The Future Development of SMR Systems in the 800 MHz Frequency Band

Federal RegisterFeb 16, 1996

Ask Donna

What actually matters in this document.

Text

FEDERAL COMMUNICATIONS COMMISSION

47 CFR Part 90

[PR Docket No. 93-144; PP Docket No. 93-253; FCC 95-501]

The Future Development of SMR Systems in the 800 MHz Frequency

Band

AGENCY: Federal Communications Commission.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: In this First Report and Order in PR Docket No. 93-144, and

Eighth Report and Order in PP Docket No. 93-253, the Commission adopts

final service and competitive bidding rules for the ``upper 10 MHz

block'' of 800 MHz Specialized Mobile Radio (SMR) spectrum and adopts

rules which streamline the licensing process for SMR services in the

800 MHz band.

In this First Report and Order (``First R&O''), the Commission

designates a portion of 800 MHz SMR spectrum for wide-area licensing

using license areas defined by the Economic Areas (EAs) established by

the U.S. Department of Commerce Bureau of Economic Analysis. Under this

wide-area licensing plan the Commission has allocated three channel

blocks, one 120-channel block, one 60-channel block, and one 20-channel

block.

In this Eighth Report and Order (``Eighth R&O''), the Commission

reiterated that competitive bidding is an appropriate licensing tool

for the 800 MHz SMR service. The Commission also adopts specific

auction rules for the upper 10 MHz block, including rules pertaining to

competitive bidding design, license grouping, bidding procedures, and

treatment of ``designated entities'' (that is, small businesses,

businesses owned by minorities and/or women, and rural telephone

companies). The intended effect of this action is to facilitate future

deployment of SMR systems in the 800 MHz band through licensing

procedures and the use of competitive bidding.

EFFECTIVE DATE: March 18, 1996.

FOR FURTHER INFORMATION CONTACT: David Furth or Lisa Warner at (202)

418-0620.

SUPPLEMENTARY INFORMATION: This First Report and Order in PR Docket No.

93-144, and this Eighth Report and Order in PP Docket No. 93-253,

adopted December 15, 1995, and released December 15, 1995, is available

for inspection and copying during normal business hours in the FCC

Dockets Branch, Room 230, 1919 M Street N.W., Washington, D.C. The

complete text may be purchased from the Commission's copy contractor,

International Transcription Service, Inc., 2100 M Street, N.E., Suite

140, Washington, D.C. 20037 (telephone (202) 857-3800).

Synopsis of First Report and Order and Eighth Report and Order:

I. Background

1. The Commission's current rules for the 800 MHz Specialized

Mobile Radio (SMR) service were designed primarily to license dispatch

radio systems on a transmitter-by-transmitter basis in local markets.

In recent years, however, some SMR licenses have been authorized

through waivers and extended implementation rules to expand the

geographic scope of their services and aggregate large numbers of

channels to provide service more directly comparable to that provided

by cellular operators and that envisioned for Personal Communications

Services (PCS). While the 800 MHz SMR rules have proven sufficiently

flexible to permit such expansion, the licensing process remains

cumbersome because of the need to license each SMR transmitter site

individually. In May 1993, the Commission adopted a Notice of Proposed

Rule Making in PR Docket No. 93-144, 58 FR 33062 (June 15, 1993)

(``Notice''), proposing wide-area licensing of the 800 MHz SMR service.

In August of 1993, Congress amended the Communications Act of 1934 to

modify the regulatory treatment of mobile services. In the Second

Report and Order in GN Docket No. 93-252, 59 FR 18493 (April 19, 1994)

(``CMRS Second R&O''), the Commission reclassified all mobile services

into two statutorily-defined categories: commercial mobile radio

services (CMRS) and private mobile radio services (PMRS). The

Commission concluded that all SMR systems providing or authorized to

provide interconnected service would be reclassified as CMRS.

2. In the Third Report and Order in GN Docket No. 93-252, 59 FR

59945 (November 21, 1994) (``CMRS Third R&O''), the Commission

concluded that 800 MHz SMR licensees either compete or have the

potential to compete with other CMRS providers. As a result, the

Commission determined that the technical and operational requirements

for the 800 MHz SMR service should be made comparable, to the extent

feasible, to those applicable to other CMRS providers. In this

connection, the Commission concluded that: (1) wide-area licensing

should be implemented in the 800 MHz SMR service; and (2) licensing of

the 800 MHz SMR spectrum should be accomplished through competitive

bidding procedures.

3. On October 20, 1994, the Commission adopted a Further Notice of

Proposed Rule Making in PR Docket No. 93-144, 59 FR 60111 (November 22,

1994) (``Further Notice''), proposing a new framework for licensing of

800 MHz SMR systems. Specifically, the Commission proposed to assign 10

MHz of SMR spectrum (consisting of 200 contiguous channels) in defined

market-based service areas to facilitate the development of wide-area,

multi-channel SMR systems, while the remaining 4 MHz of spectrum

(consisting of 80 non-contiguous

[[Page 6139]]

channels) would be designated for continued licensing on a local basis

to accommodate the needs of smaller SMR systems primarily seeking to

provide local, more dispatch-oriented service.

II. First Report and Order

A. Wide-Area SMR Licensing in the 800 MHz Band

1. Spectrum Designated for Wide-Area Licensing

4. In the CMRS Third R&O, the Commission determined that assigning

contiguous spectrum, where feasible, is likely to enhance the

competitive potential of wide-area SMR providers. The Commission

indicated its belief that contiguous spectrum is essential to the

competitive viability of a wide-area SMR system, because it permits use

of spread spectrum and other broadband technologies that are available

to other CMRS providers but unavailable to systems operating on non-

contiguous spectrum. In the Further Notice, the Commission proposed to

designate the upper 10 MHz block of 800 MHz SMR spectrum for wide-area

SMR licensing.

5. In the First R&O, the Commission concludes that the 800 MHz SMR

spectrum most suitable to be designated primarily for wide-area use is

the upper 10 MHz block, as it is the only contiguous SMR spectrum in

the 800 MHz band. The Commission further concludes that the entire 10

MHz block should be used, rather than a portion thereof, because it is

equivalent in size to the smallest amount of spectrum presently

authorized for broadband PCS.

2. Service Areas

6. In the CMRS Third R&O, the Commission concluded that the use of

service areas based on Rand McNally Major Trading Areas (MTAs),

identical to those adopted for broadband PCS, would be preferable for

wide-area licensing of the 800 MHz SMR service. The Commission noted

that allowing licensees to operate over MTAs as opposed to smaller

areas, such as Rand McNally Basic Trading Areas (BTAs), would enhance

their ability to invest in technology and to re-use channels more

effectively.

7. In this First R&O, the Commission determines that, despite its

previous conclusion in the CMRS proceeding that MTAs appear to be the

most suitable building blocks for 800 MHz SMR licensees seeking to

construct wide-area systems, a broad range of commenters expressed

support for Economic Areas (EAs) established by the U.S. Department of

Commerce Bureau of Economic Analysis rather than MTAs. The Commission

agrees with the majority of commenters that EAs reflect the actual

coverage provided by 800 MHz SMR systems and concludes that use of EAs

will further the public interest because it will result in the

dissemination of licenses among a variety of applicants as anticipated

by Section 309(j) of the Communications Act. The Commission further

concludes that use of these smaller geographic areas ultimately will

result in a more diverse group of prospective bidders, because small

and medium-sized operatives will have incentives to seek EA licenses.

8. Thus, 800 MHz SMR wide-area licenses in the upper 10 MHz block

will be based on the 172 EAs covering the continental United States and

Alaska, and three additional licensing regions covering the five U.S.

possessions, Guam, Northern Marina Islands, Puerto Rico, U.S. Virgin

Islands, and American Samoa.

3. EA Spectrum Blocks

9. In the CMRS Third R&O, the Commission observed that most

commenters agreed that wide-area SMR systems must have the ability to

use (and reuse) a large number of channels, preferably on contiguous

frequencies, to compete successfully with cellular and broadband PCS.

Based on the record established earlier in the 800 MHz SMR proceeding

and the comments submitted in the CMRS proceeding, the Further Notice

proposed to divide the upper 10 MHz block of 800 MHz SMR spectrum into

four blocks of 2.5 MHz, corresponding to 50 channels per block, under

the Commission's existing frequency allocation rules. In addition, the

Commission chose not to propose to issue a single license covering the

entire 10 MHz upper block of 800 MHz SMR spectrum because it determined

that a single 10 MHz license would preclude licensing of multiple wide-

area licensees in each market.

10. In this First R&O, the Commission concludes that dividing the

upper 10 MHz block into multiple spectrum blocks is both feasible and

desirable. The Commission concludes that allocating varying size blocks

will accomplish its goal of creating opportunities for wide-area SMR

providers with differing spectrum needs. Thus, the Commission adopts a

licensing plan which allocates one 120-channel block, one 60-channel

block, and one 20-channel block for each EA. The Commission believes

that these channel block sizes will provide opportunities for a variety

of licensees of different sizes to participate in the provision of

wide-area service.

4. 800 MHz SMR Spectrum Aggregation Limit

11. In the CMRS Third R&O, the Commission concluded that a 45 MHz

limit on aggregation of broadband PCS, cellular, and SMR spectrum,

combined with existing service-specific caps for cellular and PCS, was

sufficient to maintain a competitive CMRS market. In light of this

conclusion, in the Further Notice, the Commission concluded that an

additional aggregation limit within the 800 MHz SMR service was

unnecessary.

12. The Commission concludes in this First R&O that allowing

unrestricted aggregation of 800 MHz SMR spectrum would not impede CMRS

competition. The Commission expresses concern that limiting aggregation

of 800 MHz SMR spectrum may result in a competitive disadvantage to SMR

licensees as potential competitors to broadband PCS and cellular

providers. Thus, the Commission further concludes that SMR licensees

will be permitted to seek and (if they are the high bidders for all EA

licenses) obtain all three of the EA licenses in a particular license

area. The Commission reiterates, however, that even though it has

declined to adopt a spectrum aggregation limit specific to the 800 MHz

SMR service, such licensees remain subject to the 45 MHz CMRS spectrum

aggregation limit and to the competitive component of the public

interest standard.

5. Licensing in Mexican and Canadian Border Areas

13. In the Further Notice, the Commission tentatively concluded

that attempting to create different allocations in border areas would

be administratively unworkable, and, thus, proposed to license wide-

area spectrum blocks on a uniform basis without distinguishing border

from non-border areas. The Commission further proposed to license the

channels in border areas not contained in the wide-area spectrum block

on a channel-by-channel basis under the same rules it ultimately adopts

for the lower 80 channels in non-border areas.

14. The Commission concludes that EA spectrum blocks should be

licensed on a uniform basis, without distinguishing border from non-

border areas. EA licenses will be entitled to use any available border

area channels within their spectrum blocks, subject to international

assignment and coordination of such channels. The Commission also

concludes that the limited channel availability and other operating

restrictions in the border areas are matters to be assessed by EA

[[Page 6140]]

applicants in their valuation of EA spectrum blocks for competitive

bidding purposes. The Commission, however, defers a decision regarding

treatment of 800 MHz SMR channels licensed in border areas, but not

included within the EA spectrum blocks, until the resolution of the

Second Further Notice of Proposed Rule Making in PR Docket No. 93-144.

B. Rights and Obligations of EA Licensees

1. Operational Flexibility

15. In the Further Notice, the Commission tentatively concluded

that wide-area SMR licensees in the 800 MHz band should be authorized

to construct stations at any available site and on any available

channel within their respective spectrum blocks. In addition, the

Commission proposed to allow wide-area licensees to ``self-coordinate''

system modifications within their service areas--that is, to add,

subtract, move, and otherwise modify their base station facilities

without prior Commission consent, provided they notify the Commission

of the coordinates and certify compliance with its co-channel

interference protection and emission requirements.

16. The Commission concludes that grant of EA licenses will provide

licensees with: (1) the right to construct at any available site within

the EA, and to add, subtract, or move site locations within the EA

during the license term, on a ``self-coordinated'' basis; and (2) the

right to use any available spectrum within the EA licensee's designated

spectrum block on a self-coordinated basis, including full discretion

over channelization of available spectrum within the block (provided

that emission mask requirements are met, and co-channel interference

protection is afforded to incumbent licensees and co-channel EA

licensees in neighboring EAs). The Commission further concludes that

simplified initial licensing and subsequent system modification

substantially will reduce the existing administrative burden on both

SMR licensees and the Commission, and will establish greater

consistency with its cellular and PCS licensing rules.

2. Spectrum Management Rights--Acquisition and Recovery of Channels

Within Spectrum Blocks

17. In the Further Notice, the Commission recognized that the

operational flexibility afforded to wide-area 800 MHz SMR licensees

would be limited by the large number of systems already authorized and

operating in the band, particularly in major markets. The Commission

noted that even if wide-area licensees do not immediately obtain clear

spectrum comparable to its allocations for cellular or broadband PCS,

wide-area licensing should confer other valuable rights that would

enhance a licensee's ability to establish wide-area service. Thus, the

Commission proposed to assist wide-area licensees in consolidating

spectrum within their respective blocks by providing that (1) if an

incumbent fails to construct, discontinues operations, or otherwise has

its license terminated by the Commission, the spectrum covered by the

incumbent's authorization automatically reverts to the wide-area

licensee; and (2) if a wide-area licensee negotiates to acquire an

incumbent system by assignment or transfer, the assignment or transfer

presumptively will be considered in the public interest.

18. In this First R&O, the Commission concludes that an EA licensee

has the right to use any spectrum within the EA block that is recovered

by the Commission. In addition, the Commission determines that

assignments from incumbents operating in an EA spectrum block to the

respective EA licensee generally will be presumed to be in the public

interest. The Commission concludes that granting these rights to EA

licensees will give them greater flexibility in managing their

spectrum, establish greater consistency with its cellular and PCS

rules, and reduce regulatory burdens on both licensees and the

Commission with respect to future management of the spectrum within the

wide-area blocks. The Commission also eliminates all waiting lists for

SMR Category channels within the upper 10 MHz block, and dismisses all

applications on such waiting lists. The Commission determines that

continuing such lists would be inconsistent with the wide-area

licensing scheme it has adopted.

