DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT

[Docket No. FR-4186-N-01]

Notice of Funding Availability (NOFA) for Fiscal Year 1997 for

the Comprehensive Improvement Assistance Program (CIAP)

AGENCY: Office of the Assistant Secretary for Public and Indian

Housing, HUD.

ACTION: Notice of Funding Availability for Fiscal Year (FY) 1997.

-----------------------------------------------------------------------

SUMMARY: This notice informs Public Housing Agencies and Indian Housing

Authorities (herein referred to as HAs) that own or operate fewer than

250 public housing units and, therefore, are eligible to apply and

compete for CIAP funds, of the requirements and application deadline

date for FY 1997 CIAP funding and the availability of CIAP funds. HAs

with 250 or more public housing units are entitled to receive a formula

grant under the Comprehensive Grant Program (CGP) and are not eligible

to apply for CIAP funds. Entities other than HAs are not eligible to

apply for CIAP funds.

DATES: The CIAP Application is due on or before 3 pm local time on June

30, 1997 at the HUD Field Office with jurisdiction over the HA,

Attention: Director, Office of Public Housing (OPH), or Administrator,

Office of Native American Programs (ONAP). The term ``Field Office''

includes both the OPH and the ONAP.

FOR FURTHER INFORMATION, CONTACT: William J. Flood, Director, Office of

Capital Improvements, Department of Housing and Urban Development, 451

Seventh Street, S.W., Room 4134, Washington, D.C. 20410. Telephone

(202) 708-1640. (This is not a toll free number.)

IHAs may contact Deborah M. LaLancette, Director, Housing

Management Division, Office of Native American Programs (ONAP),

Department of Housing and Urban Development, 1999 Broadway, Suite 3390,

Denver, CO 80202. Telephone (303) 675-1600. (This is not a toll free

number.)

Hearing or speech impaired individuals may call HUD's TTY number

(202) 708-4595. (This is not a toll-free number.)

Paperwork Reduction Act Statement

The information collection requirements contained in this NOFA have

been approved by the Office of Management and Budget (OMB) under the

Paperwork Reduction Act of 1995 (44 USC 3501-3520) and have been

assigned OMB control number 2577-0044. An agency may not conduct or

sponsor, and a person is not required to respond to, a collection of

information unless the collection displays a valid control number.

Promoting Comprehensive Approaches to Housing and Community

Development

HUD is interested in promoting comprehensive, coordinated

approaches to housing and community development. Economic development,

community development, public housing revitalization, homeownership,

assisted housing for special needs populations, supportive services,

and welfare-to-work initiatives can work better if linked at the local

level. Toward this end, the Department in recent years has developed

the Consolidated Planning process designed to help communities

undertake such approaches.

In this spirit, it may be helpful for applicants under this NOFA to

be aware of other related HUD NOFAs that have recently been published

or are expected to be published in the near future. By reviewing these

NOFAs with respect to their program purposes and the eligibility of

applicants and activities, applicants may be able to relate the

activities proposed for funding under this NOFA to the recent and

upcoming NOFAs and to the community's Consolidated Plan.

A NOFA related to housing revitalization that the Department has

published is the NOFA for Revitalization of Severely Distressed Public

Housing (HOPE VI). This NOFA was published on April 14, 1997 (61 FR

18242). Other NOFAs related to housing revitalization that the

Department expects to publish in the Federal Register within the next

few weeks include: the Lead-based Paint Hazard Reduction NOFA; the

Public Housing Demolition NOFA; and the NOFA for the Section 8 Rental

Certificate and Voucher Programs.

To foster comprehensive, coordinated approaches by communities, the

Department intends for the remainder of FY 1997 to continue to alert

applicants to upcoming and recent NOFAs as each NOFA is published. In

addition, a complete schedule of NOFAs to be published during the

fiscal year and those already published appears under the HUD Homepage

on the Internet, which can be accessed at http://www.hud.gov/

nofas.html. Additional steps on NOFA coordination may be considered for

FY 1998.

For help in obtaining a copy of your community's Consolidated Plan,

please contact the community development office of your municipal

government.

SUPPLEMENTARY INFORMATION:

I. Allocation Amounts

(a) In FY 1997, $2,427,314,900 is available for the Modernization

Program (CIAP and CGP).

(1) Modernization funds are allocated between CIAP and CGP agencies

based on the relative shares of backlog needs (weighted at 50%) and

accrual needs (weighted at 50%), as determined by the field inspections

conducted for the HUD-funded ABT study of modernization needs. This

allocation results in CIAP agencies receiving approximately 12.15% or

$305,361,070 and CGP agencies receiving approximately 87.85% or

$2,121,953,830 of the total funds available.

(i) Backlog needs are needed repairs and replacements of existing

physical systems, items that must be added to meet the HUD

modernization and energy conservation standards and State or local/

tribal codes, and items that are necessary for the long-term viability

of a specific housing development.

(ii) Accrual needs are needs that arise over time and include

needed repairs and replacements of existing physical systems and items

that must be added to meet the HUD modernization and energy

conservation standards and State or local/tribal codes.

(2) The modernization funds available to CIAP agencies are

allocated between Public Housing at approximately 91.8505% or

$280,475,670 and Indian Housing at approximately 8.1495% or

$24,885,400. This allocation also is based on the relative shares of

backlog needs (weighted at 50%) and accrual needs (weighted at 50%).

(b) Assignment of Funds to Field Offices of Public Housing (OPH).

In past years, the distribution of Public Housing CIAP funds for each

Field OPH has been based solely on the relative shares of backlog and

accrual needs for CIAP PHAs. In order to obtain a more equitable

distribution of available funds relative to historical demand within

each FO jurisdiction, Headquarters has determined that the FY 1997

distribution of Public Housing CIAP funds for each Field OPH will be

based on the relative shares of backlog and accrual needs for CIAP PHAs

(weighted at 50%) and the relative demand for CIAP funds, as evidenced

by the CIAP funds requested in FY 1996 (weighted at 50%). However, to

ensure that the relative demand side of the allocation

[[Page 23929]]

formula does not give undue weight to FOs that were able to fund a

higher percentage of funds requested in a prior year, each Field OPH

will be capped by Headquarters, before FY 1997 funds are assigned, to

an allocation amount which will fund no more than 30% of funds

requested in FY 1996.

(1) The Field OPH Director shall have authority to make Joint

Review selections and CIAP funding decisions. However, the Secretary's

Representative is responsible for scoring the technical review factor

related to the degree of local/tribal government support for the

proposed modernization (see section IV(c)(5) of this NOFA). The Field

Office of Fair Housing and Equal Opportunity (FHEO) is responsible for

scoring the technical review factor related to affirmatively furthering

fair housing, which applies only to Public Housing.

(2) If additional funds for Public Housing CIAP become available,

Headquarters will allocate the funds to each Field OPH based on the

table below.

