Deletion of a Site From the National Priorities List for Uncontrolled Hazardous Waste Sites
Federal RegisterJul 25, 1997
Ask Donna
What actually matters in this document.
Text
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 300
[FRL-5862-5]
Deletion of a Site From the National Priorities List for
Uncontrolled Hazardous Waste Sites
AGENCY: Environmental Protection Agency (EPA).
ACTION: Notice of intent to delete the Frit Industries Superfund Site
from the National Priorities List; request for comments.
-----------------------------------------------------------------------
SUMMARY: The U.S. Environmental Protection Agency (``EPA''), Region 6,
announces its intent to delete the Frit Industries Superfund site
(``Site'') located in Walnut Ridge, Arkansas, from the National
Priorities List (``NPL'') and requests public comment. The NPL, a list
of sites EPA evaluates for priority cleanup of hazardous wastes, is
found in Appendix B of the National Oil and Hazardous Substances
Pollution Contingency Plan (``NCP'') which is 40 CFR part 300, Appendix
B. EPA promulgated the NCP pursuant to section 105 of the Comprehensive
Environmental Response, Compensation, and Liability Act of 1980
(``CERCLA''). The EPA and the State of Arkansas propose this deletion
under the terms of a policy published in the Federal Register on March
20, 1995. In
[[Page 40030]]
this policy EPA announced that, consistent with NCP criteria for
deletion of sites from the NPL, the Agency would delete sites if
corrective actions were proceeding pursuant to the Deletion Policy for
Resource Conservation and Recovery Act, (``RCRA''). The EPA, in
consultation with the Arkansas Department of Pollution Control and
Ecology has determined that all appropriate RCRA response activities
conducted at the site to date and scheduled in the future are
enforceable and have been and will remain protective of public health
and the environment. Moreover, that this deferral to RCRA corrective
authorities is appropriate.
DATES: The EPA will accept comments concerning its proposal for
deletion on or before August 25, 1997.
ADDRESSES: Comments should be mailed to: Mr. Donn R. Walters, Community
Relations Coordinator, U.S. EPA, Region 6 (6SF-P), 1445 Ross Avenue,
Dallas, Texas 75202-2733, 1-800-533-3508 or (214) 665-6483.
In accordance with 40 CFR 300.425(e)(4)(iii) copies of the
information supporting the proposed deletion are in the following
repositories:
Felix Goodson Library, Attention: Mrs. Marilyn Goodwin, Librarian:
Williams Baptist College, Walnut Ridge, Arkansas 72476, (501) 886-6741
Call First on Hours Open, Variable (Non-College Session)
General--Open Monday to Friday 9 a.m.-4 p.m. (When College is in
Session)
Monday through Thursday 8 a.m. to 10 p.m.
Friday 8 a.m. to 5 p.m.
Saturday 10 a.m. to 12 Noon and 1 p.m. to 4 p.m.
Sunday 1 p.m. to 5 p.m.
U.S. EPA, Region 6, Library (6MD-II), 12th Floor, 1445 Ross Avenue,
Dallas, Texas 75202-2733, (214) 665-6424 or 665-6427, Hours of
Operation: 8 a.m. to 4:30 p.m., Monday through Friday, excluding
holidays
Arkansas Department of Pollution Control and Ecology, Attn: Mr. Clark
McWilliams, RCRA State Project Manager, 8001 National Drive, Little
Rock, Arkansas 72219, (501) 682-0850. Hours of Operation: 8 a.m. to
4:30 p.m., Monday through Friday, excluding holidays.
FOR FURTHER INFORMATION CONTACT: Mr. Ernest R. Franke, P.E., Remedial
Project Manager (6SF-AP), U.S. Environmental Protection Agency, Region
6, 1445 Ross Avenue, Dallas, Texas 75202-2733, Telephone: (214) 665-
8521.
SUPPLEMENTARY INFORMATION:
Table of Contents
I. Introduction
II. NPL Deletion Criteria
III. Deletion Procedures
IV. Basis for Intended Site Deletion
I. Introduction
The Environmental Protection Agency (``EPA'') Region 6 announces
its intent to delete the Frit Industries Site from the National
Priorities List (``NPL''), 40 CFR part 300, appendix B, and requests
comments on this deletion. The EPA will accept comments on the deletion
of this Site for thirty days after publication of this notice in the
Federal Register.
