ENVIRONMENTAL PROTECTION AGENCY

[FRL-6354-2]

Agency Information Collection Activities: Comment Request; See

List of ICRs Planned To Be Submitted in Section A

AGENCY: Environmental Protection Agency (EPA).

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: In compliance with the Paperwork Reduction Act (44 U.S.C. 3501

et seq.), this document announces that EPA is planning to submit the

following 19 continuing Information Collection Requests (ICR) to the

Office of Management and Budget (OMB). Before submitting the ICRs to

OMB for

[[Page 30012]]

review and approval, EPA is soliciting comments on specific aspects of

the information collections as described at the beginning of

Supplementary Information.

DATES: Comments must be submitted on or before August 3, 1999.

ADDRESSES: US Environmental Protection Agency, 401 M Street SW, Office

of Compliance, Mail Code 2223A, Washington, DC 20460. A hard copy of an

ICR may be obtained without charge by calling the identified

information contact individual for each ICR in section B of the

Supplementary Information.

FOR FURTHER INFORMATION CONTACT: For specific information on the

individual ICRs see section B of the Supplementary Information.

SUPPLEMENTARY INFORMATION:

For All ICRs

An Agency may not conduct or sponsor, and a person is not required

to respond to, a collection information unless it displays a currently

valid OMB control number. The OMB control numbers for EPA's regulations

are displayed in 40 CFR part 9.

The EPA would like to solicit comments to:

(i) Evaluate whether the proposed collection of information is

necessary for the proper performance of the functions of the Agency,

including whether the information will have practical utility;

(ii) Evaluate the accuracy of the Agency's estimate of the

burden of the proposed collection of information;

(iii) Enhance the quality, utility, and clarity of the

information to be collected; and (iv) Minimize the burden of the

collection of information on those who are to respond, including

through the use of automated collection techniques or other forms of

information technology, e.g., permitting electronic submission of

responses.

Burden means the total time, effort, or financial resources

expended by persons to generate, maintain, retain, or disclose or

provide information to or for a Federal agency. This includes the time

needed to review instructions; develop, acquire, install, and utilize

technology and systems for the purposes of collecting, validating, and

verifying information, processing and maintaining information, and

disclosing and providing information; adjust the existing ways to

comply with any previously applicable instructions and requirements;

train personnel to be able to respond to a collection of information;

search data sources; complete and review the collection of information;

and transmit or otherwise disclose the information.

A. List of ICRs Planned To Be Submitted

In compliance with the Paperwork Reduction Act (44 U.S.C. 3501 et

seq.), this document announces that EPA is planning to submit the

following 19 continuing Information Collection Requests (ICR) to the

Office of Management and Budget (OMB):

(1) NSPS subpart D, Fossil Fuel Fired Steam Generators; EPA ICR

Number 1052, and OMB Control Number 2060-0026, expires September 30,

1999.

(2) NSPS subpart Da, Electric Utility Steam Generating Units; EPA

ICR Number 1053, and OMB Control Number 2060-0023, expires September

30, 1999.

(3) NSPS subpart Db, Industrial-Commercial-Institutional Steam

Generating Units; EPA ICR Number 1088, and OMB Control Number 2060-

0072, expires August 31, 1999.

(4) NSPS subpart I, Hot Mix Asphalt; EPA ICR Number 1127, and OMB

Control Number 2060-0083, expires September 30, 1999.

(5) NSPS subpart BB, Kraft Pulp Mills; EPA ICR Number 1055, and OMB

Control Number 2060-0021, expires September 30, 1999.

(6) NSPS subpart DD, Grain Elevators; EPA ICR Number 1130, and OMB

Control Number 2060-0082, expires November 30, 1999.

(7) NSPS subpart HH, Lime Manufacturing; EPA ICR Number 1167, and

OMB Control Number 2060-0063, expires August 31, 1999.

(8) NSPS subpart RR, Pressure Sensitive Tape and Label; EPA ICR

Number 0658, and OMB Control Number 2060-0004, expires September 30,

1999.

(9) NSPS subpart SS, Surface Coating of Large Appliances; EPA ICR

Number 0659, and OMB Control Number 2060-0108, expires October 31,

1999.

(10) NSPS subpart TT, Metal Coil Surface Coating; EPA ICR Number

0660, and OMB Control Number 2060-0107, expires October 31, 1999.

(11) NSPS subpart WW, Beverage Can Surface Coating; EPA ICR Number

0663, and OMB Control Number 2060-0001, expires September 30, 1999.

(12) NSPS subpart DDD, VOC Emissions from the Polymer Manufacturing

Industry, EPA ICR Number 1150, and OMB Control Number 2060-0145,

expires November 30, 1999.

(13) NSPS subpart GGG, Petroleum Refineries; EPA ICR Number 0983,

and OMB Control Number 2060-0067, expires August 31, 1999.

(14) NSPS subpart HHH, Synthetic Fiber Production; EPA ICR Number

1156, and OMB Control Number 2060-0059, expires October 31, 1999.

(15) NSPS subparts III and NNN, SOCMI Air Oxidation & Distillation;

EPA ICR Number 0998, and OMB Control Number 2060-0197, expires August

31, 1999.

(16) NSPS subpart JJJ, Petroleum Dry Cleaners; EPA ICR Number 0997,

and OMB Control Number 2060-0079, expires November 30, 1999.

(17) NSPS subpart RRR, SOCMI Reactor Processes; EPA ICR Number

1178, and OMB Control Number 2060-0269, expires September 30, 1999.

(18) NESHAP subpart FF, Benzene Waste; EPA ICR Number 1541, and OMB

Control Number 2060-0183, expires September 30, 1999.

(19) NESHAP subpart M, Asbestos; EPA ICR Number 0111, and OMB

Control Number 2060-0101, expires September 30, 1999.

B. Contact Individuals for ICRs

(1) NSPS subpart D, Fossil Fuel Fired Steam Generators; Jordan

Spooner, (202) 564-7058, [email protected], EPA ICR Number

1052, and OMB Control Number 2060-0026, expires September 30, 1999.

(2) NSPS subpart Da, Electric Utility Steam Generating Units;

Jordan Spooner, (202) 564-7058, [email protected] EPA ICR

Number 1053, and OMB Control Number 2060-0023, expires September 30,

1999.

(3) NSPS subpart Db, Industrial-Commercial-Institutional Steam

Generating Units; Jordan Spooner, (202) 564-7058,

[email protected], EPA ICR Number 1088, and OMB Control

Number 2060-0072, expires August 31, 1999.

(4) NSPS subpart I, Hot Mix Asphalt; Belinda Breidenbach, (202)

564-7022, [email protected], EPA ICR Number 1127, and

OMB Control Number 2060-0083, expires September 30, 1999.

(5) NSPS subpart BB, Kraft Pulp Mills; Seth Heminway, (202) 5564-

7017, [email protected], EPA ICR Number 1055, and OMB

Control Number 2060-0021, expires September 30, 1999.

(6) NSPS subpart DD, Grain Elevators; Ken Harmon, (202) 564-7049,

[email protected], EPA ICR Number 1130, and OMB Control

Number 2060-0082, expires November 30, 1999.

(7) NSPS subpart HH, Lime Manufacturing; Belinda Breidenbach, (202)

564-7022, [email protected], EPA ICR Number 1167, and

OMB

[[Page 30013]]

Control Number 2060-0063, expires August 31, 1999.

(8) NSPS subpart RR, Pressure Sensitive Tape and Label; Seth

Heminway, (202) 5564-7017, [email protected], EPA ICR

Number 0658, and OMB Control Number 2060-0004, expires September 30,

1999.

(9) NSPS subpart SS, Surface Coating of Large Appliances; Belinda

Breidenbach, (202) 564-7022, [email protected], EPA

ICR Number 0659, and OMB Control Number 2060-0108, expires October 31,

1999.

(10) NSPS subpart TT, Metal Coil Surface Coating; Belinda

Breidenbach, (202) 564-7022, [email protected], EPA

ICR Number 0660, and OMB Control Number 2060-0107, expires October 31,

1999.

(11) NSPS subpart WW, Beverage Can Surface Coating; Belinda

Breidenbach, (202) 564-7022, [email protected], EPA

ICR Number 0663, and OMB Control Number 2060-0001, expires September

30, 1999.

(12) NSPS subpart DDD, VOC Emissions from the Polymer Manufacturing

Industry, Sally Sasnett, (202) 564-7074 [email protected]

EPA ICR Number 1150, and OMB Control Number 2060-0145, expires November

30, 1999.

(13) NSPS subpart GGG, Petroleum Refineries; Tom Ripp, (202) 564-

7003, [email protected], EPA ICR Number 0983, and OMB Control

Number 2060-0067, expires August 31, 1999.

(14) NSPS subpart HHH, Synthetic Fiber Production; Belinda

Breidenbach, (202) 564-7022, [email protected], EPA

ICR Number 1156, and OMB Control Number 2060-0059, expires October 31,

1999.

(15) NSPS subparts III and NNN, SOCMI Air Oxidation & Distillation;

Marcia Mia, (202) 564-7042, [email protected], EPA ICR Number

0998, and OMB Control Number 2060-0197, expires August 31, 1999.

