DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EG97-83-000, et al.]

Corby Power Ltd., et al.; Electric Rate and Corporate Regulation

Filings

September 11, 1997.

Take notice that the following filings have been made with the

Commission:

1. Corby Power Ltd.

[Docket No. EG97-83-000]

On September 8, 1997, Corby Power Ltd. (Corby), filed with the

Federal Energy Regulatory Commission an application for determination

of exempt wholesale generator status pursuant to Part 365 of the

Commission's Regulations.

Corby owns and operates an generating facility with a net capacity

of approximately 350 MW consisting of two 119 MW gas turbines, three

generators, a 114 MW steam turbine and an air-cooled condenser. The

facility is located in Corby, Northampshire, England.

Comment date: October 2, 1997, in accordance with Standard

Paragraph E at the end of this notice.

2. Pennsylvania Power & Light Company

[Docket Nos. ER96-930-000, ER96-931-000, ER96-932-000, and ER96-933-

000]

Take notice that on July 23, 1997, Pennsylvania Power & Light

Company tendered for filing its compliance refund report in the above-

referenced dockets.

Comment date: September 24, 1997, in accordance with Standard

Paragraph E at the end of this notice.

3. New York State Electric & Gas Corporation

[Docket No. ER96-3139-000]

Take notice that on August 19, 1997, New York State Electric & Gas

Corporation tendered for filing a Notice of Withdrawal in the above-

referenced docket.

Comment date: September 25, 1997, in accordance with Standard

Paragraph E at the end of this notice.

[[Page 49004]]

4. Illinois Power Company

[Docket No. ER97-1827-001]

Take notice that on August 7, 1997, Illinois Power Company tendered

for filing a compliance filing in the above-referenced docket.

Comment date: September 24, 1997, in accordance with Standard

Paragraph E at the end of this notice.

5. Duke Power Division of Duke Energy Corp.

[Docket No. ER97-2398-000]

Take notice that on August 11, 1997, Duke Power Division of Duke

Energy Corp., tendered for filing an amendment in the above-referenced

docket.

Comment date: September 24, 1997, in accordance with Standard

Paragraph E at the end of this notice.

6. DPL Energy, Inc.

[Docket No. ER97-3040-000]

Take notice that on September 3, 1997, DPL Energy, Inc., tendered

for filing an amendment in the above-referenced docket.

Comment date: September 25, 1997, in accordance with Standard

Paragraph E at the end of this notice.

7. Dayton Power and Light Company

[Docket No. ER97-3041-000]

Take notice that on September 3, 1997, Dayton Power and Light

Company tendered for filing an amendment in the above-referenced

docket.

Comment date: September 25, 1997, in accordance with Standard

Paragraph E at the end of this notice.

8. R. Hadler and Company, Inc.

[Docket No. ER97-3056-000]

Take notice that on August 29, 1997, R. Hadler and Company tendered

for filing an amendment in the above-referenced docket.

Comment date: Septemer 25, 1997, in accordance with Standard

Paragraph E at the end of this notice.

9. Soyland Power Cooperative, Inc.

[Docket No. ER97-3090-001]

Take notice that on August 7, 1997, Soyland Power Cooperative, Inc.

tendered for filing a compliance filing in the above-referenced docket.

Comment date: September 24, 1997, in accordance with Standard

Paragraph E at the end of this notice.

10. Central Illinois Public Service Company

[Docket No. ER97-3393-000]

Take notice that on September 5, 1997, Central Illinois Public

Service Company (CIPS) filed an amendment to its June 20, 1997, filing

in this proceeding.

Comment date: September 25, 1997, in accordance with Standard

Paragraph E at the end of this notice.

11. Sierra Pacific Power Company

[Docket No. ER97-3593-000]

Take notice that on September 2, 1997, Sierra Pacific Power Company

tendered for filing an amendment in the above-referenced docket.

Comment date: September 25, 1997, in accordance with Standard

Paragraph E at the end of this notice.

12. Electrical Association Power Marketing, Inc.

[Docket No. ER97-4173-000]

Take notice that on August 12, 1997, Electrical Association Power

Marketing, Inc., tendered for filing a petition for acceptance of rate

schedule and waivers of blanket authority.

Comment date: September 24, 1997, in accordance with Standard

Paragraph E at the end of this notice.

13. El Paso Electric Company

[Docket No. ER97-4212-000]

Take notice that on August 15, 1997, El Paso Electric Company (El

Paso) tendered for filing an Index of Non-Firm Point-to-Point

Transmission Service Customers and an Index of Firm Point to Point

Transmission Service Customers under its open access transmission

service tariff. El Paso tendered for filing service agreements for non-

firm point-to-point transmission service under its open access

transmission tariff to the following customers:

Aquila Power Corporation

Arizona Public Service Company

Citizens Lehman Power Sales

Coral Power LLC

e prime, Inc.