19. With respect to the impact of these rights on the finders'

preference program, the Commission concludes that successful applicants

for a finders' preference program will be considered an ``incumbent''

within the meaning of the rules adopted in the First R&O. In addition,

the Commission no longer will accept finders' preference requests

following the adoption of this First R&O. As a result, the EA licensee

will have the exclusive right to recover unconstructed or non-

operational channels on blocks for which it is licensed.

3. License Term and Renewal Expectancy

20. In the CMRS Third R&O, the Commission determined that every

Part 90 licensee that is reclassified and treated as a CMRS licensee

when its current license term expires thereafter shall have a ten-year

license term and be afforded a renewal expectancy, provided it is able

to demonstrate that it: (1) has provided ``substantial'' service during

the license term; and (2) has complied with applicable Commission rules

and policies, and the Communications Act. Furthermore, the Commission

determined that ``grandfathered'' Part 90 licensees, because they

retain their ``private'' status until August 10, 1996, would not be

afforded either the ten-year license term or the renewal expectancy

during the statutory transition period.

21. In this First R&O, the Commission determines that EA licenses

should be granted for a ten-year license term. In addition, EA

licensees generally will be afforded a renewal expectancy as determined

in the CMRS Third R&O.

C. Treatment of Incumbent Systems

1. Mandatory Relocation

22. In the Further Notice, the Commission tentatively concluded

that incumbent SMR systems should not be subject to mandatory

relocation to new frequencies pursuant to Nextel's band-clearing

proposal. The Commission also expressed concern that mandatory

relocation could impose significant costs and disruption on incumbent

licensees.

23. The Commission concludes in this First R&O that, based on the

record in this proceeding, a smooth and expedient transition to the new

licensing framework for 800 MHz SMR service cannot be accomplished

without some form of mandatory relocation. Thus, the Commission has

created a two-phase mandatory relocation mechanism under which there is

a fixed one-year period for voluntary negotiations between EA licensees

and incumbents and a two-year period for mandatory negotiations. Under

this mechanism, if an EA licensee and an incumbent licensee fail to

reach an agreement by the conclusion of the mandatory negotiation

period, then the EA licensee may request involuntary relocation of the

incumbent's system provided that it: (1) guarantees payment of all

costs of relocating the incumbent to a comparable facility; (2)

completes all activities necessary for placing the new facilities into

operation, including engineering and frequency coordination, if

necessary; and (3) builds and tests the

[[Page 6141]]

new system. Specifically, any relocation of an incumbent must be

conducted in such a fashion that there is a ``seamless'' transition

from the incumbent's ``old'' frequency to its ``relocated'' frequency

(that is, there is no significant disruption in the incumbent's

operations). In connection with this mandatory relocation mechanism, EA

licensees will be required to notify incumbents operating on

frequencies included in their spectrum block of their intention to

relocate such incumbents within 90 days of the release of the Public

Notice commencing the voluntary negotiation period. If an applicant

does not receive timely notification of relocation, the EA licensee

loses the right to require that incumbent to relocate.

24. The Commission also initiates a partial lifting of the freeze

on acceptance of new applications for SMR and General Category channels

to permit those assignments and transfers of control that involve

modifications to licensed facilities, provided such assignments and

transfers are designed to accommodate market-driven, voluntary

relocation arrangements between incumbents and potential EA applicants,

and do not change the 22dBu service contour of the facilities to be

relocated. This option is not available for purposes of relocating

incumbents from one part of the upper 10 MHz block to another.

Moreover, potential EA applicants and relocating incumbents utilizing

this option must be completely unaffiliated. Processing of these

assignments and transfers will continue until the date the Commission

releases the Public Notice announcing the upper 10 MHz auction.

2. Incumbent Operation Flexibility

25. In the Further Notice, the Commission tentatively concluded

that in those situations in which incumbents are allowed to continue

operating on already-licensed facilities, incumbent systems should not

be allowed to expand beyond their existing service areas on those

channels designated for wide-area licensing, without the consent of the

wide-area licensee.

26. The Commission concludes that allowing non-EA licensees to

expand their systems at will after wide-area licensing has occurred

would diminish substantially the value of the EA license and would

create continuing uncertainty for EA applicants and licensees alike.

The Commission recognizes, however, that there may be circumstances in

which an EA licensee should be required to permit incumbents to make

minor alterations to their service areas to preserve the viability of

their systems. Thus, the Commission granted operational flexibility to

incumbent SMR licensees to add, subtract, or move site locations within

their current 22 dBu contours, on a ``self-coordinated'' basis. The

incumbent must, however, still comply with the short-spacing criteria

in Section 90.621(b) of the Commission's rules, even if its

modifications do not extend its 22 dBu interference contour. Incumbent

licensees will be required to notify the Commission of any changes in

technical parameters or additional stations constructed, including

agreements with an EA licensee to expand beyond their signal strength

contour, through a minor modification of their license.

D. Co-channel Interference Protection

1. Incumbent SMR Systems

27. In the CMRS Third R&O, the Commission concluded that, as a

general matter, it would retain its existing co-channel protection

rules for CMRS licensees. Under the current rules, a wide-area licensee

would be required to afford protection to incumbents, either by

locating its stations at least 113 km (70 mi) from the facilities of

any incumbent, or by complying with the co-channel separation standards

set forth in its ``short-spacing'' rule if it seeks to operate stations

located less than 113 km (70 mi) from an incumbent licensee's

facilities.

28. In this First R&O, the Commission determines to require EA

licensees to afford interference protection to incumbent SMR systems,

as provided in Section 90.621 of the Commission's rules. As a result,

an EA licensee will be able to satisfy its co-channel protection

obligations with respect to incumbents in one of three ways: (1) by

locating its stations at least 113 km (70 miles) from any incumbent's

facilities; (2) by complying with the short-spacing rule if it seeks to

operate stations less than 113 km from an incumbent's facilities; or,

(3) by negotiating an even shorter distance with the incumbent

licensee. The Commission concludes that these requirements will ensure

adequate protection of incumbent operations, without hampering the

ability of EA licensees to construct stations throughout their

authorized service areas. The Commission believes that this rule will

afford maximum flexibility to EA licensees, allow incumbents to fill in

``dead spots,'' and protect incumbent licensees from actual

interference.

2. Adjacent EA Licensees

29. In the CMRS Third R&O, the Commission concluded that the co-

channel interference protection obligations of geographic-area

licensees with respect to other geographic-area licensees would be

similar to those imposed in the cellular and PCS services. In the

Further Notice, the Commission tentatively concluded, therefore, that

wide-area SMR licensees in the 800 MHz band should not be allowed to

exceed a signal level of 22 dBuV/m at their service area boundaries

(unless they negotiate a different signal strength limit with all

potentially affected adjacent licensees).

30. In this First R&O, the Commission prohibits EA licensees from

exceeding a signal level of 40 dBuV/m at their service area boundaries,

unless all bordering EA licensees agree to a higher field strength. The

Commission requires coordination of frequency use between co-channel

adjacent EA licensees and all other affected parties. This approach

provides EA licensees with a signal strength level sufficient to

operate their systems up to the borders of their EAs, while also

providing protection to adjacent operations. As an exception to this

requirement, when a single entity obtains licenses for adjacent EAs on

the same spectrum block, it will not be required to coordinate its

operations in this manner.

3. Emission Masks

31. To protect against adjacent channel interference, the

Commission has emission mask rules in most mobile radio services to

restrict transmitter emissions on the spectrum adjacent to the

licensee's assigned channel. In the CMRS Third R&O, the Commission

affirmed its out-of-band emission rules for CMRS services and

determined that out-of-band emission rules should apply only where

emissions have the potential to affect other licensees' operations.

With respect to licensees that have exclusive use of a block of

contiguous channels, the Commission concluded that out-of-band emission

rules would be applied only to the extent necessary to protect

operations outside of the licensee's authorized spectrum.

32. The Commission concludes that out-of-band emission rules should

apply only to the ``outer'' channels included in an EA license and to

spectrum adjacent to interior channels used by incumbents. The

Commission believes that these channels alone have the potential to

affect operations outside of the EA licensee's authorized bandwidth.

The Commission also believes that this requirement will facilitate dual

mode

[[Page 6142]]

SMR/cellular operation, similar to that in the PCS/cellular context,

which ultimately will add capacity to the systems operated by the EA

licensees.

E. Construction Requirements

1. EA Licensees

33. In the CMRS Third R&O, the Commission determined that the

record in the CMRS proceeding generally supported use of longer

construction periods, combined with interim coverage requirements, to

ensure that wide-area CMRS licensees provide service to portions of

their service area before the construction period expires. In the

Further Notice, the Commission noted that such an approach has been

used for cellular service and recently was adopted for both broadband

and narrowband PCS. In the Further Notice, the Commission tentatively

concluded that wide-area SMR licensees should have five years to

construct their systems.

34. In this First R&O, the Commission concludes that EA licensees

should have a five-year construction period. While this construction

period is shorter than that imposed for PCS systems, we agree with the

majority of commenters that it is the most appropriate time period for

the 800 MHz SMR service. In addition, given the substantial

construction of 800 MHz SMR systems (including wide-area systems) to

date, the ten-year construction period applicable to PCS appears

excessive for the service. Although a five-year construction period may

give some EA licensees more time to construct certain facilities than

otherwise might have been allowed, the Commission believes that EA

licensees should have this flexibility. Furthermore, the Commission

believes that use of competitive bidding to select geographic-area

licensees provides ample incentives for rapid system construction,

since this permits license winners to recover their bidding expenses.

2. Extended Implementation Authority

35. The Commission noted in the Further Notice that some existing

SMR licensees have been granted extended implementation periods of up

to five years to construct their systems, pursuant to either a waiver

of its construction and loading rules or Section 90.629 of its Rules.

The Commission's rules require SMR licensees with extended

implementation authority to submit annual certifications of compliance

with their yearly station construction commitments. Moreover, if the

Commission concludes, at any time, that the licensee has failed to meet

such construction commitments, it may terminate extended implementation

authority and give the licensee six months from the termination date to

complete construction of the system.

36. Following the Commission's adoption of the Further Notice, some

SMR licensees filed requests for extended implementation authority,

which remain pending. With respect to two such requests filed by

Chadmoore and PCC Management Corp., the Wireless Telecommunications

Bureau (``Bureau'') released a Public Notice seeking comment on whether

the requests should be granted. In its extended implementation

authority request, Chadmoore sought three years to construct a non-

contiguous ``wide-area'' SMR system that will extend from the

southeastern United States through the upper Midwest and use new

technology. Chadmoore argued that grant of its extended implementation

request was warranted on four grounds: (a) Chadmoore's principals have

demonstrated expertise in SMR sales and service; (b) Chadmoore

previously has demonstrated its ability to acquire and construct those

licenses granted to SMR ``investors;'' (c) Chadmoore's proposal would

assist those licensees ``who have, as yet, not constructed'' their

stations, and who are in danger of losing their investment once their

already extended deadline has expired; and, (d) grant of Chadmoore's

proposal would promote competition in the SMR equipment manufacturing

market. Similarly, PCC sought a period of three years to construct a

regional, and ultimately nationwide, network of SMR systems. PCC's

proposed system would include 2,181 channels, 849 conventional channels

and 269 trunked channels, encompassing 1,118 licenses. PCC argued that

grant of its extended implementation request was warranted for the

following reasons: (a) climatic conditions for the region(s) in which

the SMR systems are located preclude construction during certain

seasons of the year; (b) grant of PCC's proposal would assist licensees

who have not yet constructed their authorized facilities; (c) PCC's

implementation plan would result in a more cost-effective build-out for

the stations included in its proposal; and (d) grant of PCC's proposal

would facilitate the implementation of an integrated nationwide

network.

37. The Commission initially established extended implementation

authority for SMRs to facilitate construction of wide-area systems. In

the First R&O, the Commission concludes that the availability of

extended implementation authority in the 800 MHz SMR service is no

longer necessary. In fact, the Commission is concerned that both

existing and future grants of extended implementation authority would

be contrary to the underlying goals of this proceeding. Specifically,

the Commission believes that allowing licensees to retain extended

implementation authority of up to five years after adoption of the

wide-area licensing approach detailed in this First R&O would impinge

upon the construction requirements imposed on EA licensees. Thus, the

Commission believes that it is necessary not only to cease acceptance

of requests for extended implementation authority but also to

accelerate the termination date of existing implementation periods so

that EA licensees will not be unnecessarily hampered in their efforts

to comply with the construction requirements associated with their

authorizations.

38. In addition, several licensees and commenters contend that such

extended implementation grants have resulted in spectrum warehousing.

To address these spectrum warehousing concerns, the Commission will

require all incumbent 800 MHz SMR licensees who have received extended

implementation authority to demonstrate that allowing them extended

time to construct their facilities is warranted and furthers the public

interest. Specifically, a licensee seeking to retain extended

implementation authority must: (a) indicate the duration of its

extended implementation period (including commencement and termination

date); (b) provide a copy of its implementation plan, as originally

submitted and approved by the Commission, and any Commission-approved

modifications thereto; (c) demonstrate its compliance with Section

90.629 of its rules if authority was granted pursuant to that

provision, including confirmation that it has filed annual

certifications regarding fulfillment of its implementation plan; and

(d) certify that all facilities covered by the extended implementation

authority proposed to be constructed as of the adoption date of this

First R&O are fully constructed and that service to subscribers has

commenced as defined in the CMRS Third R&O. These showings must be

submitted within 90 days from the effective date of this First R&O. The

Commission notes that all of the information to be included in the

showing presently is required by Section 90.629 of its Rules. The

Commission delegated to the Bureau the authority to review and take

appropriate action upon such showings.

