DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EG99-171-000, et al.]

Woodstock Hills, LLC, et al.; Electric Rate and Corporate

Regulation Filings

June 28, 1999.

Take notice that the following filings have been made with the

Commission:

1. Woodstock Hills LLC

[Docket No. EG99-171-000]

Take notice that on June 18, 1999, Woodstock Hills LLC (Woodstock),

475 E. 4th Street, Cottonwood, Minnesota 56229, tendered for filing

with the Federal Energy Regulatory Commission an application for

determination of exempt wholesale generator status pursuant to Part 365

of the Commission's Regulations. Also take notice that on June 21,

1999, Woodstock tendered for filing in the above referenced proceeding

a signed copy of the Certificate of Mailing.

Woodstock will own and operate an approximate 10.2 megawatt

windpowered electric generation facility (Facility) in Woodstock,

Minnesota. Woodstock will sell the electric output of the Facility

exclusively at wholesale. The Facility will be located in proximity to

the transmission facilities of Northern States Power Company, and the

Facility will include only those interconnecting transmission

facilities necessary to effect sales of electric energy at wholesale.

Comment date: July 8, 1999, in accordance with Standard Paragraph E

at the end of this notice. The Commission will limit its consideration

of comments to those that concern the adequacy or accuracy of the

application.

2. HL Power Company Limited Partnership

[Docket No. EC99-89-000]

Take notice that on June 22, 1999, HL Power Company Limited

Partnership (HLP), a California limited partnership, tendered for

filing an application, pursuant to 18 CFR part 33, seeking authority

under Section 203 of the Federal Power Act for the Sale of (i) a 60 KV

electric transmission line used to deliver electric energy from the

Honey Lake small power production facility, located in Lassen County,

California, to a substation known as the Milwood Substation and (ii)

the Milwood Substation, which includes various items of interconnection

equipment and the parcel of real property upon which such equipment is

located, all of which was constructed and is currently owned by HLP to

Lassen County Municipal Utility District.

HLP has requested expedited consideration of the application in

light of the fact that no changes in the rates charged by HLP will

occur and that there will be no impact on the relevant competitive

markets.

Comment date: July 22, 1999, in accordance with Standard Paragraph

E at the end of this notice.

3. West Texas Renewables Limited Partnership

[Docket No. EG99-172-000]

Take notice that on June 18, 1999, West Texas Renewables Limited

Partnership, a limited partnership formed under the laws of the State

of Delaware, filed with the Federal Energy Regulatory Commission (the

Commission) an application for determination of exempt wholesale

generator status. West Texas Renewables Limited Partnership will be

engaged directly and exclusively in the business of owning and

operating a 6.6 MW wind generation facility (the Project) located in

Howard County, Texas which will be an eligibility facility within the

meaning of section 32(a)(2) of the Public Utility Holding Company Act

of 1935, as amended. All of the electricity produced by the Project

will be sold at wholesale to the Texas Utilities Electric Company, a

Texas corporation (TU Electric) pursuant to a long-term contract.

Comment date: July 8, 1999, in accordance with Standard Paragraph E

at the end of this notice. The Commission will limit its consideration

of comments to those that concern the adequacy or accuracy of the

application.

4. Public Service Company of New Mexico

[Docket Nos. ER96-1551-005, OA96-202-000 and OA96-202-002]

Take notice that on June 22, 1999, Public Service Company of New

Mexico (PNM), tendered for filing a Compliance Report regarding refunds

to affected

[[Page 36349]]

ancillary services customers, for mandatory ancillary services fees

collected (by PNM) in excess of PNM's proposed settlement agreement

rate approved by the Federal Energy Regulatory Commission in its April

6, 1999 letter order. The affected customers are:

Aquila Power Company

Arizona Public Service Company

Citizen's Power Sales

Vitol Gas & Electric Company

Duke Energy Trading

Enron Power Marketing, Inc.

Electric Clearinghouse, Inc.

El Paso Electric Company

El Paso Energy Marketing

E Prime, Inc.

City of Gallup

Idaho Power Company

Illinova Energy Partners, Inc.

Kirtland Air Force Base

Los Alamos County

Reliant Energy Services

PacifiCorp Electric Operations

Public Service Company of Colorado

Salt River Project Agricultural Improvement and Power District

Southwestern Public Service Company

Tucson Electric Power Company

Texas-New Mexico Power Company

Williams Energy Services Company

Copies of the filing have been provided to all parties to this

proceeding, and the filing is available for public inspection at PNM's

offices in Albuquerque, New Mexico.

Comment date: July 12, 1999, in accordance with Standard Paragraph

E at the end of this notice.

5. Cinergy Services, Inc.

[Docket No. ER99-1662-000]

Take notice that on June 23, 1999, Cinergy Services, Inc., acting

as agent for and on behalf of The Cincinnati Gas & Electric Company and

PSI Energy, Inc., tendered for filing an amended Service Agreement for

firm point-to-point transmission service entered into between Cinergy

and itself under Cinergy's Open Access Transmission Tariff.