(16) NSPS subpart JJJ, Petroleum Dry Cleaners; Joyce Chandler,

(202) 564-7073, [email protected], EPA ICR Number 0997,

and OMB Control Number 2060-0079, expires November 30, 1999.

(17) NSPS subpart RRR, SOCMI Reactor Processes; Darlene Williams,

(202) 564-7031, [email protected], EPA ICR Number 1178,

and OMB Control Number 2060-0269, expires September 30, 1999.

(18) NESHAP subpart FF, Benzene Waste; Rafael Sanchez, (202) 564-

7028, [email protected], EPA ICR Number 1541, and OMB

Control Number 2060-0183, expires September 30, 1999.

(19) NESHAP subpart M, Asbestos; Tom Ripp, (202) 564-7003,

[email protected], EPA ICR Number 0111, and OMB Control Number

2060-0101, expires September 30, 1999.

C. Individual ICRs

(1) NSPS Subpart D, Fossil Fuel Fired Steam Generators; EPA ICR Number

1052, and OMB Control Number 2060-0026, Expires September 30, 1999

This standard applies to each fossil-fuel-fired steam generating

unit of more than 73 MW heat input rate (250 million Btu per hour),

that were constructed after August 17, 1971 and before September 18,

1978. Owners or operators must provide EPA or the delegated State

regulatory authority with the following one-time-only reports

(specified in 40 CFR 60.7): Notifications of the anticipated and actual

date of start up, notification of the date of construction or

reconstruction, notification of any physical or operational changes to

an existing facility which may increase the emission rate of any

regulated air pollutant, notification of the date upon which

demonstration of the continuous monitoring system performance

commences, notification of the date of the initial performance test,

and results of the performance test. Owners and operators are also

required to maintain records of the occurrence and duration of any

start up, shutdown, or malfunction in the operation of an affected

facility, or malfunction in the operation of the air pollution control

device, or any periods during which the monitoring system is

inoperative. Records shall be retained for at least two years.

In addition to reporting and recordkeeping requirements, facilities

subject to this subpart must install, calibrate, maintain, and operate

a continuous monitoring system (CMS) to monitor SO2,

NOX and opacity (specified in 40 CFR 60.45), and must notify

EPA or the State regulatory authority of the date upon which

demonstration of the CMS commences. Owners or operators must submit

quarterly reports indicating whether compliance was achieved, and their

assessment of monitoring system performance (specified in 40 CFR 60.7).

Burden Statement: The Agency computed the burden for each of the

recordkeeping and reporting requirements applicable to the industry.

Where applicable, the Agency identified specific tasks and made

assumptions, while being consistent with the concept of burden under

the Paper Reduction Act. The estimates were based on the assumption

that there would be no new affected facilities, because new utility

boilers constructed after September 18, 1978 are subject to subpart Da,

and boilers constructed after June 19, 1986 are subject to subpart Db.

Therefore, the requirements for initial notifications and the

performance test are not included. Approximately 660 sources are

currently subject to the standard. It was also assumed each source

operates 365 days per year.

For recordkeeping, it was estimated that for each source it would

take 91.25 person-hours per year to check, maintain, and operate the

continuous emission monitors. For reporting, it was estimated that for

each source it would take 4 person-hours per year for the quarterly

reports of excess emissions and monitoring system performance.

(2) NSPS Subpart Da, Electric Utility Steam Generating Units; EPA ICR

Number 1053, and OMB Control Number 2060-0023, Expires September 30,

1999

This standard applies to each electric utility steam generating

unit which is capable of combusting more than 73 MW (250 million Btu/

hr) heat input of fossil fuel, and for which construction or

modification is commenced after September 18, 1978. Owners or operators

must provide EPA, or the delegated State regulatory authority with the

following one-time-only reports: Notifications of the anticipated and

actual date of start up, notification of the date of construction or

reconstruction, notification of any physical or operational changes to

an existing facility which may increase the emission rate of any

regulated air pollutant, notification of the date upon which

demonstration of the continuous monitoring system commences,

notification of the date of the initial performance test, and results

of the performance test. Owners and operators are also required to

maintain records of the occurrence and duration of any start up,

shutdown, or malfunction in the operation of an affected facility, or

malfunction in the operation of the air pollution control device, or

any periods during which the monitoring system is inoperative. Records

shall be retained for at least two years.

[[Page 30014]]

In addition to reporting and recordkeeping requirements specified

in 40 CFR 60.7, facilities subject to this subpart must install,

calibrate, maintain, and operate a continuous monitoring system (CMS)

to monitor SO2, NOX and opacity (specified in 40

CFR 60.7 and 40 CFR 60.47a), and must notify EPA or the State

regulatory authority of the date upon which demonstration of the CMS

performance commences (specified in 40 CFR 60.47a). Owners or operators

must submit quarterly reports indicating whether compliance was

achieved, and their assessment of monitoring system performance

(specified in 40 CFR 60.49a).

Burden Statement: The Agency computed the burden for each of the

recordkeeping and reporting requirements applicable to the industry.

The estimates were based on the assumption that there would be seven

new affected facilities each year, and there were an average of 103

sources in existence for the three years covered by the ICR. It was

also assumed each source operates 365 days per year.

For each new source, it was estimated that it would take: One

person-hour to read the instructions; 10.4 person-hours to write the

initial notifications; and 290.8 person-hours to conduct the initial

performance test and reference method 9 test (assuming that 20% of the

tests must be repeated). For each source, it was estimated that it

would take: 32 person-hours to write quarterly reports of excess

emissions and monitoring system performance; and 182.5 person-hours to

check, maintain, and operate continuous emission monitors.

(3) NSPS Subpart Db, Industrial-Commercial-Institutional Steam

Generating Units; EPA ICR Number 1088, and OMB Control Number 2060-

0072, Expires August 31, 1999

Affected facilities are each steam generating unit that commences

construction, modification or reconstruction after June 19, 1984, and

that has a heat input capacity from fuels combusted in the steam

generating unit of greater than 29 MW (100 million Btu/hour). Owners or

operators of the affected facilities described must make the following

one-time-only reports: Notification of the date of construction or

reconstruction; notification of the anticipated and actual dates of

startup; notification of any physical or operational change to an

existing facility which may increase the regulated pollutant emission

rate; notification of demonstration of the continuous monitoring system

(CMS); notification of the date of the initial performance test; and

the results of the initial performance test. Owners or operators are

also required to maintain records of the occurrence and duration of any

startup, shutdown, or malfunction in the operation of an affected

facility, or any period during which the monitoring system is

inoperative. These notifications, reports and records are required, in

general, of all sources subject to NSPS.

Burden Statement: The Agency computed the burden for each of the

recordkeeping and reporting requirements applicable to the industry.

Where applicable, the Agency identified specific tasks and made

assumptions, while being consistent with the concept of burden under

the Paper Reduction Act. The estimate was based on the assumption that

there would be 58 new affected facilities each year, and that there

were approximately 785 sources in existence for the three years covered

by the ICR. The annual burden of reporting and recordkeeping

requirements for facilities subject to subpart Db are summarized by the

following information.

The reporting requirements are as follows: Read instructions (1

person-hour); initial performance test (330 person-hours); 24-hour test

for gas units (250 person-hours); repeat of initial performance test

(330 person-hours); repeat of 24-hour test for gas units (250 person-

hours) (Assume 20% of tests are repeated); demonstration of CEMS: For

SO2 (150 person-hours), for PM (100 person-hours), for

NOX (350 person-hours); repeat demonstration of CEMS (Assume

20% repeat rate); annual compliance tests for NOX (250

person-hours); Appendix F annual accuracy test: For SO2 (146

person-hours), for NOX (146 person-hours); Appendix F

quarterly audit, SO2: For in-situ (125 person-hours), for

extractive (36 person-hours); Appendix F quarterly audit,

NOX: For in-situ (125 person-hours), for extractive (36

person-hours) (Assume that 25% of units have an in-situ CEMS).

Sources are required to write reports on: Notification of

construction/reconstruction (2 person-hours), notification of

anticipated startup (2 person-hours), notification of actual startup (2

person-hours), monitoring plan (4 person-hours), notification of

initial performance test: For SO2 (2 person-hours), for PM

(2 person-hours), for NOX (2 person-hours); report of

initial performance test: For SO2 (16 person-hours), for

NOX (16 person-hours); notification of CMS demonstration:

For SO2 (2 person-hours), for PM (2 person-hours), for

NOX (2 person-hours). Quarterly reports for SO2

(16 person-hours); quarterly reports for PM: Excess (16 person-hours),

no excess (8 person-hours); quarterly reports for NOX: CEMS

compliance (16 person-hours), excess (16 person-hours), no excess (8

person-hours); Appendix F quarterly reports: For SO2 (11

person-hours), for NOX (11 person-hours). Recordkeeping

requirements include the following: Maintaining records of startups,

shutdowns, and malfunctions (1.5 person-hours); maintaining records of

all measurements (1.5 person-hours).

