ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52
[SIPTRAX PA039/067-4072; FRL-6107-9]
Approval and Promulgation of Air Quality Implementation Plans;
Pennsylvania: Attainment Demonstration and Contingency Measures for the
Liberty Borough PM-10 Nonattainment Area
AGENCY: Environmental Protection Agency (EPA).
ACTION: Proposed rule and withdrawal of proposed rule.
-----------------------------------------------------------------------
SUMMARY: EPA is proposing to approve state implementation plan (SIP)
revisions submitted by the Pennsylvania Department of Environmental
Protection (PADEP) consisting of an attainment demonstration and
contingency measures for Allegheny County, Pennsylvania's Liberty
Borough particulate matter nonattainment area. In fact, EPA is
reproposing to approve the attainment demonstration because the
Allegheny County Health Department's (ACHD) modeling analysis
(submitted as a SIP revision by PADEP) adequately demonstrates that the
regulatory portion of the attainment plan is sufficient to attain and
maintain the National Ambient Air Quality Standards (NAAQS) for
particulate matter that was in effect at the time of the submittal, and
because its analyses have been corroborated by monitored air quality
data. EPA is proposing to approve the contingency measures for the area
because they satisfy the requirements of the Clean Air Act (the Act).
EPA approved the regulatory portion of the attainment plan for the
Liberty Borough area as a SIP revision in an earlier rulemaking action.
Because EPA is reproposing approval of the attainment demonstration
portion of the attainment plan for the Liberty Borough area, it is
withdrawing its earlier April 11, 1995 (60 FR 18385) proposal to
approve the County's attainment demonstration. Any interested parties
who would like to comment on EPA's reproposal to approve the attainment
demonstration and its proposal to approve the contingency measures for
the Liberty Borough area should do so at this time by following the
directions below.
Elsewhere in the Proposed Rules section of today's Federal
Register, EPA is also proposing to find that the Liberty Borough area
has attained the NAAQS for particulate matter and is withdrawing an
earlier proposal to find that the area did not attain the NAAQS. In the
Final Rules section of today's Federal Register, EPA is taking direct
final action to approve source-specific control requirements for the
USX Clairton Coke Works which further strengthen the SIP for Liberty
Borough area.
DATES: Comments must be received on or before July 13, 1998.
ADDRESSES: Comments may be mailed to Makeba Morris, Chief, Technical
Assessment Branch, Mailcode 3AP22, U.S. Environmental Protection
Agency, Region III, 841 Chestnut Building, Philadelphia, Pennsylvania
19107. Copies of the documents relevant to this action are available
for public inspection during normal business hours at the Air
Protection Division, U.S. Environmental Protection Agency, Region III,
841 Chestnut Building, Philadelphia, Pennsylvania 19107; the Allegheny
County Health Department, Department of Air Quality, 301 39th Street,
Pittsburgh, Pennsylvania 15201; and Pennsylvania Department of
Environmental Protection, Bureau of Air Quality, P.O. Box 8468, 400
Market Street, Harrisburg, Pennsylvania 17105.
FOR FURTHER INFORMATION CONTACT: Denis M. Lohman, (215) 566-2192, or by
e-mail at [email protected]. While requests for information
may be made via e-mail, comments for EPA consideration regarding this
proposal must be submitted in writing to the address indicated above.
SUPPLEMENTARY INFORMATION:
I. Background
On January 6, 1994, the Pennsylvania Department of Environmental
Protection (PADEP) submitted an attainment plan to EPA on behalf of
Allegheny County for the Liberty Borough PM-10 nonattainment
area.1 (PM-10 is particulate matter smaller than 10 microns
in diameter.) The purpose of this revision to the PADEP's SIP is to
fulfill the requirements under section 189 of the Act for a regulatory
plan to attain the PM-10 NAAQS and to submit a demonstration (including
air quality modeling) that the plan is sufficient to attain this goal.
These ``Part D'' requirements are described in more detail in the
technical support document (TSD) to this rulemaking. Copies of the TSD
are available, upon request, from the EPA Regional office listed in the
ADDRESSES section of this document.
---------------------------------------------------------------------------
\1\ The Liberty Borough PM-10 nonattainment area is comprised of
the City of Clairton and the Boroughs of Glassport, Liberty,
Lincoln, and Port Vue.
---------------------------------------------------------------------------
On April 11, 1995, EPA proposed to approve the January 1994
attainment plan submittal, as well as two SIP revisions that the
Commonwealth had submitted previously (see 60 FR 18385). The attainment
plan consisted of regulatory requirements to reduce PM-10 emissions and
an attainment demonstration. After EPA proposed to approve the
demonstration, the County reported that the PM-10 NAAQS had been
exceeded twice in March of 1995. These exceedances called the County's
attainment demonstration into question, and, although EPA took final
action 2 to approve the regulatory portion of the attainment
plan (which included limits on a variety of industrial sources), to
make these regulations part of the SIP and federally enforceable, EPA
took no action on the attainment demonstration at that time.