39. If a licensee's extended implementation authority showing is

approved by the Bureau, such licensee

[[Page 6143]]

will be afforded a construction period of two years or the remainder of

its current extended implementation period, whichever is shorter. The

Commission recognizes that some licensees were initially granted

extended implementation periods which exceed this two-year period. In

those instances where a licensee demonstrates that it has fully

complied with the requirements of Section 90.629 of the Commission's

rules and that its system cannot reasonably be completed within the

two-year period, the Commission will entertain requests for the minimum

period of time necessary to complete implementation of the licensee's

proposal provided that the licensee explains why the two-year period is

an insufficient amount of time. The Commission anticipates that such

explanation would entail the same type of public interest showing

associated with a request for waiver of the Commission's rules under

Section 1.3 of the rules.

40. Upon the termination of this two-year period, authorizations

for facilities that remain unconstructed will cancel automatically. If

a licensee either fails to submit the showing described above within

the designated time frame or submits an insufficient or incomplete

showing, such licensee will have six months from the last day on which

it could timely file such a showing or six months from the denial of

its request to construct the remaining facilities covered under its

implementation plan. After this six-month period, authorizations for

facilities still unconstructed will cancel automatically.

41. With respect to pending requests for extended implementation

authority, the Commission determines that grant of these requests would

conflict with its goal of uniformly implementing wide-area licensing.

It also reiterates that parties that remain interested in obtaining

extended implementation authority are free to apply for an EA license

under the Commission's new rules.

3. Interim Coverage Requirements

42. In the CMRS Third R&O, the Commission concluded that 800 MHz

wide-area SMR licensees should be subject to interim coverage

requirements that are similar to those in the cellular and PCS rules.

In the Further Notice, the Commission proposed that geographic-area

licensees be required to provide coverage to one-third of the

population within their license area within three years of initial

license grant, and to two-thirds of the population by the end of their

five-year construction period.

43. In the CMRS Third R&O, the Commission noted that any interim

coverage requirements for wide-area SMR systems must account for the

fact that geographic-area licensees may be required to provide co-

channel protection to incumbent systems within their service area. In

the Further Notice, the Commission indicated its belief that when a

licensee acquires a wide-area license, it assumes the responsibility of

obtaining the right to use sufficient spectrum to provide coverage if

such spectrum is not already available. The Commission further

indicated its expectation that coverage be achieved directly by

constructing facilities on available spectrum authorized to the wide-

area licensee or acquiring such spectrum through buy-outs of incumbent

licensees within its authorized spectrum block. To the extent that the

Further Notice could be read to propose that coverage could be met

through use of resale or similar agreements, the Commission clarifies

its intention that the wide-area licensee is free to engage in resale

activities, but must satisfy its construction requirements through use

of its facilities and not capacity acquired from others through resale.

44. The Commission will require EA licensees to provide coverage to

one-third of the population of their respective EAs within three years

of initial license grant and to two-thirds by the end of their five-

year construction period. This requirement is consistent with the

Commission's 900 MHz SMR rules. Unlike its approach in the 900 MHz SMR

context, the Commission is not adopting a ``substantial service''

benchmark for the upper 10 MHz block as an alternative to the

population coverage criteria. Given the already extensive licensing in

the upper 10 MHz block, the Commission believes it is unlikely that an

EA licensee could provide substantial service without buying incumbent

systems or relocating incumbents. Similarly, the Commission did not

adopt a ``substantial service'' standard in the Multipoint Distribution

Service (MDS) because of extensive incumbent presence in that spectrum.

4. Channel Use Requirement

45. Given the extensive licensing of the upper 10 MHz block, the

Commission shares the concern of several commenters that interim

coverage requirements alone may not ensure efficient spectrum use

unless a channel use requirement is added. Specifically, the Commission

is concerned that an EA licensee potentially could satisfy the interim

coverage requirements by constructing only one channel in its spectrum

block. This would result in inefficient use of 800 MHz SMR spectrum,

for which there is great demand. In addition, unlike the 900 MHz SMR

service and other lightly encumbered auctionable services, the

substantial incumbent presence in the 800 MHz SMR service presents the

potential for a bidder who is incapable of building out a wide-area

system to participate in the auction solely to restrict a competing

incumbent licensee's ability to expand. Accordingly, the Commission

will require EA licensees to construct 50 percent of the total channels

included in their spectrum blocks in at least one location in their

respective EAs within three years of initial license grant. Although

the Commission does not impose an additional channel use requirement at

the fifth year, EA licensees nonetheless are required to maintain their

compliance with the initial channel usage requirement for the remainder

of their construction period.

5. Non-compliance With Interim Coverage Requirements

46. The Commission concluded that an EA licensee's failure to meet

either the three-year or five-year coverage requirements or the channel

usage requirement will result in forfeiture of the entire EA license.

Forfeiture of the EA license, however, will not result in the loss of

any constructed facilities authorized to the licensee prior to the

auction.

F. EA License Application Issues

1. Initial Eligibility

47. In the CMRS Third R&O and the Further Notice, the Commission

tentatively concluded that the initial application process for wide-

area SMR licenses should be open to any qualified applicant. The

Commission also sought comment on whether it was necessary to restrict

eligibility for EA licenses to incumbent licensees (or to restrict

eligibility based on other criteria) if competitive bidding procedures

are used in the upper 10 MHz block.

48. In this First R&O, the Commission concludes that restrictions

on eligibility for EA licenses are not warranted, except that EA

applicants will be presumptively classified as CMRS, and therefore will

be required to comply with the alien ownership requirements specified

in Section 310 of the Act. The Commission has adopted specific

provisions in the service rules for the upper 10 MHz block to address

these concerns, e.g., imposition of construction periods combined with

[[Page 6144]]

interim coverage and channel use requirements. Moreover, the Commission

believes that the competitive bidding process itself will deter

speculation by those not genuinely interested in providing service to

the public. In addition, the Commission believes that open eligibility

for the EA licensees will be pro-competitive and potentially will

result in a diverse group of entities providing wide-area SMR service

in the upper 10 MHz block.

49. With respect to foreign ownership, all applicants will be

subject to Section 310(b) of the Communications Act, except to the

extent they have received waiver of preexisting ownership interests. In

the CMRS docket, the Commission established specific procedures for

private mobile services licensees reclassified as CMRS to file waiver

petitions to retain existing foreign ownership interests. Thus, any

reclassified private mobile services licensees that have levels of

alien ownership or control that would be prohibited when these

licensees assume CMRS status must already have filed a petition seeking

to have such interests grandfathered.

2. Regulatory Classification of EA Licensees

50. In the CMRS Second R&O, the Commission determined that SMR

licensees would be classified as CMRS if they offered interconnected

service and as PMRS if they did not offer such service. In the Further

Notice, the Commission indicated its view that most, if not all, EA

licensees will be classified as CMRS, because they are likely to

provide interconnected service as part of their service offering. As a

result, the Commission proposed to classify all EA licensees

presumptively as CMRS providers. The Commission also proposed that EA

applicants or licensees who do not intend to provide CMRS service would

be able to overcome this presumption by demonstrating that their

service does not fall within the CMRS definition. The Commission

further proposed that the statutory grandfathering period also would

apply with respect to the operation of this presumption. As a result,

entities licensed in the SMR service as of August 10, 1993, would not

be subject to CMRS regulation, other than foreign ownership

restrictions, until August 10, 1996.

51. The Commission reiterates its conclusion that EA licensees will

be classified presumptively as CMRS providers. The Commission also

concluded that EA applicants and licensees, like other CMRS providers

(such as broadband PCS applicants and licensees), will be able to

overcome this presumption if they demonstrate that their service does

not fall within the CMRS definition provided in Section 332(d)(1) of

the Communications Act.

G. Redesignation of Other 800 MHz Spectrum--General Category Channels

and Inter-Category Sharing

52. Currently, 800 MHz SMR systems may be licensed on the General

Category channels or licensed under its inter-category sharing rules on

100 channels in the Industrial/Land Transportation and Business

Categories (collectively, ``Pool Channels''). In the Further Notice,

the Commission indicated that although it believes that SMR licensees

with existing operations on the General Category or Pool Channels

should be allowed to operate on such channels, the Commission also

believes that some restriction on future SMR applications for General

Category or Pool Channels might be appropriate.

1. General Category Channels

53. In the Further Notice, the Commission asked commenters to

address whether the entire General Category or some portion thereof

should be designated for future licensing exclusively to SMR

applicants. The Commission's licensing records indicate that the

overwhelming majority of General Category channels are used for SMR as

opposed to non-SMR service. As a result, the Commission concludes that

the demand for additional spectrum by SMR providers is significantly

greater than the demand by non-SMR services. In addition, given the

already extensive licensing on the upper 10 MHz block and the mandatory

relocation established in this First R&O, as part of its wide-area

licensing for the 800 MHz SMR service, the Commission expects that

demand for additional SMR spectrum will increase, as EA licensees seek

frequencies for relocation of incumbents. The Commission believes that

by prohibiting SMR eligibility on the Pool Channels it will relieve

much of the pressure on such frequencies. The Commission concludes that

the most efficient use of the General Category channels is to

redesignate them exclusively for SMR use.

2. Inter-Category Sharing

54. In the Further Notice, the Commission noted that the Pool

Channels are intended for non-commercial internal use by Business and

Industrial/Land Transportation licensees, and their availability for

SMR licensees was to be on a limited basis only. After the release of

the Further Notice, the Bureau placed a freeze on inter-category

sharing.

55. The Commission is concerned that continuing to allow SMR

applications for the Pool Channels could cause a scarcity of

frequencies for PMRS uses. Specifically, if these channels remain

available to SMR licensees, but are not subject to auctions, demand for

the channels by SMR applicants seeking to avoid auctions may render

them unavailable to other eligible Part 90 services. Thus, the

Commission revises current eligibility rules for inter-category sharing

of the Pool Channels to eliminate the risk of SMR encroachment on

spectrum allocated for PMRS purposes. SMR licensees no longer will be

eligible to apply for Pool Channels on an inter-category sharing basis.

56. In light of its elimination of SMR eligibility for the Pool

Channels, the Commission concludes that non-SMR licensees no longer

will be eligible for SMR channels, including the General Category

channels. With respect to the upper 10 MHz block, the Commission

concludes that non-SMR incumbent licensees, like SMR incumbent

licensees, will receive the operational rights extended to incumbents

and will be subject to the mandatory relocation mechanism.

III. Eighth Report and Order

A. Auctionability of the Upper 10 MHz Block of 800 MHz SMR Spectrum

57. Section 309(j) of the Communications Act, permits auctions only

where: (1) mutually exclusive applications for initial licenses or

construction permits are accepted for filing by the Commission; (2) the

principal use of the spectrum will involve or is reasonably likely to

involve the receipt by the licensee of compensation from subscribers in

return for enabling those subscribers to receive or transmit

communications signals; and, (3) the objectives set forth in Section

309(j)(3) would be promoted.

58. In the Second Report and Order in PP Docket No. 93-253, 59 FR

22980 (May 4, 1994) (Competitive Bidding Second R&O), the Commission

concluded that SMR as a class of service, including 800 MHz SMR, would

satisfy the Section 309(j) criteria for auctionability. The Commission

noted that its rules explicitly contemplate and expect that SMR

licensees will provide service to eligible subscribers for

compensation. The Commission concluded that the use of competitive

bidding will speed the development and rapid deployment of SMR service,

including service in rural areas, with minimal administrative or

judicial

[[Page 6145]]

delays, as required by Section 309(j)(3)(A). The Commission also

determined that competitive bidding would promote the objectives of

Section 309(j)(3)(C) in the SMR service by recovering for the public a

portion of the value of SMR spectrum made available for commercial use,

and avoiding unjust enrichment.

59. In the CMRS Third R&O, the Commission concluded that it

generally should use competitive bidding procedures to select among

mutually exclusive CMRS applications where it has the authority to do

so and where the Commission find such processing to be in the public

interest. The Commission specifically concluded that competitive

bidding procedures should be used to select between mutually exclusive

initial applications in the 800 MHz SMR service. The Commission also

concluded that, because the number of mutually exclusive applications

in future licensing in the 800 MHz SMR service may be considerable, the

use of competitive bidding will ensure that the qualified applicants

who place the highest value on the available spectrum will prevail in

the selection process.

60. The Commission reiterates its conclusion that competitive

bidding is an appropriate licensing tool for the 800 MHz SMR service.

The Commission emphasizes that the use of auctions will apply only to

issuance of initial licenses in the upper 10 MHz block, the EA

licenses. These EA licenses previously have not been issued by the

Commission, and include certain rights and obligations that previously

were not granted to or required of licensees. Significantly, its

granting of these EA licenses does not affect rights afforded to

licensees under existing authorizations, because incumbent licensees

will be able to continue to operate their systems. Even though

incumbents will be subject to mandatory relocation under certain

circumstances, their existing operations will be protected.

Furthermore, auctions will be used only in the event that there are

competing applications for the same EA license.

61. The Commission concludes that use of competitive bidding in the

upper 10 MHz block is authorized by Section 309(j) of the

Communications Act. The Commission affirmed its previous conclusion

that 800 MHz SMR, as a service, satisfies the criteria set forth by

Congress for determining when competitive bidding should be used. SMR

licenses are used to provide service to subscribers for compensation,

so a precondition to competitive bidding under Section 309(j)(2)(A) is

met. Moreover, competitive bidding will further the public interest

requirements of Section 309(j)(3), by promoting rapid development of

service, fostering competition, recovering a portion of the value of

the spectrum for the public, and encouraging efficient spectrum use.