(4) NSPS Subpart I, Hot Mix Asphalt; EPA ICR Number 1127, and OMB

Control Number 2060-0083, Expires September 30, 1999

The New Source Performance Standards (NSPS) for hot mix asphalt

facilities were proposed on June 11, 1973 and promulgated on July 25,

1977. These standards apply to each hot mix asphalt plant commencing

construction, modification, or reconstruction after the date of

proposal. The affected facility is each hot mix asphalt facility

comprised only of any combination of the following: Dryers; systems for

screening, handling, storing, and weighing hot aggregate; systems for

loading, transferring, and storing mineral filler, systems for mixing

hot asphalt; and the loading, transfer and storage systems associated

with emission control systems.

Approximately 1280 sources are currently subject to the standard

and it is estimated that an additional 60 sources per year will become

subject to the standard in the next three years. Particulate matter is

the pollutant regulated under this Subpart.

Owners or operators of the affected facilities described must make

the following one-time only reports: Notification of the date of

construction or reconstruction; notification of the anticipated and

actual date of a start up; notification of any physical or operational

change to an existing facility which may increase the regulated

pollutant emission rate; notification of the date of the initial

performance test; and results of the initial performance test including

information necessary to determine the conditions of the performance

test measurements and results, including particulate matter

concentration and opacity. Owners or operators are also required to

maintain records of the occurrence and duration of any startup, shut

down, or malfunction in the operation of an affected facility as well

as the nature and cause of the malfunction (if known) and corrective

measures taken.

Any owner or operator subject to the provisions of NSPS subpart I,

shall maintain a file for a minimum of two

[[Page 30015]]

years following the date of such measurements, maintenance reports and

records.

Burden Statement: The average annual burden to industry over the

next three years from these recordkeeping and reporting requirements is

estimated at 4611 person-hours. Initial performance test require

approximately 24 person-hours. From experience with the regulations we

assume 20% of the initial performance test will be repeated due to

failure. The written notifications of construction, modification and

notification of initial performance test require 2.0 hours each.

Reference Method 9 tests require 4 hours each. It is estimated to take

1.5 hours per year per plant to record start-ups, shut-downs, and

malfunctions.

(5) NSPS Subpart BB, Kraft Pulp Mills; EPA ICR Number 1055, and OMB

Control Number 2060-0021, Expires September 30, 1999

This ICR contains recordkeeping and reporting requirements that are

mandatory for compliance with subpart BB, New Source Performance

Standards for Kraft Pulp Mills. In the Administrator's judgement,

particulate matter and Total Reduced Sulfur (TRS) from kraft pulp mills

cause or contribute to air pollution that may reasonably be anticipated

to endanger public health or welfare. Therefore, New Source Performance

Standards have been promulgated for this source category as required

under section 111 of the Clean Air Act.

The control of emissions of particulate matter and TRS requires not

only the installation of properly designed equipment, but also the

proper operation and maintenance of that equipment. These standards

rely on the capture of pollutants vented to a control device. Owners or

operators of kraft pulp mills subject to NSPS subpart BB are required

to make initial notifications for construction, startup, and

performance testing. They must also report the results of a performance

test, and demonstration of a continuous monitoring system if

applicable. After the initial recordkeeping and reporting requirements,

semiannual excess emission reports are required. Owners or operators

are also required to maintain records of the occurrence and duration of

any startup, shutdown, or malfunction in the operation of an affected

facility, or malfunction in the operation of the air pollution control

device, or any periods during which the monitoring system is

inoperative. These notifications, reports and records are required in

general, of all sources subject to NSPS.

Burden Statement: There are 74 sources subject to the standards. It

is estimated that 2 additional sources per year will become subject to

the standard. The current ICR estimates average annual burden to the

industry to be 16,237 person hours. The following is a breakdown of

burden used in the ICR. Burden is calculated as two hours for

respondents to write the reports for; notification of construction or

reconstruction, notification of physical or operational changes,

notification of anticipated startup, notification of actual startup,

notification of initial performance test, notification of demonstration

of CMS. Initial performance tests are allocated 370 burden hours. It is

assumed that 20% of all affected facilities will have to repeat

performance tests. The ICR allocates four hours for Method 9.

The recordkeeping burden is estimated to be 30 minutes to enter

records of operating parameters. It is assumed that the plant will

operate 350 days a year, therefore, this information will be recorded

350 times a year. Sources which have excess emissions are required to

submit excess emission reports. These reports are allocated 16 burden

hours with an average of 2 reports per year. There is no additional

third party burden relevant to this ICR.

(6) NSPS Subpart DD, Grain Elevators; EPA ICR Number 1130, and OMB

Control Number 2060-0082, Expires November 30, 1999

Grain terminal elevators and grain storage elevators as defined at

40 CFR 60.301(c) and (f). Potentially affected facilities include each

truck unloading station, truck loading station, barge and ship

unloading station, barge and ship loading station, railcar unloading

station, railcar loading station, grain dryer, and all grain handling

operations at any grain terminal elevator or any grain storage

elevator. There are 66 sources subject to the standard. EPA expects the

industry to grow at the rate of one additional source each year. The

regulated pollutant is particulate matter.

The NSPS general provisions require owners or operators of the

affected facilities subject to NSPS subpart DD to make the following

one-time-only reports: Notification of the date of construction or

reconstruction 40 CFR 60.7(a)(1), notification of the anticipated date

of startup 40 CFR 60.7(a)(2), notification of actual date of startup 40

CFR 60.7(a)(3), notification of any physical or operational change to

an existing facility that may increase the rate of emission of the

regulated pollutant 40 CFR 60.7(a)(4), notification of the date of the

initial performance test 40 CFR 60.8(d). The results of the initial

performance test, 40 CFR 60.8(a), including information necessary to

determine the conditions of the performance test and performance test

measurements and results, including particulate matter concentration

and opacity must be reported. Records must be maintained of performance

test results 40 CFR 60.7(c) for at least two years after the date of

measurements 40 CFR 60.7(f), including performance test measurements,

and all other information required by the general provisions in a form

suitable for inspection. Records must be maintained of the occurrence

and duration of any startup, shutdown, or malfunction in the operation

of an affected facility, as well as the nature and cause of the

malfunction (if known) and corrective measures taken, 40 CFR 60.7(b).

Subpart DD does not specify a retention time. In the general

provisions, section 60.7(f) requires owners and operators to retain

facility records for at least two years after the date of measurement.

Burden Statement: The estimated annual burden is calculated as one

hour for the newly subject respondent to read the reporting

requirements; 24 hours for the new respondent to perform the initial

performance test, 4.8 hours annually to account for the estimated 20

percent of performance tests that must be repeated, 4 hours for the new

respondent to perform the Method 9 tests, 0.8 hours annually to account

for the estimated 20 percent of Method 9 tests that must be repeated,

two hours to prepare and send the notification of construction/

reconstruction of the newly-subject source, two hours to prepare and

send notification of anticipated startup, two hours to prepare and send

notification of actual startup, and two hours to prepare and send

notification of the initial performance test. Together, these

information collection activities required of the anticipated one new

source annually amount to and average of 42.6 person hours.

Additionally, EPA estimates that established sources will spend an

average of an hour annually entering information regarding startups,

shutdowns, and malfunctions.

(7) NSPS Subpart HH, Lime Manufacturing; EPA ICR Number 1167, and OMB

Control Number 2060-0063, Expires August 31, 1999

The New Source Performance Standards (NSPS) for lime manufacturing

plants were proposed on May 3, 1977 and promulgated on April 26, 1984.

These standards apply to each rotary lime kiln used in lime

[[Page 30016]]

manufacturing, which commenced construction, modification or

reconstruction after May 3, 1977. These standards do not apply to

facilities used in the manufacture of lime at kraft pulp mills.

Approximately 38 sources are currently subject to NSPS, subpart HH. It

is estimated that an additional two sources per year will become

subject to the standard in the next three years.

Particulate matter is the pollutant regulated under this subpart.

The standards limit particulate emissions to 0.03 kilogram per megagram

(0.60 lb/ton) of stone feed, and limit opacity to 15% when exiting from

a dry emission control device.

Owners or operators of the affected facilities described must make

the following one-time only reports: Notification of the date of

construction and reconstruction; notification of the anticipated and

actual dates of startup; notification of any physical or operational

change to an existing facility which may increase the regulated

pollutant emission rate; notification of the demonstration of the

continuous monitoring system (CMS); notification of the date of the

initial performance test; and results of the initial performance test.

Owners or operators are also required to maintain records of the

occurrence and duration of any startup, shutdown, or malfunction in the

operation of an affected facility, or any period during which the

monitoring system is inoperative. These notifications, reports and

records are required, in general, of all sources subject to NSPS.

Owners or operators of the rotary kilns using a control device with

a multiple stack exhaust or roof monitor may instead monitor visible

emissions at least once a day by a certified observer using Method 9.

Owners or operators of affected facilities using a wet scrubber

emission control device shall install, calibrate, maintain, and operate

a continuous monitoring device which monitors the pressure loss of the

gas stream through the scrubber, and a continuous monitoring device

which monitors the scrubbing liquid supply pressure to the control

device.