---------------------------------------------------------------------------
\2\ See 61 FR 29664.
---------------------------------------------------------------------------
On July 12, 1995, PADEP submitted contingency measures to EPA for
the Liberty Borough area. Contingency measures, as required by section
172(c)(9) of the Act, are enforceable emission limitations and/or
emission reduction measures, beyond what was
[[Page 32174]]
required to demonstrate attainment, that must go into effect upon a
finding by EPA that an area has failed to attain the particulate matter
NAAQS.
On July 18, 1997, EPA revised the NAAQS for particulate
matter.3 In this notice, however, ``NAAQS'' and ``PM-10
NAAQS'' refer to the previously existing NAAQS that were in effect at
the time that the attainment plan was required and submitted.
---------------------------------------------------------------------------
\3\ See 62 FR 38652.
---------------------------------------------------------------------------
II. Statutory, Regulatory and Settlement Requirements
As noted above, areas that became nonattainment for PM-10 by
operation of the Clean Air Act Amendments of 1990 must submit a
demonstration (including air quality modeling) showing that the plan
will provide for attainment of the PM-10 NAAQS as expeditiously as
practicable but no later than December 31, 1994. (See section
189(a)(1)(B) of the Act.) Alternatively, the State may show that
attainment by December 31, 1994 is impracticable. The 24-hour PM-10
NAAQS is 150 micrograms/cubic meter (g/m\3\), and the standard
is attained when the expected number of days per calendar year with a
24-hour average concentration greater than 150 g/m \3\ is
equal to or less than one. The annual PM-10 NAAQS is 50 g/m
\3\, and the standard is attained when the expected annual arithmetic
mean concentration is less than or equal to 50 g/m \3\ (see 40
CFR 50.6). The requirements for approvable attainment demonstrations
are found in 40 CFR 51, Appendix W, the Guideline on Air Quality
Models.
On February 21, 1996, the Group Against Smog and Pollution (GASP),
a citizen's environmental group, sued EPA in order to compel Agency
action on a number of planning activities regarding the Liberty Borough
area. The settlement of this suit requires, among other things, that
EPA to take action on the County's attainment demonstration by March
31, 1998, in light of air quality data collected from 1995 through
1997. The TSD includes a detailed summary of the Settlement Agreement's
provisions.
Section 172(c)(9) of the Act, requires that all moderate
nonattainment area SIPs that demonstrate attainment must include
contingency measures. These measures must take effect without further
regulatory action by the State or EPA, upon a determination by EPA that
the area has failed to make reasonable further progress toward
attainment or has failed to attain the PM-10 NAAQS by the applicable
statutory attainment date. Contingency measures should consist of other
available measures that are not already part of the area's control
strategy, and should contain emission reductions representing
approximately one year or reasonable further progress toward attainment
(see the General Preamble to Title I of the Clean Air Act Amendments of
1990, especially 57 FR 13543-13544).
III. The State Submittals
Allegheny County produced an attainment demonstration for the
Liberty Borough area using air quality modeling. The demonstration
showed that the NAAQS for PM-10 would be attained beginning in 1995 and
maintained in future years. Allegheny County's analysis shows that,
even if all sources emitted at their maximum allowable emission rates,
the 24-hour PM-10 concentration would not exceed 150 g/m \3\
more than once per year.4 Similarly, the demonstration shows
that, in the attainment year, the annual PM-10 concentration will not
exceed the annual PM-10 NAAQS of 50 g/m\3\. No separate
analysis to demonstrate that the PM-10 NAAQS will be maintained in
future years was necessary because the population of the Liberty
Borough is decreasing.
---------------------------------------------------------------------------
\4\ This demonstration did not account for the additional
emission reduction requirements on USX Clairton contained in the
SIP-strengthening, ``post-settlement'' SIP revision being approved
in the Final Rules section of today's Federal Register .
---------------------------------------------------------------------------
Section 189(e) of the Act requires that all Part D control
requirements applicable to PM-10 (e.g., RACT, new source review) must
also apply to PM-10 precursors. The County's analysis, submitted by
PADEP, demonstrated that while locally emitted sulfur dioxide was a
significant precursor to ambient PM-10, volatile organics and nitrogen
oxides were not. Therefore, according to the County's analysis, the PM-
10 control requirements, pursuant to Part D section 189(e) of the Act,
should apply to sulfur dioxide but not to volatile organics or nitrogen
oxides. EPA is reproposing to approve Allegheny County's attainment
demonstration for the Liberty Borough area, submitted by PADEP, because
the demonstration is technically sound and comports with 40 CFR Part
51, Appendix W (the Guideline on Air Quality Models). In addition, the
most recent three full years of air quality data indicate that the area
is attaining the NAAQS. The TSD for this proposal provides a detailed
description of EPA's rationale for proposing to approving the County's
attainment demonstration for the Liberty Borough area. For additional
information, see EPA's April 11, 1995 proposed approval (60 FR 18385).
The TSD for that proposal is also available upon request from the EPA
Regional Office listed in the ADDRESSES section, above.