Where competitive bidding is utilized, a diverse group of entities,

including incumbent licensees and potential new entrants, will be able

to participate in the auction process, because the Commission has

decided not to restrict eligibility for these EA licenses, an outcome

which furthers the goals of Section 309(j)(3)(B) of the Communications

Act.

62. Additionally, the Commission believes that competitive bidding

procedures will minimize administrative or judicial delays in

licensing, particularly when compared to other licensing alternatives--

comparative hearings, lotteries (which specifically are prohibited

since the 800 MHz SMR service is auctionable), or first-come, first-

served procedures. The Commission employed first-come, first-served

procedures in the 800 MHz SMR service prior to its implementation of

the Budget Act. The Commission's experience is that such procedures

have resulted in processing delays. By contrast, the Commission expects

that use of competitive bidding will allow interested parties to obtain

expeditious access to 800 MHz SMR spectrum and to use such spectrum

efficiently. The Commission concludes that this result furthers both

Section 309(j)(3)(A) and Section 309(j)(3)(D) of the Communications

Act.

63. The Commission disagrees with those commenters who argue that

the Commission's competitive bidding authority does not extend to

existing services. Section 309(j) of the Communications Act does not

distinguish between new services (such as PCS) and existing services in

terms of whether initial licenses in a given service should be subject

to competitive bidding. Accordingly, the Commission concludes that its

determination that the 800 MHz SMR service is auctionable is fully

consistent with Section 309(j) of the Communications Act.

B. Competitive Bidding Methodology for Upper 10 MHz Block

1. Competitive Bidding Design

64. Simultaneous Multiple Round Auctions. Based on the record in

this proceeding and the Commission's successful experience conducting

simultaneous multiple round auctions for other CMRS services (e.g.,

narrowband and broadband PCS), the Commission believes a simultaneous

multiple round auction is the most appropriate competitive bidding

design for the 10 MHz upper block of 800 MHz SMR spectrum. The

Commission has developed and successfully conducted auctions with

software capable of handling numerous licenses in a simultaneous

multiple round auction. Thus, this methodology will afford the

Commission administrative convenience and enable it to hold an auction

quickly and efficiently. For certain bidders, the value of these

licenses will be significantly interdependent because of the

desirability of aggregation across geographic regions. Given this high

degree of interdependency among licenses, the Commission rejects SBA's

suggestion that single round sealed bidding is a more appropriate

competitive bidding design for licensing the upper 10 MHz SMR spectrum

blocks. The Commission believes that simultaneous multiple round

bidding will generate more information about license values during the

course of the auction and provide bidders with more flexibility to

pursue back-up strategies, than if the licenses were auctioned

separately or through sealed bidding. As the Commission decided in the

900 MHz SMR service, the Bidder Information Package for the 10 MHz

upper block licenses will provide all the information about incumbent

licensees that is available in its licensing records as of 60 days

prior to the filing deadline for participation in the auction. In this

connection, upon release of the Public Notice announcing the date of

the auction for the upper 10 MHz block of 800 MHz SMR spectrum, all

pending applications for frequencies within this spectrum will be

returned without prejudice to the applicants. These applicants then

will be able to seek licenses for these frequencies through the

competitive bidding process. In addition, the Commission encourages all

potential bidders to examine these records carefully and do their own

independent investigation regarding existing licensees' operations in

each EA in which they intend to bid in order to maximize their success

in the auction. The Commission will hold a seminar for prospective

bidders to acquaint them with this competitive bidding design. The

Commission will announce the date and location for such seminar by

Public Notice. The Commission concludes, therefore, that simultaneous

multiple round bidding is most likely to award licenses to the bidders

who value them the most highly and to provide bidders with the greatest

likelihood of obtaining the license

[[Page 6146]]

combinations that best satisfy their service needs.

65. Stopping Rules. The Commission will adopt a simultaneous

stopping rule for the upper 10 MHz block 800 MHz SMR auction. The

simultaneous stopping rule is designed to allow bidders to decide how

long the auction will run, based on bidding strategy and demand for

each license. Under a simultaneous stopping rule, bidding will remain

open on all licenses in an auction until bidding stops on every

license. In this Eighth R&O, the Commission concludes that the

substitutability between licenses within the same EA and the ability to

pursue back-up strategies support the use of a simultaneous stopping

rule.

66. As a result, the upper 10 MHz block 800 MHz SMR auction will

close after one round passes in which no new valid bids or proactive

activity rule waivers are submitted. The Commission retains the

discretion to keep the auction open even if no new acceptable bids and

no proactive waivers are submitted in a single round. In the event that

the Commission exercise this discretion, the effect will be the same as

if a bidder has submitted a proactive waiver. The Commission also

retains the discretion to announce market-by-market closings.

67. The Commission further retains the discretion to declare after

40 rounds that the auction will end after some specified number of

additional rounds. Bids will be accepted only on licenses where the

high bid has increased in the last three rounds. This will deter

bidders from continuing to bid on a few low value licenses solely to

delay the closing of the auction. It also will enable the Commission to

end the auction when it determines that the benefits of terminating the

auction and issuing licenses exceed the likely benefits of continuing

to allow bidding. The Commission will announce by Public Notice the

number of remaining rounds and other final bidding procedures. In this

Eighth R&O, the Commission delegates authority to the Bureau to issue

such Public Notices.

68. Activity Rules. In the Further Notice, the Commission proposed

that if simultaneous multiple round auctions are used for the upper 10

MHz block, the Commission would use activity rules the same as or

similar to those used in simultaneous multiple round bidding for MTA-

based PCS licenses. The Commission has used the Milgrom-Wilson activity

rule to award broadband and narrowband PCS licenses. In the Competitive

Bidding Fifth R&O, the Commission permitted broadband PCS bidders one

``automatic'' waiver from the activity rule during each stage of an

auction. An automatic waiver is exercised by the Commission if a bidder

fails to bid and fails to submit a ``proactive'' waiver, unless the

bidder chooses to override the automatic waiver process to

intentionally decrease eligibility: a ``proactive'' waiver is one which

can be submitted by the bidder when it chooses not to bid in a round

and wishes to maintain its current eligibility level. With respect to

broadband PCS auctions, the Commission initially determined that only

proactive waivers, and not automatic waivers, would keep an auction

open. In that context, however, the Commission later modified the rule

by retaining the discretion to keep an auction open even if no new

acceptable bids and no proactive waivers are submitted in a single

round. The Commission will employ the Milgrom-Wilson activity rule in

conjunction with the simultaneous stopping rule. Under the Milgrom-

Wilson approach, the minimum activity level, measured as a fraction of

the bidder's eligibility in the current round, increases during the

course of the auction. The three-stage Milgrom-Wilson approach

encourages bidders to participate in early rounds by limiting their

maximum participation to some multiple of their minimum participation

level.

69. Absent waivers, a bidder's eligibility (in terms of activity

units) in the current round is determined by the bidder's activity

level and eligibility in the previous round. In the first round,

however, eligibility is determined by the bidder's upfront payment and

is equal to the upfront payment divided by $0.02 per activity unit.

70. In each round of Stage I, a bidder who wishes to maintain its

current eligibility must be active on licenses encompassing at least

one-half (50 percent) of the activity units for which it currently is

eligible. Failure to maintain the requisite activity level will result

in a reduction in the amount of activity units upon which a bidder will

be eligible to bid in the next round of bidding (unless an activity

rule waiver is used). During Stage I, if bidding activity is below the

required minimum level, eligibility in the next round will be

calculated by multiplying the current round activity by two.

Eligibility for each applicant in the first round of the auction is

determined by the amount of the upfront payment received and the

licenses identified in its auction application. In each round of Stage

II, a bidder who wishes to maintain its current eligibility in the next

round is required to be active on at least 75 percent of the activity

units for which it is eligible in the current round. During Stage II,

if activity is below the required minimum level, eligibility in the

next round will be calculated by multiplying the current round activity

by four-thirds (\4/3\). In each round of Stage III, a bidder who wishes

to maintain its current eligibility must be active on licenses

encompassing at least 95 percent of the activity units for which it is

eligible in the current round. In Stage III, if activity in the current

round is below 95 percent of current eligibility, eligibility in the

next round will be calculated by multiplying the current round activity

by twenty nineteenths (\20/19\). The Commission reserve the discretion

to set and, by announcement before or during the auction, vary the

requisite minimum activity levels (and associated eligibility

calculations) for each auction stage. Retaining this flexibility will

improve the Commission's ability to control the pace of the auction and

help ensure that the auction is completed within a reasonable period of

time.

71. As in prior auctions, the Commission will determine the

transition from one stage to the next in the 800 MHz SMR auction by the

aggregate level of bidding activity, subject to its discretion. The

transition rule also may be defined in terms of the ``auction activity

level''--the sum of activity units of those licenses whose high bid

increased in the current round, as a percentage of the total activity

units of all licenses in that auction. The auction will start in Stage

I and move to Stage II when the auction activity level is below ten

percent for three consecutive rounds in Stage I. The auction will move

from Stage II to Stage III when the auction activity level is below

five percent for three consecutive rounds in Stage II. In no case can

the auction revert to an earlier stage. The Commission retains the

discretion, however, to determine and announce during the course of an

auction when, and if, to move from one auction stage to the next. These

determinations will be based on a variety of measures of bidder

activity including, but not limited to, the auction activity level

defined above, the percentage of licenses (measured in terms of

activity units) on which there are new bids, the number of new bids,

and the percentage increase in revenue.

72. To avoid the consequences of clerical errors and to compensate

for unusual circumstances that might delay a bidder's bid preparation

or submission on a particular day, the Commission will provide bidders

with five activity rule waivers that may be used in any round during

the course of the auction.

[[Page 6147]]

If a bidder's activity level is below the required activity level a

waiver automatically will be applied. That is, if a bidder fails to

submit a bid in a round, and its activity level from any ``standing''

high bids (i.e., high bids at the end of the bid withdrawal period in

the previous round) falls below its required activity level, a waiver

automatically will be applied. A waiver will preserve current

eligibility in the next round, but cannot be used to correct an error

in the bid amount. An activity rule waiver applies to an entire round

of bidding and not to a particular EA service area.

73. Bidders will be afforded an opportunity to override the

automatic waiver mechanism when they place a bid, if they wish to

reduce their bidding eligibility and do not want to use a waiver to

retain their eligibility at its current level. If a bidder overrides

the automatic waiver mechanism, its eligibility permanently will be

reduced, and it will not be permitted to regain its bidding eligibility

from a previous round. An automatic waiver invoked in a round in which

there are no valid bids will not keep the auction open. Bidders will

have the option to enter a ``proactive'' waiver during the bid

submission period. If a bidder submits a proactive waiver in a round in

which no other bidding activity occurs, the auction will remain open.

74. The Commission retains the discretion to issue additional

waivers during the course of an auction for circumstances beyond a

bidder's control. The Commission also retains the flexibility to

adjust, by Public Notice prior to an auction, the number of waivers

permitted, or to institute a rule that allows one waiver during a

specified number of bidding rounds or during specified stages of the

auction. In this Eighth Report and Order, the Commission delegated to

the Bureau the discretion to issue additional waivers or restrict the

use of such waivers.

2. License Grouping

75. In the Further Notice, the Commission tentatively concluded

that if simultaneous multiple round auctions were used for the 800 MHz

SMR wide-area spectrum blocks, the wide-area licenses covering these

spectrum blocks should be auctioned simultaneously, because of the

relatively high value and significant interdependence of the licenses.

76. The Commission believes that the licenses for the upper 10 MHz

band are significantly interdependent. The Commission believes that

grouping interdependent licenses and putting them up for bid at the

same time will facilitate awarding licenses to bidders who value them

most highly by providing bidders with information about the prices of

complementary and substitutable licenses during the course of an

auction. Because potential bidders may be interested in aggregating

spectrum across geographic areas as well as across spectrum blocks, the

Commission disagrees with Cellcall's suggestion to auction each

geographic area individually. As a result, the Commission concludes

that all EA licenses for the upper 10 MHz block should be auctioned

simultaneously. The Commission further concludes that holding a single

auction for all 176 EAs in the 800 MHz SMR band will be the fairest,

fastest, and most efficient means of distributing these licenses.

3. Bidding Issues for Upper 10 MHz Block of 800 MHz SMR Spectrum

77. Bidding Procedures. In the Further Notice, the Commission

proposed that if simultaneous multiple round auctions are used for

wide-area SMR licenses, the Commission would use the same or similar

bidding procedures to those used in simultaneous multiple round bidding

for broadband PCS licenses. The Commission adopts the same bidding

procedures used for MTA-based PCS licenses. Under these procedures,

bidders will be able to submit bids via remote bidding, using special

bidding software, or via telephone. The Commission has established a

schedule of fees that participants in the competitive bidding process

will be assessed for certain on-line computer services, bidding

software, and for Bidder Information Packages. In addition, bidders

will be permitted to bid electronically only if they have filed a

short-form application electronically. Bidders who file their short-

form manually may bid only telephonically. When submitting bids

telephonically, bidders may utilize the Internet to learn the round-by-

round results of the auction. Online services such as CompuServe,

Prodigy, and America Online provide Internet access at a reasonable

cost. Bidders also may, at negligible cost, use a computerized bulletin

board service, accessible by telephone lines, from which auction

results can be downloaded to a personal computer. The Commission

intends to hold a seminar for prospective bidders to acquaint them with

these bidding procedures.

78. Bid Increments. In the Further Notice, the Commission proposed

that if simultaneous multiple round auctions are used for the upper 10

MHz block, the Commission would use the same or similar procedures for

bid increments as those used in simultaneous multiple round bidding for

MTA-based PCS licenses.

79. The Commission will announce, by Public Notice prior to the

auction, the general guidelines for bid increments. The Commission

retains the discretion to set and, by announcement before or during the

auction, vary the minimum bid increments for individual licenses or

groups of licenses over the course of the auction.