Semiannual excess emissions reports and monitoring system

performance reports shall include all 6-minute periods during which the

average opacity of the visible emissions from any lime kiln is greater

than 15% or for wet scrubbers, any period in which the scrubber

pressure drop is greater than 30% below the rate established during the

performance test, and reports of visible emissions; the date and time

of the exceedance or deviance; the nature and cause of the malfunction

(if known) and corrective measures taken; and identification of the

time period during which the CMS was inoperative. This does not include

zero and span checks nor typical repairs or adjustments.

Any owner or operator subject to the provisions of this part shall

maintain a file for a minimum of two years following the date of such

measurements, maintenance reports and records.

Burden Statement: The average annual burden to industry over the

next three years from these recordkeeping and reporting requirements is

estimated at 3,363.6 person-hours. The initial performance test

requires approximately 280 person-hours. (Assuming 20% of the initial

performance test will be repeated due to failure.) The Reference Method

9 test requires 4.0 hours. The written notifications of construction,

modification, notification of initial performance test and

demonstration of CMS require 2.0 person-hours each. Records of

startups, shutdown and malfunctions also require 2.0 hours to enter

information. Excess emission reports require 8.0 person-hours.

(8) NSPS Subpart RR, Pressure Sensitive Tape and Label; EPA ICR Number

0658, and OMB Control Number 2060-0004, Expires September 30, 1999

This ICR contains recordkeeping and reporting requirements that are

mandatory for compliance with subpart RR, New Source Performance

Standards for facilities that manufacture pressure sensitive tape and

labels. In the Administrator's judgement volatile organic compounds

(VOC's) from this industry contribute to air pollution that may

reasonably be anticipated to endanger public health and welfare.

Therefore, this NSPS was promulgated under Clean Air Act (CAA) section

111 for this source category. EPA is granted the authority to require

facilities to provide information concerning their air emissions under

CAA sections 111(a) and 114(a).

Owners and operators of the affected facilities must make the

following one time-only reports: Notification of the date of

construction or reconstruction; notification of the anticipated and

actual dates of initial start-up; notification of any physical change

to an existing facility that may increase the regulated pollutant

emission rate; notification of initial performance test and the results

of the initial performance test. Owners or operators are also required

to maintain records of the occurrence and duration of any start-up,

shut-down or malfunction in the operation of an affected facility, or

any period during which the monitoring system is inoperative. These

notifications, reports and records are required, in general, of all

sources subject to NSPS.

Monitoring requirements specific to these coating operations

consist of maintaining a calendar month record of all coatings used and

their VOC content, the amount of solvent applied and recovered when a

solvent recovery device is used, temperature of exhaust gases if

thermal incineration is used, temperature of exhaust gases both

upstream and downstream of the catalyst bed if catalytic incineration

is used and an indication that a hood or enclosure device to capture

fugitive emissions is operational. Any affected facility that inputs to

the coating process 45 Mg of VOC or less per 12 month period is not

subject to the emission limits of 40 CFR 60.442. However, the affected

facility shall maintain a 12 month record of the amount of solvent

applied in the coating at the facility. When thermal or catalytic

incineration is performed, the owner or operator shall keep records of

each three-hour period during which the incinerator temperature

averaged more than 38 degrees Celsius below the temperature of the most

recent performance test. Records of this information shall be kept at

the source for a period of two years. The recordkeeping requirements

for the surface coating industry of pressure sensitive tape and labels

consist of the occurrence and duration of any start-up and malfunctions

as described. They include the initial performance test results

including information necessary to determine conditions of the

performance test, and performance test measurements and results

including, for affected facilities complying with the standard without

the use of add-on controls, a weighted average of the mass of solvent

used per mass of coating solids applied; the weighted average mass of

VOC per mass of coating solids applied at facilities controlled by a

solvent recovery device; and the weighted average mass of VOC per mass

of coating solids applied being used at a facility controlled by a

solvent destruction device; and the results of the monthly performance

and records of operating parameters. Records of start-ups, shutdowns,

and malfunctions should be noted as they occur. Any owner or operator

subject to the provisions of this part shall maintain a file of these

measurements, and retain the file for at least two years following the

date of such measurements and records. The reporting requirements for

this industry currently include the

[[Page 30017]]

initial notifications listed, the initial performance test results,

quarterly reports of excess VOC emissions, and semiannual reports when

no excess emissions are recorded. Semiannual monitoring system results

shall include temperature variances of the control device, the date and

time of the deviance, the nature and cause of the malfunction (if

known) and corrective measures taken, and identification of the time

period during which the continuous monitoring system was inoperative.

Notifications inform the Agency or delegated authority about when a

source becomes subject to the standard. The reviewing authority can

then inspect the source to check if the pollution control devices are

properly installed and operated. Performance test reports are needed as

these are the Agency's record of a source's initial capability to

comply with the emissions standard. The semiannual reports are used for

problem identification, and a check on source operation and

maintenance, and for compliance determinations. This collected

information is used by the Agency to efficiently monitor industry

compliance with NSPS. In the absence of collecting such information,

continuous monitoring of compliance with the standards could be ensured

only through continuous on-site inspections.

Burden Statement: The reporting requirements for this information

collection consist of performance testing, notifications and VOC

emission reporting. EPA estimates that each initial performance test

will take 60 hours to complete and that 45 new or modified facilities

will be required to conduct the tests each year and that about 20

percent will fail and have to re-test. In addition, there are monthly

performance tests which take approximately 1 hour to conduct, for a

total of 12 hours per year per facility. These are conducted to ensure

that the pollution control systems are working. In terms of the

notification requirements, EPA estimates that on average it takes two

hours a piece to prepare the four different notifications for a new

plant, notification of construction, anticipated start-up, actual

start-up, initial performance test, and submission of the initial

performance test. Each facility is required to report on a semiannual

basis the amount of emissions that the facility emitted in excess of

the emission standard. Assuming that a facility would submit one report

a year for excess emissions in addition to the required semiannual

emission report a facility would spend about 5 hours preparing each

report for a total of 10 hours per year. For those facilities using

incineration (assume 80 percent of all facilities) to control

emissions, exhaust gas temperature reports would be submitted

semiannually and would take approximately 4 hours to prepare for a

total of 8 hours per facility. The emissions recordkeeping takes

approximately 15 minutes per day and assuming that the facility is

operational for 250 days a year the time expended on this activity

would be 62 hours and 30 minutes. An existing facility that is in

compliance will spend about 92 hours and 30 minutes complying with the

standard. A facility that is new or that has been modified will spend

an additional 68 hours complying with the performance test and

notifications for new facilities. EPA estimates that there were 350

affected facilities at the time of the previous ICR renewal. The total

industry annual burden according to EPA's estimate is 54,921 hours.

(9) NSPS Subpart SS, Surface Coating of Large Appliances; EPA ICR

Number 0659, and OMB Control Number 2060-0108, Expires October 31, 1999

The New Source Performance Standard (NSPS) for Large Appliance

Surface Coating was proposed on December 24, 1980 and promulgated on

October 27, 1982. The standards apply to each surface coating operation

in a large appliance surface coating line commencing construction,

modification or reconstruction after December 24, 1980. Approximately

294 sources are currently subject to the standard. It is estimated that

an additional 26 sources per year will become subject to the standard

in the next three years. Volatile organic compounds (VOCs) are the

pollutants regulated under NSPS Subpart SS.

Owners or operators of the affected facilities described must make

the following one-time only reports: Notification of the date of

construction or reconstruction; notification of the anticipated and

actual dates of a start up; notification of any physical or operational

change to an existing facility which may increase the regulated

pollutant emission rate; notification of the date of the initial

performance test; and results of the initial performance test. Owners

or operators are also required to maintain records of the occurrence

and duration of any startup, shut down, or malfunction in the operation

of an affected facility, or any period during which the monitoring

system is inoperative. These notifications, reports and records are

required, in general, of all sources subject to NSPS.

Recordkeeping and reporting requirements include the performance

test results including the type of coating used, and the VOC content.

Subpart SS requires daily records of temperature if thermal

incineration is used. For catalytic incineration daily records of gas

stream temperature both upstream and downstream are required, or a

daily record of the quantity of solvent recovered if a solvent recovery

device is used. Monthly averages are calculated, and any affected

facility shall report quarterly excess emissions or semiannual reports

if no excess emissions occur.

Any owner or operator subject to the provisions of NSPS subpart SS,

shall maintain at the source, for a period of at least two years,

records of all data calculations used to determine monthly VOC

emissions from each affected facility and to determine the monthly

emissions limit, where applicable.

Burden Statement: There are currently 294 facilities currently

subject to the standard. It is estimated that an additional 26 sources

per year will become subject to the standard over the next three years

of the ICR. It is assumed that there is no net growth in the number of

facilities. New sources will replace existing sources. Initial

performance and repeat performance tests require approximately 60

person-hours each. (Assuming 20% of the initial performance test will

be repeated due to failure.) The initial notifications require 2 hours.

Semiannual emissions reporting will require 5 hours. Temperature

variance reports require 4 person-hours. Eighty percent of sources use

incineration. Recordkeeping requirements of monthly performance test

require one hour and 0.25 hours is needed to record operating

parameters.