The County's contingency measures, submitted by PADEP, consist of
an amendment to section 2105.21.e of Article XXI. It requires that
within 30 days following a notice by the ACHD that EPA has made a
finding that the area has not attained the NAAQS, USX's Clairton Coke
Works (the largest source of PM-10 in the nonattainment area) shall
improve procedures to capture pushing emissions by holding hot coke
under the hood of the pushing emissions control device for at least 67
seconds immediately after the pusher ram begins to move and the damper
to the PEC device is opened, or for at least 15 seconds immediately
following the fall of the last coke into the coke car, whichever is
longer. This provision is applicable to all USX-Clairton batteries
except Battery B (which is equipped with a coke-side shed). EPA is
proposing to approve this submittal because it fulfills the
requirements of section 172(c)(9), as described above.
IV. Proposed Action
EPA is reproposing to approve the attainment demonstration portion
of the attainment plan for the Liberty Borough PM-10 nonattainment
area. EPA is also proposing to find that the PM-10 precursor
requirements of 189(e) of the Act do not apply to volatile organic
compounds or to nitrogen oxides and that they do apply for sulfur
dioxide. In addition, EPA is proposing to approve the July 12, 1995
contingency measures submittal for the area. EPA is withdrawing its
prior April 11, 1995 proposal to approve the County's attainment
demonstration for the Liberty Borough area, because three years of air
quality data are now available to corroborate the County's
demonstration, and this data provides further information not available
at the time of the 1995 proposal.
Nothing in this proposal should be construed as permitting or
allowing or establishing a precedent for any future request for
revision to any SIP. Each request for revision to the SIP shall be
considered separately in light of specific technical, economic and
environmental factors and in relation to relevant statutory and
regulatory authority.
V. Administrative Requirements
A. Executive Order 12866
The Office of Management and Budget (OMB) has exempted this
regulatory action from E.O. 12866 review.
[[Page 32175]]
B. Executive Order 13045
The proposed rule is not subject to E.O. 13045, entitled
``Protection of Children from Environmental Health Risks and Safety
Risks,'' because it is not an ``economically significant'' action under
E.O. 12866.
C. Regulatory Flexibility Act
Under the Regulatory Flexibility Act, 5 U.S.C. 600 et seq., EPA
must prepare a regulatory flexibility analysis assessing the impact of
any proposed or final rule on small entities. 5 U.S.C. 603 and 604.
Alternatively, EPA may certify that the rule will not have a
significant impact on a substantial number of small entities. Small
entities include small businesses, small not-for-profit enterprises,
and government entities with jurisdiction over populations of less than
50,000.
SIP approvals under section 110 and subchapter I, part D of the
Clean Air Act do not create any new requirements but simply approve
requirements that the State is already imposing. Therefore, because the
Federal SIP approval does not impose any new requirements, the
Administrator certifies that it does not have a significant impact on
any small entities affected. Moreover, due to the nature of the
Federal-State relationship under the CAA, preparation of a flexibility
analysis would constitute Federal inquiry into the economic
reasonableness of state action. The Clean Air Act forbids EPA to base
its actions concerning SIPs on such grounds. Union Electric Co. v. U.S.
EPA, 427 U.S. 246, 255-66 (1976); 42 U.S.C. 7410(a)(2).
D. Unfunded Mandates
Under section 202 of the Unfunded Mandates Reform Act of 1995
(``Unfunded Mandates Act''), signed into law on March 22, 1995, EPA
must prepare a budgetary impact statement to accompany any proposed or
final rule that includes a Federal mandate that may result in estimated
costs to State, local, or tribal governments in the aggregate; or to
private sector, of $100 million or more. Under section 205, EPA must
select the most cost-effective and least burdensome alternative that
achieves the objectives of the rule and is consistent with statutory
requirements. Section 203 requires EPA to establish a plan for
informing and advising any small governments that may be significantly
or uniquely impacted by the rule.
EPA has determined that the approval action being proposed does not
include a Federal mandate that may result in estimated costs of $100
million or more to either State, local, or tribal governments in the
aggregate, or to the private sector. This Federal action approves pre-
existing requirements under State or local law, and imposes no new
requirements. Accordingly, no additional costs to State, local, or
tribal governments, or to the private sector, result from this action.
The Administrator's decision to approve or disapprove this SIP
revision for the Liberty Borough PM-10 nonattainment area revision will
be based on whether it meets the requirements of section 110(a)(2)(A)-
(K) and part D of the Clean Air Act, as amended, and EPA regulations in
40 CFR part 51.
List of Subjects in 40 CFR Part 52
Environmental protection, Air pollution control, Hydrocarbons,
Nitrogen dioxide, particulate matter, Sulfur oxide.
Authority: 42 U.S.C. 7401 et seq.
Dated: May 28, 1998.
W. Michael McCabe,
Regional Administrator, Region III.
[FR Doc. 98-15582 Filed 6-11-98; 8:45 am]
BILLING CODE 6560-50-P
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.