Approval and Promulgation of Air Quality Implementation Plans; Kentucky; Revised Format for Materials Being Incorporated by Reference

Federal RegisterMay 27, 1999

Ask Donna

What actually matters in this document.

Text

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 52

[KY-9916; FRL-6343-3]

Approval and Promulgation of Air Quality Implementation Plans;

Kentucky; Revised Format for Materials Being Incorporated by Reference

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final rule; notice of administrative change.

-----------------------------------------------------------------------

SUMMARY: EPA is revising the format of 40 CFR part 52 for materials

submitted by the Commonwealth of Kentucky that are incorporated by

reference (IBR) into the State Implementation Plan (SIP). The

regulations affected by this format change have all been previously

submitted by the State agency and approved by EPA.

This format revision will affect the ``Identification of Plan''

sections of 40 CFR part 52, as well as the format of the SIP materials

that will be available for public inspection at the Office of the

Federal Register (OFR), the Air and Radiation Docket and Information

Center located in Waterside Mall, Washington, D.C., and the Regional

Office. The sections of 40 CFR part 52 pertaining to provisions

promulgated by EPA or State-submitted materials not subject to IBR

review remain unchanged.

EFFECTIVE DATE: This action is effective May 27, 1999.

ADDRESSES: SIP materials which are incorporated by reference into 40

CFR part 52 are available for inspection at the following locations:

Environmental Protection Agency, Region 4, 61 Forsyth Street, SW,

Atlanta, GA 30303;

Office of Air and Radiation, Docket and Information Center (Air

Docket), EPA, 401 M Street, SW, Room M1500, Washington, DC 20460;

and

Office of the Federal Register, 800 North Capitol Street, NW, Suite

700, Washington, D.C.

FOR FURTHER INFORMATION CONTACT: Richard Schutt, Regional SIP

Coordinator at (404) 562-9033, or Karla McCorkle at (404) 562-9043.

Address all written comments to the Region 4 address listed above.

SUPPLEMENTARY INFORMATION: The supplementary information is organized

in the following order:

What is a SIP?

How EPA enforces SIPs.

How the State and EPA update the SIP.

How EPA compiles the SIPs.

How EPA organizes the SIP Compilation.

Where you can find a copy of the SIP Compilation.

The format of the new Identification of Plan Section.

When a SIP revision become federally enforceable.

The historical record of SIP revision approvals.

What EPA is doing in this action.

How this document complies with the Federal Administrative

Requirements for rulemaking.

What Is a SIP?

Each state has a SIP containing the control measures and strategies

used to attain and maintain the national ambient air quality standards

(NAAQS). The SIP is extensive, containing such elements as air

pollution control regulations, emission inventories, monitoring

network, attainment demonstrations, and enforcement mechanisms.

How EPA Enforces SIPs

Each state must formally adopt the control measures and strategies

in the SIP after the public has had an opportunity to comment on them

and then submit the SIP to EPA.

Once these control measures and strategies are approved by EPA,

after notice and comment, they are incorporated into the Federally

approved SIP and are identified in part 52 (Approval and Promulgation

of Implementation Plans), Title 40 of the Code of Federal Regulations

(40 CFR part 52). The full text of the state regulation approved by EPA

is not reproduced in its entirety in 40 CFR part 52, but is

``incorporated by reference.'' This means that EPA has approved a given

state regulation with a specific effective date. The public is referred

to the location of the full text version should they want to know which

measures are contained in a given SIP. The information provided allows

EPA and the public to monitor the extent to which a state implements

the SIP to attain and maintain the NAAQS and to take enforcement action

if necessary.

How the State and EPA Update the SIP

The SIP is a living document which the State can revise as

necessary to address the unique air pollution problems in the State.

Therefore, EPA from time to time must take action on SIP revisions

containing new and/or revised regulations as being part of the SIP. On

May 22, 1997 (62 FR 27968), EPA revised the procedures for

incorporating by reference federally-approved SIPs, as a result of

consultations between EPA and OFR.

EPA began the process of developing:

1. A revised SIP document for each state that would be incorporated

by reference under the provisions of 1 CFR part 51;

2. A revised mechanism for announcing EPA approval of revisions to

an applicable SIP and updating both the IBR document and the CFR; and

3. A revised format of the ``Identification of Plan'' sections for

each applicable subpart to reflect these revised IBR procedures.