(3) If a Field OPH does not receive sufficient fundable

applications to use its allocation, Headquarters will reallocate the

remaining funds to one or more Field OPHs that have the highest

unfunded demand, as evidenced by approvable applications.

The following table shows the percentage distribution of CIAP funds

for PHAs, excluding IHAs, assigned by Headquarters to each Field OPH.

The percentage distributions for the Texas State and Houston Area

Offices have been further broken down to indicate what percentage of

their distribution will be allocated to HAs involved in the East Texas

civil rights case (i.e., Young v. Cuomo) to meet the requirements of

the settlement agreement, which is subject to judicial oversight, along

with other modernization needs.

------------------------------------------------------------------------

Percent of

Public

Office of Public Housing (OPH) Housing

funds

------------------------------------------------------------------------

New England:

Massachusetts State Office................................ 2.4560

Connecticut State Office.................................. .8107

New Hampshire State Office................................ 1.5676

Rhode Island State Office................................. .4361

New York/New Jersey:

Buffalo Area Office....................................... 2.0783

New Jersey State Office................................... 2.3160

New York State Office..................................... 1.4892

Mid-Atlantic:

Maryland State Office..................................... .4214

West Virginia State Office................................ 1.3081

Pennsylvania State Office................................. .6837

Pittsburgh Area Office.................................... .9155

Virginia State Office..................................... .4234

District of Columbia Office............................... .1672

Southeast:

Georgia State Office...................................... 8.2709

Alabama State Office...................................... 5.0915

South Carolina State Office............................... 1.2749

North Carolina State Office............................... 2.9244

Mississippi State Office.................................. 1.6542

Jacksonville Area Office.................................. 2.5183

Knoxville Area Office..................................... 1.0628

Kentucky State Office..................................... 4.7477

Tennessee State Office.................................... 2.7438

Florida State Office...................................... 1.0793

Midwest:

Illinois State Office..................................... 3.9655

Cincinnati Area Office.................................... .4645

Cleveland Area Office..................................... .5422

Ohio State Office......................................... 1.1608

Michigan State Office..................................... 1.8521

Grand Rapids Area Office.................................. 2.6617

Indiana State Office...................................... 1.1643

Wisconsin State Office.................................... 2.5429

Minnesota State Office.................................... 3.7183

Southwest:

New Mexico State Office................................... 1.3046

Texas State Office........................................ 7.2209

East Texas HAs.......................................... (1)

Non-East Texas HAs...................................... (2)

Houston Area Office....................................... 1.7024

East Texas HAs.......................................... (3)

Non-East Texas HAs...................................... (4)

Arkansas State Office..................................... 2.1839

Louisiana State Office.................................... 3.9607

Oklahoma State Office..................................... 2.3203

San Antonio Area Office................................... 3.1643

Great Plains:

Iowa State Office......................................... .5858

Kansas/Missouri State Office.............................. 2.7413

Nebraska State Office..................................... 1.0943

St. Louis Area Office.................................... 1.0715

Rocky Mountain:

Colorado State Office..................................... 3.1227

Pacific/Hawaii:

Los Angeles Area Office................................... .2670

Arizona State Office...................................... .9903

Sacramento Area Office.................................... .0808

California State Office................................... 1.7445

Northwest/Alaska:

Oregon State Office....................................... .6706

Washington State Office................................... 1.2608

-----------

Total................................................. 100.0000

------------------------------------------------------------------------

\1\ (0.361045 or 5% of 7.2209)

\2\ (6.859855 or 95% of 7.2209)

\3\ (0.817152 or 48% of 1.7024)

\4\ (0.885248 or 52% of 1.7024)

(c) Assignment of Funds to Offices of Native American Programs

(ONAP). Headquarters has determined the distribution of Indian Housing

CIAP funds for each ONAP, based on the relative shares of backlog and

accrual needs for CIAP IHAs, adjusted as necessary. The fund assignment

will cover Indian Housing and any Public Housing owned and operated by

IHAs.

(1) The ONAP Administrator shall have authority to make Joint

Review selections and CIAP funding decisions. However, the Secretary's

Representative for the geographic area in which the IHA is located is

responsible for scoring the technical review factor related to the

degree of local/tribal government support for the proposed

modernization (see section IV(c)(5) of this NOFA).

(2) If additional funds for Indian Housing CIAP become available,

Headquarters will allocate the funds to each ONAP based on the table

below.

(3) If an ONAP does not receive sufficient fundable applications to

use its allocation, Headquarters will reallocate the remaining funds to

one or more ONAPs that have the highest unfunded demand, as evidenced

by approvable applications.

The following table shows the percentage distribution of CIAP funds

for IHAs, assigned by Headquarters to each ONAP:

------------------------------------------------------------------------

Percent of

Indian

Office of Native American Programs (ONAP) Housing

funds

------------------------------------------------------------------------

Eastern/Woodlands........................................... 14.8444

Southern Plains............................................. 12.3324

Northern Plains............................................. 13.3174

Southwest................................................... 29.9263

Northwest................................................... 24.4868

Alaska...................................................... 5.0927

-----------

Total................................................... 100.0000

------------------------------------------------------------------------

II. Purpose and Substantive Description

(a) Authority. Section 14, United States Housing Act of 1937 (42

U.S.C. 14371); Section 7(d) Department of Housing and Urban Development

Act (42 U.S.C. 3535(d)). The CIAP regulation, 24 CFR part 968, subparts

A and B, for PHAs and 24 CFR part 950, subpart I, for IHAs.

(b) Program Highlights.

(1) Departmental Priority. Improving Public and Indian Housing is

one of the Department's major priorities. Accordingly, a review has

been made of the entire Public and Indian Housing Program.

Specifically, the Department is very concerned about several aspects of

the Modernization Program, as follows:

(i) Design. When identifying physical improvement needs to meet the

modernization standards, HAs are encouraged to consider design which

supports the integration of public housing into the broader community.

Although high priority needs, such as those related to health and

safety, vacant, substandard units, structural or system integrity, and

compliance with statutory, regulatory or court-ordered deadlines, will

receive funding priority, HAs should plan their modernization in a way

which promotes good design, but maintains the modest nature of public

housing. The HA should pay particular attention to design, which is

sensitive to traditional cultural values, and be

[[Page 23930]]

receptive to creative, but cost-effective approaches suggested by

architects, residents, HA staff, and other local entities. Such

approaches may complement the planning for basic rehabilitation needs.

It should be noted that there will be no increase in operating subsidy

as a result of any modernization activities.

(ii) Physical Accessibility and Visitability. In addition to the

design considerations set forth in paragraph (b)(i) of this section,

HAs must comply with accessibility requirements and are encouraged to

provide units that are ``visitable'' by persons with mobility

impairments. Visitability gets the person into the home, but does not

require that all features be made accessible throughout the home.

(A) Accessibility. An accessible home means that the home is

located on an accessible route (36'' clear passage) and, when designed,

constructed, altered or adapted, can be approached, entered, and used

by an individual with physical disabilities.

