology, mineral resources, and soils
Water resources, fisheries, and wetlands
Coastal and marine resources
Vegetation and wildlife
Endangered and threatened species
Land ownership and use
Recreation and public interest areas
Visual resources and aesthetics
Cultural resources
Air quality and noise
Hazardous waste
Socioeconomics
Pipeline safety
Alternatives
Our independent analysis of the issues will be in the Draft EIS
which will be mailed to Federal, state, and local agencies, public
interest groups, affected landowners and other interested individuals,
newspapers, libraries, and the Commission's official service list for
this proceeding. A 45-day comment period will be allotted for review of
the Draft EIS. We will consider all comments on the Draft EIS and
revise the document, as necessary, before issuing a Final EIS. The
Final EIS will include our response to each comment received and will
be used by the Commission in its decision-making process to determine
whether to approve the project.
To ensure that your comments are considered, please carefully
follow the instructions in the public participation section beginning
on page 9.
Currently Identified Environmental Issues
The EIS will discuss impacts that could occur as a result of the
construction and operation of the proposed project. FERC and MMS have
already identified a number of issues that we think deserve attention
based on a preliminary review of the proposed facilities and the
environmental information provided by Buccaneer. Some of these issues
are listed below. This is a preliminary list of issues and will be
changed based on your comments and our analysis. Currently identified
environmental issues for the Buccaneer Gas Pipeline Project include:
--Effect of construction on 136 perennial waterbody crossings,
including about 39 waterbodies 100 feet wide or greater;
--Crossing six waterbodies classified as Outstanding Florida Waters;
--Erosion control and potential for sediment transport to waterbodies
and wetlands;
--Effect of construction on aquifers at or near the land surface;
--Effect of construction on 448 wetland crossings, including about 129
acres of permanent alteration of wetlands;
--Clearing of about 825 acres of forest;
--Effect on wildlife, fisheries, and rare plant habitats, both onshore
and offshore;
--Potential to affect 58 federally endangered and threatened species
and 116 state-protected species including the bald eagle, Florida scrub
jay, red-cockaded woodpecker, Atlantic gulf sturgeon, and West Indian
manatee;
--Effect on marine resources, including subsurface geology, live bottom
habitat, seagrass beds, and essential fish habitat;
--Potential to affect commercial and recreational boating operations;
--Potential to affect military marine training operations;
--Potential for sinkhole formation and flooding;
--Construction through or along the edge of active or inactive surface
mines;
--Effect on historic and prehistoric archaeological sites and historic
structures;
--Impact on about 206 residences potentially within 50 feet of the
construction right-of-way;
--Potential impact on 11 planned residential areas and 19 Developments
of Regional Impact;
--Potential introduction and control of non-native species;
--Effect on speciality crops such as citrus groves;
--Effect on public lands and special use areas including the Pinellas
County Aquatic Preserve, Green Swamp, Starkey Wilderness Park,
Tasohatchee State Preserve, and Brevard Coastal Scrub Ecosystem;
--Effect on bird rookeries;
--Visual effect of above ground facilities on surrounding areas;
--Effect on local air quality and noise environment as a result of
compressor station operations; and
--Combined effect of the proposed project with other projects,
including other natural gas pipelines, which
[[Page 69252]]
have been or may be proposed in the same region and similar time
frames.
Public Participation and Scoping Meetings
You can make a difference by providing us with our specific
comments or concerns about the project. By becoming a commenter, your
concerns will be addressed in the EIS and considered by the Commission.
You should focus on the potential environmental effects of the
proposal, alternatives to the proposal (including alternative routes),
and measures to avoid or lessen environmental impact. The more specific
your comments, the more useful they will be. Please carefully follow
these instructions to ensure that your comments are received in time
and properly recorded:
Send two copies of your comments to: David P. Boergers,
Secretary, Federal Energy Regulatory Commission, 888 First St., N.E.,
Room 1A, Washington, DC 20426.
Label one copy of the comments for the attention of the
Environmental Review and Compliance Branch II, PR-11.2.
Reference Docket No. CP00-14-000.
Mail your comments so that they will be received in
Washington, DC on or before January 21, 2000.
In addition to or in lieu of sending written comments, we invite
you to attend the public scoping meetings the FERC will conduct in the
project area. The locations and times for these meetings are listed
below.