The description of the revised SIP document, IBR procedures and

``Identification of Plan'' format are discussed in further detail in

the May 22, 1997, Federal Register document.

How EPA Compiles the SIPs

The federally-approved regulations and source specific permits

(entirely or portions of), submitted by each state agency have been

compiled by EPA into a ``SIP Compilation.'' The SIP Compilation

contains the updated regulations and source specific permits approved

by EPA through previous rule making actions in the Federal Register.

The compilations are contained in 3-ring binders and will be updated,

primarily on an annual basis.

How EPA Organizes the SIP Compilation

Each SIP Compilation contains two parts. Part 1 contains the

regulations

[[Page 28749]]

and part 2 contains the source specific requirements that have been

approved as part of the SIP. Each part has a table of contents

identifying each regulation or each source specific permit. The table

of contents in the compilation corresponds to the table of contents

published in 40 CFR part 52 for each state. The Regional EPA Offices

have the primary responsibility for ensuring accuracy and updating the

compilations.

Where You Can Find a Copy of the SIP Compilation

The Region 4 EPA Office developed and will maintain the compilation

for the Commonwealth of Kentucky. A copy of the full text of each

State's current compilation will also be maintained at the Office of

Federal Register and EPA's Air Docket and Information Center.

The Format of the New Identification of Plan Section

In order to better serve the public, EPA revised the organization

of the ``Identification of Plan'' section and included additional

information to clarify the enforceable elements of the SIP.

The revised Identification of plan section contains five

subsections:

(a) Purpose and scope

(b) Incorporation by reference

(c) EPA approved regulations

(d) EPA approved source specific permits

(e) EPA approved nonregulatory provisions such as transportation

control measures, statutory provisions, control strategies, monitoring

networks, etc.

When a SIP Revision Becomes Federally Enforceable

All revisions to the applicable SIP become federally enforceable as

of the effective date of the revisions to paragraph (c), (d), or (e) of

the applicable identification of plan found in each subpart of 40 CFR

part 52.

The Historical Record of SIP Revision Approvals

To facilitate enforcement of previously approved SIP provisions and

provide a smooth transition to the new SIP processing system, EPA

retains the original Identification of Plan section, previously

appearing in the CFR as the first or second section of part 52 for each

state subpart. After an initial two year period, EPA will review its

experience with the new system and enforceability of previously

approved SIP measures, and will decide whether or not to retain the

Identification of Plan appendices for some further period.

What EPA Is Doing in This Action

Today's rule constitutes a ``housekeeping'' exercise to ensure that

all revisions to the State programs that have occurred are accurately

reflected in 40 CFR part 52. State SIP revisions are controlled by EPA

regulations at 40 CFR part 51. When EPA receives a formal SIP revision

request, the Agency must publish the proposed revision in the Federal

Register and provide for public comment before approval.

EPA has determined that today's rule falls under the ``good cause''

exemption in section 553(b)(3)(B) of the Administrative Procedures Act

(APA) which, upon finding ``good cause,'' authorizes agencies to

dispense with public participation and section 553(d)(3) which allows

an agency to make a rule effective immediately (thereby avoiding the

30-day delayed effective date otherwise provided for in the APA).

Today's rule simply codifies provisions which are already in effect as

a matter of law in Federal and approved State programs.

Under section 553 of the APA, an agency may find good cause where

procedures are ``impractical, unnecessary, or contrary to the public

interest.'' Public comment is ``unnecessary'' and ``contrary to the

public interest'' since the codification only reflects existing law.

Immediate notice in the CFR benefits the public by removing outdated

citations.

How This Document Complies With the Federal Administrative

Requirements for Rule Making

A. Executive Order 12866

The Office of Management and Budget (OMB) has exempted this

regulatory action from review under Executive Order (E.O.) 12866,

entitled Regulatory Planning and Review.

B. Executive Order 12875

Under E.O. 12875, EPA may not issue a regulation that is not

required by statute and that creates a mandate upon a State, local or

tribal government, unless the Federal Government provides the funds

necessary to pay the direct compliance costs incurred by those

governments, or EPA consults with those governments. If EPA complies by

consulting, E.O. 12875 requires EPA to provide to the Office of

Management and Budget a description of the extent of EPA's prior

consultation with representatives of affected State, local and tribal

governments, the nature of their concerns, copies of any written

communications from the governments, and a statement supporting the

need to issue the regulation. In addition, E.O. 12875 requires EPA to

develop an effective process permitting elected officials and other

representatives of State, local and tribal governments ``to provide

meaningful and timely input in the development of regulatory proposals

containing significant unfunded mandates.''

