DEPARTMENT OF ENERGY
Uranium Mill Tailings Remedial Action (UMTRA) Ground Water
Project
AGENCY: Department of Energy.
ACTION: Record of decision.
-----------------------------------------------------------------------
SUMMARY: The Department of Energy (DOE) is issuing this Record of
Decision regarding its programmatic decision for the Uranium Mill
Tailings Remedial Action (UMTRA) Ground Water Project. This decision
enables DOE to take action under its UMTRA Ground Water Project, and is
based on the environmental analyses in the Final Programmatic
Environmental Impact Statement (PEIS) for the Uranium Mill Tailings
Remedial Action Ground Water Project (DOE/EIS-0198), which DOE issued
in December 1996. The Nuclear Regulatory Commission, the Navajo Nation,
the Hopi Tribe, the State of Colorado and the State of Texas cooperated
in the preparation of the PEIS.
Under Title I of the Uranium Mill Tailings Radiation Control Act of
1978 (UMTRCA), DOE is responsible for performing remedial action to
bring 22 designated former uranium mill processing sites into
compliance with applicable Environmental Protection Agency (EPA)
standards for milling-related contamination (40 CFR part 192). Under
DOE's UMTRA Surface Project, DOE has completed surface remediation at
20 sites and work is underway at the remaining two sites. These sites
are located in nine States and are on or near four Indian Tribal lands.
The shallow ground water at most of these sites has been contaminated
with uranium, nitrates, and other milling-related contaminants. The
purpose of the UMTRA Ground Water Project is to protect human health
and the environment by meeting EPA's ground water standards, which were
issued January 11, 1995.
DOE has decided to implement the Proposed Action for conducting the
Ground Water Project. The Proposed Action, which was identified as
DOE's preferred alternative in the final PEIS, is intended to establish
a consistent risk-based framework for implementing the UMTRA Ground
Water Project and determining appropriate ground water compliance
strategies for complying with EPA ground water standards at the UMTRA
project former processing sites. Under this preferred alternative, DOE
may use active, passive, and no-remediation strategies to comply with
the ground water standards as conditions warrant at specific sites.
Before making site-specific decisions to implement the preferred
alternative for the Ground Water Project, DOE will prepare appropriate
further National Environmental Policy Act (NEPA) documentation. DOE
encourages affected States, tribes, local government agencies and
members of the public to continue to participate in the site-specific
decision making processes for the Ground Water Project.
FOR FURTHER INFORMATION CONTACT: Further information on the final PEIS
can be obtained by contacting Mr. Donald R. Metzler, Grand Junction
Office, Department of Energy, 2567 B 3/4 Road, Grand Junction, Colorado
81503, telephone 970-248-7612. Information about the Department of
Energy National Environmental Policy Act process can be obtained by
contacting Carol M. Borgstrom, Director, Office of NEPA Policy and
Assistance, EH-42, U.S. Department of Energy, 1000 Independence Avenue
SW, Washington, D.C. 20585, telephone 202-586-4600, or leave a message
at 800-472-2756.
SUPPLEMENTARY INFORMATION: DOE has prepared this Record of Decision
pursuant to the Council on Environmental Quality Regulations for
implementing the procedural provisions of NEPA (40 CFR parts 1500-1508)
and DOE's NEPA regulations (10 CFR part 1021). This Record of Decision
is based on the Final Programmatic Environmental Impact Statement for
the Uranium Mill Tailings Remedial Action Ground Water Project (PEIS)
(DOE/EIS-0198, issued December 1996). The Nuclear Regulatory Commission
(NRC), the Navajo Nation, the Hopi Tribe, the State of Colorado and the
State of Texas participated as cooperating agencies in the preparation
of this PEIS.
A Notice of Intent was published in the Federal Register on
November 18, 1992 (57 FR 54374), announcing that the Department would
prepare a PEIS to examine programmatic alternatives for conducting the
UMTRA Ground Water Project at former uranium processing sites. Dates,
locations, and times for public scoping meetings were announced locally
and published in the Federal Register on February 8, 1993 (58 FR 7551).
