Airworthiness Directives; Boeing Model 747 Series Airplanes
Federal RegisterNov 5, 1999
Ask Donna
What actually matters in this document.
Text
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. 99-NM-231-AD]
RIN 2120-AA64
Airworthiness Directives; Boeing Model 747 Series Airplanes
AGENCY: Federal Aviation Administration, DOT.
ACTION: Notice of proposed rulemaking (NPRM).
-----------------------------------------------------------------------
SUMMARY: This document proposes the adoption of a new airworthiness
directive (AD) that is applicable to all Boeing Model 747 series
airplanes. This proposal would require repetitive inspections to detect
cracking of the forward and aft inner chords and the splice fitting of
the forward inner chord of the station 2598 bulkhead, and repair, if
necessary. This proposal is prompted by reports of fatigue cracking
found in those areas. The actions specified by the proposed AD are
intended to detect and correct such cracking, which could result in
reduced structural capability of the bulkhead and the inability of the
structure to carry horizontal stabilizer flight loads.
DATES: Comments must be received by December 20, 1999.
ADDRESSES: Submit comments in triplicate to the Federal Aviation
Administration (FAA), Transport Airplane Directorate, ANM-114,
Attention: Rules Docket No. 99-NM-231-AD, 1601 Lind Avenue, SW.,
Renton, Washington 98055-4056. Comments may be inspected at this
location between 9:00 a.m. and 3:00 p.m., Monday through Friday, except
Federal holidays.
The service information referenced in the proposed rule may be
obtained from Boeing Commercial Airplane Group, P.O. Box 3707, Seattle,
Washington 98124-2207. This information may be examined at the FAA,
Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton,
Washington.
FOR FURTHER INFORMATION CONTACT: Bob Breneman, Aerospace Engineer,
Airframe Branch, ANM-120S, FAA, Transport Airplane Directorate, Seattle
Aircraft Certification Office, 1601 Lind Avenue, SW., Renton,
Washington 98055-4056; telephone (425) 227-2776; fax (425) 227-1181.
SUPPLEMENTARY INFORMATION:
Comments Invited
Interested persons are invited to participate in the making of the
proposed rule by submitting such written data, views, or arguments as
they may desire. Communications shall identify the Rules Docket number
and be submitted in triplicate to the address specified above. All
communications received on or before the closing date for comments,
specified above, will be considered before taking action on the
proposed rule. The proposals contained in this notice may be changed in
light of the comments received.
Comments are specifically invited on the overall regulatory,
economic, environmental, and energy aspects of the proposed rule. All
comments submitted will be available, both before and after the closing
date for comments, in the Rules Docket for examination by interested
persons. A report summarizing each FAA-public contact concerned with
the substance of this proposal will be filed in the Rules Docket.
Commenters wishing the FAA to acknowledge receipt of their comments
submitted in response to this notice must submit a self-addressed,
stamped postcard on which the following statement is made: ``Comments
to Docket Number 99-NM-231-AD.'' The postcard will be date stamped and
returned to the commenter.
Availability of NPRMs
Any person may obtain a copy of this NPRM by submitting a request
to the FAA, Transport Airplane Directorate, ANM-114, Attention: Rules
Docket No. 99-NM-231-AD, 1601 Lind Avenue, SW., Renton, Washington
98055-4056.
Discussion
The FAA has received reports indicating that fatigue cracking has
been detected in the forward and aft inner chords and the splice
fitting of the forward inner chord of the station 2598 bulkhead on
Boeing Model 747 series airplanes. The horizontal stabilizer hinge
fittings are attached to the station
[[Page 60387]]
2598 bulkhead. The bulkhead includes a large cutout that gives access
to the rear spar of the horizontal stabilizer. The reports indicate
that the cracking was detected around the upper corners of the cutout.
In addition, a recent report indicates that a fatigue crack was
detected in the station 2598 splice fitting where it attaches to the
upper and lower sections of the bulkhead forward inner chord. Such
cracking, if not detected and corrected, could result in reduced
structural capability of the bulkhead and the inability of the
structure to carry horizontal stabilizer flight loads.
Explanation of Relevant Service Information
The FAA has reviewed and approved Boeing Alert Service Bulletin
747-53A2427, dated December 17, 1998, which describes procedures for a
one-time high frequency eddy current (HFEC) inspection and repetitive
detailed visual inspections to detect cracking of the forward and aft
inner chords of the station 2598 bulkhead, and repair, if necessary.
Explanation of Requirements of Proposed Rule
Since an unsafe condition has been identified that is likely to
exist or develop on other products of this same type design, the
proposed AD would require a one-time HFEC inspection and repetitive
detailed visual inspections to detect cracking of the forward and aft
inner chords of the station 2598 bulkhead, and repair, if necessary.
