ENVIRONMENTAL PROTECTION AGENCY

[CO-001-0036; AD-FRL-6451-7]

Approval and Promulgation of State Implementation Plans; Call for

Visibility SIP Revision for Colorado Class I Visibility Protection

AGENCY: Environmental Protection Agency (EPA).

ACTION: Information notice.

-----------------------------------------------------------------------

SUMMARY: EPA hereby gives notice that in a September 22, 1999 letter it

notified the Governor of Colorado that the Colorado State

Implementation Plan (SIP) for Class I Visibility Protection (Visibility

SIP) is substantially inadequate to make reasonable progress toward the

National visibility goal, as specified in section 169A(a)(1) of the

Clean Air Act. Specifically, Colorado's Visibility SIP is substantially

inadequate to remedy existing and prevent future man-made visibility

impairment in Mt. Zirkel Wilderness Area and must be revised.

DATES: A revision to the Colorado Visibility SIP is due within 12

months of the date of EPA's letter to the Governor.

FOR FURTHER INFORMATION CONTACT: Amy Platt, Air and Radiation Program,

999 18th Street, suite 500, Denver, Colorado 80202-2466, (303) 312-

6449.

SUPPLEMENTARY INFORMATION:

I. Background

Section 169A of the Clean Air Act (CAA), 42 U.S.C. 7491,

establishes as a National goal the prevention of any future, and the

remedying of any existing, anthropogenic visibility impairment in

mandatory Class I Federal areas 1 (referred to herein as the

National visibility goal). Section 169A calls for EPA to, among other

things, issue regulations to assure reasonable progress toward meeting

the National visibility goal, including requiring each State with a

mandatory Class I Federal area to revise its SIP to contain such

emission limits, schedules of compliance and other measures as may be

necessary to make reasonable progress toward meeting the National

visibility goal. CAA section 169A(b)(2). Section 110(a)(2)(J) of the

CAA, 42 U.S.C. 7410(a)(2)(J), similarly requires SIPs to meet the

visibility protection requirements of the CAA.

---------------------------------------------------------------------------

\1\ Mandatory Class I Federal areas include international parks,

national wilderness areas greater than five thousand acres in size,

national memorial parks greater than five thousand acres in size,

and national parks greater than six thousand acres in size, as

described in section (162)(a) of the CAA (42 U.S.C. 7472(a)). Each

mandatory Class I Federal area is the responsibility of a ``Federal

land manager'' (FLM), the Secretary of the department with authority

over such lands. See section 302(i) of the CAA, 42 U.S.C. 7602(i).

---------------------------------------------------------------------------

EPA promulgated regulations that require affected States to, among

other things, (1) coordinate development of SIPs with appropriate

Federal Land Managers (FLMs); (2) develop a program to assess and

remedy visibility impairment from new and existing sources; and (3)

develop a long-term strategy to assure reasonable progress toward the

National visibility goal. See 45 FR 80084, December 2, 1980 (codified

at 40 CFR 51.300-51.307). The regulations provide for the remedying of

visibility impairment that is reasonably attributable to a single

existing stationary facility or small group of existing stationary

facilities.

The Colorado SIP for Class I Visibility Protection was approved by

EPA on August 12, 1988 (53 FR 30428). EPA approved subsequent revisions

to this SIP on October 11, 1994 and January 16, 1997 (see 59 FR 51376

and 62 FR 2305, respectively).

On July 14, 1993, the U.S. Forest Service (USFS) certified

visibility impairment in Mt. Zirkel Wilderness Area, a mandatory Class

I Federal area, and named the Hayden and Craig Generating Stations in

the Yampa Valley of northwest Colorado as suspected sources. The USFS

is the FLM for Mt. Zirkel Wilderness Area. Although the State resolved

the certification of impairment with respect to Hayden Station (see 62

FR 2305, January 16, 1997), the State has not resolved the

certification for Craig Generating Station.

II. Finding of Inadequacy

In its September 22, 1999 letter to the Governor of Colorado, EPA

found 2 that the Colorado Visibility SIP is substantially

inadequate to make reasonable progress toward the National visibility

goal, as specified in section 169A(a)(1) of the CAA, 42 U.S.C.

7491(a)(1). Specifically, Colorado's Visibility SIP is substantially

inadequate to remedy existing and prevent future man-made visibility

impairment in Mt. Zirkel Wilderness Area. EPA believes that a Best

Available Retrofit Technology (BART) limit is warranted for Craig

Generating Station and that the current SIP is deficient because it

does not include such a BART or BART equivalent limit.

---------------------------------------------------------------------------

\2\ The finding was made pursuant to section 110(k)(5) of the

Clean Air Act, 42 U.S.C. 7410(k)(5).

---------------------------------------------------------------------------

III. Call for SIP Revision

The finding of SIP inadequacy requires Colorado to submit a SIP

revision no later than 12 months from the date of EPA's letter to the

Governor. To ensure that the SIP deadline is met, EPA requested the

State to submit an action plan for the development of the SIP revision

within 30 days from receipt of EPA's letter to the Governor. Any

control strategies adopted and implemented as part of this SIP revision

must provide for the remedying of existing and the prevention of future

man-made visibility impairment in Mt. Zirkel Wilderness Area resulting

from Craig Generating Station's emissions.

IV. EPA Action

The finding of inadequacy and call for a SIP revision as set out in

the September 22, 1999 letter to the Governor do not constitute a final

agency action that is ripe for judicial review. EPA's action is a

preliminary step in an ongoing administrative process. See Greater

Cincinnati Chamber of Commerce v. U.S. EPA, 879 F.2d 1379 (6th Cir.

1989). A final agency action will occur when EPA makes a binding

determination regarding the State's response to the SIP call. This

would occur, for example, if EPA either approves or disapproves the SIP

submittal or promulgates a Federal Implementation Plan if the State

does not submit an adequate SIP revision. (See sections 110(c) and

110(k) of the Clean Air Act.) Either action would become final only

after EPA provides public notice and an opportunity for public comment.

A technical support document (TSD) is available from the contact

person listed above. The TSD discusses in more detail the Mt. Zirkel

Wilderness Area certification of visibility impairment issued by the

USFS in 1993, technical studies related to the Craig Generating

Station's contribution to such impairment and available control

technology, the SIP call and legal authority, and the SIP revision

schedule.

List of Subjects in 40 CFR Part 52

Air pollution control, Intergovernmental relations, Nitrogen

dioxide, Particulate matter, Sulfur oxides.

Authority: Sections 101, 107, 110, 116 and 301(a) of the Clean

Air Act, as amended (42 U.S.C. 7401, 7407, 7410, 7416 and 7610(a)).

Dated: September 23, 1999.

William P. Yellowtail,

Regional Administrator, Region VIII.

[FR Doc. 99-25834 Filed 10-4-99; 8:45 am]

BILLING CODE 6560-50-P

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.

Approval and Promulgation of State Implementation Plans; Call for Visibility SIP Revision for Colorado Class I Visibility Protection · 64 FR 54010 | Frix