Silver Creek Integrated Resource Project, Boise National Forest, Idaho
Federal RegisterSep 25, 1997
Ask Donna
What actually matters in this document.
Text
DEPARTMENT OF AGRICULTURE
Forest Service
Silver Creek Integrated Resource Project, Boise National Forest,
Idaho
AGENCY: Forest Service, USDA.
ACTION: Notice, intent to prepare environmental impact statement.
-----------------------------------------------------------------------
SUMMARY: The Emmett Ranger District of the Boise National Forest will
prepare an environmental impact statement (EIS) for an integrated
resource management project in the Silver Creek subwatershed, a
headwater tributary to the Middle Fork Payette River drainage. The
project area is located about 80 road miles north of Boise, Idaho.
The Forest Service is seeking information and comments from
Federal, State, tribal, and local agencies, as well as individuals and
organizations who may be interested and/or affected by the proposed
action. The agency invites written comments and suggestions on the
issues related to the proposal and the area being analyzed. The
information received will be used in preparing the draft and final EIS.
For most effective use, comments should be submitted within 30 days
from the date of publication of this Notice in the Federal Register.
Proposed Action
Six objectives have been identified for the project: (1) Restore
and/or maintain the presence of the seral, shade intolerant tree
species (i.e., ponderosa pine, aspen) as part of the area's vegetative
mosaic; (2) improve forest resilience to damaging insects and disease;
(3) improve timber stand vigor and growth; (4) reduce the risk of
large, stand-destroying wildfire, especially in the vicinity of the
Silver Creek Plunge Hot Springs Resort and rural subdivision; (5)
restore streambanks, riparian areas, and other wet, upland sites
damaged by unrestricted, cross-country motorized travel; and, (6)
provide sawlogs and other wood products to help sustain local sawmills
and communities.
The proposed action would treat, either with timber harvest or
prescribed fire, a total of 9,545 acres. An estimated 23 million board
feet (MMBF) of timber would be harvested by ground-based (1,089 acres),
skyline/cable (304 acres), or helicopter (4,722 acres) yarding systems.
The proposed action would employ a variety of silvicultural systems,
including improvement selection (38 percent), commercial thinning (31
percent), sanitation/salvage (13 percent), irregular shelterwood (9
percent) and group selection (6 percent). Prescribed fire would also
occur on another 3,430 acres to rejuvenate old, decadent aspen stands
and/or provide seedbeds for potential white-bark pine regeneration. The
existing transportation system would be improved to facilitate the
harvest operation and reduce sedimentation, 3 miles of road relocation
and construction, 1.3 miles of temporary road construction, and spot
graveling of intermittent sections of Roads No. 698 (Middle Fork
Payette), No. 671 (Silver Creek), and No. 678 (Bridge-Bryan Creek). Two
bridges would be constructed to provide log haul access. Six existing
helicopter landings would be used, however, each would be first
``stabilized'' to improve drainage and reduce potential sediment
delivery. Two dry, upland meadows would also be used as possible log
landing sites. An estimated 4 miles of existing, user-developed roads,
the majority which either lies immediately adjacent to perennial
streams or is deeply eroded, would be obliterated. Five existing, user-
developed stream crossings would be closed and rehabilitated. Upon
completion of post-harvest activities, motorized travel east of Silver
Creek would be restricted to designated routes (i.e., roads and
trails), except for snowmobiles during the winter.
To meet the project's objectives, several changes to the Boise Land
and Resource Management Plan (Forest Plan) would be needed. The
proposed Forest Plan changes include redefining the visual quality
objectives (VQO's) for the Peace Rock, Silver Creek, and Lightning
Creek management areas (MA's) as well as changing the prohibition
concerning the use of ground-based yarding systems, mechanized
equipment, and road construction in the Peace Rock MA.
Preliminary Issues
Anticipated concerns related with the proposed action are: (1)
Timber harvest and road relocation and/or construction could effect a
portion of the Peace Rock inventoried roadless area's (IRA) wild
character; (2) bridge construction and road relocation/reconstruction
activities could result in short-term increases in the sediment
entering area streams; (3) the project could alter the scenic quality
of the Silver Creek area; (4) the proposed restrictions on cross-
country, motorized travel could displace some outdoor enthusiasts and/
or reduce recreational opportunities for some user groups; and (5) the
activities resulting from the proposed Forest Plan changes could alter
the semiprimitive, motorized character of the area. Other potential
issues may be identified during the current scoping period.
Schedule
The draft EIS is anticipated to be available for public review and
comment in April 1998; the final EIS by July 1998.
Public Involvement
The Forest Service is inviting the public to visit Silver Creek
with Emmett District personnel. Two field tours are scheduled for the
project area; one on October 3, 1997; the other on October 4, 1997.
Both field tours will be from 9 a.m. to 4 p.m., beginning at the Garden
Valley Station, Garden Valley, Idaho, with a brief presentation and
then proceeding to the project area. In addition, a public meeting will
be held at the Garden Valley Senior Citizens' Center, Crouch, Idaho on
October 6, 1997, from 7-9 p.m. to discuss the proposed activities.
Comments received from those field tours, as well as the public meeting
will be incorporated into the analysis and decision-making process.
Comments
Written comments concerning the proposed project should be received
on
[[Page 50289]]
or before 30 days following publication of this announcement in the
Federal Register. Mail comments to, or for further information contact,
Chris Worth, Project Team Leader, Emmett Ranger District, 1805 Highway
16, Room 5, Emmett, ID 83617, or telephone 208-365-7000.
Comments received in response to this solicitation, including the
names and addresses of those who comment, will be considered part of
the public record on this proposal and will be available to public
inspection. Comments submitted anonymously will be accepted and
considered; however, those who submit anonymous comments will not have
standing to appeal the subsequent decision under 36 CFR 215 or 217.
Additionally, pursuant to 7 CFR 1.27(d), any person may request the
agency to withhold a submission from the public record by showing how
the Freedom of Information Act (FOIA) permits such confidentiality.
Persons requesting such confidentiality should be aware that, under
FOIA, confidentiality may be granted in only limited circumstances,
such as to protect trade secrets. The Forest Service will inform the
requester of the agency's decision regarding the request for
confidentiality, and where the request is denied, the agency will
return the submission and notify the requester that the comments may be
resubmitted with or without name and address within 10 days.
Responsible Official
David D. Rittenhouse, Forest Supervisor, Boise National Forest is
the responsible official.
Dated: September 15, 1997.
Cathy Barbouletos,
Acting Forest Supervisor.
[FR Doc. 97-25473 Filed 9-24-97; 8:45 am]
BILLING CODE 3410-11-M
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.