80. Duration of Bidding Rounds. In simultaneous multiple round

auctions, the Commission recognize that bidders may need a significant

amount of time to evaluate back-up strategies and develop their bidding

plans. The Commission delegated to the Bureau the discretion to vary

the duration of the bidding rounds or the interval at which bids are

accepted (e.g., to run more than one round per day) in order to move

the auction to closure more quickly. The Bureau will announce any

changes to the duration of and intervals between bidding rounds, either

by Public Notice prior to the auction or by announcement during the

auction.

4. Procedural and Payment Issues

81. Pre-Auction Application Procedures. In the Competitive Bidding

Second R&O, the Commission determined that it should require only a

short-form application (FCC Form 175) prior to auction, and that only

winning bidders should be required to submit a long-form license

application (FCC Form 600) after the auction. In this connection, the

Commission determined that such a procedure would fulfill the statutory

requirements and objectives and adequately protect the public interest.

In the Further Notice, the Commission proposed to treat all wide-area

applicants as initial applicants for public notice, application

processing, and competitive bidding purposes, regardless of whether

they already are incumbent licensees in the 800 MHz band. In addition

in the Further Notice, the Commission proposed to require applicants

for wide-area SMR licenses to file an initial ``short-form''

application in order to qualify for competitive bidding.

82. The Commission will extend the pre-auction application

procedures established in the Competitive Bidding Second R&O to the

competitive bidding process for the upper 10 MHz block. With respect to

the definition of ``initial'' application in the upper 10 MHz block of

800 MHz SMR spectrum, the Commission believes that the most appropriate

basis for this determination is an evaluation of the nature of the EA

license. As EA licensees will gain use of

[[Page 6148]]

a large geographic area and the freedom to locate base stations

anywhere within that larger geographic region, they differ from the

existing 800 MHz SMR licensees that essentially are confined to smaller

geographic areas, are site-specific, and do not encompass a large

number of frequencies. Accordingly, the Commission will treat all EA

applicants as initial applicants for public notice, application

processing, and auction purposes, regardless of whether they already

are incumbent operators.

83. Prior to the start of the 800 MHz SMR auction, the Commission

will release an initial Public Notice announcing the auction. The

initial Public Notice will specify the licenses to be auctioned and the

time and place of the auction in the event that mutually exclusive

applications are filed. The Public Notice will specify the method of

competitive bidding to be used, applicable bid submission procedures,

stopping rules, activity rules, the deadline by which short-form

applications must be filed, and the amounts and deadlines for

submitting upfront payments. The Commission will not accept

applications filed before or after the dates specified in the Public

Notice. Applications submitted before the release of the Public Notice

will be returned as premature. Likewise, applications submitted after

the deadline specified by the Public Notice will be dismissed, with

prejudice, as untimely.

84. Soon after the release of the initial Public Notice, a Bidder

Information Package will be made available to prospective bidders. The

Bidder Information Package for the 800 MHz SMR service will contain

information on the incumbents occupying blocks on which bidding will be

available.

85. Section 309(j)(5) provides that no party may participate in an

auction ``unless such bidder submits such information and assurances as

the Commission may require to demonstrate that such bidder's

application is acceptable for filing.'' Moreover, ``[n]o license shall

be granted to an applicant selected pursuant to this subsection unless

the Commission determines that the applicant is qualified pursuant to

Section 309(a), Section 308(b), and Section 310'' of the Communications

Act. As the legislative history of Section 309(j) makes clear, the

Commission may require that bidders' applications contain all

information and documentation sufficient to demonstrate that the

application is not in violation of the Commission's rules, and the

Commission will dismiss applications not meeting those requirements

prior to the auction.

86. Thus, all bidders will be required to submit short-form

applications on FCC Form 175 (and FCC Form 175-S, if applicable), by

the date specified in the initial Public Notice. Applicants are

encouraged to file FCC Form 175 electronically. Detailed instructions

regarding electronic filing will be contained in the Bidder Information

Package. Those applicants filing manually will be required to submit

one paper original and one diskette original of their application, as

well as two diskette copies. In addition, applicants filing manually

will not be permitted to bid electronically. The short-form

applications will require applicants to provide the information

required by Section 1.2105(a)(2) of the Commission's rules.

Specifically, each applicant will be required to specify on its FCC

Form 175 application certain identifying information, including its

status as a designated entity, its classification (i.e., individual,

corporation, partnership, trust, or other), the EAs and spectrum blocks

for which it is applying, and, assuming that the licenses will be

auctioned, the names of persons authorized to place or withdraw a bid

on its behalf. The Commission requests applicants indicate their

designated entity status in order to assist us in analyzing the

applicant pool and the auction results to determine whether the

Commission has accomplished substantial participation by minorities,

women, small businesses, and rural telephone companies. In this

connection, the Commission notes that Section 309(j) of the

Communications Act requires us to prepare a report on the participation

of designated entities in the auction and in the provision of spectrum-

based services.

87. As the Commission indicated in the Competitive Bidding Second

R&O, if it receives only one application that is acceptable for filing

for a particular license, and thus there is no mutual exclusivity, the

Commission will issue a Public Notice cancelling the auction for this

license and establishing a date for the filing of a long-form

application, the acceptance of which will trigger the procedures

permitting petitions to deny. If no petitions to deny are filed, the

application will be grantable after 30 days. By ensuring that bidders

and license winners are serious, qualified applicants, these rules will

minimize the need to re-auction licenses and will prevent delays in the

provision of 800 MHz SMR service to the public. In response to those

commenters concerned about the ability of unsuccessful bidders to

participate in geographic-area licensing, the Commission reiterated its

decision in the First R&O that incumbents, post-auction, will be able

to trade-in their multiple licenses for a single authorization in a

particular area, provided certain conditions are satisfied.

88. Amendments and Modifications. The Commission will adopt the

following procedures for amendments to and modifications of short-form

applications in the 800 MHz SMR service. Upon reviewing the short-form

applications, the Commission will issue a Public Notice listing all

defective applications, and applicants with minor defects will be given

an opportunity to cure them and resubmit a corrected version. By the

resubmission date, all applicants will be required to submit an upfront

payment to the Commission, as discussed below, to the Commission's

lock-box by the date specified in the Public Notice, which should be no

later than 14 days before the scheduled auction. After the Commission

receives from its lock-box bank the names of all applicants who have

submitted timely upfront payments, the Commission will issue a second

Public Notice announcing the names of all applicants that have been

determined to be qualified to bid. An applicant who fails to submit a

sufficient upfront payment to qualify it to bid on any license being

auctioned will not be identified on this Public Notice as a qualified

bidder. Each applicant listed on this Public Notice will be issued a

bidder identification number and further information and instructions

regarding auction procedures.

89. On the date set for submission of corrected applications,

applicants that on their own have discovered minor errors in their

applications (e.g., typographical errors, incorrect license

designations, etc.) will be permitted to file corrected applications.

The Commission also will waive the ex parte rules as they apply to the

submission of amended short-form applications for the 800 MHz SMR

auctions, to maximize applicants' opportunities to seek Commission

staff advice on making such amendments. Applicants will not be

permitted to make any major modifications to their applications,

including, but not limited to, changes in license areas and changes in

control of the applicant, or additions of other bidders into the

bidding consortia, until after the auction. Applicants also may modify

their short-form applications to reflect formation of consortia or

changes in ownership at any time before or during an auction, provided

such changes will not result in a change in de jure or de facto control

of the applicant,

[[Page 6149]]

and provided that the parties forming consortia or entering into

ownership agreements have not applied for licenses in any of the same

geographic license areas, i.e., EAs. In addition, applications that are

not signed will be dismissed as unacceptable for filing, as will

applications in which no market designations are made.

90. In addition, a single member of a bidding consortium may

withdraw from a consortium only in a particular EA(s), but otherwise

remain in the consortium for purposes of bidding on all other markets

specified on the short-form application. However, such arrangements to

assign the member's interests in particular licenses to other

consortium members after the auction must be disclosed on an original

or amended short-form application, and a request to transfer or assign

the license also must be filed in conjunction with the long-form

application.

5. Upfront Payments

91. In the Competitive Bidding Second R&O, the Commission

established a minimum upfront payment of $2,500 and stated that this

amount could be modified on a service-specific basis. In the Further

Notice, the Commission proposed to require 800 MHz SMR auction

participants to tender in advance to the Commission a substantial

upfront payment, $0.02 per activity unit for the largest combination of

activity units on which a bidder anticipates bidding in any round, as a

condition of bidding in order to ensure that only serious, qualified

bidders participate in auctions, and to ensure payment of the monetary

assessment in the event of bid withdrawal or default. The Commission

also sought comment on the upfront payment formula and minimum upfront

payment most appropriate for the 800 MHz SMR service.

92. The Commission adopts the standard $0.02 per activity unit

formula to calculate the upfront payment. The Commission also adopts a

minimum upfront payment of $2,500 for the 800 MHz SMR service. In the

initial Public Notice issued prior to the auction, the Commission will

announce population information corresponding to each license and the

upfront payment amount for each EA license. In general, population

coverage for each channel block in each EA will be based on a formula

that takes into account the presence of incumbent licensees.

93. Upfront payments will be due by a date specified by Public

Notice, but generally no later than 14 days before a scheduled auction.

Each qualified bidder will be issued a bidder identification number and

further information and instructions regarding the auction procedures.

During the auction, bidders will be required to provide their bidding

identification numbers when submitting bids.

6. Down Payments and Full Payments

94. Down Payments. In the Competitive Bidding Second R&O, the

Commission generally required successful bidders to tender a 20 percent

down payment on their bids to discourage default between the auction

and licensing, and to ensure payment of the monetary assessment if such

default occurs. In the Further Notice, the Commission proposed to

require the winning bidders for 800 MHz SMR licenses to supplement

their upfront payments with a down payment sufficient to bring their

total deposits up to 20 percent of their winning bid(s).

95. The Commission concludes that winning bidders must supplement

their upfront payments with a down payment sufficient to bring their

total deposits up to 20 percent of their winning bid(s). If the upfront

payment already tendered by a winning bidder, after deducting any bid

withdrawal and default payments due, amounts to 20 percent or more of

its winning bids, no additional deposit will be required. If the

upfront payment amount on deposit is greater than 20 percent of the

winning bid amount after deducting any bid withdrawal and default

payments due, the additional monies will be refunded. If a bidder has

withdrawn a bid or defaulted, but the amount of the payment cannot yet

be determined, the bidder will be required to make a deposit of 20

percent of the amount bid on such licenses. When it becomes possible to

calculate and assess the payment, any excess deposit will be refunded.

Upfront payments will be applied to such deposits, and to bid

withdrawal and default assessments due, before being applied toward the

bidder's down payment on licenses the bidder has won and seeks to

acquire.

96. The Commission also will require winning bidders to submit the

required down payment by cashier's check or wire transfer to its lock-

box bank by a date and time to be specified by Public Notice, generally

within five business days following the close of bidding. The

Commission will hold the down payment until the high bidder is awarded

the license and has paid the remaining balance due on such license, or

until the winning bidder is found unqualified to be a licensee or has

defaulted, in which case it will be returned, less applicable monetary

assessments. All auction winners generally will be required to make

full payment of the balance of their winning bids within five business

days following Public Notice that the Commission is prepared to award

the license. The Commission generally will grant uncontested licenses

within ten business days after receiving full payment. During the

period that deposits are held pending the ultimate award of the

license, the interest that accrues, if any, will be retained by the

U.S. Treasury.

97. Long-Form Applications. The Commission will follow these

procedures if the winning bidder makes the down payment in a timely

manner: A long-form application filed on FCC Form 600 must be filed by

a date specified by Public Notice, generally within ten business days

after the close of bidding. After the Commission receives the winning

bidder's down payment and long-form application, the Commission will

review the long-form application to determine if it is acceptable for

filing. Upon acceptance for filing of the long-form application, the

Commission will issue a Public Notice announcing this fact, triggering

the filing window for petitions to deny. If the Commission denies all

petitions to deny, and otherwise is satisfied that the applicant is

qualified, the license(s) will be granted to the auction winner.

98. Petitions to Deny and Limitations on Settlements. A party

filing a petition to deny against an 800 MHz SMR application will be

required to demonstrate standing and meet all other applicable filing

requirements. The restrictions in Section 90.162 were established to

prevent the filing of speculative applications and pleadings (or

threats of the same) designed to extract money from 800 MHz SMR

applicants. Thus, the Commission will limit the consideration that an

applicant or petitioner is permitted to receive for agreeing to

withdraw an application or petition to deny to the legitimate and

prudent expenses of the withdrawing applicant or petitioner.

99. With respect to petitions to deny, the Commission need not

conduct a hearing before denying an application if it determines that

an applicant is not qualified and no substantial and material issue of

fact exists concerning that determination. In the event the Commission

identifies substantial and material issues of fact, Section 309(i)(2)

of the Communications Act permits the submission of all or part of

evidence in written form in any hearing and allows employees other than

administrative law judges to preside over the taking of written

evidence.

[[Page 6150]]

100. Bid Withdrawal, Default, and Disqualification. In the Further

Notice, the Commission proposed to adopt bid withdrawal, default, and

disqualification rules for the 800 MHz SMR service, based on the

procedures established in its general competitive bidding rules.

101. The Commission believes that forfeiture of the entire upfront

payment is too extreme for the bidder who withdraws only one bid. Since

commenters have not stated why the 800 MHz SMR service differs in this

respect from the narrowband and broadband PCS services, there is no

justification for departing from the already tested narrowband and

broadband PCS withdrawal, default, and disqualification assessments.

Therefore, the Commission believes applying Section 1.2104(g)(1) of its

Rules to the 800 MHz SMR auction is more equitable and is consistent

with its practice in prior auctions. Section 1.2104(g)(1) provides that

any bidder that withdraws a high bid during an auction before the

Commission declares bidding closed will be required to reimburse the

Commission in the amount of the difference between its high bid and the

amount of the winning bid the next time the license is offered by the

Commission, if this subsequent winning bid is lower than the withdrawn

bid.