Nineteen public scoping meetings in 16 communities were held between
November 18, 1992, and April 15, 1993, to solicit public comment
regarding the scope and content of the PEIS. The UMTRA Ground Water
Project PEIS Implementation Plan (DOE/AL/62350-72D, March 31, 1994)
summarized the comments received during scoping and described how the
comments would be addressed in the PEIS.
A Notice of Availability of the draft PEIS was published in the
Federal Register on May 17, 1995 (60 FR 26417). Nine public hearings
were conducted in communities near tailings sites between June 7 and
28, 1995, to solicit public comment on the draft PEIS. Volume II of the
final PEIS identifies and responds to the 576 comments received during
the public comment period.
Alternatives Considered
Proposed Action (Preferred Alternative)
Under the proposed action, which was identified in the draft PEIS
as DOE's preferred alternative, DOE would use ground water compliance
strategies tailored for each site to achieve conditions that are
protective of human health and the environment and that meet EPA ground
water standards. The proposed action would consider ground water
compliance decisions in a step-by-step approach, beginning with
consideration of a ``no-remediation'' strategy and proceeding, if
necessary, to consideration of passive strategies, such as natural
flushing with compliance monitoring and institutional controls, and
finally to consideration of more complex, active ground water methods,
if needed. For example, under the proposed action, if a site risk
assessment and Site Observational Work Plan
[[Page 22914]]
indicate that the strategy of ``no-remediation'' would be protective of
human health and the environment, a more complex and potentially
environmentally disruptive strategy involving active cleanup methods
would not be necessary.
The proposed action is intended to establish a consistent risk-
based framework for implementing the UMTRA Ground Water Project and
determining appropriate ground water compliance strategies for
complying with EPA ground water standards at the UMTRA Project former
processing sites. In determining site-specific ground water compliance
strategies DOE will consider: site-specific ground water conditions;
human and environmental risks; the views of tribes, States and local
communities; and cost. The proposed action as well as all the other
alternatives discussed below except for ``no action,'' are sufficiently
flexible to allow DOE to conduct interim actions, such as providing
alternate water supply systems, should they be necessary in order to
reduce risk and/or support institutional controls. The proposed action
would also allow the consideration of new ground water cleanup methods
as they become available.
No Action Alternative
The Council on Environmental Quality regulations for implementing
NEPA require assessment of the no action alternative (40 CFR
1502.14(d)), even if the agency is under a legislative mandate to act,
to enable decision makers to compare the magnitude of environmental
effects of the action alternatives (51 FR 15618 April 25, 1986). Under
the no action alternative, no further activities would be carried out
to comply with EPA standards at the inactive UMTRA Project former
processing sites.
Active Remediation to Background Levels Alternative
Under this alternative, ground water at the former processing sites
would be restored to background levels or to levels as close to
background as possible using active ground water remediation methods
without regard to existing risk or cost of implementation. The
philosophy behind this alternative is an assumption that ground water
at most of the former uranium processing sites was of better quality
before uranium processing activities occurred and that the ground water
should be restored to its preprocessing quality. If this alternative
were implemented, most of the UMTRA Project sites would require the use
of active ground water remediation methods such as gradient
manipulation, ground water extraction and treatment, or in situ ground
water treatment, regardless of the quality of the unaffected background
ground water. The specific active remediation method at each site would
be determined using the observational approach and evaluation of site-
specific data in the pertinent Site Observational Work Plans.
Passive Remediation Alternative
Under this alternative, only passive remediation strategies would
be used to meet the EPA ground water standards.1 The passive
remediation strategies are: (1) Performing no remediation at sites that
qualify for supplemental standards or alternate concentration limits as
defined below or sites where contaminant concentrations are below
maximum concentration limits or background levels, or (2) relying on
natural flushing. Natural flushing means allowing the natural ground
water movement and geochemical processes to decrease contaminant
concentrations. This alternative differs from the no action alternative
in that it includes site characterization, monitoring, and risk
assessment activities.