(B) Visitability. Visitability restricts itself to two areas of a

home; i.e., at least one entrance is at grade (no-step); and all doors

inside provide a 32'' clear passage. A visitable home serves not only

persons with disabilities, but also persons without disabilities. (For

example, a mother pushing a stroller; person delivering large

appliances; person using a walker, etc.). One difference between

``visitability'' and ``accessibility'' is that accessibility requires

that all features of a dwelling unit be made accessible for mobility

impaired persons. A visitable home provides less accessibility than an

accessible home. Examples of actions that HAs may take to support

visitability include:

(1) When conducting a ``needs assessment,'' the HA may identify 25

single family scattered site homes and make those units visitable.

(2) When undertaking substantial alterations as defined in 24 CFR

8.23(a), the HA may identify 50 units in an elderly development not

subject to the new construction requirements of 24 CFR 8.22 and make

those units visitable.

(3) The HA may target the first floor of an existing 3-story family

apartment complex and make those units visitable.

(C) Requirements. In carrying out modernization work, HAs are

required to comply with the requirements of 24 CFR 8.23(a) regarding

substantial alterations and 24 CFR 8.23(b) regarding other alterations,

as well as with Title II of the Americans with Disabilities Act and 28

CFR part 35. Title II is applicable to HAs established under State law.

Also, the HA shall comply with the requirements of 24 CFR 8.22 and 24

CFR 100.205 (the Fair Housing Act) regarding new construction.

(iii) Provision of Community Space for Welfare-to-Work Initiatives.

HAs are encouraged to provide community space for Welfare-to-Work

initiatives, which include, but are not limited to services

coordination/case management, training, child care, health care,

transportation, and economic development. Where community space is not

otherwise available, CIAP funds may be used to convert existing

dwelling space, renovate existing nondwelling space, or construct or

acquire nondwelling space for this purpose. Where CIAP funds will be

used to provide community space, HAs are required to submit written

evidence from a qualified local agency or provider that the agency or

provider agrees to furnish, equip, operate and maintain the community

space, as well as provide insurance coverage. Where HAs themselves

intend to operate the community space, they must submit written

evidence of the continuing funding sources to furnish, equip, operate,

maintain and insure the community space.

(iv) Resident Involvement and Economic Uplift. HAs are required to

explore and implement through all feasible means the involvement of

residents, including duly-elected resident councils, regardless of

race, color, religion, sex, national origin, disability, and familial

status, in every aspect of the CIAP, from planning through

implementation. HAs shall use the provisions of Section 3 of the

Housing and Urban Development Act of 1968 to the maximum feasible

extent. HAs are encouraged to seek ways to employ Section 3 residents

in all aspects of the CIAP's operation and to develop means to promote

contracting opportunities for businesses in Section 3 areas. Refer to

24 CFR 85.36(e) regarding the provision of such opportunities.

(v) Elimination of Vacant Units. HAs are encouraged to apply for

CIAP funds to address vacant units where the work does not involve

routine maintenance, but will result in reoccupancy.

(vi) Expediting the Program. HAs are reminded that they are

expected to obligate all funds within two years and to expend all funds

within three years of program approval (Annual Contributions Contract

(ACC) Amendment execution) unless a longer implementation schedule

(Part III of the CIAP Budget) is approved by the Field Office due to

the size or complexity of the program. Failure to obligate funds in a

timely manner may result in the termination of the program and

recapture of the funds.

(2) Relationship to Technical Review Factors. The Departmental goal

of improving Public and Indian Housing is reflected in the technical

review factors, set forth in section IV(c)(5) of this NOFA, on which

the Field Office scores each HA's CIAP Application. Based on the HA's

total score, the Field Office then ranks each HA to determine selection

for Joint Review. The technical review factors emphasize the following

Departmental initiatives to improve Public and Indian Housing:

(i) Restoration of vacant units to occupancy;

(ii) Resident capacity-building and resident involvement in HA

operations, including opportunities for resident management and

homeownership;

(iii) Job training and employment opportunities for residents,

including Step-Up employment and training programs, and contracting

opportunities for Section 3 businesses;

(iv) Drug elimination initiatives;

(v) Partnership with local government; and

(vi) Provision of appropriate replacement housing, as described in

paragraph (c) below.

(c) Expansion of Eligible Activities. The FY 1997 Appropriations

Act continued the expanded eligible activities that, with prior HUD

approval, may be funded from FY 1997 and prior FY CIAP or CGP funds.

These activities include: new construction or acquisition of additional

public housing units, including replacement units (refer to Notice PIH

96-56 (HA), dated July 29, 1996); modernization activities related to

the public housing portion of housing developments held in partnership

or cooperation with non-public housing entities; other activities

related to public housing, including activities eligible under the

Urban Revitalization Demonstration (HOPE VI), such as community

services; and operating subsidy purposes (not to exceed 10 percent of

the grant amount).

III. Application Preparation and Submission by HA.

(a) Planning. In preparing its CIAP Application, the HA is

encouraged to assess all its physical and management improvement needs.

Physical improvement needs should be reviewed against the modernization

standards as set forth in HUD Handbook 7485.2, as revised, physical

accessibility requirements as set forth in 24 CFR part 8, and 28 CFR

part 35, and any cost-effective energy conservation measures,

identified in updated energy audits. The modernization standards

include

[[Page 23931]]

development specific work to ensure the long-term viability of the

developments, such as amenities and design changes to promote the

integration of low-income housing into the broader community. See

section II(b)(1)(i) of this NOFA. In addition, the HA is strongly

encouraged to contact the Field Office to discuss its modernization

needs and obtain information.

(b) Resident Involvement and Local/Tribal Official Consultation

Requirements.

(1) Residents/Homebuyers. The CIAP regulations at Secs. 968.215 or

950.632 require the HA to establish a Partnership Process to ensure

full resident participation in the planning, implementation and

monitoring of the modernization program, as follows:

(i) Before submission of the CIAP Application, consultation with

the residents, resident organization, and resident management

corporation (herein referred to as residents) of the development(s)

being proposed for modernization regarding its intent to submit an

application and to solicit resident comments;

(ii) Reasonable opportunity for residents to present their views on

the proposed modernization and alternatives to it, and full and serious

consideration of resident recommendations;

(iii) Written response to residents indicating acceptance or

rejection of resident recommendations, consistent with HUD requirements

and the HA's own determination of efficiency, economy and need, with a

copy to the Field Office at Joint Review. If the Joint Review is

conducted off-site, a copy is mailed to the Field Office;

(iv) After HUD funding decisions, notification to residents of the

approval or disapproval and, where requested, provision to residents of

a copy of the HUD-approved CIAP Budget; and

(v) During implementation, periodic notification to residents of

work status and progress and maximum feasible employment of residents

in the modernization effort.

(2) Local/Tribal Officials. Before submission of the CIAP

Application, consultation with appropriate local/tribal officials

regarding how the proposed modernization may be coordinated with any

local plans for neighborhood revitalization, economic development, drug

elimination and expenditure of local funds, such as Community

Development Block Grant funds.