Today's rule does not create a mandate on State, local or tribal

governments. The rule does not impose any enforceable duties on these

entities. Accordingly, the requirements of section 1(a) of E.O. 12875

do not apply to this rule.

C. Executive Order 13084

Under E.O. 13084, EPA may not issue a regulation that is not

required by statute, that significantly or uniquely affects the

communities of Indian tribal governments, and that imposes substantial

direct compliance costs on those communities, unless the Federal

government provides the funds necessary to pay the direct compliance

costs incurred by the tribal governments, or EPA consults with those

governments. If EPA complies by consulting, E.O. 13084 requires EPA to

provide to the Office of Management and Budget, in a separately

identified section of the preamble to the rule, a description of the

extent of EPA's prior consultation with representatives of affected

tribal governments, a summary of the nature of their concerns, and a

statement supporting the need to issue the regulation. In addition,

E.O. 13084 requires EPA to develop an effective process permitting

elected officials and other representatives of Indian tribal

governments ``to provide meaningful and timely input in the development

of regulatory policies on matters that significantly or uniquely affect

their communities.''

Today's rule does not significantly or uniquely affect the

communities of Indian tribal governments. Accordingly, the requirements

of section 3(b) of E.O. 13084 do not apply to this rule.

D. Executive Order 13045

Protection of Children from Environmental Health Risks and Safety

Risks (62 FR 19885, April 23, 1997), applies to any rule that: (1) Is

determined to be ``economically significant'' as defined under E.O.

12866, and (2) concerns an environmental health or safety risk that EPA

has reason to believe may have a disproportionate effect on children.

If the regulatory action meets both criteria, the Agency must evaluate

the environmental health or safety effects of the planned rule on

children, and explain why the planned regulation is

[[Page 28750]]

preferable to other potentially effective and reasonably feasible

alternatives considered by the Agency.

This rule is not subject to E.O. 13045 because it does not involve

decisions intended to mitigate environmental health or safety risks.

E. Regulatory Flexibility Act

The Regulatory Flexibility Act (RFA) generally requires an agency

to conduct a regulatory flexibility analysis of any rule subject to

notice and comment rulemaking requirements unless the agency certifies

that the rule will not have a significant economic impact on a

substantial number of small entities. Small entities include small

businesses, small not-for-profit enterprises, and small governmental

jurisdictions. This final rule will not have a significant impact on a

substantial number of small entities because SIP approvals under

section 110 and subchapter I, part D of the Clean Air Act do not create

any new requirements but simply approve requirements that the State is

already imposing. Therefore, because the Federal SIP approval does not

create any new requirements, I certify that this action will not have a

significant economic impact on a substantial number of small entities.

Moreover, due to the nature of the Federal-State relationship under the

Clean Air Act, preparation of flexibility analysis would constitute

Federal inquiry into the economic reasonableness of state action. The

Clean Air Act forbids EPA to base its actions concerning SIPs on such

grounds. Union Electric Co., v. U.S. EPA, 427 U.S. 246, 255-66 (1976);

42 U.S.C. 7410(a)(2).

F. Unfunded Mandates

Under section 202 of the Unfunded Mandates Reform Act of 1995

(``Unfunded Mandates Act''), signed into law on March 22, 1995, EPA

must prepare a budgetary impact statement to accompany any proposed or

final rule that includes a Federal mandate that may result in estimated

annual costs to State, local, or tribal governments in the aggregate;

or to private sector, of $100 million or more. Under section 205, EPA

must select the most cost-effective and least burdensome alternative

that achieves the objectives of the rule and is consistent with

statutory requirements. Section 203 requires EPA to establish a plan

for informing and advising any small governments that may be

significantly or uniquely impacted by the rule.

EPA has determined that the approval action promulgated does not

include a Federal mandate that may result in estimated annual costs of

$100 million or more to either State, local, or tribal governments in

the aggregate, or to the private sector. This Federal action approves

pre-existing requirements under State or local law, and imposes no new

requirements. Accordingly, no additional costs to State, local, or

tribal governments, or to the private sector, result from this action.