These actions would be required to be accomplished in accordance with
the alert service bulletin described previously, except as discussed
below. The proposed AD also would require a one-time HFEC inspection
and repetitive detailed visual inspections to detect cracking of the
splice fitting of the forward inner chord of the station 2598 bulkhead.
Such inspections of the splice fitting of the forward inner chord would
be required to be accomplished in accordance with procedures included
in paragraphs (a)(2) and (b)(2) of this AD. If any cracking is found
during such inspections, repair would be required to be accomplished in
accordance with a method approved by the FAA, as specified in paragraph
(d) of this proposed AD.
Differences Between Proposed Rule and Alert Service Bulletin
Operators should note that, although the alert service bulletin
specifies that the manufacturer may be contacted for disposition of
certain repair conditions, this proposed AD would require the repair of
those conditions to be accomplished in accordance with a method
approved by the FAA, or in accordance with data meeting the type
certification basis of the airplane approved by a Boeing Company
Designated Engineering Representative who has been authorized by the
FAA to make such findings.
Operators also should note that, as described previously, this
proposed AD would require a one-time HFEC inspection and repetitive
detailed visual inspections to detect cracking of the splice fitting of
the forward inner chord of the station 2598 bulkhead. The alert service
bulletin does not specify such inspections of the splice fitting. Also,
though this inspection area is shown in Figure 2, Detail A, and Figure
3, Detail A, of the alert service bulletin, the inspection area is not
highlighted in those figures.
Interim Action
This is considered to be interim action. The manufacturer has
advised that it currently is developing a modification that will
positively address the unsafe condition addressed by this AD. Once this
modification is developed, approved, and available, the FAA may
consider additional rulemaking.
Cost Impact
There are approximately 1,301 airplanes of the affected design in
the worldwide fleet. The FAA estimates that 260 airplanes of U.S.
registry would be affected by this proposed AD.
It would take approximately 2 work hours per airplane to accomplish
the proposed HFEC inspection, at an average labor rate of $60 per work
hour. Based on these figures, the cost impact of the proposed
inspection on U.S. operators is estimated to be $31,200, or $120 per
airplane.
It would take approximately 2 work hours per airplane to accomplish
the proposed detailed visual inspections, at an average labor rate of
$60 per work hour. Based on these figures, the cost impact of the
proposed inspections on U.S. operators is estimated to be $31,200, or
$120 per airplane, per inspection cycle.
The cost impact figures discussed above are based on assumptions
that no operator has yet accomplished any of the proposed requirements
of this AD action, and that no operator would accomplish those actions
in the future if this AD were not adopted.
Regulatory Impact
The regulations proposed herein would not have substantial direct
effects on the States, on the relationship between the national
government and the States, or on the distribution of power and
responsibilities among the various levels of government. Therefore, in
accordance with Executive Order 12612, it is determined that this
proposal would not have sufficient federalism implications to warrant
the preparation of a Federalism Assessment.
For the reasons discussed above, I certify that this proposed
regulation (1) is not a ``significant regulatory action'' under
Executive Order 12866; (2) is not a ``significant rule'' under the DOT
Regulatory Policies and Procedures (44 FR 11034, February 26, 1979);
and (3) if promulgated, will not have a significant economic impact,
positive or negative, on a substantial number of small entities under
the criteria of the Regulatory Flexibility Act. A copy of the draft
regulatory evaluation prepared for this action is contained in the
Rules Docket. A copy of it may be obtained by contacting the Rules
Docket at the location provided under the caption ADDRESSES.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Safety.
The Proposed Amendment
Accordingly, pursuant to the authority delegated to me by the
Administrator, the Federal Aviation Administration proposes to amend
part 39 of the Federal Aviation Regulations (14 CFR part 39) as
follows:
PART 39--AIRWORTHINESS DIRECTIVES
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
2. Section 39.13 is amended by adding the following new
airworthiness directive:
Boeing: Docket 99-NM-231-AD.
Applicability: All Model 747 series airplanes, certificated in
any category.
Note 1: This AD applies to each airplane identified in the
preceding applicability provision, regardless of whether it has been
modified, altered, or repaired in the area subject to the
requirements of this AD. For airplanes that have been modified,
altered, or repaired so that the performance of the requirements of
this AD is affected, the owner/operator must request approval for an
alternative method of compliance in accordance with paragraph (e) of
this AD. The request should include an assessment of the effect of
the modification, alteration, or repair on the unsafe condition
addressed by this AD; and, if the unsafe condition has not
[[Page 60388]]
been eliminated, the request should include specific proposed
actions to address it.
Compliance: Required as indicated, unless accomplished
previously.