(c) Contents of CIAP Application. Within the established deadline

date, the HA shall submit the CIAP Application to the Field Office,

with a copy to appropriate local/tribal officials. The HA may obtain

the necessary forms from the Field Office. The CIAP Application is

comprised of the following documents:

(1) Form HUD-52822, CIAP Application, in an original and two

copies, which includes:

(i) A general description of HA development(s), in priority order,

(including the current physical condition, for each development for

which the HA is requesting funds, or for all developments in the HA's

inventory) and physical and management improvement needs to meet the

Secretary's standards in Sec. 968.115 or Sec. 950.610; description of

work items required to correct identified deficiencies, including

accessibility work; and the estimated cost. Where the HA has not

included some of its developments in the CIAP Application, the Field

Office may not consider funding any non-emergency work at excluded

developments or subsequently approve use of leftover funds at excluded

developments. Therefore, to provide maximum flexibility, the HA may

wish to include all of its developments in the CIAP Application, even

though there are no known current needs. Following is an example of the

general description:

Development 1-1: 50 units of low-rent; 25 years old; physical needs

are: new roofs; storm windows and doors; and electrical upgrading at

estimated cost of $150,000.

Development 1-2: 40 units of low-rent; 20 years old; physical needs

are: physical accessibility for kitchens, bathrooms and doors in 2

units and common laundry room; visitability in 4 ground floor units;

kitchen floors; shower/bathtub surrounds; fencing; and exterior

lighting at estimated cost of $130,000.

Development 1-3: 35 units of Turnkey III; 15 years old; physical

needs are: physical accessibility in 3 units; and roof insulation at

estimated cost of $50,000.

Development 1-4: 20 units of low-rent; 5 years old; no physical

needs; no funding requested.

(ii) Where funding is being requested for management improvements,

an identification of the deficiency, a description of the work required

for correction, and estimated cost. Examples of management improvements

include, but are not limited to the following areas:

(A) The management, financial, and accounting control systems of

the HA;

(B) The adequacy and qualifications of personnel employed by the HA

in the management and operation of its developments by category of

employment; and

(C) The adequacy and efficacy of resident programs and services,

resident and development security, resident selection and eviction,

occupancy and vacant unit turnaround, rent collection, routine and

preventive maintenance, equal opportunity, and other HA policies and

procedures.

(iii) A certification that the HA has met the requirements for

consultation with local/tribal officials and residents/homebuyers and

that all developments included in the application have long-term

physical and social viability, including prospects for full occupancy.

If the HA cannot make this certification with respect to long-term

viability, the HA shall attach a narrative, explaining its viability

concerns.

(2) A narrative statement, in an original and two copies,

addressing each of the technical review factors in section IV(c)(5) of

this NOFA and, where applicable, the bonus points in section IV(c)(6)

of this NOFA. The affirmatively furthering fair housing technical

review factor in section IV(c)(5) of this NOFA applies only to Public

Housing; therefore, IHAs are not required to address this factor. In

addressing the affirmatively furthering fair housing technical review

factor, actions that the PHA has taken, or plans to take, to accomplish

this objective may include, but are not limited to the following:

(i) Actions that contribute toward the reduction of concentration

of low-income-persons who are protected under the Fair Housing Act.

Such actions may include housing programs/activities that provide

information regarding housing opportunities outside of minority

concentrated areas within the PHA's jurisdictional boundaries, or

efforts that encourage landlords/owners to make available housing

opportunities outside of minority concentrated areas. For example, the

PHA may refer applicants to other available housing as part of an

established housing counseling service or assist applicants in getting

on other waiting lists.

(ii) Actions that overcome the consequences of prior discriminatory

practices or usage which may have tended to exclude persons of a

particular race, color or national origin; or that overcome the effects

of past discrimination against persons with disabilities. Such actions

may include those actions taken without any kind of legally binding

order, but which have changed previous discriminatory management,

tenant selection and assignment or maintenance practices.

(3) Form HUD-50071, Certification for Contracts, Grants, Loans and

[[Page 23932]]

Cooperative Agreements, in an original only, required of HAs

established under State law, applying for grants exceeding $100,000.

(4) SF-LLL, Disclosure of Lobbying Activities, in an original only,

required of HAs established under State law, only where any funds,

other than federally appropriated funds, will be or have been used to

influence Federal workers, Members of Congress and their staff

regarding specific grants or contracts. The HA determines if the

submission of the SF-LLL form is applicable.

(5) Form HUD-2880, Applicant/Recipient Update/Disclosure Report, in

an original only, required of HAs established under State law.

(6) At the option of the HA, photographs or video cassettes showing

the physical condition of the developments.

IV. Application Processing by Field Office

(a) Completeness Review (Corrections to Deficient Applications). To

be eligible for processing, the CIAP Application must be physically

received by the Field Office by the time and date specified in this

NOFA. A facsimile application will not be accepted. The Field Office

shall immediately perform a completeness review to determine whether an

application is complete, responsive to the NOFA, and acceptable for

technical processing.

(1) If either Form HUD-52822, CIAP Application, or the narrative

statement on the technical review factors ismissing, the HA's

application will be considered substantially incomplete and, therefore,

ineligible for further processing. The Field Office shall immediately

notify the HA in writing.

(2) If Form HUD-50071, Certification for Contracts, Grants, Loans,

and Cooperative Agreements, or SF-LLL, Disclosure of Lobbying

Activities, are required, but missing, or Form HUD-2880, Applicant/

Recipient Update/Disclosure Form, is missing, or there is a technical

mistake, such as no signature or no original signature on a submitted

form or the HA failed to address all of the technical review factors,

the Field Office shall immediately notify the HA in writing to submit

or correct the deficiency within 14 calendar days from the date of

HUD's written notification. This is not additional time to

substantially revise the application. Deficiencies which may be

corrected at this time are inadvertently omitted documents, as

specified in this subparagraph, or clarifications of previously

submitted material and other changes which are not of such a nature as

to improve the competitive position of the application.

(3) If the HA fails to submit or correct the items within the

required time period, the HA's application will be ineligible for

further processing. The Field Office shall immediately notify the HA in

writing after this occurs.

(4) The HA may submit a CIAP Application for Emergency

Modernization whenever needed. See section IV(j) of this NOFA.

(b) Eligibility Review. After the HA's CIAP Application is

determined to be complete and accepted for review, the Field Office

eligibility review shall determine if the application is eligible for

full processing or processing on a reduced scope.

(1) Eligibility for Full Processing. To be eligible for full

processing:

(i) Each eligible development for which work is proposed has

reached the Date of Full Availability (DOFA) and is under ACC at the

time of CIAP Application submission; and

(ii) Where funded under Major Reconstruction of Obsolete Projects

(MROP) after FY 1988, the development/building has reached DOFA or,

where funded during FYs 1986-1988, all MROP funds for the development/

building have been expended.