G. Submission to Congress and the Comptroller General

The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the

Small Business Regulatory Enforcement Fairness Act of 1996, generally

provides that before a rule may take effect, the agency promulgating

the rule must submit a rule report, which includes a copy of the rule,

to each House of the Congress and to the Comptroller General of the

United States. EPA will submit a report containing this rule and other

required information to the U.S. Senate, the U.S. House of

Representatives, and the Comptroller General of the United States prior

to publication of the rule in the Federal Register. This rule is not a

``major'' rule as defined by 5 U.S.C. 804(2).

H. Petitions for Judicial Review

EPA has also determined that the provisions of section 307(b)(1) of

the Clean Air Act pertaining to petitions for judicial review are not

applicable to this action. Prior EPA rulemaking actions for each

individual component of the Alabama compilation has previously afforded

interested parties the opportunity to file a petition for judicial

review in the United States Court of Appeals for the appropriate

circuit within 60 days of such rulemaking action. Thus, EPA sees no

need in this action to reopen the 60-day period for filing such

petitions for judicial review.

List of Subjects in 40 CFR Part 52

Environmental protection, Air pollution control, Carbon monoxide,

Hydrocarbons, Incorporation by reference, Intergovernmental relations,

Lead, Nitrogen dioxide, Ozone, Particulate matter, Reporting and

recordkeeping requirements, Sulfur oxides.

Dated: March 18, 1999.

Michael V. Peyton,

Acting Regional Administrator, Region 4.

Part 52 of chapter I, title 40, Code of Federal Regulations, is

amended as follows:

PART 52--[AMENDED]

1. The authority for citation for part 52 continues to read as

follows:

Authority: 42 U.S.C. 7401 et seq.

Subpart S--Kentucky

2. Section 52.920 is redesignated as Sec. 52.939 and the heading

and paragraph (a) are revised to read as follows:

Sec. 52.939 Original identification of plan section.

(a) This section identifies the original ``Air Implementation Plan

for the Commonwealth Kentucky'' and all revisions submitted by Kentucky

that were federally approved prior to March 1, 1999.

* * * * *

3. A new Sec. 52.920 is added to read as follows:

Sec. 52.920 Identification of plan.

(a) Purpose and scope. This section sets forth the applicable State

Implementation Plan for Kentucky under section 110 of the Clean Air

Act, 42 U.S.C. 7401, and 40 CFR part 51 to meet national ambient air

quality standards.

(b) Incorporation by reference.

(1) Material listed in paragraph (c) of this section with an EPA

approval date prior to March 1, 1999, was approved for incorporation by

reference by the Director of the Federal Register in accordance with 5

U.S.C. 552(a) and 1 CFR part 51. Material is incorporated as it exists

on the date of the approval, and notice of any change in the material

will be published in the Federal Register. Entries in paragraph (c) of

this section with EPA approval dates after March 1, 1999, will be

incorporated by reference in the next update to the SIP compilation.

(2) EPA Region 4 certifies that the rules/regulations provided by

EPA in the SIP Compilation at the addresses in paragraph (b)(3) are an

exact duplicate of the officially promulgated State rules/regulations

which have been approved as part of the State Implementation Plan as of

March 1, 1999.

(3) Copies of the materials incorporated by reference may be

inspected at the Region 4 EPA Office at 61 Forsyth Street, SW.,

Atlanta, GA 30303; the Office of Federal Register, 800 North Capitol

Street, NW., Suite 700, Washington, DC; or at the EPA, Air and

Radiation Docket and Information Center, Air Docket (6102), 401 M

Street, SW., Washington, DC 20460.

(c) EPA approved regulations.

[[Page 28751]]

EPA-Approved Kentucky Regulations for Kentucky

----------------------------------------------------------------------------------------------------------------

State EPA

Regulation Title/subject effective approval Federal Register Notice

date date

----------------------------------------------------------------------------------------------------------------

Chapter 50 General Administrative Procedures

----------------------------------------------------------------------------------------------------------------

401 KAR 50:005................ General application.......... 06/06/79 07/12/82 47 FR 30059

401 KAR 50:010................ Definitions and abbreviations 06/06/96 01/21/97 62 FR 2916

401 KAR 50:012................ General application.......... 11/12/97 07/24/98 63 FR 39739

401 KAR 50:015................ Documents incorporated by 09/26/88 02/07/90 55 FR 4169

reference.

