Intent to Prepare Environmental Impact Statement
Federal RegisterAug 21, 1998
Ask Donna
What actually matters in this document.
Text
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[NV-020-1990-10]
Intent to Prepare Environmental Impact Statement
AGENCY: Bureau of Land Management, Interior.
ACTION: Notice of intent to prepare an Environmental Impact Statement
(EIS) for a mining Plan of Operations (POO) amendment for the Rayrock
Mines, Inc., Marigold Mining Company's (MMC) expansion project located
on public and private lands in Humboldt County, Nevada, and; notice of
scoping period and public meetings.
-----------------------------------------------------------------------
SUMMARY: Pursuant to section 102(2)(c) of the National Environmental
Policy Act of 1969 and, title 43 of the Code of Federal Regulations,
subpart 3809, the Bureau of Land Management (BLM) will be directing the
preparation of an EIS for the proposed expansion of a mine in Humboldt
County, Nevada. The EIS will be prepared by contract and funded by
Rayrock Mines, Inc. Public meetings will be held to identify issues to
be addressed in the EIS, and to encourage public participation in the
review process. Representatives of the BLM and MMC will be summarizing
the POO and accepting comments from the audience. The BLM invites
comments and suggestions on the scope of the analysis.
DATES: Two scoping meetings will be held. The first is on Tuesday,
October 5, 1998 at the Battle Mountain Field Office of the BLM, 50
Bastian Road, Battle Mountain, Nevada. The second will be Wednesday,
October 6, 1998, at the Winnemucca Field Office of the BLM, 5100 E.
Winnemucca Blvd., Winnemucca, Nevada. Both meetings are scheduled to
run from 7-9 p.m. Written comments on the POO and scope of the EIS will
be accepted until the close of business, October 23, 1998. The Draft
EIS is expected to be completed by August 16, 1999, when the document
will be made available for public review and comment.
ADDRESSES: Scoping comments may be sent to: District Manager,
Winnemucca Field Office BLM, 5100 E. Winnemucca Blvd., Winnemucca, NV
89445, Attn: Gerald Moritz, Marigold Mine EIS Project Coordinator.
FOR FURTHER INFORMATION CONTACT: Gerald Moritz, Winnemucca Field Office
BLM, 5100 E. Winnemucca Blvd., Winnemucca NV 89445, phone (702) 623-
1500.
SUPPLEMENTARY INFORMATION: This EIS will address the issues of geology,
soils, water resources, vegetation, wildlife, grazing management, air
quality, aesthetic resources, cultural resources, ethnographic
concerns, paleontologic resources, land use, access, recreation, social
and economic values related to project development. In addition, the
EIS will address cumulative impacts for the above listed resources.
MMC has been operating the Marigold Mine, an open-pit gold mine at
the site, since 1998. The Marigold Mine is located on public and
private lands approximately five miles south of the Valmy Exit on
Interstate Highway 80, in Humboldt County, Nevada, approximately 43
miles east of Winnemucca and approximately 12 miles west of Battle
Mountain, Nevada.
The Marigold Mine uses conventional open pit mining methods
including drilling, blasting, loading, and hauling
[[Page 44922]]
ore and overburden material. The total mining rate for the existing
open pits is 1,700,000 tons per month. Processing operations include
milling of high grade ore and utilizing heap leach technology to
retrieve gold from the lower grade ore. Waste rock is delivered to
waste dumps, or backfilled into portions of the mined out pits. The
total project boundary encompasses approximately 10,480 acres of public
and private lands. Total approved disturbance under existing operations
is approximately 1,349 acres, located on public and private lands.
The proposed action would be to expand existing mining facilities
and to construct new facilities, increasing surface disturbances from
1,349 acres to 2,058 acres. Of the 710 acres of new disturbance
proposed, approximately 254 acres would be disturbed on BLM-
administered public land with 456 acres of disturbance on private
lands. Upon approval of this expansion proposal, mining would continue
through the year 2006 at approximately the current level of production
of existing operations. The proposed expansion includes the following;
1. Construct two new pits and expand existing pits.
2. Construct one new waste dump and expand existing waste dumps.
3. Develop one new heap leach facility and expand existing heap
leach facility, including new solution ponds.
4. Construct a new tailing dam facility.
5. Redirect two stream drainages by installing creek diversions.
6. Construct haul roads and miscellaneous access roads.
7. Construct associated ancillary facilities, including a utility
corridor.
8. Amend operations boundary.
In addition to the above, the mine reclamation plan would be
amended to include recontouring slopes, ripping compacted areas, where
needed and covering with suitable plant growth medium, and seeding.
Heap leach facilities would be detoxified by rinsing the pads with
fresh water. Buildings, process structures, and other equipment would
be removed from the site at the end of mining. Foundations would be
buried in place prior to growth medium application and revegetation.
Equipment, electrical and instrumentation, piping, miscellaneous
fencing, and mobile trailers would also be removed from the site or
returned to local vendors.
The main issues identified thus far in the project expansion are;
sequential backfilling of pits, cumulative air quality effects, visual
impacts due to the proximity of Interstate 80, hydrology, and impacts
to bat habitat.
Federal, state, and local agencies and other individuals or
organizations who may be interested in or affected by the BLM's
decision on the POO are invited to participate in the scoping process.
The Authorized Officer will respond to public input and comment as part
of the final EIS. The decision regarding the proposal will be recorded
as a Record of Decision, which is subject to appeal under 43 CFR part
4.
Dated: August 13, 1998.
Colin P. Christensen,
Acting Field Office Manager, Winnemucca.
[FR Doc. 98-22517 Filed 8-20-98; 8:45 am]
BILLING CODE 4310-HC-M
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.