The NPL is a list of sites that EPA evaluates for priority cleanup
under the Comprehensive Environmental Response, Compensation, and
Liability Act (``CERCLA''), 42 U.S.C. 9601, et seq. Listing of a site
on the NPL does not, itself, create, alter or revoke any individual
rights or obligations under CERCLA, or any other law. The NPL is
designed primarily for information purposes and to assist Agency
management. Sites on the NPL may be remediated using the Hazardous
Substances Superfund (``Superfund'' or ``Fund'') established by section
9507 of the Internal Revenue Code of 1986. Use of this fund for cleanup
of hazardous substances is governed by section 111 of CERCLA, 42 U.S.C.
9611, and implementing regulations.
As a general matter, deletion of the Frit Industries Site from the
NPL will clarify that Arkansas Department of Pollution & Ecology,
Office of Resource Conservation and Recovery Act (``RCRA'') Programs
will have primary responsibility for ensuring that the hazardous wastes
released at the Site are appropriately remediated. Notwithstanding any
such deletion of this Site from the NPL, in the event that conditions
at this Site warrant additional remedial corrective action, this Site
remains eligible for Fund-financed remedial action. Pursuant to section
300.425(e)(3) of the NCP, 40 CFR 300.425(e)(3): ``All releases deleted
from the NPL are eligible for further Fund-financed remedial actions
should future conditions warrant such action.
Whenever there is a significant release from a site deleted from
the NPL, the site shall be restored to the NPL without application of
the [Hazard Ranking System].'' Therefore, deletion of this, or any
other, site from the NPL does not preclude eligibility for subsequent
Fund-financed remedial action if future conditions warrant such action.
Section II of this notice summarizes the criteria for deleting
sites from the NPL. Section III summarizes the procedural steps EPA
takes prior to deleting a site from the NPL. Section IV discusses the
Frit Industries Site and explains how the Frit Industries Site meets
the deletion criteria.
II. NPL Deletion Criteria
The National Oil and Hazardous Substances Pollution Contingency
Plan (``NCP''), 40 CFR part 300, establishes the criteria the Agency
uses to delete sites from the NPL. Section 300.425(e) of the NCP, 40
CFR 300.425(e), provides that sites may be deleted from the NPL where
no further response is appropriate. In making a determination to delete
a site from the NPL, EPA shall consider, in consultation with the
appropriate state, whether the following criteria have been met:
(I) Responsible parties or other persons have implemented all
appropriate response actions required;
(ii) All appropriate Fund-financed responses under CERCLA have been
implemented and no further action by responsible parties is
appropriate; or
(iii) The remedial investigation has shown that the release poses
no significant threat to public health or the environment and,
therefore, taking of remedial measures is not appropriate.
Consistent with Sec. 300.425(e) of the NCP, 40 CFR 300.425(e), EPA
proposes deletion of the Frit Industries Site because, as explained
further below, no further CERCLA response is appropriate. This
determination is based on a new policy that EPA has adopted for
implementation of the NPL deletion criteria. This new policy, entitled
``The National Priorities List for Uncontrolled Hazardous Waste Sites;
Deletion Policy for Resource Conservation and Recovery Act
Facilities,'' was published in the Federal Register on March 20, 1995
(60 FR 14641). This new policy sets forth the following criteria and
their general application for deleting RCRA facilities from the NPL:
1. If evaluated under EPA's current RCRA/NPL deferral policy (which
refers to the policy in effect at the time the deletion decision is
made. As past Federal Register notices demonstrate, the RCRA/NCP
deferral policy has changed, and may continue to change based upon the
Agency's continued evaluation of how best to implement the statutory
authority of RCRA and CERCLA), the site would be eligible for deferral
from listing on the NPL;
2. The CERCLA site is currently being addressed by RCRA corrective
action authorities under an existing enforceable order or permit
containing corrective action provisions;
[[Page 40031]]
3. Response under RCRA is progressing adequately; and
4. Deletion would not disrupt an ongoing CERCLA action.
Under this new policy, two types of sites may be eligible for
deletion: (1) Sites that would be eligible for deferral under current
deferral criteria, but were not deferred because the deferral policy at
the time of listing was different; and (2) sites that were not eligible
for deferral when listed, but now may be eligible because of changed
conditions at the site (e.g., the site is now in compliance with a
corrective action order). For facilities within the second category,
the Agency reviews the original listing rationale together with current
information to ascertain whether conditions at the site have changed
sufficiently to warrant deletion from the NPL.
