Transcontinental Gas Pipe Line Corporation; Notice of Intent To Prepare an Environmental Assessment for the Proposed Cherokee Expansion Project and Request for Comments on Environmental Issues
Federal RegisterJul 7, 1997
Ask Donna
What actually matters in this document.
Text
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP97-331-000]
Transcontinental Gas Pipe Line Corporation; Notice of Intent To
Prepare an Environmental Assessment for the Proposed Cherokee Expansion
Project and Request for Comments on Environmental Issues
June 30, 1997.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the construction and operation of
the facilities proposed in the Cherokee Expansion Project.\1\ This EA
will be used by the Commission in its decision-making process to
determine whether the project is in the public convenience and
necessity.
---------------------------------------------------------------------------
\1\ Transco's application was filed with the Commission under
Section 7 of the Natural Gas Act and Part 157 of the Commission's
regulations.
---------------------------------------------------------------------------
Summary of the Proposed Project
Transcontinental Gas Pipe Line Corporation (Transco) wants to
expand the capacity of its facilities in Alabama and Georgia to provide
87,070 dekatherms per day of additional firm transportational capacity
to growing markets in the southeast for two existing customers, a local
distribution company and a municipal gas distribution system. Transco
seeks authority to:
Construct about 11.2 miles of 48-inch-diameter pipeline
loop from milepost (MP) 826.3 to MP 837.5 in Marengo County, Alabama;
Uprate the 16-inch-diameter Georgia Extension in Walton
and Gwinnett Counties, Georgia from a maximum allowable operating
pressure (MAOP) of 780 pounds per square inch (psi) to a MAOP of 960
psi. The uprating would include:
a. Replacement of 3.7 miles of 16-inch-diameter pipeline with 3.7
miles of 16-inch-diameter pipeline in five sections;
b. Expansion and/or uprating of four meter and regulator (M&R)
stations;
c. Hydrostatic testing of 26.7 miles of 16-inch-diameter pipeline;
and
d. Abandonment in place of about 0.1 mile of 16-inch-diameter
pipeline.
Construct a new 15,000 horsepower (hp) compressor station
(Compressor Station 115), in Coweta County, Georgia;
Install an additional 8,000 hp of compression at
Compressor Station 125 in Walton County, Georgia; and
Rewheel existing compressor units at Compressor Station
100 in Chilton County, Alabama and Compressor Station 120 in Henry
County, Georgia and install additional gas cooling capacity at
Compressor Station 110 in Randolph County, Alabama.
The general location of the project facilities is shown in appendix
1.\2\ If you are interested in obtaining detailed maps of a specific
portion of the project, or procedural information, please write to the
Secretary of the Commission.
---------------------------------------------------------------------------
\2\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies are available from the
Commission's Public Reference and Files Maintenance Branch, 888
First Street, N.E., Washington, D.C. 20426, or call (202) 208-1371.
Copies of the appendices were sent to all those receiving this
notice in the mail.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of Transco's proposed pipeline facilities in Alabama
would affect about 156.8 acres, of which 32.0 acres would be within
existing, cleared right-of-way. Following construction, about 34.8
acres would be maintained as new permanent right-of-way. The remaining
122.0 acres of land would be restored and allowed to revert to its
former use.
Replacement of the pipeline facilities in Georgia would affect
about 38.4 acres, of which 29.0 acres would be within existing cleared
right-of-way. The replacement pipeline would be installed in the same
location as the existing 16-inch-diameter pipeline after it is removed
and would not require any new permanent right-of-way.
Construction of Compressor Station 115 would require about 30.0
acres of which 25.5 acres would be maintained during operation of the
compressor station. Construction at Compressor Station 125 would affect
about 1.7 acres of which about 1.0 acre would be maintained with the
existing compressor station area during operation. The installation of
the additional cooling capacity at Compressor Station 110 would require
about 1.0 acre of land of which less than 0.1 acre would be affected by
operation. The work that would occur at Compressor Stations 100 and 120
would take place within the existing compressor station buildings and
would not require additional land.
Modification of the M&R stations would affect a total of about 0.6
acre of land during construction. However, no increases in the size of
the existing fenced areas would occur.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
to discover and address concerns the public may have about proposals.
We call this ``scoping''. The main goal of the scoping process is to
focus the analysis in the EA on the important environmental issues. By
this Notice of Intent, the Commission requests public comments on the
scope of the issues it will address in the EA. All comments received
are considered during the preparation of the EA. State and local
government representatives are encouraged to notify their constituents
of this proposed action and encourage them to comment on their areas of
concern.
The EA will discuss impacts that could occur as a result of the
construction and operation of the proposed project under these general
headings:
Geology and soils
Water resources, fisheries, and wetlands
Vegetation and wildlife
Endangered and threatened species
Public safety
Land use
Cultural resources
Air quality and noise
Hazardous waste
We will also evaluate possible alternatives to the proposed project
or portions of the project, and make recommendations on how to lessen
or avoid impacts on the various resource areas.
Our independent analysis of the issues will be in the EA. Depending
on the comments received during the scoping process, the EA may be
published and mailed to Federal, state, and local agencies, public
interest groups, interested individuals, affected landowners,
newspapers, libraries, and the Commission's official service list for
[[Page 36278]]
this proceeding. A comment period will be allotted for review if the EA
is published. We will consider all comments on the EA before we make
our recommendations to the Commission.
Currently Identified Environmental Issues
We have already identified several issues that we think deserve
attention based on a preliminary review of the proposed facilities and
the environmental information provided by Transco. This preliminary
list of issues may be changed based on your comments and our analysis.
Seven perennial waterbodies would be crossed by the
Alabama portion of the project.
About 2.5 miles of wetlands in Alabama and Georgia would
be disturbed.
Construction may affect water wells, structures, and other
utilities.
About 61.2 acres of forest would be cleared.
About 36 residences would be within 50 feet of the
proposed construction work area.
Additional compression would be constructed at Compressor
Station 125 in Walton County, Georgia.
Public Participation
You can make a difference by sending a letter addressing your
specific comments or concerns about the project. You should focus on
the potential environmental effects of the proposal, alternatives to
the proposal (including alternative locations/routes), and measures to
avoid or lessen environmental impact. The more specific your comments,
the more useful they will be. Please follow the instructions below to
ensure that your comments are received and properly recorded:
Send two copies of your letter to: Lois Cashell,
Secretary, Federal Energy Regulatory Commission, 888 First St., NE.,
Room 1A, Washington, DC 20426;
Reference Docket No. CP97-331-000; and
Mail your comments so that they will be received in
Washington, DC on or before July 30, 1997.
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an official party to the proceeding or become an
``intervenor''. Among other things, intervenors have the right to
receive copies of case-related Commission documents and filings by
other intervenors. Likewise, each intervenor must provide copies of its
filings to all other parties. If you want to become an intervenor you
must file a motion to intervene according to Rule 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.214) (see
appendix 2).
You do not need intervenor status to have your comments considered.
Lois D. Cashell,
Secretary.
[FR Doc. 97-17544 Filed 7-3-97; 8:45 am]