(10) NSPS Subpart TT, Metal Coil Surface Coating; EPA ICR Number 0660,

and OMB Control Number 2060-0107, Expires October 31, 1999

The New Source Performance Standards (NSPS) for Metal Coil Surface

Coating were proposed on January 5, 1981 and promulgated on November 1,

1982. The standards apply to the following facilities in Metal Coil

Surface Coating operation: Each prime coat operation, each finish coat

operation, and each prime and finish coat operation cured

simultaneously where the finish coat is applied wet on wet over the

prime coat and both coatings are cured simultaneously. These standards

apply to metal coil surface coating facilities commencing construction,

modification or reconstruction after January 5, 1981.

[[Page 30018]]

Approximately 143 sources are currently subject to the standard. It

is estimated that an additional 6 sources per year will become subject

to the standard in the next three years. Volatile organic compounds

(VOCs) are the pollutants regulated under NSPS subpart TT.

Owners or operators of the affected facilities described must make

the following one-time only reports: Notification of the date of

construction or reconstruction; notification of the anticipated and

actual dates of a start up; notification of any physical or operational

change to an existing facility which may increase the regulated

pollutant emission rate; notification of the date of the initial

performance test; and results of the initial performance test. Owners

or operators are also required to maintain records of the occurrence

and duration of any startup, shut down, or malfunction in the operation

of an affected facility, or any period during which the monitoring

system is inoperative.

Monitoring requirements specific to Metal Coil Surface Coating

Operations requires the owner or operator to compute and record the

average VOC content of coating applied during each calendar month for

each affected facility. Initial compliance reports are required. There

are specific recordkeeping requirements in section 60.465 depending on

whether low VOC content coatings are used or higher VOC content

coatings are used in conjunction with an emission control device. Where

compliance is achieved through the use of low VOC-content coating

without emission control devices or through the use of higher VOC-

content coating in conjunction with emission control devices, each

owner or operator shall include in the initial compliance report the

weighted average of the VOC content of coatings used during the period

of one calender month for each affected facility. Values must be

separated if the control device was used intermittently. Where

compliance is achieved using an emission control device that destroys

VOCs, each owner or operator shall include in the initial compliance

report the overall VOC destruction rate used to attain compliance and

the combustion temperature of the thermal incinerator or the gas

temperature both upstream and downstream of the incinerator catalyst

bed. Subpart TT also requires reports of incinerator temperature drop.

Affected facilities shall report quarterly excess emissions or

semiannual reports if no emissions occur. Any owner or operator subject

to the provisions of NSPS subpart TT, shall maintain at the source, for

a period of at least two years, records of all data and calculations.

Burden Statement: There are 143 existing sources, and it is

estimated that an additional 6 sources per year will become subject to

the requirements. The initial performance test requires approximately

60 person-hours. It is assumed that 20% of the initial performance

tests will be repeated due to failure. The initial notifications each

require 2 hours. Semiannual emissions reporting will require about 5

hours and temperature variance reports require 4 person-hours.

Recordkeeping requirements of monthly performance tests require one

hour. To record the operating parameters requires 0.25 hours and it is

assumed the plant operates 250 days a year.

(11) NSPS Subpart WW, Beverage Can Surface Coating; EPA ICR Number

0663, and OMB Control Number 2060-0001, Expires September 30, 1999

The New Source Performance Standards (NSPS) for Beverage Can

Surface Coating were proposed on November 26, 1980 and promulgated on

August 25, 1983. These standards apply to following affected facilities

in the beverage can surface coating lines: each exterior base coat

operation, each overvarnish coating operation, and each inside spray

coating operation. These standards apply to coating facilities

commencing construction, modification or reconstruction after the

November 26, 1980.

Approximately 24 sources are currently subject to the standard. It

is estimated that an additional 2 sources per year will become subject

to the standard in the next three years. Volatile organic compounds

(VOCs) are the pollutants regulated under NSPS subpart WW.

Owners or operators of the affected facilities described must make

the following one-time only reports: Notification of the date of

construction or reconstruction; notification of the anticipated and

actual dates of a start up; notification of any physical or operational

change to an existing facility which may increase the regulated

pollutant emission rate; notification of the date of the initial

performance test; and results of the initial performance test. Owners

or operators are also required to maintain records of the occurrence

and duration of any startup, shut down, or malfunction in the operation

of an affected facility, or any period during which the monitoring

system is inoperative.

Monitoring requirements specific to Beverage Can Surface Coating

Operations include monthly performance tests to assure compliance with

the performance standard for mass of VOCs per volume of coating solids.

Additional monitoring is required only if a capture system and

incineration are used. It is assumed 80% of sources use incineration.

Owners or operators of the affected facilities using incineration are

also required to install, calibrate, and maintain temperature

measurement devices. If thermal incineration is used, the device shall

be installed in the firebox. If catalytic incineration is used the

devices shall be placed both upstream and downstream of the catalyst

bed. The temperature must be continuously monitored and recorded.

Records must be maintained if the VOC content of coatings is below

the specified limits. If one or more coatings used the volume weighted

average of the total mass of VOC per volume of coating solids must be

recorded. When thermal or catalytic incineration is performed, the

owner shall keep records of each three-hour period during which the

incinerator temperature averaged more than 28 degrees Celsius below the

temperature of the most recent performance test at which destruction

efficiency was determined. The owners or operators shall identify,

record and submit quarterly reports of each instance in which the

volume-weighted average of the total mass of VOCs per volume of coating

solids exceeded the standard. If there are no exceedances reports shall

be submitted semiannually.

Owners or operators are required to maintain a file of all

measurements including the monitoring device, and performance testing

measurements; all monitoring device calibration check adjustments and

maintenance performed on these systems recorded in a permanent file,

suitable for inspection and retained at the facility for a minimum

period of two years.

Burden Statement: The average annual burden to industry over the

next three years from these recordkeeping and reporting requirements is

estimated at 3,092 person-hours. Initial performance test requires

approximately 60 person-hours. Assume 20% of the initial performance

tests will be repeated due to failure. The initial notifications each

require 2.0 hours. Semiannual emissions reports require 5.0 hours and

temperature variance reports 4.0 person-hours. Recordkeeping

requirements of monthly performance tests require one hour. To record

the operating parameters requires 0.25 hours and it is assumed the

plant operates 365 days a year.

[[Page 30019]]

(12) NSPS Subpart DDD, VOC Emissions From the Polymer Manufacturing

Industry, EPA ICR Number 1150, and OMB Control Number 2060-0145,

Expires November 30, 1999

The standards apply to affected facilities involved in the

manufacture of polypropylene, polystyrene, or poly (ethylene

terephthalate) commencing construction, modification or reconstruction

after January 10, 1989, depending on the process section.

Approximately 75 sources are currently subject to the standard and

it is estimated that an additional 10 sources per year will become

subject to the standard in the next three years. Volatile organic

compounds (VOCs) are the pollutants regulated under this Subpart.

Owners or operators of the affected facilities must make the

following one-time only reports: Notification of the date of

construction or reconstruction; notification of the anticipated actual

dates of startup; notification of any physical or operational change to

an existing facility which may increase the regulated pollutant

emission rate; notification of demonstration of the continuous

monitoring system (CMS); notification of the date of the initial

performance test; and results of the initial performance test. Owners

and operators are also required to maintain records of the occurrence

and duration of any startup, shutdown, or malfunction in the operation

of the affected facility, or any period during which the monitoring

system is inoperative.

In addition, owners/operators of the affected facilities are

required to record periods of operation during which the performance

standards are exceeded, results of flare pilot flame monitoring, all

periods of operation of a boiler or process heater, and to continuously

record the indication of any emission stream diverted away from the

control device. In general, these records are required to be maintained

for at least two years following the dates of such measurements or

records.

Approximately one facility per year will conduct the initial

performance test and it takes approximately 360 hours to conduct. It is

estimated that approximately 20 percent of performance tests are

repeated due to failure. Report writing including notifications of

construction/modification, anticipated startup, and initial performance

test takes approximately two hours per occurrence once a year for up to

10 respondents. Notification of actual startup takes approximately one

hour once per year for up to 10 respondents. (Assumes a growth rate of

10 facilities per year.) Semi-annual reports take approximately 3 hours

twice per year for 75 respondents. Recordkeeping for operating

parameters and exceedances take approximately 8 hours once per year and

records of startup, shutdown or malfunction take 1.5 hours per

occurrence per year for 75 respondents.

(13) NSPS Subpart GGG, Petroleum Refineries; EPA ICR Number 0983, and

OMB Control Number 2060-0067, Expires August 31, 1999

Entities potentially affected by this action are process units at

petroleum refineries that commenced construction, modification, or

reconstruction after January 4, 1983. Affected process units include

each group of equipment assembled to produce intermediate or final

products from petroleum, unfinished petroleum derivatives, or other

intermediates. Owners or operators of the affected facilities described

must make the following one-time-only reports: notifications of the

anticipated and actual date of startup, notification of the date of

construction or reconstruction, notification of any physical or

operational change to an existing facility which may increase the

emission rate of any regulated air pollutant, notification of the date

of the initial performance test, and results of the performance tests.

Owners or operators are also required to maintain records of the

occurrence and duration of any startup, shutdown, or malfunction in the

operation of an affected facility. These notifications, reports and

records are required in general, of all sources subject to NSPS.