---------------------------------------------------------------------------
1 EPA's ground water protection standards provide three
alternative approaches to determining site-specific cleanup
requirements. Concentrations of certain contaminants that are within
``maximum concentration limits'' or at background levels are
acceptable without further consideration. Alternatively, DOE may
apply ``alternate concentration limits'' that will not pose a
substantial present or potential hazard to human health or the
environment under site-specific circumstances. Finally, when certain
criteria are met (e.g., ground water restoration is technically
impracticable), DOE may develop and apply ``supplemental standards''
in lieu of the otherwise applicable standards.
---------------------------------------------------------------------------
Under the first strategy of this alternative, the DOE would apply
supplemental standards or alternate concentration limits if maximum
concentration limits and/or background concentrations were exceeded. If
supplemental standards or alternate concentration limits are to be
applied at any site, concurrence by the NRC would be required.
Under the second strategy of this alternative, natural flushing
would be used to achieve background levels or maximum concentration
limits if supplemental standards and alternate concentration limits are
not applied. Concurrence by the NRC would be required. According to the
EPA standards, natural flushing can be used if it is shown to be
protective of human health and the environment, if it will meet the EPA
standards within 100 years, and if it complies with other provisions
that EPA established for its use. However, natural flushing may not
always meet the EPA standards in 100 years, and may not be protective
of human health and the environment at all sites. Therefore, if the
passive remediation alternative were selected, DOE may not comply with
the EPA standards at some sites.
The specific passive ground water compliance strategy selected for
each site would be determined using the observational approach and
evaluation of data gathered and included in the pertinent Site
Observational Work Plan. Active ground water remediation methods would
not be used under this alternative, even if the EPA standards cannot be
met by passive methods.
Existing Conditions
The designated UMTRA Project processing sites were active for
varying lengths of time from the 1940s into the 1970s. These sites, the
surrounding areas, and the underlying ground water constitute the
affected environment for this PEIS. Minority or low income groups near
UMTRA sites that have the potential for disproportionately high and
adverse effects include those near the Tuba City and Monument Valley,
Arizona; Shiprock, New Mexico; Mexican Hat, Utah; and Riverton,
Wyoming, sites. Land contaminated by uranium mill tailings and other
contaminants associated with UMTRA Title I former processing sites
ranged from a low of 21 acres (ac) (8 hectares (ha)) at the Spook,
Wyoming, site to a maximum of 612 ac (248 ha) at the Ambrosia Lake, New
Mexico, site. The amount of contaminated materials ranged from 85,000
cubic yards (yd3) (65,000 cubic meters (m3)) at the North
Continent Slick Rock, Colorado, site to 5,764,000 yd3 (4,407,000
m3) at the Falls City, Texas, site. The total amount of
contaminated material at the sites is 39,000,000 yd3 (30,000,000
m3). As a result of uranium processing, contaminants have entered
the shallow ground water at most of the UMTRA Project sites. Some of
the more common contaminants at UMTRA sites that exceed maximum
concentration limits under EPA's standards include but are not limited
to molybdenum, nitrate, selenium, and uranium.
DOE currently estimates that approximately 10 billion gallons (gal)
(39 million m3) of ground water are contaminated. One site
(Lowman, Idaho) shows no sign of contamination related to processing
activities. The site with the largest amount of contamination,
Gunnison, Colorado, has an estimated 1.9 billion gal (7.0 million
m3) of contaminated ground water.
[[Page 22915]]
Surface remediation of the designated sites has been in progress
since the mid-1980s; surface remediation is complete at 20 sites and
under way at the remaining two sites. Two additional sites, in Belfield
and Bowman, North Dakota, were included in the PEIS analysis but at the
request of the State are not scheduled for surface remediation. These
two sites therefore will not be included in the DOE Ground Water
Program. Affected States are required by UMTRCA to share 10 percent of
remedial action costs.
Impacts Analysis
The PEIS provides a qualitative analysis of potential impacts of
the alternative ground water compliance strategies and compares the
relative potential impacts of the alternatives. More detailed site-
specific quantitative impact assessments will be provided in the NEPA
documents that tier off the PEIS. Tiering is process in which broad
environmental issues are analyzed in an initial NEPA document (the PEIS
in this case) to facilitate subsequent NEPA reviews of narrower scope
(site-specific reviews in this case).