102. If a license is re-offered by auction, the ``winning bid''

refers to the high bid in the auction in which the license is re-

offered. If a license is re-offered in the same auction, the winning

bid refers to the high bid amount, made subsequent to the withdrawal,

in that auction. If the subsequent high bidder also withdraws its bid,

that bidder will be required to pay an assessment equal to the

difference between its withdrawn bid and the amount of the subsequent

winning bid the next time the license is offered by the Commission. If

a license which is the subject of withdrawal or default is not re-

auctioned, but instead is offered to the highest losing bidders in the

initial auction, the ``winning bid'' refers to the bid of the highest

bidder who accepts the offer. Losing bidders will not be required to

accept the offer, i.e., they may decline without penalty. The

Commission wish to encourage losing bidders in simultaneous multiple

round auctions to bid on other licenses, and therefore the Commission

will not hold them to their losing bids on a license for which a bidder

has withdrawn a bid or on which a bidder has defaulted.

103. After bidding closes, the Commission will apply Section

1.2104(g)(2) of its Rules to assess a defaulting auction winner an

additional payment of three percent of the subsequent winning bid or

three percent of the amount of the defaulting bid, whichever is less.

The additional three percent payment is designed to encourage bidders

who wish to withdraw their bids to do so before bidding ceases. The

Commission will hold deposits made by defaulting or disqualified

auction winners until full payment is made. In the unlikely event that

there is more than one bid withdrawal on the same license, the

Commission will hold each withdrawing bidder responsible for the

difference between its withdrawn bid and the amount of the winning bid

the next time the licenses are offered for auction by the Commission.

104. These payment requirements will discourage default and ensure

that bidders meet all eligibility and qualification requirements. If a

default or disqualification involves gross misconduct,

misrepresentation or bad faith by an applicant, the Commission may

declare the applicant and its principals ineligible to bid in future

auctions, and may take any other action that it deems necessary,

including institution of proceedings to revoke any existing licenses

held by the applicant.

105. If the EA license winner defaults, is otherwise disqualified

after having made the required down payment, or the license is

terminated or revoked, then the Commission will re-auction the license.

If the default occurs within five business days after the bidding has

closed, the Commission retains the discretion to offer the license to

the second highest bidder at its final bid level, or if that bidder

declines the offer, to offer the license to other bidders (in

descending order of their bid amounts) at the final bid levels. If only

a short time has passed since the initial auction, the Commission may

choose to offer the license to the highest losing bidders if the cost

of running another auction exceeds the benefits.

7. Regulatory Safeguards

106. Rules Prohibiting Collusion. The Commission's rules prevent

parties from agreeing in advance to bidding strategies that divide the

market according to their strategic interests and/or disadvantage other

bidders. Bidders will be required to (i) disclose all parties with whom

they have entered into any agreement that relates to the competitive

bidding process, and (ii) certify they have not entered into any

explicit or implicit agreements, arrangements, or understandings with

any parties, other than those identified, regarding the amount of their

bid, bidding strategies, particular properties on which they will or

will not bid or any similar agreement.

107. The Commission will subject 800 MHz SMR licensees to the

reporting requirements and rules prohibiting collusion embodied in

Sections 1.2105 and 1.2107 of the Commission's rules. Bidders will be

required by Section 1.2105(a)(2) to identify on their FCC Form 175

applications all parties with whom they have entered into any

consortium arrangements, joint ventures, partnerships or other

agreements or understandings which relate to the competitive bidding

process. If parties agree in principle on all material terms, those

parties must be identified on the short-form application, even if the

agreement has not been reduced to writing. Only at such level of

agreement can it be fairly stated that the parties have entered into a

bidding consortium or other joint bidding arrangement. If the parties

have not agreed in principle by the short-form filing deadline, an

applicant would not include the names of those parties on its

application, and may not continue negotiations with those parties.

Bidders will be required to certify that they have not entered and will

not enter into any explicit or implicit agreements, arrangements or

understandings with any parties, other than those identified, regarding

the amount of their bid, bidding strategies or the particular

properties on which they will or will not bid. In this connection, any

communications between EA bidders and incumbent licensees should take

place prior to the deadline for filing FCC Form 175 applications.

108. After the FCC Form 175 filing deadline, applicants may not

discuss the substance of their bids or bidding strategies with bidders,

other than those identified on their FCC Form 175 application, that are

bidding in the same license areas, i.e., EAs. This prohibition on

discussions extends to providing indirect information that affects bids

or bidding strategy. For example two applicants not listed on each

other's FCC Form 175 applications for the 800 MHz SMR auctions may not

discuss bids or bidding strategies with each other if they are bidding

for licenses in any of the same EAs, even if they are not bidding for

the same spectrum blocks.

109. Section 1.2105(c) of the Commission's rules, however, provides

certain exceptions to the rule prohibiting discussions with other

applicants after the filing of the short-form application. First,

applicants may make agreements to bid jointly for licenses, so long as

the applicants have not applied for licenses in any of the same license

areas. Second, an applicant

[[Page 6151]]

may modify its short-form application to reflect formation of bidding

agreements or changes in ownership at any time before or during the

auction, as long as the changes do not result in change of de jure or

de facto control of the applicant, and the parties forming the bidding

agreement have not applied for licenses in any of the same license

areas. Finally, a holder of a non-controlling attributable interest in

an applicant may acquire an ownership interest in, or enter into a

bidding agreement with other applicants in the same license area, if

(1) the owner of the attributable interest certifies that it has not

communicated and will not communicate bids or bidding strategies of

more than one of the applicants in which it holds an attributable

interest or with which it has a bidding agreement; and (2) the

arrangements do not result in any change of control of the applicant.

However, once the short-form application has been filed, a party with

an attributable interest in once bidder may not acquire a controlling

interest in another bidder bidding for licenses in any of the same

license areas.

110. Where the applicant does not meet one of these exceptions, it

may not discuss matters relating to bidding with other applicants. Even

when an applicant has withdrawn its application after the short-form

filing deadline, the applicant may not enter into a bidding agreement

with another applicant bidding on authorizations in the license areas

from which the first applicant withdrew.

111. If an applicant has the high bid for a license, Section

1.2107(d) of the Commission's rules requires the applicant to include

with its long-form application a detailed explanation of the terms and

conditions and parties involved in any bidding consortia, joint

venture, partnership or other agreement or arrangement it had entered

into relating to the competitive bidding process prior to the time

bidding was completed. Under the Commission's rules prohibiting

collusion, the term ``applicant'' includes the entity submitting the

application, owners of 5 percent or more of the entity, and all

officers and directors of such entity.

112. The Commission noted that even where the applicant discloses

parties with whom it has reached on agreement on the short-form

application, thereby permitting discussions with those parties, the

applicant nevertheless is subject to existing antitrust laws. As

discussed in the Competitive Bidding Fourth Memorandum Opinion & Order

in PP Docket No. 93-253, 59 FR 53364 (October 24, 1994) (``Competitive

Bidding MO&O''), under the antitrust laws, the parties to an agreement

may not discuss bid prices if they have applied for licenses in the

same license area. In addition, agreements between actual or potential

competitors to submit collusive, non-competitive or rigged bids are per

se violations of Section One of the Sherman Antitrust Act. Further,

actual or potential competitors may not agree to divide territories

horizontally in order to minimize competition, regardless of whether

they split a license area in which they both do business, or whether

they merely reserve one license area for one and another for the other.

113. The Commission noted that where specific instances of

collusion in the competitive bidding process are alleged during the

petition to deny process, the Commission may conduct an investigation

or refer such complaints to the United States Department of Justice for

investigation. Bidders who are found to have violated the antitrust

laws, in addition to any penalties they incur under the antitrust laws,

or who are found to have violated the Commission's rules in connection

with their participation in the auction process may be subject to a

variety of sanctions, including forfeiture of their down payment or

their full bid amount, revocation of their license(s), and may be

prohibited from participating in future auctions.

114. Transfer Disclosure Requirements. In Section 309(j)(4)(E) of

the Communications Act, Congress directed the Commission to ``require

such transfer disclosures and anti-trafficking restrictions and payment

schedules as may be necessary to prevent unjust enrichment as a result

of the methods employed to issue licenses and permits.'' In the

Competitive Bidding Second R&O, the Commission adopted safeguards

designed to ensure that the requirements of Section 309(j)(4)(E) are

satisfied. The Commission decided that it was important to monitor

transfers of licenses awarded by competitive bidding to accumulate the

necessary data to evaluate its auction designs and to judge whether

``licenses [have been] issued for bids that fall short of the true

market value of the license.'' Therefore, the Commission imposed a

transfer disclosure requirement on licenses obtained through the

competitive bidding process, whether such licenses were held by a

designated entity or not. The Commission proposed in the Further Notice

to adopt the transfer disclosure requirements of Section 1.2111(a) of

its Rules to all 800 MHz SMR licenses obtained through the competitive

bidding process.

115. The Commission believes that a three-year holding period is

unnecessary. In other auctionable services, the Commission has required

holding periods only in limited circumstances. For example, the

Commission's broadband PCS rules require those successful bidders

benefitting from special provisions for designated entities to hold

their licenses for a certain period of time and restrict the type of

transfers and assignments of such licenses during that time. The

Commission is not adopting special provisions for designated entities

on the upper 10 MHz block of 800 MHz SMR spectrum. When the Commission

has not established special provisions for designated entities in other

auctionable services, the Commission generally has required only

disclosure of certain information regarding transfers or assignments

within the first three years after initial license grant. The

Commission concludes that this is the most appropriate course of action

here. Thus, the Commission will apply Section 1.2111(a) to all 800 MHz

SMR licenses obtained through the competitive bidding process.

Generally, licensees transferring their licenses within three years

after the initial license grant will be required to file, together with

their transfer applications, the associated contracts for sale, option

agreements, management agreements, and all other documents disclosing

the total consideration received in return for the transfer of their

licenses. The Commission will give particular scrutiny to auction

winners who have not yet begun commercial service and who seek approval

for a transfer of control or assignment of their licenses within three

years after the initial license grant, so that the Commission may

determine if any unforeseen problems relating to unjust enrichment have

arisen.

116. Performance Requirements. The Communications Act requires the

Commission to ``include performance requirements, such as appropriate

deadlines and penalties for performance failures, to ensure prompt

delivery of service to rural areas, to prevent stockpiling or

warehousing of spectrum by licensees or permittees, and to promote

investment in and rapid deployment of new technologies and services.''

In the Competitive Bidding Second R&O, the Commission decided it was

unnecessary and undesirable to impose additional performance

requirements, beyond those already provided in the service rules, for

all auctionable services. In the Further Notice, the Commission did not

propose

[[Page 6152]]

to adopt any additional performance requirements for competitive

bidding purposes.

117. The service rules for the upper 10 MHz block contain specific

performance requirements, such as the requirement to construct within a

specific period of time, channel construction requirements, and interim

coverage requirements. Because the failure to meet these requirements

will result in automatic cancellation of the EA license, the Commission

believes this is a sufficient incentive to promote prompt service and

prevent spectrum warehousing. Thus, the Commission will not adopt any

performance requirements for the 800 MHz SMR service beyond those

required by Section 90.685 of the Rules.

8. Treatment of Designated Entities

118. Overview, Objectives, and the Impact of Adarand Constructors

v. Pena. The Communications Act provides that, in developing

competitive bidding procedures, the Commission shall consider various

statutory objectives and consider several alternative methods for

achieving them. Specifically, the statute provides that in establishing

eligibility criteria and bidding methodologies the Commission shall

``promot[e] economic opportunity and competition and ensur[e] that new

and innovative technologies are readily accessible to the American

people by avoiding excessive concentration of licenses and by

disseminating licenses among a wide variety of applicants, including

small businesses, rural telephone companies, and businesses owned by

members of minority groups and women.'' Small businesses, rural

telephone companies and businesses owned by minorities and/or women are

collectively referred to as ``designated entities.'' Section

309(j)(4)(A) provides that in order to promote the Communications Act's

objectives, the Commission shall ``consider alternative payment

schedules and methods of calculation, including lump sums or guaranteed

installment payments, with or without royalty payments, or other

schedules or methods * * * and combinations of such schedules and

methods.'' The Communications Act also requires the Commission to

``ensure that small businesses, rural telephone companies, and

businesses owned by members of minority groups and women are given the

opportunity to participate in the provision of spectrum-based

services.''

119. To meet the statutory objectives of providing opportunities

for designated entities, the Commission has employed a wide range of

special provisions and eligibility criteria in other spectrum-based

services. The measures adopted thus far for each service were

established after closely examining the specific characteristics of the

service and determining whether any particular barriers to accessing

capital impeded opportunities for designated entities. After examining

the record in the Competitive Bidding proceeding in PP Docket 93-253,

the Commission established provisions to enable designated entities to

overcome the barriers to accessing capital in each particular service.

Moreover, these provisions were designed to increase the likelihood

that designated entities who win licenses in the auctions become strong

competitors in the provision of wireless services.

120. Impact of Adarand Constructors, Inc. v. Pena. In the broadband

PCS docket, the Commission determined that, on separate entrepreneurs'

blocks, the bidding credits would vary according to the type of

designated entity that applied (i.e., a small business would receive a

10 percent bidding credit, a business owned by minorities or women

would receive a 15 percent bidding credit, and a small business owned

by women or minorities would receive an aggregated bidding credit of 25

percent), and all entrepreneurs' block licensees would be eligible for

varying degrees of installment payments. The Commission adopted special

provisions for businesses owned by members of minority groups or women

and analyzed their constitutionality using the ``intermediate

scrutiny'' standard of review articulated in Metro Broadcasting v. FCC,

because, as in Metro Broadcasting, the proposed provisions involved

Congressionally-mandated benign race- and gender-conscious measures.