401 KAR 50:020................ Air quality control regions.. 06/06/79 07/12/82 47 FR 30059

401 KAR 50:025................ Classification of counties... 06/01/83 04/02/96 61 FR 14489

401 KAR 50:030................ Registration of sources...... 06/06/79 07/12/82 47 FR 30059

401 KAR 50:035................ Permits...................... 09/28/94 08/27/95 60 FR 49775

401 KAR 50:040................ Air quality models........... 06/06/79 07/12/82 47 FR 30059

401 KAR 50:042................ Good engineering practice 06/10/86 09/04/87 52 FR 33592

stack height.

401 KAR 50:045................ Performance test............. 06/06/79 07/12/82 47 FR 30059

401 KAR 50:047................ Test procedures for capture 06/24/92 06/23/94 59 FR 32343

efficiency.

401 KAR 50:050................ Monitoring................... 06/06/79 07/12/82 47 FR 30059

401 KAR 50:055................ General compliance 08/22/82 05/04/89 54 FR 19169

requirements.

401 KAR 50:060................ Enforcement.................. 06/06/79 07/12/82 47 FR 30059

401 KAR 50:065................ Conformity of general federal 09/11/95 07/27/98 63 FR 40044

actions.

----------------------------------------------------------------------------------------------------------------

Chapter 51 New Source Requirements; Non-Attainment Areas

----------------------------------------------------------------------------------------------------------------

401 KAR 51:001................ Definitions and abbreviations 06/06/96 01/21/97 62 FR 2916

of terms used in title 401,

chapter 51.

401 KAR 51:005................ Purpose and general provision 06/06/79 07/12/82 47 FR 30059

401 KAR 51:010................ Attainment status 11/12/97 07/24/98 63 FR 39739

designations.

401 KAR 51:017................ Prevention of significant 03/12/97 07/24/98 63 FR 39741

deterioration of air quality.

401 KAR 51:052................ Review of new sources in or 02/08/93 06/23/94 59 FR 32343

impacting upon nonattainment

areas.

----------------------------------------------------------------------------------------------------------------

Chapter 53 Ambient Air Quality

----------------------------------------------------------------------------------------------------------------

401 KAR 53:005................ General provisions........... 04/14/88 02/07/90 55 FR 4169

401 KAR 53:010................ Ambient air quality standard. 04/14/88 02/07/90 55 FR 4169

----------------------------------------------------------------------------------------------------------------

Chapter 55 Emergency Episodes

----------------------------------------------------------------------------------------------------------------

401 KAR 55:005................ Significant harm criteria.... 04/14/88 02/07/90 55 FR 4169

401 KAR 55:010................ Episode criteria............. 04/14/88 02/07/90 55 FR 4169

401 KAR 55:015................ Episode declaration.......... 06/06/79 01/25/80 45 FR 6092

401 KAR 55:020................ Abatement strategies......... 06/06/79 01/25/80 45 FR 6092

----------------------------------------------------------------------------------------------------------------

Chapter 59 New Source Standards

----------------------------------------------------------------------------------------------------------------

401 KAR 59:001................ Definitions & abbreviations 06/06/96 01/21/97 62 FR 2916

used in title 401, chapter

59.

401 KAR 59:005................ General provisions........... 12/01/82 12/04/86 51 FR 43742

401 KAR 59:010................ New process operations....... 04/14/88 02/07/90 55 FR 4169

401 KAR 59:015................ New indirect heat exchangers. 01/07/81 03/22/83 48 FR 11945

401 KAR 59:020................ New incinerators............. 01/07/81 07/12/82 47 FR 30059

401 KAR 59:046................ Selected new petroleum 06/29/79 07/07/81 46 FR 40188

refining processes and

equipment.

401 KAR 59:050................ New storage vessels for 02/04/81 03/30/83 48 FR 13168

petroleum Liquids.

401 KAR 59:080................ New kraft (sulfate) pulp 06/06/79 01/25/80 45 FR 6092

mills.

401 KAR 59:085................ New sulfite pulp mills....... 06/06/79 07/12/82 47 FR 30059

401 KAR 59:090................ New ethylene producing plants 06/06/79 07/12/82 47 FR 30059

401 KAR 59:095................ New oil-effluent water 06/06/79 08/07/81 46 FR 40188

separators.