El Paso Electric Company

Electric Clearinghouse, Inc.

Idaho Power Company

Minnesota Power & Light Company

PacifiCorp

PanEnergy Trading & Market Services LLC

Public Service Company of New Mexico

Salt River Project

Southern Energy Trading and Marketing, Inc.

Southwestern Public Service Company

Valero Power Services Company

Williams Energy Services Company

Comment date: September 24, 1997, in accordance with Standard

Paragraph E at the end of this notice.

14. Union Electric Company

[Docket No. ER97-4300-000]

Take notice that on August 22, 1997, Union Electric Company (UE),

tendered for filing Service Agreements for Firm Point-to-Point

Transmission Services between UE and Citizens Power Sales, Enron Power

Marketing, Inc., Entergy Operating Companies, Minnesota Power & Light

Company, NorAm Energy Services, Inc., PECO Energy Company--Power Team

and Wisconsin Electric Power Company. UE asserts that the purpose of

the Agreements is to permit UE to provide transmission service to the

parties pursuant to UE's Open Access Transmission Tariff filed in

Docket No. OA96-50.

Comment date: September 25, 1997, in accordance with Standard

Paragraph E at the end of this notice.

15. Union Electric Company

[Docket No. ER97-4301-000]

Take notice that on August 22, 1997, Union Electric Company (UE),

tendered for filing a Service Agreement for Non-Firm Point-to-Point

Transmission Service between NP Energy Inc. (NP) and UE. UE asserts

that the purpose of the Agreement is to permit UE to provide

transmission service to NP pursuant to UE's Open Access Transmission

Tariff filed in Docket No. OA96-50.

Comment date: September 25, 1997, in accordance with Standard

Paragraph E at the end of this notice.

16. Consolidated Edison Company

[Docket No. ER97-4303-000]

Take notice that on August 22, 1997, Consolidated Edison Company of

New York, Inc. (Con Edison), tendered for filing a service agreement to

provide non-firm transmission service pursuant to its Open Access

Transmission Tariff to ProMark Energy (ProMark).

Con Edison states that a copy of this filing has been served by

mail upon ProMark.

Comment date: September 25, 1997, in accordance with Standard

Paragraph E at the end of this notice.

17. Rochester Gas and Electric Corporation

[Docket No. ER97-4304-000]

Take notice that on August 22, 1997, Rochester Gas and Electric

Corporation (RG&E) filed a Service Agreement between RG&E and the

Virginia Power (Customer). This Service Agreement specifies that the

Customer has agreed to the rates, terms and conditions of the RG&E open

access transmission tariff filed on July 9, 1996 in Docket No. OA96-

141-000.

RG&E requests waiver of the Commission's sixty (60) day notice

requirements and an effective date of August 15, 1997 for the Virginia

Power Service Agreement. RG&E has served

[[Page 49005]]

copies of the filing on the New York State Public Service Commission

and on the Customer.

Comment date: September 25, 1997, in accordance with Standard

Paragraph E at the end of this notice.

18. Consolidated Edison Company of New York, Inc.

[Docket No. ER97-4305-000]

Take notice that on August 22, 1997, Consolidated Edison Company of

New York, Inc. (Con Edison), tendered for filing a service agreement to

provide non-firm transmission service pursuant to its Open Access

Transmission Tariff to Constellation Power Source, Inc. (CPS).

Con Edison states that a copy of this filing has been served by

mail upon CPS.

Comment date: September 25, 1997, in accordance with Standard

Paragraph E at the end of this notice.

19. Louisville Gas and Electric Company

[Docket No. ER97-4306-000]

Take notice that on August 22, 1997, Louisville Gas and Electric

Company (LG&E), tendered for filing an executed Non-Firm Point-to-Point

Transmission Service Agreement between LG&E and NESI Power Marketing,

Inc. under LG&E's Open Access Transmission Tariff.

Comment date: September 25, 1997, in accordance with Standard

Paragraph E at the end of this notice.

20. Central Hudson Gas and Electric Corporation

[Docket No. ER97-4307-000]

Take notice that on August 22, 1997, Central Hudson Gas and

Electric Corporation (CHG&E), tendered for filing pursuant to 35.12 of

the Federal Energy Regulatory Commission's (Commission) Regulations in

18 CFR a Service Agreement between CHG&E and Energy Transfer Group. The

terms and conditions of service under this Agreement are made pursuant

to CHG&E's FERC Electric Rate Schedule, Original Volume No. 1 (Power

Sales Tariff) accepted by the Commission in Docket No. ER97-890-000.

CHG&E also has requested waiver of the 60-day notice provision pursuant

to 18 CFR 35.11.