121. After the release of the Further Notice, the Supreme Court

decided Adarand Constructors, Inc. v. Pena, which overruled Metro

Broadcasting ``to the extent that Metro Broadcasting is inconsistent

with'' the holding in Adarand that ``all racial classifications . . .

must be analyzed by a reviewing court under strict scrutiny.'' As a

result of the Adarand decision, the constitutionality of any federal

program that makes distinctions on the basis of race must serve a

compelling governmental interest and must be narrowly tailored to serve

that interest. In this connection, the Bureau issued a Public Notice

requesting further comment on the effect of the decision in Adarand on

the proposals made in the Further Notice in order to supplement the

record in the 800 MHz SMR proceeding.

122. Special Provisions for Designated Entities. In instructing the

Commission to ensure the opportunity for designated entities to

participate in auctions and provision of spectrum-based services,

Congress was well aware of the problems that designated entities would

have in competing against large, well-capitalized companies in auctions

and the difficulties these bidders encounter in accessing capital. For

example, the legislative history accompanying Congress's grant of

auction authority states generally that the Commission's regulations

``must promote economic opportunity and competition,'' and ``[t]he

Commission will realize these goals by avoiding excessive concentration

of licenses and by disseminating licenses among a wide variety of

applicants, including small businesses and businesses owned by members

of minority groups and women.'' The House Report states that the House

Committee was concerned that, ``unless the Commission is sensitive to

the need to maintain opportunities for small businesses, competitive

bidding could result in a significant increase in concentration in the

telecommunications industries.'' More specifically, the House Committee

was concerned that adoption of competitive bidding should not have the

effect of ``excluding'' small businesses from the Commission's

licensing procedures, and anticipated that the Commission would adopt

regulations to ensure that small businesses would ``continue to have

opportunities to become licensees.''

123. Consistent with Congress's concern that auctions not operate

to exclude small businesses, the provisions relating to installment

payments clearly were intended to assist small businesses. The House

Report states that these related provisions were drafted to ``ensure

that all small businesses will be covered by the Commission's

regulations, including those owned by members of minority groups and

women.'' It also states that the provisions in Section 309(j)(4)(A)

relating to installment payments were intended to promote economic

opportunity by ensuring that competitive bidding does not inadvertently

favor incumbents with deep pockets ``over new companies or start-ups.''

124. In addition, with regard to access to capital, Congress

previously made specific findings in the Small Business Credit and

Business Opportunity Enhancement Act of 1992, that ``small business

concerns, which represent higher degrees of risk in financial markets

than do large businesses, are

[[Page 6153]]

experiencing increased difficulties in obtaining credit.'' As a result

of these difficulties, Congress resolved to consider carefully

legislation and regulations ``to ensure that small business concerns

are not negatively impacted'' and to give priority to passage of

``legislation and regulations that enhance the viability of small

business concerns.''

125. In the 800 MHz SMR service, as in other auctionable services,

the Commission is committed to meeting the statutory objectives of

promoting economic opportunity and competition, of avoiding excessive

concentration of licenses, and of ensuring access to new and innovative

technologies by disseminating licenses among a wide variety of

applicants, including small businesses, rural telephone companies, and

businesses owned by members of minority groups and women. Accordingly,

in balancing the objectives set forth in the Communications Act, the

Further Notice proposed bidding credits and a tax certificate program

for businesses owned by women and minorities and installment payments

for small businesses on all 800 MHz SMR channel blocks in each MTA.

126. The Commission concludes that special provisions for small

businesses are appropriate for the 800 MHz SMR service because build-

out of an EA license may require a significant amount of capital.

Although the Commission believes that the 800 MHz SMR service is less

capital intensive than PCS, the Commission also believes that it is

more capital-intensive than the 900 MHz SMR service. The Commission

further believes that small entities may be disadvantaged in their

efforts of acquiring 800 MHz SMR licenses if required to bid against

existing large companies. For instance, if one or more of these big

firms targets a market for strategic reasons, there is almost no

likelihood that it could be outbid by a small business. The Commission

will address this potential outcome in two ways. First, for the upper

10 MHz block, the Commission will adopt the same ``tiered'' installment

payments approach adopted in the 900 MHz SMR service. Specifically,

licensees who qualify for installment payments will be entitled to pay

their winning bid amount in quarterly installments over the term of the

license, with interest charges to be fixed at the time of licensing at

a rate equal to the rate for ten-year U.S. Treasury obligations plus

2.5 percent. Small businesses with gross revenues less than $15 million

will be required to pay interest only for the first two years of the

license term at the same interest rate as set forth above. Interest

will accrue at the Treasury note rate plus 2.5 percent. Small

businesses with gross revenues less that $3 million will be able to

make interest-only payments for five years. Interest will accrue at the

Treasury note rate without the additional 2.5 percent. Timely payment

of all quarterly installments will be a condition of the license grant,

and failure to make such timely payment will be grounds for revocation

of the license. As the Commission have noted previously, allowing

installment payments reduces the amount of private financing needed by

prospective small business licensees and therefore mitigates the effect

of limited access to capital by small businesses. In determining

eligibility for these installment payment plans, the Commission will

not attribute gross revenues of investors that hold less than a 20

percent interest in the applicant, but the Commission will include the

gross revenues of the applicant's affiliates and investors with

ownership interests of 20 percent or more in the applicant. As has been

the case in prior auctions where special provisions for small

businesses have been made, it also is the Commission's expectation that

a qualifying small business or principals of a qualifying small

business will retain de facto and de jure control of the applicant. In

determining attribution when 800 MHz SMR licensees are held indirectly

through intervening corporate entities, the Commission will use the

same multiplier employed for the 900 MHz SMR service.

127. Second, the Commission has proposed additional special

provisions for small businesses seeking licenses for the lower 80 and

General Category channels in the Second Further Notice of Proposed Rule

Making in PR Docket No. 93-144, because the Commission believes that

most, if not all, of the incumbent licensees relocated will qualify as

small businesses under its proposed definition, and the lower 80 and

General Category channels will be the spectrum to which they most

likely will be relocated. This approach is consistent with the

Commission's approach in the broadband PCS context in which the

Commission designated certain frequency blocks as ``entrepreneurs'

blocks'' and restricted eligibility based on size limitations. The

Commission also believes that the service areas and spectrum blocks for

the upper 10 MHz block the Commission adopted in the First R&O will

permit operators of smaller SMR systems to participate in the upper 10

MHz block auction.

128. At this time the Commission concludes that there is an

insufficient record to support the adoption of special provisions

solely benefitting minority- and women-owned businesses (regardless of

size) for the upper 10 MHz block auction. The Commission notes,

however, that in the Second Further Notice of Proposed Rule Making, the

Commission is seeking comment on this issue with respect to the lower

80 and General Category channels. Moreover, the Commission believes

that most minority- and women-owned businesses will be able to take

advantage of the installment plan described above. The Commission

expects that the vast majority of minority- and women-owned businesses

will be able to qualify as small businesses under any definition the

Commission adopts.

129. Partitioning. In the Further Notice, the Commission did not

propose any special provisions for rural telephone companies, on the

basis that: (1) they, like other wireline carriers, then were

ineligible to hold SMR licenses; (2) even if wireline entry into SMR

was permitted, the Commission questioned whether special bidding

provisions would be necessary to ensure the participation of rural

telephone companies in the provision of SMR service given the

relatively modest build-out costs involved to serve rural areas; and

(3) in view of the fact that rural telephone companies may use their

existing infrastructure to support integrated 800 MHz SMR service in

their rural service areas, the Commission anticipated that they would

have ample opportunity to participate in 800 MHz SMR.

130. Since adoption of the Further Notice, rural telephone

companies have gained eligibility to hold SMR licenses. Thus, the

Commission concludes that rural telephone companies will be permitted

to acquire partitioned EA licenses in either of two ways: (1) They may

form bidding consortia to participate in auctions, and then partition

the licenses won among consortia participants; and (2) they may acquire

partitioned 800 MHz SMR licenses from other licensees through private

negotiation and agreement either before or after the auction. Each

member of a consortium will be required to file a long-form

application, following the auction, for its respective mutually agreed-

upon geographic area. Partitioned areas must conform to established

geo-political boundaries (such as county lines), and each area must

include all portions of the wireline service area of the rural

telephone company applicant that lie within the EA service area. The

Commission also will use the definition for rural telephone companies

used in its

[[Page 6154]]

broadband PCS and 900 MHz SMR rules. Thus, rural telephone companies

will be defined as ``local exchange carriers having 100,000 or fewer

access lines, including all affiliates.'' In the Second Further Notice

of Proposed Rule Making, the Commission seeks comment on its proposal

to extend the partitioning option to SMR licensees generally.

131. Set-Aside Spectrum. In the Further Notice, the Commission

expressed its concern, based on its experience with PCS, that

designated entities may have difficulties competing for 800 MHz SMR

licenses against large firms with significant financial resources. The

Commission tentatively concluded, however, that it would not be

feasible to designate a wide-area spectrum block as an entrepreneurs'

block because the large number of incumbents already licensed

throughout the spectrum designated for wide-area licensing make it

virtually impossible to identify a suitable block.

132. The Commission does not adopt an entrepreneurs' block in the

upper 10 MHz block of 800 MHz SMR spectrum. The Commission concluded

that an entrepreneur's block in this portion of 800 MHz SMR spectrum is

not feasible, given the substantial number of licensees already

licensed on such spectrum. However, the Commission is interested in

ensuring that small businesses have a meaningful opportunity to

continue to participate in the provision of 800 MHz SMR service. Thus,

in the Second Further Notice of Proposed Rule Making the Commission

seeks additional comment on whether designation of an entrepreneurs'

block for other 800 MHz spectrum would be feasible.

IV. Procedural Matters and Ordering Clauses

A. Final Regulatory Flexibility Analysis

133. With respect to this First Report and Order and Eighth Report

and Order, pursuant to the Regulatory Flexibility Act of 1980, an

Initial Regulatory Flexibility Analysis (IRFA) was incorporated in the

Further Notice of Proposed Rule Making in PR Docket No. 93-144. Written

comments on the IRFA were requested. The Commission's final analysis is

as follows:

Need for and purpose of the action. The rule making proceeding has

implemented Sections 332 and 3(n), respectively, of the Communications

Act of 1934, as amended. The rules adopted herein will carry out

Congress's intent to establish a consistent framework for all

commercial mobile radio services (CMRS).

Issues raised in response to the IRFA. No comments were submitted

in response to the IRFA.

Significant alternatives considered and rejected. All significant

alternatives have been addressed in the First Report and Order in PR

Docket No. 93-144, the Third Report and Order in GN Docket No. 93-252,

and the Eighth Report and Order in PP Docket No. 93-253.

B. Paperwork Reduction Act

SUMMARY: The Federal Communications Commission, as part of its

continuing effort to reduce paperwork burden, invites the general

public and other Federal agencies to take this opportunity to comment

on the following proposed and/or continuing information collections, as

required by the Paperwork Reduction Act of 1995, Public Law 104-13.

Comments are requested concerning (a) whether the proposed collection

of information is necessary for the proper performance of the functions

of the Commission, including whether the information shall have

practical utility; (b) the accuracy of the Commission's burden

estimates; (c) ways to enhance the quality, utility, and clarity of the

information collected; and (d) ways to minimize the burden of the

collection of information on the respondents, including the use of

automated collection techniques or other forms of information

technology.

DATES: Written comments should be submitted on or before April 16,

1996. If you anticipate that you will be submitting comments but find

it difficult to do so within the period of time allowed by this notice,

you should advise the contact listed below as soon as possible.

ADDRESSES: Direct all comments to Dorothy Conway, Federal

Communications Commission, Room 234, 1919 M St., NW., Washington, DC

20554, or via Internet to [email protected]; and Timothy Fain, OMB Desk

Officer, 10236 NEOB, 725 17th St., NW., Washington, DC 20503, or via

Internet to [email protected].

FOR FURTHER INFORMATION CONTACT: Dorothy Conway, (202) 418-0217, or via

Internet at [email protected].

SUPPLEMENTARY INFORMATION:

Title: Amendment to the Commission's Rules to Facilitate Future

Development of SMR Systems in the 800 MHz Frequency Band.

Type of Review: Revised collection.

Respondents: Individuals or households; Business or other for-

profit; Not-for-profit institutions; State, Local or Tribal Government.

Number of Respondents: 9,570.

Estimated Time Per Response: Approximately 2 hours.

Total Annual Burden: Approximately 17,254 hours.

Total Annual Cost: $6,468,260 this includes the costs for filing

the information electronically or mailing submissions and hiring

consultants that may be necessary to respond the requests.

Needs and Uses: The information will be used by the Commission for

the following purposes: (a) To determine if the grant or retention of

an extended implementation schedule is warranted; (b) to update the

Commission's licensing database and thereby facilitate the successful

coexistence of EA licensees and incumbents in the upper 10 MHz block of

800 MHz SMR spectrum; (c) to ensure that incumbents are timely notified

of possible relocation thus allowing relocation to occur in an orderly,

efficient, and expedient manner; and (d) to determine whether an

applicant is eligible for special provisions for small businesses

provided for applicants in the 800 MHz SMR service.

C. Ex Parte Rules--Non-Restricted Proceeding

This is a non-restricted notice and comment rulemaking proceeding.

Ex parte presentations are permitted except during the Sunshine Agenda

period, provided they are disclosed as provided in the Commission's

rules, 47 CFR Secs. 1.1202, 1.1203, 1.1206(a).

D. Authority

The legal authority for this proposed information collection

includes 47 U.S.C. Sections 154(i), 303(c), 303(f), 303(g), 303(r),

309(j) and 332 47 U.S.C. Secs. 154(i), 303(c), 303(f), 303(g), 303(r),

309(j), 332, as amended. The information collection would not affect

any FCC forms. The proposed collection would increase minimally the

burden on 800 MHz SMR service applicants.