To give more weight to impacts that may have more significant
consequences (for example, human health), long-term and short-term
impacts are compared separately in the PEIS. Long-term impacts are
those that would occur from leaving contaminated ground water in place
or from implementing institutional controls for an extended period of
time. Short-term impacts would usually occur only during remediation
activities. In general, short-term impacts would be less significant
than long-term impacts, because most (for example, habitat destruction,
noise, and dust emissions) would be relatively minor and temporary and
could be mitigated. While these impacts are of concern, there is
greater concern regarding potential long-term health and environmental
effects.
Potential long-term impacts could arise under the following
circumstances:
If the contaminated ground water did not comply with EPA
standards and its use were not sufficiently controlled. This could
occur under the no action alternative and the passive remediation
alternative.
If the ground water compliance strategy were not
protective of human health and the environment at all sites. This could
occur under the no action alternative and passive remediation
alternative.
If institutional controls were implemented and were needed
for longer than they should reasonably be relied upon (i.e., in excess
of 100 years under the EPA standard). This could occur under all the
alternatives except the no action alternative, but is unlikely to occur
under the proposed action and active remediation alternatives.
If the no action alternative were selected, significant adverse
impacts to human health and the environment could result. Under this
alternative, the public could be exposed to hazardous contaminants by
drinking contaminated ground water. Further, minority and/or low-income
communities would be disproportionately impacted under the no action
alternative because such communities comprise the majority of the
population near several UMTRA Project sites. Adverse impacts to the
environment could potentially occur if contamination enters the food
chain (such as through livestock or produce) or affects sensitive
habitats (such as wetlands) or threatened or endangered species. These
potentially significant adverse impacts are not expected to occur under
the proposed action or the active remediation to background levels
alternative because these alternatives are intended to comply with EPA
standards at all UMTRA Project sites in a reasonable timeframe. In
addition, when required, surface and ground water monitoring would take
place before, during, and after implementation of the proposed action
and the active remediation to background levels alternative to ensure
the public is not exposed to existing or potential surface and ground
water contamination.
Implementation of the passive remediation alternative also could
result in potential exposure of humans and the environment to hazardous
contaminants because institutional controls may not always effectively
restrict access to contaminated ground water. Under the passive
remediation alternative, no active remediation of contaminated ground
water would occur even if such a hazard were identified. In contrast,
under both the proposed action and active remediation to background
levels alternatives, DOE would use hydrogeologic data and risk
assessments to identify the need for implementing active remediation
strategies to mitigate risks.
While no active remediation would occur under this alternative, the
passive remediation alternative could result in institutional controls
for more than 100 years and could result in potentially significant
long-term land use and social and economic impacts associated with
access restrictions at contaminated sites. In contrast, the proposed
action and the active remediation to background levels alternatives
would implement strategies intended to achieve ground water compliance
within 100 years.
In summary, the proposed action and active remediation to
background levels alternatives are most effective in protecting human
health and the environment from the contaminated ground water at the
UMTRA Project sites. Short-term adverse environmental impacts
associated with construction and operation of ground water remediation
systems (e.g., habitat destruction, noise and dust emissions) would
occur under both of these alternatives; such impacts would likely be
greater under the active remediation alternative because remediation
systems would be employed at every site. For all the reasons stated
above, DOE regards both of these alternatives as environmentally
preferable to the no action and passive remediation alternatives. The
proposed action likely would be more cost effective than the active
remediation alternative because it relies on less costly passive ground
water compliance strategies at sites where these strategies can be
shown to be protective of human health and the environment. The active
remediation alternative would be the most costly option. Both it and
the preferred alternative would result in compliance with the EPA
ground water standards, but the active remediation alternative, with
its reliance on active ground water remediation, would provide no
substantial additional benefits to human health and the environment.
Further, active remediation technologies may not always achieve
background concentrations of contaminants within 100 years at former
uranium processing sites.
Decision
The Department has decided to implement the proposed action, which
was identified as the Department's preferred alternative in the draft
PEIS. This approach provides a health and environmental risk-based
framework for implementing the UMTRA Ground Water Project and for
determining appropriate ground water compliance strategies at the UMTRA
Project former processing sites.
