Southwestern Region; Coconino National Forest, Arizona; Draft Environmental Impact Statement, Windmill Range Allotment
Federal RegisterJun 27, 1997
Ask Donna
What actually matters in this document.
Text
SUMMARY: The Coconino National Forest of the Forest Service is planning
to prepare an environmental impact statement on proposals to change
cattle management on the 248,792 acre Windmill Allotment planning area.
DATES: This analysis has been ongoing and public participation has
occurred at various stages. The Draft Environmental Impact Statement
will be published in July of 1997.
ADDRESSES: Send comments to Mormon Lake Ranger Districts, 4373 S. Lake
Mary Road, Flagstaff, Arizona 86001, Reference: Windmill EIS.
[[Page 34685]]
EFFECTIVE DATE: Send comments to Mormon Lake Ranger District, 4373 S.
Lake Mary Road, Flagstaff, Arizona 86001, Reference: Windmill EIS.
RESPONSIBLE OFFICIAL: Fred Trevey, Coconino Forest Supervisor.
FOR FURTHER INFORMATION CONTACT:
District Range Staff, Mike Hannemann, (520) 774-1147.
SUPPLEMENTARY INFORMATION: The Windmill Allotment Management Plan was
updated in 1982 to address the distribution of livestock. In 1988 the
Allotment plan for the Winter Division was updated to change the
grazing system to improve the growth of cool-season Stipa grasses and
overall range conditions.
In 1994, the Peaks, Mormon Lake and Sedona Ranger Districts in
partnership with the Arizona Game and Fish Department and the Windmill
Ranch initiated a comprehensive analysis of the Windmill Allotment to
update the Allotment Management Plan. The Allotment was selected for
analysis to address:
Large, open meadows that are in poor condition indicating an
imbalance between plant growth and use of plants throughout the
meadows;
Riparian areas that are in less than preferable condition;
Management of threatened, endangered and sensitive species;
Administrative inefficiencies (three allotment plans versus one
plan);
Fragmentation indicating a need for landscape scale planning;
Livestock/elk conflicts.
In 1995, a 10 year grazing permit was issued for the Windmill
Allotment under the term of the Rescission Bill (Burns Amendment). This
permit included some interim mitigating measures including fencing
riparian and sensitive plant habitats, sweeping cattle from driveways
and shipping culled cows. As required by this legislation, the
Allotment was then rescheduled for comprehensive analysis within the 10
year period.
In 1996, the comprehensive analysis was continued. The core team
focused on gaining an understanding of relationships between forage
production, soils, tree densities, climate, past grazing, and the
dietary needs of cattle and elk. Further, the team focused on judging
where forage dietary needs and grazing use were out of balance with the
lands ability to produce forage with upward trends and designing
management actions to respond to problem areas. The following describes
the analysis in detail.
Specifically, the purpose of this analysis is to evaluate the
grazing use on the Windmill Allotment and to propose options for moving
toward resource improvement goals and objectives. Cattle grazing
alternatives (including no cattle grazing) are being considered. If a
cattle grazing alternative is selected, a new permit will be issued
along with a new Allotment Management Plan (AMP).
Tentative alternatives are: 1. Alternative A is designed to meet
all the current grazing management issues while maintaining a viable
ranching operation. This alternative uses permittee and range
conservationist knowledge to determine proper livestock numbers, graze
periods, graze rotations, and pasture splits. Total livestock numbers
are 1252 to 1257.
2. Alternative B is the no action alternative as required by the
National Environmental Policy Act regulations. Selection of this
alternative would mean that no grazing would occur on this allotment
for the next 10 years.
3. Alternative C is the management system currently in place. This
alternative permits a total of 1,252 to 1,257 cattle to graze year-
round on the Windmill Range Allotment.
4. Alternative D is designed to respond to grazing capacity and
proper use guideline issues. This alternative uses timberstand data
base and TES data to project total yearly forage production for each
pasture. Total livestock numbers are 635.
5. Alternative F is the same as Alternative A except for adjusting
the Luke Mountain pasture of the Foxboro Herd from a two-way pasture
split to a three-way pasture split. This third pasture reduces graze
periods in Little T-Six from 20 to 10 days and Highway Camp from 14-20
days to 10 days. Total livestock numbers are 1252 to 1257.
6. Alternative G is designed to better meet resource concerns of
poor and declining range conditions in parts of Munds-Pocket and
Foxboro Herd areas. This alternative improves on Alternative A in these
areas by reducing livestock numbers, adjusting graze periods and
additional pasture splits. Total livestock numbers are 1090 to 1125.
Items common to alternatives include fencing some riparian areas to
exclude livestock. The areas chosen for fencing are easily accessed by
cattle, are fairly large and have adjacent wet meadows and are
estimated to have high potential for improvement. Not all riparian
springs located on the Allotment are fenced. Those not chosen for
fencing are less accessible to cattle, are not associated with wet
meadows and are estimated to have high potential for improvement. Not
all riparian springs located on the Allotment are fenced. Those not
chosen for fencing are less accessible to cattle, are not associated
with wet meadows and are very small. Major creeks and rivers will not
have direct cattle access under any of the alternatives. Other items
common to all alternatives include tank re-location and/or waterlot
construction where tanks occur in dry meadows. Pastures that will not
be used in the 10 year management plan period are also identified.
Environmental analysis has been ongoing. It is anticipated that a
draft environmental impact statement will be published in July of 1997.
A ninety day comment period pursuant to 36 CFR 219.10(b) will be
provided for the public to make comments on the draft environmental
impact statement. A record of decision will be prepared and filed with
the final environmental impact statement. A ninety day appeal period
pursuant to 36 CFR 217.8(a) will be applicable. The ninety day comment
period on the draft environmental impact statement will begin when the
Environmental Protection Agency's Notice of Availability appears in the
Federal Register.
To be most helpful, comments on the draft environmental impact
statement should be as specific as possible and may address the
adequacy of the statement or the merits of the alternatives discussed
(see Council on Environmental Quality Regulations for implementing the
procedural provisions of the National Environmental Policy Act at 40
CFR 1503.3).
This is the second notice for this draft environmental impact
statement. The publication of the draft was changed from our original
estimate of February, 1997 to July, 1997.
Fred Trevey,
Coconino Forest Supervisor.
[FR Doc. 97-16885 Filed 6-26-97; 8:45 am]
BILLING CODE 3410-11-M
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.