NSPS GGG directs sources to comply with the requirements of NSPS

VV. Semiannual reports are required to measure compliance with the

standards of NSPS subpart VV. Monthly monitoring of equipment in VOC

service shall take place as specified in subpart, VV section 60.485(b).

If no leaks are detected for two successive months, monitoring may be

performed once per quarter. If a leak is detected, the equipment shall

be monitored monthly until a leak is not detected for two successive

months. Also, leak location shall be recorded in a log, and this

information shall be kept available for at least two years. Leaks shall

be repaired within 15 days and the date of successful repair shall be

recorded in the log.

Semiannual reports shall be submitted itemizing information for

each month. All reports are to be sent to the delegated State or local

authority. In the event that there is no such delegated authority, the

reports are sent directly to the EPA Regional office. Notifications are

used to inform the agency or delegated authority when a source becomes

subject to the standard. The reviewing authority may then inspect the

source to check if the standard is being met. Performance test results

are needed as these are the Agency's record of a sources initial

capacity to meet the standard. The semiannual reports are used for

problem identification, as a check on source operations and

maintenance, and for compliance determinations.

In the Administrator's judgement, VOC emissions from process units

cause or contribute to air pollution that may reasonably be anticipated

to endanger public health or welfare. Therefore, New Source Performance

Standards have been promulgated for this source category as required

under section 111 of the Clean Air Act.

The control of emissions of VOC from process units requires not

only the installation of properly designed equipment, but also the

proper operation and maintenance of that equipment so that emissions

can be minimized. VOC emissions from process units are the result of

equipment leaks. These standards rely on the maintenance of the

equipment and adequate monitoring. To ensure compliance with these

standards, adequate recordkeeping and reporting is necessary. In the

absence of such information collection requirements, enforcement

personnel would be unable to determine whether the standards are being

met on a continuous basis, as required by the Clean Air Act and in

accordance with any applicable permit.

Burden Statement: The Agency computed the burden for each of the

recordkeeping and reporting requirements applicable to the industry.

Where appropriate, the Agency identified specific tasks and made

assumptions, while being consistent with the concept of burden under

the Paper Work Reduction Act.

The estimate was based on the assumption that there would be three

new affected facilities each year and that there was an average of 34

sources in existence at the start of the three years covered by the

ICR. For the new sources, it was estimated that it would take: one hour

to read the instructions, 8 person-hours to gather the information to

write the initial reports and 28 person-hours to conduct the initial

performance tests (assuming that 60% of the tests must be repeated).

For all sources, it was estimated that it would take approximately 19

person-hours to fill out the excess emission reports, and

[[Page 30020]]

approximately 129 person-hours to enter information for records of

operating parameters (assuming a source operates 365 days per year and

that it takes 0.3 hours per occurrence).

(14) NSPS Subpart HHH, Synthetic Fiber Production; EPA ICR Number 1156,

and OMB Control Number 2060-0059, Expires October 31, 1999

The New Source Performance Standards (NSPS) for subpart, HHH-

Synthetic Fiber Production Facilities were proposed on November 23,

1982 and promulgated on April 5,1984. These standards apply to each

solvent spun synthetic fiber process that produces more than 500

megagrams of fiber per year that commenced construction after November

23, 1982. The provisions of this subpart do not apply to facilities

that use the reaction spinning process to produce spandex fiber or the

viscose process to produce rayon fiber, nor to facilities that commence

modification but not reconstruction after November 23, 1982. Twenty

eight sources are currently subject to the standard. It is estimated

that an additional one source per year will become subject to the

standard in the next three years. VOCs are the pollutants regulated

under NSPS subpart HHH.

Owners or operators of the affected facilities must make the

following one-time only reports: Notification of the date of

construction or reconstruction; notification of the anticipated and

actual date of a start up; notification of any physical or operational

change to an existing facility which may increase the regulated

pollutant emission rate; notification of the demonstration of the

continuous monitoring system (CMS); notification of the date of the

initial performance test; and results of the initial performance test.

Owners or operators are also required to maintain records of the

occurrence and duration of any startup, shut down, or malfunction in

the operation of an affected facility, or any period during which the

monitoring system is inoperative.

Any owner or operator subject to the provisions of this part shall

maintain a file for a minimum of two years following the date of such

measurements, maintenance reports and records.

Burden Statement: The average annual burden to industry over the

next three years from these recordkeeping and reporting requirements is

estimated at 2448.65 person-hours. The initial performance test done by

new sources requires approximately 72 person-hours per test. It is

assumed that 20% of the initial performance test will be repeated due

to failure. Written notifications of construction, modification,

notification of initial performance test and demonstration of CMS

require 2.0 person-hours each test. Records of anticipated and actual

startups, shutdowns and malfunctions require 2.0 hours each test to

enter information. VOC emission reports require 8.0 person-hours. It is

assumed that each affected facility must submit one quarterly report

every other year, in addition to semiannual reports.

(15) NSPS Subparts III and NNN, SOCMI Air Oxidation and Distillation;

EPA ICR Number 0998, and OMB Control Number 2060-0197, Expires August

31, 1999

This ICR contains recordkeeping and reporting requirements that are

mandatory for compliance with 40 CFR 60.610, Subpart III, Standards of

Performance for VOC Emissions from SOCMI Air Oxidation Unit Processes

and 40 CFR 60.660, Subpart NNN, Standards of Performance for VOC from

SOCMI Distillation Operations. This information is used by the Agency

to identify sources subject to the standards and to insure that the

best demonstrated technology is being properly applied. The standards

require periodic recordkeeping to document process information relating

to the sources' ability to meet the requirements of the standard and to

note the operation conditions under which compliance was achieved.

In the Administrator's judgment, VOC emissions from SOCMI air

oxidation unit processes and distillation operations cause or

contribute to air pollution that may reasonably be anticipated to

endanger public health or welfare. Therefore, NSPS were promulgated for

this source category.

Owners or operators of the affected facilities described must make

the following one-time-only reports: Notification of the date of

construction or reconstruction; notification of the anticipated and

actual dates of startup; notification of any physical or operational

change to an existing facility which may increase the regulated

pollutant emission rate; notification of the date of the initial

performance test; and the results of the initial performance test.

Owners or operators are also required to maintain records of the

occurrence and duration of any startup, shutdown, or malfunction in the

operation of an affected facility, or any period during which the

monitoring system is inoperative. These notifications, reports and

records are required, in general, of all sources subject to NSPS.

In addition, owners/operators of affected facilities are required

to record periods of operation during which the performance boundaries

are exceeded, results of flare pilot flame monitoring, all periods of

operation of a boiler or process heater, and to continuously record the

indication of vent stream flow to the control device. Records of

startups, shutdowns, and malfunctions should be noted as they occur.

Any owner or operator subject to the provisions of this part shall

maintain a file of all of these records, and retain the file for at

least two years following the date of such measurements and records.

The reporting requirements for this industry currently include the

initial notifications listed, the initial performance test results, and

semiannual reports. Semiannual reports shall include the following: All

exceedances of parameter boundaries; all periods during which the vent

stream is diverted from the control device or has no flow rate; all

periods when the boiler or process heater was not operated; all periods

in which the pilot flame of the flare was absent; and any recalculation

of the TRE index value. All reports are sent to the delegated State or

local authority. In the event that there is no such delegated

authority, the reports are sent directly to the EPA Regional Office.

Notifications are used to inform the Agency or delegated authority when

a source becomes subject to the standard. The reviewing authority may

then inspect the source to check if the pollution control devices are

properly installed and operated and the standard is being met.

Performance test reports are needed as these are the Agency's records

of a source's initial capability to comply with the emission standard,

and note the operating conditions under which compliance was achieved.

The semiannual reports are used for problem identification, as a check

on source operation and maintenance, and for compliance determinations.

Burden Statement: The Agency computed the burden for each of the

recordkeeping and reporting requirements applicable to the industry for

the currently approved ICR. Where appropriate, the Agency identified

specific tasks and made assumptions, while being consistent with the

concept of burden under the Paperwork Reduction Act.

The burden estimates for NSPS subpart III: The estimate was based

on the assumption that there would be 10 new affected facilities each

year and that there would be an annual average of 75 affected

facilities over each of the three years covered by the ICR. For new

[[Page 30021]]

sources, it was estimated that it would take: 1 person hour to read the

instructions, 60 person hours to conduct the initial performance tests

(assuming that 20% of the tests must be repeated), and 7 person hours

to gather the information and write the initial reports. For all

sources, it was estimated that it would take: 6 person hours to fill

out semiannual reports and 84 person hours to enter information for

records of operating parameters.

The burden estimates for NSPS subpart NNN: The estimate was based

on the assumption that there would be 236 new affected facilities each

year and that there would be an annual average of 1770 affected

facilities over each of the three years covered by the ICR. For new

sources, it was estimated that it would take: 1 person hour to read the

instructions, 72 person hours to conduct the initial performance tests

(assuming that 20% of the tests must be repeated), and approximately 7

person hours to gather the information and write the initial reports.

For all sources, it was estimated that it would take: 6 person hours

each to fill out semiannual reports and 84 person hours each to enter

information for records of operating parameters.