III. Deletion Procedures
Prior to deleting a site from the NPL, 40 CFR 300.425(e) requires
that EPA provide the appropriate state with thirty (30) working days to
review the proposed notice of intent to delete. After providing the
appropriate state authorities with such opportunity for review, EPA
must next provide the public with a minimum of thirty (30) calendar
days to provide comments to the appropriate EPA Region. Prior to
deleting a site from the NPL, EPA must receive concurrence from the
appropriate state authorities. Additionally, EPA must respond to each
significant comment and any significant new data submitted during the
public comment period. A deletion occurs when the Regional
Administrator places a notice of final deletion in the Federal
Register. Generally, the NPL will reflect deletion in the final update
following deletion. After the notice of final deletion is published,
EPA is required to place the final deletion package in a local
information repository. As mentioned in Section I (Introduction) of
this document, 40 CFR 300.425(e)(3) states that deletion of a site from
the NPL does not preclude eligibility for future Fund-financed response
actions.
With respect to this notice of intent to delete, EPA has provided
the Arkansas Department of Pollution Control and Ecology (ADPC&E) with
a thirty (30) working day period for review and comment. The ADPC&E has
provided EPA Region 6 with its concurrence on this notice of intent to
delete. Before making the final decision as to whether to delete the
Frit Industries Site from the NPL, EPA Region 6 will respond to each
significant comment and any significant new data submitted during the
public comment period in a Responsiveness Summary. In addition to this
notice of intent to delete, EPA Region 6 has published a notice of
availability of this notice of intent to delete in a major local
newspaper and has placed copies of documents supporting this notice in
an information repository at or near the Frit Industries Site. After
the public comment period has closed, copies of the Responsiveness
Summary will be made available to interested parties by the EPA Region
6. In the event that EPA issues a notice of final deletion for the Frit
Industries Site, EPA Region 6 will place the final deletion package in
the local repository.
IV. Basis for Intended Site Deletion
The following summary provides the EPA's rationale for the
intention to delete the Frit Industries Site (``Site'') from the NPL.
A. Site Background
Frit Industries, Inc., has operated a micronutrient fertilizer
additive manufacturing facility on approximately 22 acres of land
leased from the City of Walnut Ridge, Arkansas, from 1973 to the
present. In 1979, a major on-site fire in a storage building resulted
in contaminants being released by air emissions as well as surface and
ground water runoff. The incident focused public attention and resulted
in a site evaluation. The site was evaluated by EPA with a HRS
composite package score of 39.47. This score resulted in the site being
placed on the NPL on November 24, 1982.
Frit Industries had an electric arc furnace and brass mill baghouse
materials on site from 1973 to 1987 with hazardous waste K061 (emission
control dust/sludge from the primary production of steel in electric
furnaces), D006 (cadmium), and D008 (lead); this placed the site under
the Arkansas State RCRA program. The lead agency, the ADPC&E,
determined that three unit areas of the site are subject to regulation
as hazardous waste management facilities in accordance with applicable
regulations promulgated in the Arkansas Hazardous Waste Management Act,
A.C.A. Section 8-7-214, and the Arkansas Hazardous Management Code.
An Administrative Order On Consent (AOC), Document Number CERCLA
VI-1-83, was issued pursuant to section 106(a) of CERCLA, 42 U.S.C.
9606(a), Executive Order 12316, August 20, 1981, and 46 Federal
Regulation 42237. This was dated, entered, and effective February 3,
1983, between Frit Industries, Inc., and the USEPA. The order was
divided into three sections requiring action: Surface Water, Ground
Water, and Substances Stored on Site. Considerable work and progress
had already been completed on many of the items addressed in the order
before the effective date of the order. The investigations and actions
that were required by the CERCLA Administrative Order were completed in
August 1989. Mr. Carl Schauble, Executive Vice President of Frit
Industries documented completion of the AOC and requested the Frit
Industries facility be removed from the NPL.
Pursuant with 40 CFR 272.201, section 3006(b) of RCRA, 42 U.S.C.
6926(b), the lead agency for Frit Industries is the Arkansas Department
of Pollution Control and Ecology (ADPC&E).
As the result of an appeal of a Final Closure Plan (May 1989),
which was approved with modifications by the State of Arkansas (ADPC&E)
on February 28, 1990, Frit Industries, Inc., entered into an agreement
with the ADPC&E, by signing a Consent Administrative Order (CAO) LIS
No. 91-161. The CAO required a facility investigation (FI) of the site.
On November 4, 1991, Frit Industries employed American Environmental
Engineering of Leeds, Alabama, (Engineer) to conduct the FI and to
prepare a report of the finding of the investigation.