Pursuant to the Commission's letter order dated May 24, 1999 in

this proceeding, Cinergy's filing was amended to include a specific

point of receipt and capacity reservation for the receipt/delivery

point combination.

Cinergy states that it has served copies of its filing upon all

parties of record in this proceeding.

Comment date: July 13, 1999, in accordance with Standard Paragraph

E at the end of this notice.

6. Duke Energy Corporation

[Docket No. ER99-2285-000]

Take notice that on June 23, 1999, Duke Energy Corporation (Duke),

tendered for filing an amendment to its firm point-to-point

transmission service agreement filed in the above-referenced docket.

Comment date: July 13, 1999, in accordance with Standard Paragraph

E at the end of this notice.

7. Electric Clearinghouse, Inc. and Illinois Power Company

[Docket No. ER99-3322-000]

Take notice that on June 21, 1999, Electric Clearinghouse, Inc.

(ECI) and Illinois Power Company (Illinois Power), jointly tendered for

filing pursuant to Rule 205, 18 CFR 385.205, revisions to their

respective rate schedules related to sales of energy and capacity at

market-based rates to each other.

ECI and Illinois Power request waiver of the Commission's 60-day

prior notice requirement in order to permit their respective revisions

to become effective on June 22, 1999.

Comment date: July 9, 1999, in accordance with Standard Paragraph E

at the end of this notice.

8. Ohio Valley Electric Corporation and Indiana-Kentucky Electric

Corporation

[Docket No. ER99-3326-000]

Take notice that on June 22, 1999, Ohio Valley Electric Corporation

(including its wholly-owned subsidiary, Indiana-Kentucky Electric

Corporation) (OVEC), tendered for filing a Service Agreement for Non-

Firm Point-To-Point Transmission Service, dated May 25, 1999 (the

Service Agreement) between Constellation Power Source, Inc.

(Constellation Power) and OVEC. The Service Agreement provides for non-

firm transmission service by OVEC to Constellation Power. In its

filing, OVEC states that the rates and charges included in the Service

Agreement are the rates and charges set forth in OVEC's Open Access

Transmission Tariff.

OVEC proposes an effective date of May 25, 1999 and requests waiver

of the Commission's notice requirement to allow the requested effective

date.

Copies of this filing were served upon the Public Service

Commission of Maryland, the Public Service Commission of District of

Columbia and Constellation Power.

Comment date: July 12, 1999, in accordance with Standard Paragraph

E at the end of this notice.

9. FirstEnergy System

[Docket No. ER99-3327-000]

Take notice that on June 22, 1999, FirstEnergy System tendered for

filing a Service Agreement to provide Firm Point-to-Point Transmission

Service for Carolina Power & Light Company, the Transmission Customer.

Services are being provided under the FirstEnergy System Open Access

Transmission Tariff submitted for filing by the Federal Energy

Regulatory Commission in Docket No. ER97-412-000.

The proposed effective date under this Service Agreement is June

10, 1999, for the above mentioned Service Agreement in this filing.

Comment date: July 12, 1999, in accordance with Standard Paragraph

E at the end of this notice.

10. Maine Electric Power Company

[Docket No. ER99-3328-000]

Take notice that on June 22, 1999, Maine Electric Power Company

(MEPCO), tendered for filing a service agreement for Short-Term Firm

Point-to-Point Transmission Service entered into with PP&L EnergyPlus

Company Service will be provided pursuant to MEPCO's Open Access

Transmission Tariff, designated rate schedule MEPCO-FERC Electric

Tariff, Original Volume No.1, as supplemented.

Comment date: July 12, 1999, in accordance with Standard Paragraph

E at the end of this notice.

11. UtiliCorp United Inc.

[Docket No. ER99-3329-000]

Take notice that on June 22, 1999, UtiliCorp United Inc.

(UtiliCorp), tendered for filing a service agreement with Enron Power

Marketing, Inc., for service under its Short-Term Firm Point-to-Point

open access service tariff for its operating division, WestPlains

Energy-Colorado.

Comment date: July 12, 1999, in accordance with Standard Paragraph

E at the end of this notice.

12. TXU Energy Trading Company

[Docket No. ER99-3333-000]

Take notice that on June 22, 1999, TXU Energy Trading Company

tendered for filing a Notice of Succession pursuant to Section 35.16 of

the Commission's Regulations, 18 CFR 35.16. As a result of a name

change, TXU Energy Trading Company is succeeding to the Rate Schedule

No. 1 and Supplement No. 1 to Rate Schedule No. 1 of Enserch Energy

Services, Inc., effective June 14, 1999.

Comment date: July 12, 1999, in accordance with Standard Paragraph

E at the end of this notice.