(16) NSPS Subpart JJJ, Petroleum Dry Cleaners; EPA ICR Number 0997, and

OMB Control Number 2060-0079, Expires November 30, 1999

The information collected is needed to determine which sources are

subject to the regulation and whether these sources are in compliance

with the standards. EPA is required to under section 111 of the Clean

Air Act, as amended, to establish standard of performance for new

stationary sources. Volatile organic compounds (VOC) are the pollutants

regulated under this Subpart. The standards require that any affected

petroleum dry cleaning dryer be a solvent recovery dryer.

Owners or operators of the affected facilities described must make

the following one-time-only reports: notification of the date of

construction or reconstruction; notification of the anticipated and

actual dates of startup; notification of any physical or operational

change to an existing facility which may increase the regulated

pollutant emission rate; and the notification of the date of the

initial performance test. Owners or operators are also required to

maintain records of the occurrence and duration of any startup,

shutdown, or malfunction in the operation of the affected facility.

These notifications, reports and records are required, in general, of

all sources subject to NSPS. Notifications are used to inform the

Agency or delegated authority when a source becomes subject to the

standard. Performance test records are needed as these are the Agency's

record of a source's initial capability to comply with the emission

standards.

Recordkeeping requirements specific to petroleum dry cleaners

include only the performance test required under section 60.624. There

are no reporting requirements specific to subpart JJJ. Under the

General Provisions for NSPS under section 60.7, the owners or operators

are also required to maintain records of the occurrence and duration of

any startup, shutdown, or malfunction in the operation of an affected

facility. These records are required of all sources subject to NSPS.

Burden Statement: The estimate was based on the assumption that

there are approximately 270 sources currently subject to the standard,

and it is estimated that an additional 18 sources per year will become

subject to the standard in the next three years. For new sources it is

estimated that it takes a respondent 82.4 person hours for

recordkeeping and reporting. This is based upon 69 person-hours for

reporting, which includes 61 hours for the initial performance test,

reading instructions, and planning activities; two hours each for the

notification reports (construction/modification, anticipated startup,

actual startup, and initial performance test); and 1 person-hour for

recording the performance test recordkeeping. It also assumes that 20%

of the performance tests will required repeat tests. The frequency of

these reports is once. The annual burden to industry is 1,483 person

hours per year. Burden means the total time, effort, or financial

resources expended by persons to generate, maintain, retain, or

disclose or provide information to or for a Federal agency.

(17) NSPS Subpart RRR, SOCMI Reactor Processes; EPA ICR Number 1178,

and OMB Control Number 2060-0269, Expires September 30, 1999

Entities potentially affected by this action are those which are

subject to the Standards of Performance of Volatile Organic Compound

(VOC) emissions from the Synthetic Organic Chemical Manufacturing

Industry (SOCMI) Reactor Processes, subpart RRR with the exceptions

listed in 40 CFR 60.760 (c). This ICR contains recordkeeping and

reporting requirements that are mandatory for compliance with 40 CFR

60.700, subpart RRR, Standards of Performance for VOC Emissions from

SOCMI Reactor Processes. This information is used by the Agency to

identify sources subject to the standards and to insure that the best

demonstrated technology is being properly applied. The standards

require periodic recordkeeping to document process information relating

to the sources' ability to meet the requirements of the standard and to

note the operation conditions under which compliance was achieved.

In the Administrator's judgment, VOC emissions from SOCMI reactor

processes cause or contribute to air pollution that may reasonably be

anticipated to endanger public health or welfare. Therefore, NSPS were

promulgated for this source category.

Owners or operators of the affected facilities described must make

the following one-time-only reports: notification of the date of

construction or reconstruction; notification of the anticipated and

actual dates of startup; notification of any physical or operational

change to an existing facility which may increase the regulated

pollutant emission rate; notification of the date of the initial

performance test; and the results of the initial performance test.

Owners or operators are also required to maintain records of the

occurrence and duration of any startup, shutdown, or malfunction in the

operation of an affected facility, or any period during which the

monitoring system is inoperative. These notifications, reports and

records are required, in general, of all sources subject to NSPS. In

addition, owners/operators of affected facilities are required to

record periods of operation during which the performance boundaries are

exceeded, results of flare pilot flame monitoring, all periods of

operation of a boiler or process heater, and to continuously record the

indication of vent stream flow to the control device. Records of

startups, shutdowns, and malfunctions should be noted as they occur.

Any owner or operator subject to the provisions of this part shall

maintain a file of all of these records, and retain the file for at

least two years following the date of such measurements and records.

The reporting requirements for this industry currently include the

initial notifications listed, the initial performance test results, and

semiannual reports. Semiannual reports shall include the following: All

exceedances of parameter boundaries; all periods during which the vent

stream is diverted from the control device or has no flowrate; all

periods when the boiler or process heater was not operated; all periods

in which the pilot flame of the flare was absent; and

[[Page 30022]]

any recalculation of the TRE index value.

All reports are sent to the delegated State or local authority. In

the event that there is no such delegated authority, the reports are

sent directly to the EPA Regional Office. Notifications are used to

inform the Agency or delegated authority when a source becomes subject

to the standard. The reviewing authority may then inspect the source to

check if the pollution control devices are properly installed and

operated and the standard is being met. Performance test reports are

needed as these are the Agency's records of a source's initial

capability to comply with the emission standard, and note the operating

conditions under which compliance was achieved. The semiannual reports

are used for problem identification, as a check on source operation and

maintenance, and for compliance determinations.

Burden Statement: The Agency computed the burden for each of the

recordkeeping and reporting requirements applicable to the industry for

the currently approved ICR. Where appropriate, the Agency identified

specific tasks and made assumptions, while being consistent with the

concept of burden under the Paperwork Reduction Act.

The existing ICR (1996) burden estimates for NSPS Subpart RRR was

based on the assumption that there would be 27 new affected facilities

each year and that there would be an annual average of 203 affected

facilities over each of the three years covered by the ICR. For new

sources, it was estimated that it would take each affected facility: 1

hour to read the instructions, 426 person-hours to conduct the initial

performance tests (assuming that 20% of the tests must be repeated),

and 16 person-hours to gather the information and write the initial

reports. For all sources, it was estimated that it would take each: 4-

person hours to fill out semiannual reports and approximately 18

person-hours to enter information for records of operating parameters.

(18) NESHAP Subpart FF, Benzene Waste; EPA ICR Number 1541, and OMB

Control Number 2060-0183, Expires September 30, 1999

The provisions of this subpart apply to owners and operators of

chemical manufacturing plants, coke by-product recovery plants, and

petroleum refineries. In addition, this subpart applies to owners and

operators of hazardous waste treatment, storage, and disposal

facilities that treat, store, or dispose of hazardous waste generated

from the above facilities.

The calculation of total annual benzene (TAB) quantity in all

aqueous waste streams determines whether a facility is subject to

control requirements of the rule. A facility at or above the TAB

threshold in the rule of 10 megagram per year (Mg/yr) is required to

control each benzene waste stream at the facility or demonstrate that

the waste stream meets a criterion in the rule for exemption from

control. A facility with a TAB below 10 Mg/yr is only subject to the

rule's reporting and recordkeeping provisions, unless the facility

receives a waste from offsite that must be controlled to meet subpart

FF in which case that waste must be controlled. A facility with a TAB

less than 1 Mg/yr is only subject to maintain documentation of the

quantity of benzene in the waste.

Owners or operators of the affected facilities described above must

make the following one-time-only notices or reports: Notifications of

anticipated and actual startup; notification of emission test, report

following an emission test; notification of any physical/operational

changes (i.e., modification) that could increase emissions, a

monitoring system performance test; and a report following a monitoring

system performance test. These notifications and reports are general

provisions and required of all sources subject to any NESHAP.

Reporting requirements specific to benzene waste operations include

submission, within 90 days after January 7,1993 or by the initial

startup for a new source, of an initial report that summarizes the

regulatory status of each waste stream containing benzene. Each owner

or operator who has no benzene onsite in wastes, products, byproducts,

or intermediary shall submit an initial report that is a statement to

this effect.

If the TAB quantity from facility waste is less tan 1 Mg/yr, then

the owner and operator shall submit a report that updates its

regulatory status whenever there is a change in the process that may

cause the TAB to increase. If the TAB is less than 10 Mg/yr but equal

to or greater than 1 Mg/yr, then the owner or operator shall submit to

a report that updates the regulatory status of each waste stream

containing benzene. The report shall be submitted annually and whenever

there is a change in the process generating the waste stream that could

cause the total annual benzene quantity from facility waste to increase

to 10 Mg/yr or more. If the information in the annual report is not

changed in the following year, the owner or operator may submit a

statement to that effect.

If the total annual benzene quantity from facility waste is equal

to or greater than 10 Mg/yr, then the owner or operator shall submit to

the following reports:

(1) Within 90 days after January 7, 1993, or by the date of

initial startup for a new source with an initial startup after the

effective date, a certification that the equipment necessary to

comply with these standards has been installed and that the required

initial inspections or tests have been carried out in accordance

with this subpart.

(2) Beginning on the date that the equipment necessary to comply

with these standards has been certified, the owner or operator shall

submit annually a report that updates the regulatory status of each

stream.