In the FI Report, section 3, Source Characterization, the Engineer
identifies fourteen Solid Waste Management Units (SWMU's). These are
listed with history and status as follows:
SWMU #1--Granulated Facility Storage Unit (160'x120' Bldg.) The
granulated storage building was built by the U. S. Army Corps of
Engineers in the early 1940's. This area was used during and after
World War II to perform maintenance on aircraft, clean engines, and to
store and repair batteries. Historical documents reveal problems with
soil contamination from those operations. This facility was used by all
of the previous lessees and Frit Industries. Electric arc furnace dust
was stored in the facility in 1973 when Frit Industries first began
operations. This building was demolished and decontaminated between
September 1988 and March 1989. The current Closure Action is pending
the State's RCRA scheduled CAO action items.
SWMU #2--Unidentified Depression--Historical documents confirm SWMU
#2 was not constructed or operated as a surface water impoundment by
Frit Industries, rather it is a site low point (ponding area) of the
facility yard.
SWMU #3--Unidentified Pond--former surface water impoundment area.
The area in which SWMU #3 is
[[Page 40032]]
located is the general area where Texas Railway and Equipment Company
and Aircraft Conversion Company (TRECO/ACC) operated an aluminum
recovery smelter during the period 1946 to 1948. This recovery
operation consisted of the scrapping and smelting of surplus aircraft
from World War II. Swindle Field, which included the current Frit
Industries facility, was estimated to have processed 5,000 to 10,000
airplanes. Debris from this operation litters the top soil of the
region south of the Frit facility and west of the Municipal Airport
runway. The area, which was closed in 1982, covers \1/3\ of an acre.
SWMU #4--Zinc Sulfate Storage--This unit was also within the area
of the post-World War II smelting operation, and it was at this
location where the U.S. Army Air Corps stored aviation fuel in 50,000
gallon above-ground storage tanks, which were documented to have
leakage problems. The Zinc Sulfate Storage area is a unit that was used
between 1977 and 1989 to store brass mill baghouse dust. It was built
of corrugated steel on a 36' x 80' concrete slab. The closure plan for
the Zinc Sulfate facility was prepared by NOVA Environmental Services.
The plan was approved by the State of Arkansas (ADPC&E) on February 28,
1990. The facility was partially closed and dismantled in 1990.
SWMU #5--Primary Pond--This pond was constructed in 1980 to contain
and recycle site storm water runoff in the immediate area of the zinc
sulfate facility. Closure activity consisted of using a new lined pond
constructed under SWMU #7. The pond was closed October 27, 1986.
SWMU #6--Surge Pond--This was a former unlined surface impoundment
from 1984 until its closure approval by State of Arkansas (ADPC&E) in
1993.
SWMU #7--Overflow Pond--The overflow pond is adjacent to the surge
pond and receives effluent from the surge pond. The pond was
constructed with a synthetic geotextile liner in 1984 and is not a RCRA
unit. This pond provides flow equalization to the waste water treatment
plant. The overflow pond replaces two smaller ponds identified as 7a
and 7b which were previously located between the southwestern one-half
of the present-day overflow pond. The smaller ponds were the former
settling and neutralization ponds that functioned to settle solids and
adjust water pH used for super-phosphate production. The production of
this product and use of these ponds was discontinued in 1973.
SWMU #8--Alleged Dump Site--An alleged pesticides dumpsite was
located south of the surge and overflow ponds.
This site was investigated by EPA during a visual site
investigation on December 11 and 12, 1986, but the location could not
be identified during this investigation. An EM-31 Conductive Survey for
buried drums was completed by ADPC&E and no drums were detected or
found.
SWMU #9--Waste Water Treatment Plant--The waste-water treatment
plant is located between the overflow pond and the employee change
house. This facility operates under a National Pollutant Discharge
Elimination System (NPDES) Permit and the outfall is located at the
southwest corner of the site. Construction of the treatment plant was
completed in September 1984 and the plant began operation the following
month. The filter cake generated by the treatment plant is recycled
into Frit Industries micronutrient production process.
SWMU #10--Product Storage Warehouse--The product warehouse is
located in the central portion of the site, east of the overflow pond
on the southeast side of Avenue B. A fire destroyed a portion of the
former product storage building in the warehouse area on February 18,
1979. A new warehouse was then constructed and continues to be used for
storing raw materials, finished products, and packing materials used at
the site.
SWMU #11--Acid Cutting Pits for Sulfuric Acid--This unit consisted
of former pits used to dilute or cut sulfuric acid for use in the
manufacture of superphosphates. These pits were located east of the
overflow pond on the southeast side of Avenue B. In 1954 the
superphosphate plant was constructed by Spencer Chemical Company and
ArkMo Plant Food Company. When Frit Industries started operations at
the site in 1973, the superphosphate production plant was shut down and
dismantled. Final Closure action is pending soils sampling and ground
water results; these operations are scheduled in the three listed RCRA
activities.