A copy of this filing has been served on the Public Service

Commission of the State of New York.

Comment date: September 25, 1997, in accordance with Standard

Paragraph E at the end of this notice.

21. Portland General Electric Company

[Docket No. ER97-4308-000]

Take notice that on August 22, 1997, Portland General Electric

Company (PGE), tendered for filing its Average System Cost (ASC) as

calculated by PGE and determined by the Bonneville Power Administration

under the revised ASC Methodology which became effective on October 1,

1984. This filing includes PGE's revised Appendix 1 of the Residential

Purchase and Sale Agreement.

PGE states that the revised Appendix 1 shows the ASC to be 35.32

mills/kWh effective December 1, 1996. The Bonneville Power

Administration determined the ASC rate for PGE to be 34.67 mills/kWh.

However, there is no effect on the residential exchange payments

because the amount for fiscal year 1997 was fixed by federal

legislation.

Copies of the filing have been served on the persons named in the

transmittal letter as included in the filing.

Comment date: September 25, 1997, in accordance with Standard

Paragraph E at the end of this notice.

22. Maine Electric Power Company

[Docket No. ER97-4309-000]

Take notice that on August 22, 1997, Maine Electric Power Company

(MEPCO), tendered for filing a service agreement for Firm Point-to-

Point Transmission service entered into with Enron Power Marketing,

Inc. Service will be provided pursuant to MEPCO's Open Access

Transmission Tariff, designated rate schedule MEPCO--FERC Electric

Tariff, Original Volume No. 1, as supplemented.

Comment date: September 25, 1997, in accordance with Standard

Paragraph E at the end of this notice.

23. Aroostook Valley Electric Company

[Docket No. ER97-4310-000]

Take notice that on August 22, 1997, Aroostook Valley Electric

Company (AVEC), submitted to the Federal Energy Regulatory Commission

and other interested persons a Second Amendment to Power Purchase

Agreement with Central Maine Power Company (CMP). Also submitted is the

Certificate of Concurrence of CMP to such Second Amendment to Power

Purchase Agreement.

The Second Amendment to Power Purchase Agreement extends the

expiring term of the existing Power Purchase Agreement from October 1,

1997 through October 31, 1999.

Comment date: September 25, 1997, in accordance with Standard

Paragraph E at the end of this notice.

24. Maine Public Service Company

[Docket No. ER97-4311-000]

Take notice that on August 22, 1997, Maine Public Service Company

(Maine Public), filed an executed Service Agreement for non-firm point-

to-point transmission service under Maine Public's open access

transmission tariff with NP Energy Inc.

Comment date: September 25, 1997, in accordance with Standard

Paragraph E at the end of this notice.

25. Maine Public Service Company

[Docket No. ER97-4312-000]

Take notice that on August 22, 1997, Maine Public Service Company

(Maine Public) filed an executed Service Agreement for non-firm point-

to-point transmission service under Maine Public's open access

transmission tariff with Williams Energy Services Company.

Comment date: September 25, 1997, in accordance with Standard

Paragraph E at the end of this notice.

26. Midwest Energy, Inc.

[Docket No. ER97-4313-000]

Take Notice that on August 22, 1997, Midwest Energy, Inc.

(Midwest), tendered for filing with the Federal Energy Regulatory

Commission the Service Agreement for Non-Firm Point-to-Point

Transmission Service entered into between Midwest and Constellation

Power Source, Inc.

Midwest states that it is serving copies of the instant filing to

its customers, State Commissions and other interested parties.

Comment date: September 25, 1997, in accordance with Standard

Paragraph E at the end of this notice.

27. Old Dominion Electric Cooperative

[Docket No. ER97-4314-000]

Take notice that on August 22, 1997, Old Dominion Electric

Cooperative (Old Dominion), filed a Petition for blanket authority to

sell power at market-based rates to non-affiliated entities and to its

distribution cooperative members. Old Dominion's Petition is filed

pursuant to 205 of the Federal Power Act and Rules 205 and 207 of the

Commission's Rules of Practice and Procedure, 18 CFR 385.205 and

385.207. Old Dominion also seeks waiver of the cost-of-service filing

requirements of 18 CFR 35.12 and 35.13, and the 60-day notice

requirement of 18 CFR 35.3 in order to permit Old Dominion to commence

sales of power at market-based rates as of the earlier of 60 days from

the date of the filing of its Petition or the date of an order

accepting its market-based rate schedule.

[[Page 49006]]

Comment date: September 25, 1997, in accordance with Standard

Paragraph E at the end of this notice.

28. Maine Electric Power Company

[Docket No. ER97-4315-000]

Take notice that on August 22, 1997, Maine Electric Power Company

(MEPCO), tendered for filing a service agreement for Non-Firm Point-to-

Point transmission service entered into with Pro Mark Energy. Service

will be provided pursuant to MEPCO's Open Access Transmission Tariff,

designated rate schedule MEPCO--FERC Electric Tariff, Original Volume

No. 1, as supplemented.