To detect and correct cracking of the forward and aft inner
chords and the splice fitting of the forward inner chord of the
station 2598 bulkhead, which could result in reduced structural
capability of the bulkhead and the inability of the structure to
carry horizontal stabilizer flight loads, accomplish the following:
Initial Inspection
(a) Prior to the accumulation of 13,000 total flight cycles, or
within 1,000 flight cycles after the effective date of this AD,
whichever occurs later: Accomplish the requirements specified in
paragraphs (a)(1) and (a)(2) of this AD.
(1) Perform a high frequency eddy current inspection (HFEC) to
detect cracking of the forward and aft inner chords of the station
2598 bulkhead, in accordance with Boeing Alert Service Bulletin 747-
53A2427, dated December 17, 1998.
(2) Perform an HFEC inspection to detect cracking of the splice
fitting along the upper and lower attachment to the forward inner
chord of the station 2598 bulkhead, as shown in Figure 2, Detail A,
of Boeing Alert Service Bulletin 747-53A2427, dated December 17,
1998.
Note 2: Operators should note that the inspection area specified
in paragraph (a)(2) of this AD is NOT highlighted in Figure 2,
Detail A, of Boeing Alert Service Bulletin 747-53A2427, dated
December 17, 1998.
Repetitive Inspections
(b) Within 3,000 flight cycles after accomplishment of the
inspections required by paragraph (a) of this AD: Accomplish the
inspections specified in paragraphs (b)(1) and (b)(2) of this AD.
Repeat the inspection thereafter at intervals not to exceed 3,000
flight cycles.
(1) Perform a detailed visual inspection to detect cracking of
the forward and aft inner chords of the station 2598 bulkhead, in
accordance with Boeing Alert Service Bulletin 747-53A2427, dated
December 17, 1998.
Note 3: For the purposes of this AD, a detailed visual
inspection is defined as: ``An intensive visual examination of a
specific structural area, system, installation, or assembly to
detect damage, failure, or irregularity. Available lighting is
normally supplemented with a direct source of good lighting at
intensity deemed appropriate by the inspector. Inspection aids such
as mirror, magnifying lenses, etc., may be used. Surface cleaning
and elaborate access procedures may be required.''
(2) Perform a detailed visual inspection to detect cracking of
the splice fitting along the upper and lower attachment to the
forward inner chord of the station 2598 bulkhead, as shown in Figure
3, Detail A, of Boeing Alert Service Bulletin 747-53A2427, dated
December 17, 1998.
Note 4: Operators should note that the inspection area specified
in paragraph (b)(2) of this AD is NOT highlighted in Figure 3,
Detail A, of Boeing Alert Service Bulletin 747-53A2427, dated
December 17, 1998.
Repair
(c) If any cracking is detected during the inspections required
by paragraph (a)(1) or (b)(1) of this AD, prior to further flight,
repair in accordance with Boeing Alert Service Bulletin 747-53A2427,
dated December 17, 1998, except as provided by paragraph (d) of this
AD.
(d) If any cracking is detected during the inspections required
by paragraph (a)(2) or (b)(2) of this AD, or where the alert service
bulletin specifies that the manufacturer may be contacted for
disposition of certain repair conditions, prior to further flight,
repair in accordance with a method approved by the Manager, Seattle
Aircraft Certification Office (ACO), FAA, Transport Airplane
Directorate; or in accordance with data meeting the type
certification basis of the airplane approved by a Boeing Company
Designated Engineering Representative (DER) who has been authorized
by the Manager, Seattle ACO, to make such findings. For a repair
method to be approved by the Manager, Seattle ACO, or a Boeing DER,
as required by this paragraph, the approval letter must specifically
reference this AD.
Alternative Methods of Compliance
(e) An alternative method of compliance or adjustment of the
compliance time that provides an acceptable level of safety may be
used if approved by the Manager, Seattle ACO. Operators shall submit
their requests through an appropriate FAA Principal Maintenance
Inspector, who may add comments and then send it to the Manager,
Seattle ACO.
Note 5: Information concerning the existence of approved
alternative methods of compliance with this AD, if any, may be
obtained from the Seattle ACO.
Special Flight Permits
(f) Special flight permits may be issued in accordance with
sections 21.197 and 21.199 of the Federal Aviation Regulations (14
CFR 21.197 and 21.199) to operate the airplane to a location where
the requirements of this AD can be accomplished. Issued in Renton,
Washington, on November 1, 1999.
D. L. Riggin,
Acting Manager, Transport Airplane Directorate, Aircraft Certification
Service.
[FR Doc. 99-29056 Filed 11-4-99; 8:45 am]
BILLING CODE 4910-13-U
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.