Schedule of Public Scoping Meetings for the Buccaneer Gas Pipeline
Project Environmental Impact Statement
------------------------------------------------------------------------
Date and Time Location Phone
------------------------------------------------------------------------
January 4, 2000; 7:00 p.m........ Mobile Convention 334-208-2128
Center, 1 South
Water Street,
Mobile,.
Alabama \3\.........
January 5, 2000; 7:00 p.m........ Clarion Hotel, 5316 727-847-9005
U.S. Highway 19,
New Port Richey,.
Florida.............
January 11, 2000; 7:00 p.m....... Florida Dept. of 863-291-5820
Agriculture and
Consumer Services,
The Florida Room,
500 3rd Street, NW,
Winter Haven,
Florida \3\.
January 12, 2000; 7:00 p.m....... Holiday Inn, 2145 E. 407-846-4646
Irlo Bronson
Memorial Hwy,
Kissimmee, Florida.
January 13, 2000; 7:00 p.m....... City of Titusville 321-383-5774
Council Chambers,
55 South Washington
Avenue, Titusville,
Florida.
------------------------------------------------------------------------
The public meetings are designed to provide you with more detailed
information and another opportunity to offer your comments on the
proposed project. Prior to the start of the meetings, company
representatives will be available to informally discuss the project. At
7:00 p.m. each company will provide a summary discussion of the project
(about 10 minutes each). Then the comment period will begin. Interested
groups and individuals are encouraged to attend the meetings and to
present comments on the environmental issues they believe should be
addressed in the Draft EIS. A transcript of each meeting will be made
so that your comments will be accurately recorded.
---------------------------------------------------------------------------
\3\ Scoping meetings at Mobile, Alabama and Winter Haven Florida
would involve joint meetings for the Buccaneer and Gulfstream
Projects.
---------------------------------------------------------------------------
On the dates of the meetings, our staff will also be visiting some
project areas. Anyone interested in participating in a site visit may
contact the Commission's Office of External Affairs identified at the
end of appendix 1 of this notice for more details and must provide
their own transportation.
Becoming an Intervenor
In addition to involvement in the EIS scoping process, you may want
to become an official party to the proceeding known as an
``intervenor.'' Intervenors play a more formal role in the process.
Among other things, intervenors have the right to receive copies of
case-related Commission documents and filings by other intervenors.
Likewise, each intervenor must provide 14 copies of its filings to the
Secretary of the Commission and must send a copy of its filings to all
other parties on the Commission's service list for this proceeding. If
you want to become an intervenor you must file a motion to intervene
according to Rule 214 of the Commission's Rules of Practice and
Procedure (18 CFR 385.214)(see appendix 5). Only intervenors have the
right to seek rehearing of the Commission's decision.
The date for filing timely motions to intervene in this proceeding
has passed. Therefore, parties now seeking to file late interventions
must show good cause, as required by section 385.214(b)(3), why this
time limitation should be waived. Environmental issues have been viewed
as good cause for late intervention. You do not need intervenor status
to have your environmental comments considered.
Environmental Mailing List
This notice is being sent to individuals, organizations, and
government entities interested in and/or potentially affected by the
proposed project. It is also being sent to all identified potential
right-of-way grantors. As details of the project become established,
representatives of Buccaneer Gas Pipeline Project may also separately
contact landowners, communities, and public agencies concerning project
matters, including acquisition of permits and rights-of-way.
All commenters will be retained on our mailing list. If you do not
want to send comments at this time but still want to keep informed and
receive copies of the Draft and Final EISs, you must return the
Information Request (appendix 6). If you do not send comments or return
the Information Request, you will be taken off the mailing list.
Additional information about the proposed project is available from
Mr. Paul McKee of the Commission's Office of external Affairs at (202)
208-1088 or on the FERC website (www.ferc.fed.us) using the ``RIMS''
link to information in this docket number. For assistance with access
to RIMS, the RIMS helpline can be reached at (202) 208-2222.
Similarly, the ``CIPS'' link on the FERC Internet website provides
access to the texts of formal documents issued by the Commission, such
as orders, notices, and rulemakings. From the FERC Internet website,
click on the ``CIPS'' link, select ``Docket #'' from the CIPS menu, and
follow the instructions. For assistance with access to CIPS, the
[[Page 69253]]
CIPS helpline can be reached at (202) 208-2474.
David P. Boergers,
Secretary.
[FR Doc. 99-32007 Filed 12-9-99; 8:45 am]
BILLING CODE 6717-01-M
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.