401 KAR 59:101................ New bulk gasoline plants..... 09/28/94 06/28/96 61 FR 33674

401 KAR 59:105................ New process gas steams....... 04/07/82 03/22/83 48 FR 11945

401 KAR 59:174................ Stage II controls at gasoline 01/12/98 12/08/98 63 FR 67586

dispensing facilities.

401 KAR 59:175................ New service stations......... 02/08/93 06/23/94 59 FR 32343

401 KAR 59:185................ New solvent metal cleaning 06/24/92 06/23/94 59 FR 32343

equipment.

401 KAR 59:190................ New insulation of magnet wire 06/24/92 06/23/94 59 FR 32343

operations.

401 KAR 59:210................ New fabric, vinyl and paper 06/24/92 06/23/94 59 FR 32343

surface coating operations.

401 KAR 59:212................ New graphic arts facilities 06/24/92 06/23/94 59 FR 32343

using rotogravure and

flexography.

401 KAR 59:214................ New factory surface coating 06/24/92 06/23/94 59 FR 32343

operations of flat wood

paneling.

401 KAR 59:225................ New miscellaneous metal parts 06/24/92 06/23/94 59 FR 32343

and products surface coating

operations.

401 KAR 59:230................ New synthesized 06/24/92 06/23/94 59 FR 32343

pharmaceutical product

manufacturing operations.

401 KAR 59:235................ New pneumatic rubber tire 02/04/81 03/30/83 48 FR 12168

manufacturing plants.

401 KAR 59:240................ New perchloroethylene dry 06/24/92 06/23/94 59 FR 32343

cleaning systems.

401 KAR 59:315................ Specific new sources......... 06/24/92 06/23/94 59 FR 32343

----------------------------------------------------------------------------------------------------------------

Chapter 61 Existing Source Standards

----------------------------------------------------------------------------------------------------------------

401 KAR 61:001................ Definitions & abbreviations 06/06/96 06/19/97 62 FR 2916

of terms used in 401KAR

chapter 61.

401 KAR 61:005................ General provisions........... 12/01/82 05/04/89 54 FR 19169

[[Page 28752]]

401 KAR 61:010................ Existing incinerators........ 06/06/79 05/04/89 54 FR 19169

401 KAR 61:015................ Existing indirect heat 04/01/84 04/02/96 61 FR 14489

exchangers.

401 KAR 61:020................ Existing process operations.. 04/14/88 02/07/90 55 FR 4169

401 KAR 61:025................ Existing kraft (sulfate) pulp 06/06/79 05/26/82 47 FR 22955

mills.

401 KAR 61:030................ Existing sulfuric acid plants 06/06/79 03/22/83 48 FR 11945

401 KAR 61:035................ Existing process gas streams. 04/07/82 03/22/83 48 FR 11945

401 KAR 61:040................ Existing ethylene producing 06/06/79 01/25/80 45 FR 6092

plants.

401 KAR 61:045................ Existing oil-effluent water 06/29/79 08/07/81 46 FR 40188

separators.

401 KAR 61:050................ Existing storage vessels for 06/24/92 06/23/94 59 FR 32345

petroleum liquids.

401 KAR 61:055................ Existing loading facilities 08/24/82 03/30/83 48 FR 13168

at bulk gasoline terminals.

401 KAR 61:056................ Existing bulk gasoline plants 09/28/94 06/28/96 61 FR 33674

401 KAR 61:060................ Existing sources using 06/29/79 01/25/80 45 FR 6092

organic solvents.

401 KAR 61:065................ Existing nitric acid plants.. 06/06/79 06/12/82 47 FR 30059

401 KAR 61:070................ Existing ferroalloy 06/06/79 05/03/84 49 FR 18833

production facilities.

401 KAR 61:075................ Steel plants and foundries 12/01/82 05/04/89 54 FR 19169

using existing electric arc

furnaces.

401 KAR 61:080................ Steel plants and using 04/01/84 05/04/89 54 FR 19169

existing basic oxygen

process furnaces.

401 KAR 61:085................ Existing service stations.... 02/08/93 06/23/94 59 FR 32343

401 KAR 61:090................ Existing automobile and light- 06/24/92 06/23/94 59 FR 32343

duty surface coating

operations.

401 KAR 61:095................ Existing solvent metal 06/24/92 06/23/94 59 FR 32343

cleaning equipment.

401 KAR 61:100................ Existing insulation of magnet 06/24/92 06/23/94 59 FR 32343

wire operations.