(2) Eligibility for Processing on Reduced Scope. When the following

conditions exist, the HA's application will be reviewed on a reduced

scope:

(i) Section 504 Compliance. Where the HA has not completed all

required structural changes to meet the need for accessible units and

nondwelling facilities, as identified in the HA's Section 504 needs

assessment, the HA is eligible for processing only for Emergency

Modernization or physical work needed to meet the requirements of

section 504 of the Rehabilitation Act of 1973.

(ii) Lead-Based Paint (LBP) Testing Compliance. Where the HA has

not complied with the statutory requirement to complete LBP testing on

all pre-1978 family units, the HA is eligible for processing only for

Emergency Modernization or work needed to complete the testing.

(iii) Fair Housing and Equal Opportunity (FHEO) Compliance. Where

the HA has not complied with FHEO requirements as evidenced by an

enforcement action, finding or determination, the HA is eligible for

processing only for Emergency Modernization or work needed to remedy

civil rights deficiencies--unless the HA is implementing a voluntary

compliance agreement or settlement agreement designed to correct the

area(s) of noncompliance. The enforcement actions, findings or

determinations that trigger limited eligibility are described in

paragraphs (A) through (E) below:

(A) A pending proceeding against the HA based upon a Charge of

Discrimination issued under the Fair Housing Act. A Charge of

Discrimination is a charge under section 810(g)(2) of the Fair Housing

Act, issued by the Department's Assistant Secretary for FHEO or legally

authorized designee;

(B) A pending civil rights suit against the HA, referred by the

Department's Assistant Secretary for FHEO and instituted by the

Department of Justice;

(C) Outstanding HUD findings of HA noncompliance with civil rights

statutes and executive orders under 24 CFR part 5 and 24 CFR 968.110 or

24 CFR 950.115, or implementing regulations, as a result of formal

administrative proceedings;

(D) A deferral of the processing of applications from the HA

imposed by HUD under Title VI of the Civil Rights Act of 1964 and HUD

implementing regulations (24 CFR 1.8), the Attorney General's

Guidelines (28 CFR 50.3), and procedures (HUD Handbook 8040.1), or

under section 504 of the Rehabilitation Act of 1973 and HUD

implementing regulations (24 CFR 8.57); or

(E) An adjudication of a violation under any of the authorities

specified in 24 CFR part 5 and 24 CFR 968.110 or 24 CFR 950.115 in a

civil action filed against the HA by a private individual.

(c) Selection Criteria and Ranking Factors. After all CIAP

Applications are reviewed for eligibility, the Field Office shall

categorize the eligible HAs and their developments into two processing

groups, as defined in subparagraph (1) of this paragraph: Group 1 for

Emergency Modernization; and Group 2 for Other Modernization. HA

developments may be included in both groups and the same development

may be in each group. However, the HA is only required to submit one

CIAP Application.

(1) Grouping Modernization Types.

(i) Group 1, Emergency Modernization. This is a type of

modernization program for a development that is limited to physical

work items of an emergency nature to correct conditions that pose an

immediate threat to the health or safety of residents or are related to

fire safety, and that must be corrected within one year of CIAP funding

approval. Funding may not be used for management improvements.

Emergency Modernization includes all LBP testing and abatement of units

housing children under six years old with elevated blood

[[Page 23933]]

lead levels (EBLs) and all LBP testing and abatement of HA-owned day

care facilities used by children under six years old with EBLs. Group 1

developments are not subject to the technical review rating and ranking

in subparagraphs (5), (6) and (7) of this paragraph and the long-term

viability and reasonable cost determinations in section V(a) of this

NOFA.

(ii) Group 2, Other Modernization. This is a type of modernization

program for a development that includes one or more physical work

items, where the Field Office determines that the physical improvements

are necessary and sufficient to extend substantially the useful life of

the development, and/or one or more development specific or HA-wide

management work items (including planning costs), and/or LBP testing,

professional risk assessment, interim containment, and abatement.

Therefore, eligibility of work under Other Modernization ranges from a

single work item to the complete rehabilitation of a development. Refer

to section II(b)(1)(i) of this NOFA regarding modest amenities and

improved design. Group 2 developments are subject to the technical

review rating and ranking in subparagraphs (5), (6) and (7) of this

paragraph and the long-term viability and reasonable cost

determinations in section V(a) of this NOFA.

(2) Assessment of HA's Management Capability. As part of its

technical review of the CIAP Application, the Field Office shall

evaluate the HA's management capability. Particular attention shall be

given to the adequacy of the HA's maintenance in determining the HA's

management capability. This assessment shall be based on the compliance

aspects of on-site monitoring, such as audits, reviews or surveys which

are currently available within the Field Office, and on performance

reviews, as follows:

(i) Public Housing. A PHA has management capability if it is (A)

not designated as Troubled under 24 CFR part 901, Public Housing

Management Assessment Program (PHMAP), or (B) designated as Troubled,

but has a reasonable prospect of acquiring management capability

through CIAP-funded management improvements and administrative support.

A Troubled PHA is eligible for Emergency Modernization only, unless it

is making reasonable progress toward meeting the performance targets

established in its memorandum of agreement or equivalent under 24 CFR

901.140 or has obtained alternative oversight of its management

functions.

(ii) Indian Housing. An IHA has management capability if it is (A)

not designated as High Risk under 24 CFR 950.135 or (B) designated as

High Risk, but has a reasonable prospect of acquiring management

capability through CIAP-funded management improvements and

administrative support. A High Risk IHA is eligible for Emergency

Modernization only, unless it is making reasonable progress toward

meeting the performance targets established in its management

improvement plan under 24 CFR 950.135 or has obtained alternative

oversight of its management functions.

(3) Assessment of HA's Modernization Capability. As part of its

technical review of the CIAP Application, the Field Office shall

evaluate the HA's modernization capability, including the progress of

previously approved modernization and the status of any outstanding

findings from CIAP monitoring visits, as follows:

(i) Public Housing. A PHA has modernization capability if it is (A)

not designated as Modernization Troubled under 24 CFR part 901, PHMAP,

or (B) designated as Modernization Troubled, but has a reasonable

prospect of acquiring modernization capability through CIAP-funded

management improvements and administrative support, such as hiring

staff or contracting for assistance. A Modernization Troubled PHA is

eligible for Emergency Modernization only, unless it is making

reasonable progress toward meeting the performance targets established

in its memorandum of agreement or equivalent under 24 CFR 901.140 or

has obtained alternative oversight of its modernization functions.

Where a PHA does not have a funded modernization program in progress,

the Field Office shall determine whether the PHA has a reasonable

prospect of acquiring modernization capability through hiring staff or

contracting for assistance.