13. Maine Electric Power Company

[Docket No. ER99-3334-000]

Take notice that on June 22, 1999, Maine Electric Power Company

(MEPCO), tendered for filing a service

[[Page 36350]]

agreement for Long-Term Firm Point-to-Point Transmission Service

entered into with Engage Energy US, L.P. Service will be provided

pursuant to MEPCO's Open Access Transmission Tariff, designated rate

schedule MEPCO--FERC Electric Tariff, Original Volume No. 1, as

supplemented. This service represents a reassignment of transmission

rights currently held by Central Maine Power Company (CMP) under FERC

Rate Schedule Vol. 1, Service Agreement No. 5.

Comment date: July 12, 1999, in accordance with Standard Paragraph

E at the end of this notice.

14. Rocky Road Power, LLC

[Docket No. ER99-3335-000]

Take notice that on June 22, 1999, Rocky Road Power, LLC, tendered

for filing a Power Purchase Agreement for short-term transactions

between Rocky Road Power, LLC and Electric Clearinghouse, Inc., to be

in effect as of May 24, 1999.

Comment date: July 12, 1999, in accordance with Standard Paragraph

E at the end of this notice.

15. Northeast Utilities Service Company

[Docket No. ER99-3336-000]

Take notice that on June 23, 1999, Northeast Utilities Service

Company (NUSCO), tendered for filing a Service Agreement with TransAlta

Energy Marketing (U.S.) Inc. (TransAlta) under the NU System Companies'

Sale for Resale Tariff No. 7.

NUSCO states that a copy of this filing has been mailed to

TransAlta.

NUSCO requests that the Service Agreement become effective July 1,

1999.

Comment date: July 13, 1999, in accordance with Standard Paragraph

E at the end of this notice.

16. Florida Power & Light Company

[Docket No. ER99-3337-000]

Take notice that on June 23, 1999, Florida Power & Light Company

(FPL), tendered for filing proposed service agreements with Electric

Clearinghouse, Inc., for Short-Term Firm transmission service under

FPL's Open Access Transmission Tariff.

FPL requests that the proposed service agreements be permitted to

become effective on June 1, 1999.

FPL states that this filing is in accordance with Part 35 of the

Commission's Regulations.

Comment date: July 13, 1999, in accordance with Standard Paragraph

E at the end of this notice.

17. Penobscot Hydro, LLC

[Docket No. ER99-3338-000]

Take notice that on June 23, 1999, Penobscot Hydro, LLC

(Penobscot), tendered for filing with the Commission an executed

Transitional Power Sales Agreement (TSA) between Penobscot and Bangor

Hydro-Electric Company (Bangor) to replace the unexecuted agreement

previously accepted for filing by the Commission on April 23, 1999, in

this docket.

Comment date: July 13, 1999, in accordance with Standard Paragraph

E at the end of this notice.

18. California Independent System Operator Corporation

[Docket No. ER99-3339-000]

Take notice that on June 23, 1999, the California Independent

System Operator Corporation (ISO), tendered for filing a proposed

amendment (Amendment No. 19) to the ISO Tariff. Amendment No. 19, would

modify the ISO Tariff to implement the ISO's New Generator

Interconnection Policy, which sets forth the obligations and

responsibilities of Generating Units requesting interconnection to the

ISO Controlled Grid and the procedures and requirements for processing

such interconnection requests.

The ISO states that this filing has been served upon the Public

Utilities Commission of California, the California Energy Commission,

the California Electricity Oversight Board, and all parties with

effective Scheduling Coordinator Service Agreements under the ISO

Tariff.

Comment date: July 13, 1999, in accordance with Standard Paragraph

E at the end of this notice.

19. Joe Bob Perkins

[Docket No. ID-3184-003]

Take notice that on June 23, 1999, Mr. Joe Bob Perkins, a former

officer and director of El Dorado Energy, LLC, tendered for filing with

the Federal Energy Regulatory Commission (Commission) a notice of

withdrawal from interlocking positions pursuant to Section 305(b) of

the Federal Power Act, Section 45.5(b) of the Commission's Regulations,

18 CFR 45.5(b), and the Commission's Order in El Dorado Energy, LLC, 85

FERC para. 61,006 (1998).

Comment date: July 13, 1999, in accordance with Standard Paragraph

E at the end of this notice.

Standard Paragraphs

E. Any person desiring to be heard or to protest such filing should

file a motion to intervene or protest with the Federal Energy

Regulatory Commission, 888 First Street, NE, Washington, DC 20426, in

accordance with Rules 211 and 214 of the Commission's Rules of Practice

and Procedure (18 CFR 385.211 and 385.214). All such motions or

protests should be filed on or before the comment date. Protests will

be considered by the Commission in determining the appropriate action

to be taken, but will not serve to make protestants parties to the

proceeding. Any person wishing to become a party must file a motion to

intervene. Copies of these filings are on file with the Commission and

are available for public inspection. This filing may also be viewed on

the Internet at http://www.ferc.fed.us/online/rims.htm (call 202-208-

2222 for assistance).

David P. Boergers,

Secretary.

[FR Doc. 99-16981 Filed 7-2-99; 8:45 am]

BILLING CODE 6717-01-P

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.