(3) Beginning three months after the date that the equipment

necessary to comply with these standards has been certified, the

owner or operator shall submit quarterly a certification that all of

the required inspections have been carried out in accordance with

the requirements of this subpart.

(4) Beginning three months after the date that the equipment

necessary to comply with these standards has been certified, the

owner or operator shall submit a report quarterly that summarizes

all the monitoring of operations.

(5) Beginning one year after the date that the equipment

necessary to comply with these standards has been certified, the

owner or operator shall submit annually a report that summarizes all

inspections during which detectable emissions are measured or a

problem (such as a broken seal, gap or other problem) that could

result in benzene emissions is identified, including information

about the repairs or corrective action taken.

Monitoring and record keeping requirements specific to benzene

waste operations includes maintaining records that identify each waste

stream at the facility subject to this subpart, and indicate whether

the waste stream is controlled for benzene emissions in accordance with

this subpart. In addition the owner or operator shall maintain the

following records:

(1) For each waste stream not controlled for benzene emissions

in accordance with this subpart, the records shall include all test

results, measurements, calculations, and other documentation used to

determine the following information for the waste stream: Waste

stream identification, water content, whether or not the waste

stream is a process wastewater stream, annual waste quantity, range

of benzene concentrations, annual average flow-weighted benzene

concentration, and annual benzene quantity.

(2) For each process wastewater stream not controlled for

benzene emissions, the records shall include all measurements,

calculations, and other documentation used to determine that the

continuous flow of process wastewater is less than 0.02 liters per

minute or the annual waste quantity of process wastewater is less

than 10 Mg/yr.

(3) For each facility where process wastewater streams are

controlled for

[[Page 30023]]

benzene emissions, the records shall include for each treated

process wastewater stream all measurements, calculations, and other

documentation used to determine the annual benzene quantity in the

process wastewater stream exiting the treatment process.

(4) For each facility where wastewater streams are controlled

for benzene emissions, the records shall include all measurements,

calculations, and other documentation used to determine the annual

benzene quantity in the wastewater streams exiting wastewater

treatment systems at the facility.

(5) Owners or operators transferring waste off-site to another

facility for treatment shall maintain documentation for each offsite

waste shipment that includes the following information: date waste

is shipped offsite, quantity of waste shipped offsite, name and

address of the facility receiving the waste, and a copy of the

notice sent with the waste shipment.

(6) An owner or operator of control equipment, shall maintain

engineering design documentation for all control equipment installed

on the waste management unit. The documentation shall be retained

for the life of the control equipment.

Burden Statement: Most of the industry costs associated with the

information collection activity in the standards are labor. The current

average annual burden to industry from these record keeping and

reporting requirements is estimated at 17,028 person-hours.

Based upon available information, it has been estimated that 395

facilities are subject to the standards and 140 of those are estimated

to have more than 10 Mg/yr of benzene in the waste. In addition, the

EPA estimates that these 140 facilities have a total of 2,819 waste

streams per facility for which initial benzene concentration

determination could be made. A total of 57 facilities are estimated to

have more than 50 Mg/yr of benzene in their wastes and are expected to

apply controls without applying for exceptions.

(19) NESHAP Subpart M, Asbestos; EPA ICR Number 0111, and OMB Control

Number 2060-0101, Expires September 30, 1999

Owners or operators of the affected milling, manufacturing,

fabricating, waste disposal, and waste conversion facilities described

must make the following one-time-only reports: Notification of the date

of construction or reconstruction; notification of the anticipated and

actual dates of startup; notification of any physical or operational

change to an existing facility which may increase the regulated

pollutant emission rate. Owners or operators are also required to

maintain records of the occurrence and duration of any startup,

shutdown, or malfunction in the operation of an affected facility, or

any period during which the monitoring system is inoperative.

Therefore, the recordkeeping requirements for the facilities mentioned

above consist of the occurrence and duration of any startup and

malfunction as described. They include the initial performance test

results including information necessary to determine the conditions of

the performance test, the performance test measurements and results,

including monitoring each potential source of asbestos emissions for

visible emissions to the outside air and inspecting air cleaning

devices to ensure proper operation. Records of startups, shutdowns, and

malfunctions should be noted as they occur. Any owner or operator

subject to the provisions of this subpart shall maintain a file of

these measurements for at least two years following the date of such

measurements, maintenance reports, and records. The reporting

requirements for this industry currently include the initial

notifications listed, the initial performance test results, and

quarterly reports of instances when visible emissions are observed at

any time during the quarter.

Owners or operators of demolitions and renovations must notify EPA

in advance of the initiation of any asbestos removal work. The notice

provides information on the dates of operation, the nature of the

removal operation, the quantity of asbestos, and controls to be used.

The reviewing authority may then inspect the source to ensure

compliance with the standard. Demolitions and renovations tend to be

short projects, and it is difficult at best to determine compliance

with the standard once the project has been completed. Therefore, it is

important that the delegated authority be renotified as necessary when

information in the original notification changes. Additionally, without

renotification, the Agency or delegated authority may needlessly

inspect a demolition or renovation site where the project has been

delayed. The demolition and renovation standard requires that a

representative (such as a foreman or management-level person) trained

in the provisions of the standard be present at the facility. Evidence

that the required training has been completed is required in order to

ensure compliance with the provisions of the standard. The regulation

requires asbestos removal contractors that claim exemption from the

wetting provisions because of freezing temperatures to take temperature

readings throughout the day and record the information. The provisions

require that all containers of asbestos waste be labeled including the

name of the waste generator and the location of where the waste was

generated. Owners or operators of demolitions and renovations are

required to prepare and maintain, for at least two years, records of

waste shipment as to its destination, the quantity of waste, the date

of shipment, and to furnish a copy of the record to disposal site

owners or operators. The regulation also requires that generators of

asbestos waste attempt to reconcile instances in which a signed copy of

the waste shipment record is not received from the disposal site and

that the generator notify EPA if delivery to the disposal site cannot

be confirmed.

Owners or operators of waste disposal sites are required to

document all asbestos waste shipments that are received and send a copy

of each record back to the generator. A record of the location and

quantity of asbestos in the landfill is required as well as noting the

presence and location of asbestos in the landfill property deed.

Disposal site owners or operators have to report to EPA any

discrepancies between the amount of waste designated on the waste

shipment record and the amount actually received, as well as instances

of improperly contained waste. Disposal sites are required to maintain

records for at least two years. An owner or operator of an operation in

which asbestos-containing materials are spray-applied must notify EPA

in advance of the spraying operation. The notice provides information

on the name and address of the owner or operator, location of the

spraying operation, and procedure to be followed.

In the Administrator's judgement, asbestos emissions from the

demolition or renovation of asbestos-containing structures; the

disposal of asbestos waste; asbestos milling, manufacturing, and

fabricating; the use of asbestos on roadways; the use of asbestos

insulation and spray materials; and the conversion of asbestos-

containing waste material into nonasbestos material cause or contribute

to air pollution that may reasonably be anticipated to endanger public

health or welfare. Therefore, a NESHAP was promulgated under section

112 of the Clean Air Act for this source category. The control of

emissions of asbestos from the regulated sources requires not only the

installation of properly designed equipment, but also the operation and

maintenance of that equipment and following specified work practices.

These standards rely on the capture and reduction of asbestos emissions

by air cleaning equipment and specified work

[[Page 30024]]

practices. Effective enforcement of the standard is particularly

necessary in light of the hazardous nature of asbestos. In order to

ensure compliance with the standards, adequate recordkeeping is

necessary. In the absence of such information, enforcement personnel

would be unable to determine whether the standards are being met on a

continuous basis, as required by the Clean Air Act.

Burden Statement: The Agency computed the burden for each of the

recordkeeping and reporting requirements applicable to the industry.

Where appropriate the Agency identified specific tasks and made

assumptions, while being consistent with the concept of burden under

the Paper Work Reduction Act.

The estimate was based on the assumption that there was an average

of 70,380 sources of demolitions or renovations per year (completed by

approximately 6,900 contractors), and that 3,447 sources for milling,

manufacturing, fabricating and waste disposal were subject to the

standard. For demolitions and renovations, it was estimated that it

would take 1 hour for each of the 6,900 respondents to read the

instructions, 164,565 person-hours to write notifications (assuming

that there are 12,420 renotifications at 0.25 person-hours per

renotification) and excepted waste shipment record reports, 6.7 person-

hours per respondent to record information and mark vehicles, and 12

person-hours per respondent to train supervisors. For milling,

manufacturing, and fabricating, it was estimated that there was 430

respondents, and that it would take 1 person-hour each to read the

instructions, 106.3 hours per respondent to record the information and

mark vehicles, 3 person-hours per respondent to write the reports and

develop the record system. For waste disposal, it was estimated that

there were 3,017 respondents, and that it would take each respondent 1

hour to read the instructions, approximately 23 person-hours per

respondent to create and gather the information, and 3.5 person-hours

per respondent to write the reports.

Dated: May 27, 1999.

Bruce R. Weddle,

Acting Director, Office of Compliance.

[FR Doc. 99-14221 Filed 6-3-99; 8:45 am]

BILLING CODE 6560-50-U

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.