(ii) Indian Housing. An IHA has modernization capability if it is

(A) not designated as High Risk under 24 CFR 950.135, or (B) designated

as High Risk, but has a reasonable prospect of acquiring modernization

capability through CIAP-funded management improvements and

administrative support, such as hiring staff or contracting for

assistance. An IHA that has been classified High Risk with regard to

modernization is eligible for Emergency Modernization only, unless it

is making reasonable progress toward meeting the performance targets

established in its management improvement plan under 24 CFR

950.135(f)(2) or has obtained alternative oversight of its

modernization functions. Where an IHA does not have a funded

modernization program in progress, the ONAP shall determine whether the

IHA has a reasonable prospect of acquiring modernization capability

through hiring staff or contracting for assistance.

(4) Technical Processing. After categorizing the eligible HAs and

their developments into Group 1 and Group 2, the Field Office shall

forward a list of all HAs in Group 2 to the Secretary's Representative

for scoring the technical review factor related to local/tribal

government support of the proposed modernization, within an established

time frame; the Field Office shall provide the Secretary's

Representative with the portion of each HA's narrative statement,

included in the CIAP Application, related to the technical review

factor on local/tribal government support. In addition, the Field OPH

shall forward a list of all PHAs in Group 2 to the Field Office of FHEO

for scoring the technical review factor related to affirmatively

furthering fair housing, within an established time frame; the Field

OPH shall provide the Office of FHEO with the portion of each PHA's

narrative statement, included in the CIAP Application, related to the

technical review factor on affirmatively furthering fair housing. The

Field OPH shall review and rate each Group 2 HA on each of the

remaining technical review factors in subparagraph (5) of this

paragraph. With the exception of the technical review factor of

``extent and urgency of need,'' a Group 2 HA is rated on its overall HA

application and not on each development. For the technical review

factor of ``extent and urgency of need,'' each development for which

funding is requested in the CIAP Application by a Group 2 HA is scored;

the development with the highest priority needs is scored the highest

number of points, which are then used for the overall HA score on that

factor.

(5) Technical Review Factors. The technical review factors for

assistance are:

[[Page 23934]]

------------------------------------------------------------------------

Maximum

Technical review factors points

------------------------------------------------------------------------

Extent and urgency of need, based on high priority needs

(non-emergency health and safety; vacant, substandard

units; structural or system integrity; or compliance with

statutory, regulatory or court-ordered deadlines), need to

complete previously funded modernization work, or need to

provide appropriate replacement housing for HUD-approved

demolition/disposition.................................... 40

HA's modernization capability based on, for Public Housing,

its PHMAP score on the Modernization Indicator, and for

Indian Housing, its assessment under 24 CFR 950.135....... 15

HA's management capability based on, for Public Housing,

its overall PHMAP score, and for Indian Housing, its

assessment under 24 CFR 950.135........................... 15

Extent of vacancies based on the HA-wide vacancy rate,

where the vacancies are not due to insufficient demand.... 5

Degree of resident involvement in HA operations based on FO

file evidence............................................. 2

Degree of HA activity in coordinating/providing resident

services related to Welfare-to-Work initiatives in

community facilities at or near HA developments based on

FO file evidence. Such services include, but are not

limited to services coordination/case management,

training, child care, health care, transportation, and

economic development...................................... 4

Degree of HA activity in resident initiatives, including

resident management, economic development, homeownership,

and drug elimination efforts or other resident initiatives

for non-elderly based on FO file evidence, including, for

Public Housing, its PHMAP score on the Resident

Initiatives Indicator..................................... 2

Degree of non-elderly resident employment through direct

hiring or contracting/subcontracting or job training

initiatives based on FO file evidence..................... 2

Local/tribal government support for proposed modernization,

through either funding or in-kind contributions, over and

above what is required under the Cooperation Agreement for

municipal services, such as police and fire protection and

refuse collection, within the last 12 months, that will

directly benefit the Public/Indian housing or the

neighborhood surrounding the Public/Indian housing........ 5

Extent of actions that HA has taken, or plans to take to

Affirmatively Further Fair Housing (only applicable to

Public Housing)........................................... 10

------------

Total Maximum Score for Public Housing................. 100

Total Maximum Score for Indian Housing................. 90

------------------------------------------------------------------------

(6) Bonus points. The Field Office shall provide up to 5 bonus

points for any HA that can demonstrate that it has, over the past 12

months, displayed creative approaches for providing ``visitability''

throughout its housing inventory.

(7) Rating and Ranking. After rating all Group 2 HAs/developments

on each of the technical review factors and providing any bonus points

as set forth in subparagraph (6) of this paragraph, the Field Office

shall then rank each Group 2 HA based on its total score, list Group 2

HAs in descending order, subject to confirmation of need and cost at

Joint Review, and identify for Joint Review selection the highest

ranking applications in Group 2 and other Group 2 HAs with lower

ranking applications, but with high priority needs. High priority needs

are non-emergency needs, but related to: health or safety; vacant,

substandard units; structural or system integrity; or compliance with

statutory, regulatory or court-ordered deadlines. All Group 1

applications are automatically selected for Joint Review. The Field

Office shall consult with Headquarters regarding any identified FHEO

noncompliance.

(d) Joint Review. The purpose of the Joint Review is for the Field

Office to discuss with the HA the proposed modernization program, as

set forth in the CIAP Application, review long-term viability and cost

reasonableness determinations, and determine the size of the grant, if

any, to be awarded.

(1) The Field Office shall select HAs, including all Group 1 HAs,

for Joint Review so that the total dollar value of all proposed

modernization recommended for funding exceeds the Field Office's

estimated funding amount by at least 15 percent. This preserves the

Field Office's ability to adjust cost estimates and work items as a

result of Joint Review.

(2) The Field Office shall notify each HA whose application has

been selected for further processing as to whether Joint Review will be

conducted on-site or off-site (e.g., by telephone or in-office

meeting).

(3) The HA shall prepare for Joint Review by preparing a draft CIAP

Budget and reviewing the other items to be covered during Joint Review,

as prescribed by HUD, such as the need for professional services,

method of accomplishment of physical work (contract or force account

labor), HA compliance with various Federal statutes and regulations,

etc. If conducted on-site, Joint Review will include an inspection of

the proposed physical work.

(4) The Field Office shall advise in writing each HA not selected

for Joint Review of the reasons for non-selection.

(e) Funding Decisions. After all Joint Reviews are completed, the

Field Office shall adjust the HAs, developments, and work items to be

funded and the amounts to be awarded, on the basis of information

obtained from Joint Reviews, FHEO review, and environmental reviews

(refer to paragraph (h) of this section) and make the funding

decisions. Such adjustments are necessary where the Field Office

determines that actual Group 1 emergencies and Group 2 high priority

needs, HA priorities, or cost estimates vary from the HA's application.

Such adjustments may preclude the Field Office from funding all of the

applications selected for Joint Review in order to accommodate the

funding of high priority needs. However, where the information obtained

from Joint Reviews, FHEO review, and environmental reviews confirms the

information used to establish the rankings before Joint Review, the

Field Office shall make funding decisions in accordance with its

rankings. Even if the information obtained from Joint Reviews, FHEO

review, and environmental reviews does not confirm the information used

to establish the rankings before Joint Review, only the funding awarded

will be adjusted accordingly; the scores will not be affected. An HA

will not be selected for Joint Review if there is a duplication of

funding (refer to section V(c) of this NOFA). After Congressional

notifications, the Field Office shall notify the HAs of their funding

approval, subject to submission of the CIAP Budget, including an

implementation schedule, and other required documents.