401 KAR 61:105................ Existing metal furniture 06/24/92 06/23/94 59 FR 32343

coating operations.

401 KAR 61:110................ Existing large appliance 06/24/92 06/23/94 59 FR 32343

surface coating operations.

401 KAR 61:120................ Existing fabric, vinyl and 06/24/92 06/23/94 59 FR 32343

paper surface coating

operations.

401 KAR 61:122................ Existing graphic arts 06/24/92 06/23/94 59 FR 32343

facilities using rotogravure

and flexography.

401 KAR 61:124................ Existing factory surface 06/24/92 06/23/94 59 FR 32343

coating operations of flat

wood paneling.

401 KAR 61:125................ Existing can surface coating 06/24/92 06/23/94 59 FR 32343

operations.

401 KAR 61:130................ Existing coil surface coating 06/24/92 06/23/94 59 FR 32343

operations.

401 KAR 61:132................ Existing miscellaneous metal 06/24/92 06/23/94 59 FR 32343

parts and products surface

coating operations.

401 KAR 61:135................ Selected existing pertroleum 06/29/79 01/25/80 45 FR 6092

refining processes and

equipment.

401 KAR 61:137................ Leaks from existing petroleum 06/24/92 06/23/94 59 FR 32343

refinery equipment.

401 KAR 61:140................ Existing by-product coke 09/04/86 01/08/88 53 FR 501

manufacturing plants.

401 KAR 61:145................ Existing petroleum refineries 01/07/81 03/22/83 48 FR 11945

401 KAR 61:150................ Existing synthesized 06/24/92 06/23/94 59 FR 32343

pharmaceutical product

manufacturing operations.

401 KAR 61:155................ Existing pneumatic rubber 06/24/92 06/23/94 59 FR 32343

tire manufacturing plants.

401 KAR 61:160................ Existing perchloroethylene 06/24/92 06/23/94 59 FR 32343

dry cleaning systems.

401 KAR 61:165................ Existing primary aluminum 06/04/85 12/02/86 51 FR 43395

reduction plants.

401 KAR 61:170................ Existing blast furnace 04/14/88 02/07/90 55 FR 4169

casthouses.

401 KAR 61:175................ Leaks from existing synthetic 06/24/92 06/23/94 59 FR 32343

organic chemical and polymer

manufacturing equipment.

----------------------------------------------------------------------------------------------------------------

Chapter 63 General Standards of Performance

----------------------------------------------------------------------------------------------------------------

401 KAR 63:001................ Definitions & abbreviations 06/06/96 01/01/97 62 FR 2916

of terms used in 401 KAR

chapter 63.

401 KAR 63:005................ Open burning................. 01/12/98 12/08/98 63 FR 67586

401 KAR 63:010................ Fugitive emissions........... 06/06/79 07/12/82 47 FR 30059

401 KAR 63:015................ Flares....................... 06/06/79 12/24/80 45 FR 84999

401 KAR 63:020................ Potentially hazardous matter 06/06/79 12/24/80 45 FR 84999

or toxic substances.

401 KAR 63:025................ Asphalt paving operations.... 06/24/92 06/23/94 59 FR 32343

401 KAR 63:031................ Leaks from gasoline tank 02/08/93 06/23/94 59 FR 32343

trunks.

----------------------------------------------------------------------------------------------------------------

Chapter 65 Mobile Source Related Emissions

----------------------------------------------------------------------------------------------------------------

401 KAR 65:001................ Definitions & abbreviations 06/19/96 01/21/97 62 FR 2916

of terms used in 401 KAR

chapter 65.

401 KAR 65:005................ Liquefied petroleum gas 06/06/79 01/25/80 45 FR 6092

carburetion systems.

401 KAR 65:010................ Vehicle emission control 01/12/98 12/08/98 63 FR 67586

programs.

----------------------------------------------------------------------------------------------------------------

(d) EPA-approved source specific requirements.

EPA-Approved Kentucky Source-Specific Requirements

----------------------------------------------------------------------------------------------------------------

State EPA

Name of source Permit number effective approval Federal Register Notice

date date

----------------------------------------------------------------------------------------------------------------

Bubble action at Kentucky Utilities N/A.................... 12/01/80 06/15/81 46 FR 31260

Green River Plant.

Bubble action at Corning Glassworks.. N/A.................... 05/18/81 10/29/81 46 FR 53408

Bubble action at National Distillers N/A.................... 12/24/80 09/14/81 46 FR 45610

Company's, Old Crow Plant.

