Wyoming Interstate Company, Ltd.; Notice of Intent To Prepare an Environmental Assessment for the Proposed Medicine Bow Lateral Phase II Project and Request for Comments on Environmental Issues

Federal RegisterOct 27, 1999

Ask Donna

What actually matters in this document.

Text

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP99-624-000]

Wyoming Interstate Company, Ltd.; Notice of Intent To Prepare an

Environmental Assessment for the Proposed Medicine Bow Lateral Phase II

Project and Request for Comments on Environmental Issues

October 21, 1999.

The staff of the Federal Energy Regulatory Commission (FERC or

Commission) will prepare an environmental assessment (EA) that will

discuss the environmental impacts of the Medicine bow Lateral Phase II

Project involving the construction and operation of natural gas

transmission facilities by Wyoming Interstate Company, Ltd. (WIC) in

Weld County, Colorado and Converse County, Wyoming.\1\ These proposed

facilities primarily consist of about 5.6 miles of 24-inch-diameter

pipeline and 7,170 horsepower (hp) of compression. This EA will be used

by the Commission in its decision-making process to determine whether

the project is in the public convenience and necessity.

---------------------------------------------------------------------------

\1\ WIC's application was filed with the Commission under

Section 7 of the Natural Gas Act and Part 157 of the Commission's

regulations.

---------------------------------------------------------------------------

If you are a landowner receiving this notice, you may be contacted

by a pipeline company representative about the acquisition of an

easement to construct, operate, and maintain the proposed facilities.

The pipeline company would seek to negotiate a mutually acceptable

agreement. However, if the project is approved by the Commission, that

approval conveys with it the right of eminent domain. Therefore, if

easement negotiations fail to produce an agreement, the pipeline

company could initiate condemnation proceedings in accordance with

state law. A fact sheet addressing a number of typically asked

questions, including the use of eminent domain, is attached to this

notice as appendix 1.\2\

---------------------------------------------------------------------------

\2\ The appendices referenced in this notice are not being

printed in the Federal Register. Copies are available from the

Commission's Public Reference and Files Maintenance Branch, 888

First Street, NE., Washington, DC 20426, or call (202) 208-1371.

Copies of the appendices were sent to all those receiving this

notice in the mail.

---------------------------------------------------------------------------

Summary of the Proposed Project

WIC wants to expand the capacity of its facilities in Colorado and

Wyoming to transport an additional 120,000 Decatherms per day of

natural gas on the Medicine Bow Lateral. WIC seeks authority to

construct and operate:

Phase II Facilities (1999)

About 5.6 miles of 24-inch-diameter pipeline in Weld

County, Colorado;

One 7,170-hp compressor unit at its existing Douglas

Compressor Station in Converse County, Wyoming; and

One check meter at its existing Cheyenne Compressor

Station in Weld County, Colorado.

The location of the project facilities is shown in appendix 2.

Land Requirements for Construction

Construction of the proposed facilities would require about 61.3

acres of land. Following construction, about 33.3 acres would be

maintained as permanent right-of-way. The remaining 28 acres of land

would be restored and allowed to revert to it former use. All

construction at WIC's Douglas Compressor Station in Converse County,

Wyoming and its Cheyenne Compressor Station in Weld County, Colorado

would occur within the existing sites.

The EA Process

The National Environmental Policy Act (NEPA) requires the

Commission to take into account the environmental impacts that could

result from an action whenever it considers the issuance of a

Certificate of Public Convenience and Necessity. NEPA also requires us

to discover and address concerns the public may have about proposals.

We call this ``scoping''. The main goal of the scoping process is to

focus the analysis in the EA on the important environmental issues. By

this Notice of Intent, the Commission requests public comments on the

scope of the issues it will address in the EA. All comments received

are considered during the preparation of the EA. State and local

government representatives are encouraged to notify their constituents

of this proposed action and encourage them to comment on their areas of

concern.

The EA will discuss impacts that could occur as a result of the

construction and operation of the proposed project under these general

headings:

geology and soils

water resources, fisheries, and wetlands

vegetation and wildlife

endangered and threatened species

land use

cultural resources

air quality and noise

We will also evaluate possible alternatives to the proposed project

or portions of the project, and make recommendations on how to lessen

or avoid impacts on the various resource areas.

[[Page 57874]]

Our independent analysis of the issues will be in the EA. Depending

on the comments received during the scoping process, the EA may be

published and mailed to Federal, state, and local agencies, public

interest groups, interested individuals, affected landowners,

newspapers, libraries, and the Commission's official service list for

this proceeding. A comment period will be allotted for review if the EA

is published. We will consider all comments on the EA before we make

our recommendations to the Commission.

To ensure your comments are considered, please carefully follow the

instructions in the public participation section below.

Public Participation

You can make a difference by providing us with your specific

comments or concerns about the project. By becoming a commenter, your

concerns will be addressed in the EA and considered by the Commission.

You should focus on the potential environmental effects of the

proposal, alternatives to the proposal (including alternative routes),

and measures to avoid or lessen environmental impact. The more specific

your comments, the more useful they will be. Please carefully follow

these instructions to ensure that your comments are received in time

and properly recorded.

Send two copies of your letter to: David P. Boergers,

Secretary, Federal Energy Regulatory Commission, 888 First St., NE,

Room 1A, Washington, DC 20426;

Label one copy of the comments for the attention of the

Environmental Review and Compliance Branch, PR-11.1;

Reference Docket No. CP99-624-000; and

Mail your comments so that they will be received in

Washington, DC on or before November 22, 1999.

Becoming an Intervenor

In addition to involvement in the EA scoping process, you may want

to become an official party to the proceeding known as an

``intervenor''. Intervenors play a more formal role in the process.

Among other things, intervenors have the right to receive copies of

case-related Commission documents and filings by other intervenors.

Likewise, each intervenor must provide 14 copies of its filings to the

Secretary of the Commission and must send a copy of its filings to all

other parties on the Commission's service list for this proceeding. If

you want to become an intervenor you must file a motion to intervene

according to Rule 214 of the Commission's Rules of Practice and

Procedure (18 CFR 385.214) (see appendix 3). Only intervenors have the

right to seek rehearing of the Commission's decision.

You do not need intervenor status to have your environmental

comments considered. Additional information about the proposed project

is available from Mr. Paul McKee of the Commission's Office of External

Affairs at (202) 208-1088 or on the FERC website (www.ferc.fed.us)

using the ``RIMS'' link to information in this docket number. Click on

the ``RIMS'' link, select ``Docket #'' from the RIMS Menu, and follow

the instructions. For assistance with access to RIMS, the RIMS helpline

can be reached at (202) 208-2222.

Similarly, the ``CIPS'' link on the FERC Internet website provides

access to the texts of formal documents issued by the Commission, such

as orders, notices, and rulemakings. From the FERC Internet website,

click on the ``CIPS'' link, select ``Docket #'' from the CIPS menu, and

follow the instructions. For assistance with access to CIPS, the CIPS

helpline can be reached at (202) 208-2474.

David P. Boergers,

Secretary.

[FR Doc. 99-28029 Filed 10-26-99; 8:45 am]

BILLING CODE 6717-01-M