Comment date: September 25, 1997, in accordance with Standard

Paragraph E at the end of this notice.

29. Maine Electric Power Company

[Docket No. ER97-4316-000]

Take notice that on August 22, 1997, Maine Electric Power Company

(MEPCO), tendered for filing a service agreement for Non-Firm Point-to-

Point transmission service entered into with Tractebel Energy

Marketing, Inc. Service will be provided pursuant to MEPCO's Open

Access Transmission Tariff, designated rate schedule MEPCO--FERC

Electric Tariff, Original Volume No. 1, as supplemented.

Comment date: September 25, 1997, in accordance with Standard

Paragraph E at the end of this notice.

30. Central Maine Power Company

[Docket No. ER97-4317-000]

Take notice that on August 22, 1997, Central Maine Power Company

(CMP), tendered for filing a service agreement for Non-Firm Point-to-

Point Transmission service entered into with NP Energy Inc. Service

will be provided pursuant to CMP's Open Access Transmission Tariff,

designated rate schedule CMP--FERC Electric Tariff, Original Volume No.

3, as supplemented.

Comment date: September 25, 1997, in accordance with Standard

Paragraph E at the end of this notice.

31. Maine Electric Power Company

[Docket No. ER97-4318-000]

Take notice that on August 22, 1997, Maine Electric Power Company

(MEPCO), tendered for filing a service agreement for Non-Firm Point-to-

Point transmission service entered into with PECO Energy Company.

Service will be provided pursuant to MEPCO's Open Access Transmission

Tariff, designated rate schedule MEPCO--FERC Electric Tariff, Original

Volume No. 1, as supplemented.

Comment date: September 25, 1997, in accordance with Standard

Paragraph E at the end of this notice.

32. Maine Electric Power Company

[Docket No. ER97-4319-000]

Take notice that on August 22, 1997, Maine Electric Power Company

(MEPCO), tendered for filing a service agreement for Non-Firm Point-to-

Point transmission service entered into with NP Energy Inc. Service

will be provided pursuant to MEPCO's Open Access Transmission Tariff,

designated rate schedule MEPCO--FERC Electric Tariff, Original Volume

No. 1, as supplemented.

Comment date: September 25, 1997, in accordance with Standard

Paragraph E at the end of this notice.

33. San Diego Gas & Electric Company

[Docket No. ER97-4320-000]

Take notice that on August 22, 1997, San Diego Gas & Electric

Company (SDG&E), tendered for filing a Notice of Cancellation for the

following:

1. Rate Schedule FERC No. 96--Coordination Agreement between San

Diego Gas & Electric Company and Eclipse Energy, Inc., executed June

20, 1994, to be terminated October 31, 1997;

2. Rate Schedule FERC No. 115--Coordination Agreement between San

Diego Gas & Electric Company and Utility-2000 Energy Corp. Executed May

5, 1995, to be terminated October 31, 1997; and

3. Service Agreement for Firm Point-to-Point Transmission Service

between San Diego Gas & Electric Company and San Diego Gas & Electric

Company--Energy Trading, dated June 30, 1997, to be terminated August

1, 1997.

Comment date: September 25, 1997, in accordance with Standard

Paragraph E at the end of this notice.

34. Vastar Resources, Inc.; Vastar Gas Marketing, Inc.; Vastar Power

Marketing, Inc.; Vastar Energy, Inc.; SEI Holdings, Inc.; Southern

Energy North America, Inc.; Southern Energy Trading and Marketing, SC

Ashwood Holdings, Inc.; SC Energy Ventures, Inc.; Southern Company

Energy Marketing L.P.; Southern Company Energy Marketing G.P., L.L.C.

[Docket No. EC97-49-000]

Take notice that on September 9, 1997, the above-captioned parties

(Applicants) filed an amendment to their application under Section 203

of the Federal Power Act.

Comment date: October 7, 1997, in accordance with Standard

Paragraph E at the end of this notice.

Standard Paragraph:

E. Any person desiring to be heard or to protest said filing should

file a motion to intervene or protest with the Federal Energy

Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426,

in accordance with Rules 211 and 214 of the Commission's Rules of

Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such

motions or protests should be filed on or before the comment date.

Protests will be considered by the Commission in determining the

appropriate action to be taken, but will not serve to make protestants

parties to the proceeding. Any person wishing to become a party must

file a motion to intervene. Copies of this filing are on file with the

Commission and are available for public inspection.

Lois D. Cashell,

Secretary.

[FR Doc. 97-24818 Filed 9-17-97; 8:45 am]

BILLING CODE 6717-01-P

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.