Bubble action at General Electric in N/A.................... 08/07/81 01/12/82 47 FR 1291

Louisville.

[[Page 28753]]

Bubble action at Borden Chemical CO. N/A.................... 03/05/82 05/11/82 47 FR 20125

in Jefferson CO.

Variance for seven perchloroethylene N/A.................... 08/04/82 05/02/83 48 FR 19176

dry cleaners.

Variance for two dry cleaners........ N/A.................... 01/27/83 05/05/83 48 FR 20233

Variance for Jiffy and Hiland Dry N/A.................... 04/25/84 04/18/85 50 FR 15421

Cleaners.

TVA Paradise Permit.................. KDEPDAQ Permit 0-87-012 06/29/87 08/25/89 54 FR 35326

Opacity variance for boiler Units 1 KDEPDAQ Permit 0-86-75. 07/24/96 08/17/88 53 FR 30998

and 2 of TVA's Paradise Steam Plant.

Operating Permits for nine presses at APCDJC Permits 103-74, 02/28/90 05/16/90 55 FR 20269

the Alcan Foil Products facility-- 104-74, 105-74, 103-

Louisville. 74, 110-74, 111-74.

Operating Permit requiring VOC RACT KYDEPDAQ Permit 0-94- 11/17/94 05/24/95 60 FR 27411

for Calgon CO. 020.

Reynolds Metals Company.............. APCDJC Permits 103-74, 04/16/97 01/13/98 63 FR 1929

104-74, 016-74, 110-

74, 111-74.

----------------------------------------------------------------------------------------------------------------

(e) EPA-approved nonregulatory provisions.

EPA-Approved Kentucky Nonregulatory Provisions

----------------------------------------------------------------------------------------------------------------

State EPA

Appendix Title/subject effective approval Federal Register Notice

date date

----------------------------------------------------------------------------------------------------------------

1.......................... 1979 revisions for Part D 06/29/79 01/25/80 45 FR 6092

requirements for ozone NAA.

2.......................... 1979 revisions for Part D 06/29/79 10/31/80 45 FR 72153

requirements for SO2 NAA.

3.......................... 1979 revisions for Part D 06/29/79 12/24/80 45 FR 84999

requirements for total

suspended particulate NAA.

4.......................... Corrections in 1979 ozone 05/18/80 08/07/81 46 FR 40188

revisions required by

conditional approval of 1/25/

80.

5.......................... 1979 Revisions for Part D 06/29/79 08/07/81 46 FR 40186

requirements for the Jefferson

CO NAA.

6.......................... Air Quality surveillance plan.. 11/15/79 11/16/81 46 FR 56198

7.......................... Boone CO I/M ordinance and 11/19/80 11/30/81 46 FR 58080

transportation control

measures.

8.......................... Lead SIP....................... 05/07/80 11/30/81 46 FR 58082

9.......................... Miscellaneous non-Part D 06/29/79 07/12/82 47 FR 30059

revisions.

10......................... Corrections in 79 Part D 09/24/82 03/22/83 48 FR 13168

revisions for SO2 NAA Boyd CO.

11......................... 1982 Revisions to Part D Plan 02/09/83 10/09/84 49 FR 39547

for the Jefferson CO ozone and 06/15/83

CO NAA.

12......................... Protection Visibility in Class 08/31/97 07/12/88 53 FR 26253

I Areas.

13......................... Maintenance Plan for Owensboro 12/28/92 11/03/94 59 FR 55058

and Edmonson County areas.

14......................... Maintenance Plan for Pudach 01/15/93 02/07/95 60 FR 38707

Area.

15......................... SBAP........................... 07/15/93 06/19/95 60 FR 31915

16......................... Lexington Maintenance Plan..... 01/15/93 09/11/95 60 FR 47094

17......................... Ashland-Huntington Maintenance 05/24/95 06/29/95 60 FR 33752

Plan.

18......................... Maintenance Plan Revision for 04/14/98 09/03/98 63 FR 46898

Owensboro & Edmonson CO.

19......................... Northern Kentucky 15% Plan & I/ 09/11/98 12/08/98 63 FR 67591

M.

----------------------------------------------------------------------------------------------------------------

[FR Doc. 99-13385 Filed 5-26-99; 8:45 am]

BILLING CODE 6560-50-P

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.