The Department will use a logic framework established by the
proposed action to identify the appropriate specific ground water
compliance strategy or strategies for a site to ensure compliance with
EPA standards and the protection of public health and the environment.
The first step in the decision process will be to determine whether
the uranium processing activities at a specific site have resulted in
ground
[[Page 22916]]
water contamination exceeding background levels or maximum
concentration limits. If ground water contamination has not exceeded
these standards and is not expected to do so in the future, remediation
will not be required.
Pursuant to the EPA standards, if ground water has been
contaminated by uranium processing activities and the contamination
exceeds background levels or maximum concentration limits, the next
step will be to determine whether compliance with EPA ground water
standards could be achieved by applying supplemental standards under 40
CFR 192.21(g), based on a determination that the ground water met EPA's
definition of ``limited use ground water.'' ``Limited use ground
water'' means ground water that is not a current or potential source of
drinking water because of: high concentration of dissolved solids;
ambient contamination unrelated to milling operations that cannot
reasonably be cleaned up; or poor aquifer yield (40 CFR 192.11(e)). If
limited use ground water is shown to exist and if supplemental
standards are protective of human health and the environment, no site-
specific remediation will be required. If supplemental standards based
on limited use ground water is not applicable, the next step will be to
determine whether alternate concentration limits apply.
If alternate concentration limits are protective of human health
and the environment, alternate concentration limits will be applied. If
not, it will be necessary to determine whether the contaminated ground
water plume(s) will qualify for supplemental standards which, under 40
CFR 192.21(b) of the EPA ground water standards, may be appropriate if
remediation will cause more environmental harm than benefit. At some
sites where supplemental standards or alternate concentration limits
may be applied, ground water monitoring and institutional controls may
be necessary to ensure that the application of alternate concentration
limits or supplemental standards will continue to be protective of
human health and the environment. In addition, when limited-use ground
water is present, supplemental standards must ensure that current and
reasonably projected uses of the affected ground water are preserved.
If supplemental standards will not be protective, the next step
will be to determine whether natural flushing (attenuation) will bring
the contaminated ground water into compliance (i.e., within maximum
concentration limits, background levels, or alternate concentration
limits) within 100 years. Natural flushing could be used if DOE
determines and NRC concurs that institutional controls could be
implemented, maintained, and enforced during the natural flushing
period; that this strategy is protective of human health and the
environment; and that all other EPA provisions are met.
If natural flushing will not be protective, it will be necessary to
determine whether natural flushing combined with active remediation
methods will meet the EPA ground water standards and will be protective
of human health and the environment. If so, a two-part strategy will be
implemented. Active remediation methods will first be used for a short
time to remove the most contaminated ground water in a discrete area,
and then natural flushing will occur. When appropriate, DOE would use
active methods that have low operational and maintenance requirements,
such as gradient manipulation or geochemical barriers, in conjunction
with natural flushing.
Site characterization data may show that natural flushing combined
with active remediation will not result in ground water quality that is
protective of human health and the environment. If that is the case,
the next step in the framework will be to determine whether active
ground water remediation techniques will meet the EPA ground water
standards, and if so, to implement these techniques. Several methods of
active ground water remediation could be used, including gradient
manipulation, ground water extraction, and in situ ground water
treatment. The active remediation methods could be used individually or
in combination with other cleanup methods. If active remediation
results in compliance with the EPA standards, remedial action will be
complete. If these methods do not result in compliance, supplemental
standards based on technical impracticability of remediation will be
applied, along with institutional controls where necessary.
Site-specific NEPA documentation will be prepared to evaluate the
impact(s) from alternative strategies for implementing the programmatic
decision described above. In accordance with DOE policy, DOE will
solicit input from the public, local organizations, and educational
institutions on issues that should be identified, considered, and
analyzed, and will conduct public meetings for that purpose in the
affected communities. Furthermore, DOE will adopt all practicable means
to avoid or minimize environmental harm during site-specific
activities.
Issued in Washington, DC, on April 21, 1997.
Alvin L. Alm,
Assistant Secretary for Environmental Management.
[FR Doc. 97-10860 Filed 4-25-97; 8:45 am]
BILLING CODE 6450-01-P
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.