(f) HA Submission of Additional Documents

After Field Office funding decisions, the HA shall submit the

following documents within the time frame prescribed by the Field

Office:

(1) Form HUD-52825, CIAP Budget/Progress Report, which includes the

[[Page 23935]]

implementation schedule(s), in an original and two copies.

(2) Form HUD-50070, Certification for a Drug-Free Workplace, in an

original only.

(3) Form HUD-52820, HA Board Resolution Approving CIAP Budget, in

an original only.

(g) ACC Amendment

After HUD approval of the CIAP Budget, the Field Office and the HA

shall enter into an ACC amendment in order for the HA to draw down

modernization funds. The ACC amendment shall require low-income use of

the housing for not less than 20 years from the date of the ACC

amendment (subject to sale of homeownership units in accordance with

the terms of the ACC). The HA Executive Director, where authorized by

the Board of Commissioners and permitted by State/tribal law, may sign

the ACC amendment on behalf of the HA. HUD has the authority to

condition an ACC amendment (e.g., to require an HA to hire a

modernization coordinator or contract administrator to administer its

modernization program).

(h) Environmental review

Under 24 CFR part 58, the responsible entity, as defined in

Sec. 58.2(a)(7), must assume the environmental responsibilities for

projects being funded under the CIAP. If the HA objects to the

responsible entity conducting the environmental review, on the basis of

performance, timing or compatibility of objectives, the Field OPH

Director/ONAP Administrator will review the facts to determine who will

perform the environmental review. At any time, the Field OPH Director/

ONAP Administrator may reject the use of a responsible entity to

conduct the environmental review in a particular case on the basis of

performance, timing or compatibility of objectives, or in accordance

with Sec. 58.77(d)(1). If a responsible entity objects to performing an

environmental review, or if the Field OPH Director/ONAP Administrator

determines that the responsible entity should not perform the

environmental review, the Field OPH Director/ONAP Administrator may

designate another responsible entity to conduct the review or may

itself conduct the environmental review in accordance with the

provisions of 24 CFR part 50. After selection by the Field Office for

Joint Review, the HA shall provide any documentation to the responsible

entity (or Field Office, where applicable) that is needed to perform

the environmental review.

(1) Where the environmental review is completed before Field Office

approval of the CIAP budget and the HA has submitted its request for

release of funds (RROF), the budget approval letter shall state any

conditions, modifications, prohibitions, etc. as a result of the

environmental review.

(2) Where the environmental review is not completed and/or the HA

has not submitted the RROF before Field Office approval of the CIAP

budget, the budget approval letter shall instruct the HA to refrain

from undertaking, or obligating or expending funds on, physical

activities or other choice-limiting actions, until the Field PH

Director/ONAP Administrator approves the HA's RROF and the related

certification of the responsible entity (or the Field Office has

completed the environmental review). The budget approval letter also

shall advise the HA that the approved budget may be modified on the

basis of the results of the environmental review.

(i) Declaration of Trust

Where the Field Office determines that a Declaration of Trust is

not in place or is not current, the HA shall execute and file for

record a Declaration of Trust, as provided under the ACC, to protect

the rights and interests of HUD throughout the 20-year period during

which the HA is obligated to operate its developments in accordance

with the ACC, the Act, and HUD regulations and requirements. HUD has

determined that its interest in Mutual Help units is sufficiently

protected without the further requirement of a Declaration of Trust;

therefore, a Declaration of Trust is not required for Mutual Help

units.

(j) ``Fast Tracking'' Emergency Applications. Emergency

applications do not have to be processed within the normal processing

time allowed for other applications. Where an immediate hazard must be

addressed, HA emergency applications may be submitted and processed at

any time during the year when funds are available. The Field Office

shall ``fast track'' the processing of these emergency applications so

that fund reservation may occur as soon as possible. An emergency

application is comprised of the following documents:

(1) Form HUD-52825, CIAP Budget/Progress Report, which includes the

implementation schedule(s), in an original and two copies.

(2) Form HUD-52820, HA Board Resolution Approving CIAP Budget, in

an original only.

(3) Form HUD-50070, Certification for a Drug-Free Workplace, in an

original only.

(4) Form HUD-50071, Certification for Contracts, Grants, Loans and

Cooperative Agreements, in an original only.

(5) SF-LLL, Disclosure of Lobbying Activities, in an original only,

where determined by the HA to be applicable.

(6) Form HUD-2880, Applicant/Recipient Update/Disclosure Report, in

an original only.

(7) At the option of the HA, photographs or video cassettes showing

the physical condition of the developments.

V. Other Program Items

(a) Long-Term Viability and Reasonable Cost. On Form HUD-52822,

CIAP Application, the HA certifies whether the developments proposed

for modernization have long-term physical and social viability,

including prospects for full occupancy. During Joint Review, the Field

Office will review with the HA the determination of reasonable cost for

the proposed modernization to ensure that unfunded hard costs do not

exceed 90 percent of the computed total development cost (TDC) for a

new development with the same structure type and number and size of

units in the market area. The Field Office shall make a final viability

determination. Where the estimated per unit unfunded hard cost is equal

to or less than the per unit TDC for the smallest bedroom size at the

development, no further computation of the TDC limit is required.

(1) If the Field Office determines that completion of the

improvements and replacements will not reasonably ensure the long-term

physical and social viability of the development at a reasonable cost,

the Field Office shall only approve Emergency Modernization or non-

emergency funding for essential non-routine maintenance needed to keep

the property habitable until the demolition or disposition application

is approved and residents are relocated.

(2) Where the Field Office wishes to fund a development with hard

costs exceeding 90 percent of computed TDC, the Field Office shall

submit written justification to Headquarters for final decision. Such

justification shall include:

(i) Any special or unusual conditions have been adequately

explained, all work has been justified as necessary to meet the

modernization and energy conservation standards, including development

specific work necessary to provide a modest, non-luxury development;

and

(ii) Reasonable cost estimates have been provided, and every effort

has been made to reduce costs; and

(iii) Rehabilitation of the existing development is more cost-

effective in the long-term than construction or acquisition of

replacement housing; or

[[Page 23936]]

(iv) There are no practical alternatives for replacement housing.

(b) Use of Dwelling Units for Economic Self-Sufficiency Services

and/or Drug Elimination Activities. CIAP funds may be used to convert

dwelling units for purposes related to economic self-sufficiency

services and/or drug elimination activities. Regarding the eligibility

for funding under the Performance Funding System of dwelling units used

for these purposes, refer to Sec. 990.108(b)(2) or Sec. 950.720(b)(2).