SWMU #12--Fire Water Pond--This pond was constructed in 1971 at the
plant entrance, northwest of Avenue B and northeast of Mill Street in
the northern portion of the site. The pond is used to collect storm
water overflow; runoff goes to SWMU #7 and SWMU #9.
SWMU #13--Original Containment Area--This storage area consists of
the original containment area used to store raw materials; however,
TRECO/ACC operated the aluminum recovery smelter of the airplane
demolition (see SWMU #3 above) in this immediate area.
SWMU #14--Former Waste Pile. These materials were removed to a
landfill near Paragould, Arkansas. No hazardous waste or constituents
are known or have been documented to be present in this material.
Under this RCRA closure SWMU 1, SWMU 4, SWMU 5 , SWMU 6 and SWMU 11
are analyzed compositely to determine how these units impact ground
water and it will be on a site-wide basis. Ground water and the other
site medias of surface water, and air, will be addressed within the
scheduled eminent major submittals namely, the Baseline Risk
Assessment, the identification and development, evaluation,
justification of Corrective Measure Alternatives, and Corrective
Measure Implementation.
B. Documentation That the Frit Industries Site Meets RCRA Deferral
Criteria Set Forth in EPA's March 20, 1995, Policy
1. If evaluated under EPA's current RCRA/NPL deferral policy, the
Site would be eligible for deferral from listing on the NPL.
At the time of the NPL listing, the Site posed a threat to human
health and the environment that was not being addressed under either
CERCLA or RCRA corrective action authorities. At that time, EPA
determined that the most expeditious way to address the contamination
at the Site was through the use of CERCLA authorities. Since that
determination, Frit Industries and ADPC&E on February 28, 1990, entered
into a RCRA CAO LIS No. 91-161 and the order has been addressing all of
the contamination at the Site pursuant to section 3008(h) of RCRA. Frit
Industries fulfilled the conditions of the RCRA CAO and is currently in
compliance with the Order. Consequently, if this Site were evaluated
for NPL listing under the current conditions, the Site would qualify
for deferral to RCRA.
2. The CERCLA Site is currently being addressed by RCRA corrective
action authorities under an existing enforceable order or permit
containing corrective action provisions.
As described previously, EPA and Frit Industries entered into a
RCRA CAO, pursuant to section 3008(h) of RCRA, on February 3, 1983.
Under the terms of that AOC, Frit Industries was required to complete
an on-site and off-site investigation of the nature and extent of the
release of hazardous wastes from the Site and to conduct a study to
evaluate various cleanup alternatives. Frit Industries subsequently
fulfilled the conditions of this AOC.
As also described previously, ADPC&E and Frit Industries entered
[[Page 40033]]
into a RCRA CAO, pursuant to section 3008(h) of RCRA, on February 28,
1990. The 1990 RCRA CAO will remain in effect until such time when
ADPC&E determines that the terms of this order have been satisfied.
Frit Industries has been in compliance with the RCRA CAO. All known
groundwater contamination is being addressed through ADPC&E and EPA's
exercise of its corrective action authorities pursuant to RCRA.
3. Response under RCRA is progressing adequately.
Corrective action is progressing satisfactorily under the RCRA CAO,
as described above. There has been no history of protracted
negotiations due to lack of cooperation. See 60 FR 14642, 14643 (March
20, 1995).
4. Deletion would not disrupt an ongoing CERCLA action.
The EPA has received the following concurrence from ADPC&E: ``The
ADPC&E concurs in the decision to delete the site from the NPL, but
reserves all of its rights, abilities and authorities to address
contamination at the site and to pursue responsible parties regarding
this contamination.''
The EPA concludes that this Site meets the criteria under the new
NPL deletion policy and announces its intention to delete the Site from
the NPL.
The EPA believes it is appropriate to delete sites from the NPL
based upon the deferral policy to RCRA under these established
circumstances. Deletion of this site from the NPL to defer it to RCRA
Subtitle C corrective action authorities avoids possible duplication of
effort and the need for Frit Industries to follow more than one set of
regulatory procedures. Moreover, EPA and the State of Arkansas (ADPC&E)
have determined that remedial actions conducted at the site to date and
scheduled in future under RCRA actions have been and will remain
protective of public health, and the environment.
Dated: June 30, 1997.
Approved By:
Lynda F. Carroll,
Acting Regional Administrator.
[FR Doc. 97-19396 Filed 7-24-97; 8:45 am]
BILLING CODE 6560-50-P