(c) Duplication of Funding. The HA shall not receive duplicate

funding for the same work item or activity under any circumstance and

shall establish controls to assure that an activity, program, or

project that is funded under any other HUD program shall not be funded

by CIAP.

VI. Application Deadline Date and Summary of FY 1997 CIAP

Processing Steps

The deadline date for submission of the FY 1997 CIAP Application is

[insert 60 calendar days after date of publication]. Dates for other

processing steps will be established by each Field Office to reflect

local workload issues.

Summary of Processing Steps

1. HA submits CIAP Application.

2. Field Office conducts completeness review and requests

corrections to deficient applications or notifies HAs of ineligible

applications.

3. HA submits corrections to deficient applications within 14

calendar days of notification from Field Office.

4. Field Office conducts eligibility review and technical review

(rating and ranking) and makes Joint Review selections.

5. Field Office completes Joint Reviews and FHEO review; Field

Office or responsible entity completes environmental reviews.

6. Field Office makes funding decisions and forwards Congressional

notifications to Headquarters.

7. Congressional notification is completed and Field Office

notifies HA of funding decisions.

8. HA submits additional documents as required in section IV(f) of

this NOFA.

9. Field Office completes fund reservations and forwards ACC

amendment to HA for signature and return.

10. Field Office executes ACC amendment and HA begins

implementation.

VII. Other Matters

(a) Environmental Impact. A Finding of No Significant Impact with

respect to the environment has been made in accordance with HUD

regulations at 24 CFR part 50 implementing section 102(2)(C) of the

National Environmental Policy Act of 1969 (42 USC 4332). The Finding of

No Significant Impact is available for public inspection and copying

between 7:30 a.m. and 5:30 pm weekdays at the Office of the Rules

Docket Clerk, 451 Seventh Street, SW, Room 10276, Washington, DC 20410.

(b) Federalism Impact. The General Counsel, as the Designated

Official under section 6(a) of Executive Order 12612, Federalism, has

determined that the policies and procedures contained in this NOFA will

not have substantial direct effects on States or their political

subdivisions, or the relationship between the federal government and

the States, or on the distribution of power and responsibilities among

the various levels of government. As a result, the NOFA is not subject

to review under the Order.

(c) Impact on the Family. The General Counsel, as the Designated

Official for Executive Order 12606, The Family, has determined that

this NOFA does not have the potential for significant impact on family

formation, maintenance, and general well-being, and thus, is not

subject to review under the order. No significant change in existing

HUD policies or programs would result from promulgation of this rule,

as those policies and programs relate to family concerns.

Accountability in the Provision of HUD Assistance

Section 102 of the Department of Housing and Urban Development

Reform Act of 1989 (42 USC 3545) (HUD Reform Act) and the final rule

codified at 24 CFR part 4, subpart A, published on April 1, 1996 (61 FR

1448), contain a number of provisions that are designed to ensure

greater accountability and integrity in the provision of certain types

of assistance administered by HUD. On January 14, 1992, HUD published,

at 57 FR 1942, a notice that also provides information on the

implementation of section 102. The documentation, public access, and

disclosure requirements of section 102 are applicable to assistance

awarded under this NOFA as follows:

Documentation and public access requirements. HUD will ensure that

documentation and other information regarding each application

submitted pursuant to this NOFA are sufficient to indicate the basis

upon which assistance was provided or denied. This material, including

any letters of support, will be made available for public inspection

for a five-year period beginning not less than 30 days after the award

of the assistance. Material will be made available in accordance with

the Freedom of Information Act (5 USC 552) and HUD's implementing

regulations at 24 CFR part 15. In addition, HUD will include the

recipients of assistance pursuant to this NOFA in its Federal Register

notice of all recipients of HUD assistance awarded on a competitive

basis.

Disclosures. HUD will make available to the public for five years

all applicant disclosure reports (HUD Form 2880) submitted in

connection with this NOFA. Update reports (also Form 2880) will be made

available along with the applicant disclosure reports, but in no case

for a period less than three years. All reports--both applicant

disclosures and updates--will be made available in accordance with the

Freedom of Information Act (5 USC 552) and HUD's implementing

regulations at 24 CFR part 15.

(e) Prohibition Against Advance Information on Funding Decisions.

HUD's regulation implementing section 103 of the Department of Housing

and Urban Development Reform Act of 1989, codified as 24 CFR part 4,

applies to the funding competition announced today. The requirements of

the rule continue to apply until the announcement of the selection of

successful applicants. HUD employees involved in the review of

applications and in the making of funding decisions are limited by part

4 from providing advance information to any person (other than an

authorized employee of HUD) concerning funding decisions, or from

otherwise giving any applicant an unfair competitive advantage. Persons

who apply for assistance in this competition should confine their

inquiries to the subject areas permitted under 24 CFR part 4.

Applicants or employees who have ethics related questions should

contact the HUD Ethics Law Division (202) 708-3815. (This is not a

toll-free number.) For HUD employees who have specific program

questions, the employee should contact the appropriate Field Office

Counsel, or Headquarters counsel for the program to which the question

pertains.

(f) Prohibition Against Lobbying Activities. The use of funds

awarded under this NOFA is subject to the disclosure requirements and

prohibitions of Section 319 of the Department of Interior and Related

Agencies Appropriations Act for Fiscal Year 1990 (31 USC 1352) and the

HUD implementing regulations at 24 CFR part 87. These authorities

prohibit recipients of federal contracts, grants or loans from using

appropriated funds for lobbying

[[Page 23937]]

the Executive or Legislative Branches of the Federal Government in

connection with a specific contract, grant or loan. The prohibition

also covers the awarding of contracts, grants, cooperative agreements

or loans unless the recipient has made an acceptable certification

regarding lobbying. Under 24 CFR part 87, applicants, recipients and

subrecipients of assistance exceeding $100,000 must certify that no

federal funds have been or will be spent on lobbying activities in

connection with the assistance.

IHAs established by an Indian tribe as a result of the exercise of

the tribe's sovereign power are excluded from coverage of the Byrd

Amendment, but IHAs established under State law are not excluded from

the statute's coverage.

If the amount applied for is greater than $100,000, the

certification is required at the time application for funds is made

that federally appropriated funds are not being or have not been used

in violation of the Byrd Amendment. If the amount applied for is

greater than $100,000 and the HA has made or has agreed to make any

payment using nonappropriated funds for lobbying activity, as described

in 24 CFR part 87 (Byrd Amendment), the submission also must include

the SF-LLL, Disclosure of Lobbying Activities. The HA determines if the

submission of the SF-LLL is applicable.

VIII. Catalog of Federal Domestic Assistance Program

The Catalog of Federal Domestic Assistance Program Number is

14.852.

Dated: April 23, 1997.

Kevin Emanuel Marchman,

Acting Assistant Secretary for Public and Indian Housing.

[FR Doc. 97-11272 Filed 4-30-97; 8:45 am]

BILLING CODE 4210-33-P

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.