E. Ordering Clauses

It is ordered that the rule changes made herein will become

effective March 18, 1996. This action is taken pursuant to Sections

4(i), 303(r), and 309(j) of the Communications Act of 1934, as amended,

47 U.S.C. Secs. 154(i), 303(r), and 309(j).

It is further ordered that all requests for extended implementation

authority for the 800 MHz SMR service filed pursuant to Section 90.629

of the Commission's rules and currently pending before the Commission

are denied.

It is further ordered that the Secretary shall send a copy of this

First Report

[[Page 6155]]

and Order and Eighth Report and Order to the Chief Counsel for Advocacy

of the Small Business Administration.

List of Subjects in 47 CFR Part 90

Common carriers, Radio, Reporting and recordkeeping requirements.

Federal Communications Commission.

William F. Caton,

Acting Secretary.

Rule Changes

Part 90 of Chapter I of Title 47 of the Code of Federal Regulations

is amended as follows:

PART 90--PRIVATE LAND MOBILE RADIO SERVICES

The authority citation for Part 90 is revised to read as follows:

Authority: 47 U.S.C. Secs. 154, 303, and 332, unless otherwise

noted.

Section 90.7 is amended by adding the definitions for ``EA-based or

EA license'' and ``Economic Areas (EAs)'' in alphabetical order to read

as follows:

Sec. 90.7 Definitions.

* * * * *

EA-based or EA license. A license authorizing the right to use a

specified block of SMR spectrum within one of the 175 Economic Areas

(EAs) as defined by the Department of Commerce Bureau of Economic

Analysis. The EA Listings and the EA Map are available for public

inspection at the Wireless Telecommunications Bureau's public reference

room, Room 5608, 2025 M St. NW, Washington, DC 20554 and Office of

Operations--Gettysburg, 1270 Fairfield Road, Gettysburg, PA 17325.

Economic Areas (EAs). A total of 175 licensing regions based on the

United States Department of Commerce Bureau of Economic Analysis

Economic Areas available from the Bureau of Economic Analysis at (202-

606-3700) defined as of February 1995, with the following exceptions:

(1) Guam and Northern Mariana Islands are licensed as a single EA-

like area

(2) Puerto Rico and the U.S. Virgin Islands are licensed as a

single EA-like area

(3) American Samoa is licensed as a single EA-like area

* * * * *

3. Section 90.155 is amended by revising paragraph (a) to read as

follows:

Sec. 90.155 Time in which station must be placed in operation.

(a) All stations authorized under this part, except as provided in

paragraphs (b) and (d) of this section and in Secs. 90.629, 90.631(f),

90.665, and 90.685, must be placed in operation within eight (8) months

from the date of grant or the authorization cancels automatically and

must be returned to the Commission.

* * * * *

4. Section 90.173 is amended by revising paragraph (k) and adding a

new paragraph (n) to read as follows:

Sec. 90.173 Policies governing the assignment of frequencies.

* * * * *

(k) Notwithstanding any other provisions of this part, any eligible

person may seek a dispositive preference for a channel assignment on an

exclusive basis in the 220-222 MHz, 470-512 MHz, and 800/900 MHz

(except on frequencies designated exclusively for SMR service) bands by

submitting information that leads to the recovery of channels in these

bands. Recovery of such channels must result from information provided

regarding the failure of existing licensees to comply with the

provisions of Secs. 90.155, 90.157, 90.629, 90.631 (e) or (f), or

90.633 (c) or (d). Any recovered channels in the 900 MHz SMR service

will revert automatically to the MTA licensee.

* * * * *

(n) Any recovered channels in the 800 MHz SMR service will revert

automatically to the holder of the EA license within which such

channels are included. If there is no EA licensee for recovered

channels, such channels will be retained by the Commission for future

licensing.

Section 90.210 is amended by adding a new footnote 3 to the entry

for ``806-821/851-866'' in the introductory paragraph table to read as

follows:

Sec. 90.210 Emission masks.

* * * * *

Applicable Emission Masks

------------------------------------------------------------------------

------------------------------------------------------------------------

Frequency Band MHz.............. Mask for equipment Mask for equipment

with audio low without audio low

path filter. path filter.

* * * * *

806-821/851-866 \3\............. B................. G.

* * * * *

------------------------------------------------------------------------

\3\ Equipment used in this band licensed to EA systems shall comply with

the emission mask provisions of Sec. 90.691.

* * * * *

6. Section 90.609 is amended by revising paragraphs (c) and (d)

introductory text to read as follows:

Sec. 90.609 Special limitations on amendment of applications for

assignment or transfer of authorizations for radio systems above 800

MHz.

* * * * *

(c) Licensees of constructed systems in any category other than

Spectrum Block D frequencies in the 800 MHz SMR service (formerly

General Category) are permitted to make partial assignments of an

authorized grant to an applicant proposing to create a new system or to

an existing licensee that has loaded its system to 70 mobiles per

channel and is expanding that system. An applicant authorized to expand

an existing system or to create a new system with frequencies from any

category other than Spectrum Block D frequencies in the 800 MHz SMR

service obtained through partial assignment will receive the assignor's

existing license expiration date and loading deadline for the

frequencies that are assigned. A licensee that makes a partial

assignment of a station's frequencies will not be authorized to obtain

additional frequencies for that station for a period of one year from

the date of the partial assignment.

(d) A constructed system originally licensed in the General

Category that is authorized to operate in the conventional mode may be

combined with an existing SMR system above 800 MHz authorized to

operate in the trunked mode by assignment of an authorized grant of the

General Category station to the SMR station.

* * * * *

7. Section 90.611 is amended by revising paragraphs (a) and (c) and

by removing and reserving paragraph (d) to read as follows:

Sec. 90.611 Processing of applications.

* * * * *

(a) All applications will first be considered to determine whether

they are substantially complete and acceptable for filing. If so,

except as otherwise specifically provided for in this subpart, they

will be assigned a file number and put in pending status. If not, they

will be returned to the applicant.

* * * * *

(c) Each application will be reviewed to determine whether it can

be granted. Applicants must specify the intended frequency (or

frequencies) of operation.

* * * * *

8. Section 90.615 is revised to read as follows:

[[Page 6156]]

Sec. 90.615 Frequencies available in Spectrum Block D in the 800 MHz

SMR service (formerly General Category).

(a) Except as indicated in Sec. 90.619, as of March 18, 1996,

frequencies in the 800 MHz Spectrum Block D (Channels 1-150) previously

designated as General Category channels are re-allocated for use

exclusively by the SMR service for either trunked or conventional

operations. The frequencies are available to SMR licensees in areas

farther than 110 km (68.4 miles) from the U.S./Mexico border and

farther than 140 km (87 miles) from the U.S./Canada border.

(b) Non-SMR stations that were authorized to transmit on these

frequencies prior to March 18, 1996 and have remained so authorized

continuously since that time may continue to operate in accordance with

their current authorizations. Such authorizations may be renewed

unchanged or with minor modifications as described in Sec. 90.693.

9. Section 90.617 is amended by revising introductory paragraphs

(b) and (c) (the Tables remain unchanged), paragraph (d) and Table 4A

of paragraph (d) to read as follows:

Sec. 90.617 Frequencies in the 809.750-824/854.750-869 MHz, and 896-

901/935-940 MHz bands available for trunked or conventional system use

in non-border areas.

* * * * *

(b) The channels listed in Table 2A are available to eligible

applicants in the Industrial/Land Transportation Category (consisting

of the Power, Petroleum, Forest Products, Film and Video Production,

Relay Press, Special Industrial, Manufacturers, Telephone Maintenance,

Motor Carrier, Railroad, Taxicab and Automobile Emergency Radio

Services). These frequencies are available in areas farther than 110 km

(68.4 miles) from the U.S./Mexico border and farther than 140 km (87.0

miles) from the U.S./Canada border. Specialized Mobile Radio (SMR)

systems will not be authorized on these frequencies. These channels are

available for inter-category sharing as indicated in Sec. 90.621(g).

* * * * *

(c) The channels listed in Table 3A are available to eligible

applicants in the Business Radio Category. This category does not

include Specialized Mobile Radio Systems as defined in Sec. 90.7. These

frequencies are available in areas farther than 110 km (68.4 miles)

from the U.S./Mexico border and farther than 140 km (87.0 miles) from

the U.S./Canada border. Specialized Mobile Radio Systems will not be

authorized on these frequencies. These channels are available for

inter-category sharing as indicated in Sec. 90.621(g).

* * * * *

(d) The channels listed in Tables 4A and 4B are available only to

eligibles in the SMR category which consists of Specialized Mobile

Radio (SMR) stations and eligible end users. The frequencies listed in

Table 4A are available to SMR eligibles desiring to be authorized for

EA-based service areas in accordance with Sec. 90.681. SMR licensees

licensed on Channels 401-600 on or before March 18, 1996 may continue

to utilize these frequencies within their existing service areas,

subject to the mandatory relocation provisions of Sec. 90.699. Systems

licensed on the channels listed in Table 4A as Spectrum Block D or E

Channels will be licensed on a site-specific basis. This paragraph

deals with the assignment of frequencies only in areas farther than 110

km (68.4 miles) from the U.S./Mexico border and farther than 140 km

(87) miles from the U.S./Canada border. See Sec. 90.619 for the

assignment of SMR frequencies in these border areas. For stations

located within 113 km (70 miles) of Chicago, channels 401-600 will be

assigned in blocks as outlined in Table 4C.

Table 4A.--SMR Category 806-821/851-866 MHz Band Channels

------------------------------------------------------------------------

Spectrum block Channel No.

------------------------------------------------------------------------

EA-Based SMR Category Systems (200

channels):

A..................................... 401-420.

B..................................... 421-480.

C..................................... 481-600.

SMR Category (230 channels):

D..................................... 1-150.

E..................................... 201-208, 221-228, 241-248,

261-268, 281-288, 301-308,

321-328, 341-348, 361-368,

381-388.

------------------------------------------------------------------------

* * * * *

10. Section 90.619 is amended by revising introductory paragraph

(a)(3), the introductory text of paragraph (a)(5) and Table 4A of

paragraph (a)(5), Table 12 in paragraph (b)(8), Table 16 in paragraph

(b)(9), Table 20 in paragraph (b)(10), and Table 24 in paragraph

(b)(11) to read as follows:

Sec. 90.619 Frequencies available for use in the U.S./Mexico and U.S./

Canada border areas.

(a) * * *

(3) Tables 2A and 2B list the channels that are available for

assignment to eligible applicants in the Industrial/Land Transportation

Category (consisting of the Power, Petroleum, Forest Products, Video

Production, Relay Press, Special Industrial, Manufacturers, Telephone

Maintenance, Motor Carrier, Railroad, Taxicab and Automobile Emergency

Radio Services). New applications for Specialized Mobile Radio systems

will not be accepted for these channels after March 18, 1996.

* * * * *

(5) Tables 4A and 4B list the channels that are available for

assignment for the SMR Category (consisting of Specialized Mobile Radio

systems as defined in Sec. 90.7). These channels are not available for

inter-category sharing.

Table 4A.--United States-Mexico Border Area, SMR Category 806-821/851-

866 MHZ Band (95 Channels)

------------------------------------------------------------------------

Spectrum block Offset channel No.

------------------------------------------------------------------------

EA-Based SMR Category (30 Channels):

A.................................... None.

B.................................... 429, 431, 433, 435, 437,439,

469, 471, 473, 475, 477, 479.

C.................................... 509, 511, 513, 515, 517, 519,

549, 551, 553, 555, 557, 559,

589, 591, 593, 595, 597, 599.

SMR Category (65 Channels):

D.................................... None.

E.................................... None.

Other................................ 228-240, 268-280, 308-320, 348-

360, 388-400.

------------------------------------------------------------------------

* * * * *

(b) * * *

(8) * * *

Table 12.--SMR Category--95 Channels

[Regions 1, 4, 5, 6]

------------------------------------------------------------------------

Spectrum block Channel No.

------------------------------------------------------------------------

EA-Based SMR Category (90 Channels):

A.................................... None.

B.................................... 463-480.

C.................................... 493-510, 523-540, 553-570, 583-

600.

SMR Category (5 Channels):

[[Page 6157]]

D.................................... 30, 60, 90, 120, 150.

E.................................... None.

------------------------------------------------------------------------

(9) * * *

Table 16.--SMR Category--60 Channels

[Region 2]

------------------------------------------------------------------------

Spectrum block Channel No.

------------------------------------------------------------------------

EA-Based SMR Category (55 Channels):

A.................................... None.

B.................................... None.

C.................................... 518-528, 536-546, 554-564, 572-

582, 590-600.

SMR Category (5 Channels):

D.................................... 18, 36, 54, 72, 90.

E.................................... None.

------------------------------------------------------------------------

(10) * * *

Table 20.--SMR Category--135 Channels

[Region 3]

------------------------------------------------------------------------

Spectrum block Channel No.

------------------------------------------------------------------------

EA-Based SMR Category (120 Channels):

A.................................... 417-420.

B.................................... 421-440, 457-480.

C.................................... 497-520, 537-560, 577-600.

SMR Category (15 Channels):

D.................................... 38, 39, 40, 78, 79, 80, 118,

119, 120.

E.................................... None.

Other................................ 158, 159, 160, 198, 199, 200.

------------------------------------------------------------------------

(11) * * *

Table 24.--(Regions 7, 8) SMR Category--190 Channels

------------------------------------------------------------------------

Spectrum block Channel No.

------------------------------------------------------------------------

EA-Based SMR Category (80 Channels):

A.................................... None.

B.................................... 425-440, 465-480.

C.................................... 505-520, 545-560, 585-600.

SMR Category (110 Channels):

D.................................... 35-40, 75-80, 115-120.

E.................................... 225-228, 265-268, 305-308, 345-

348, 385-388.

Other................................ 155-160, 195-200, 229-240, 269-

280, 309-320, 349-360, 389-

400.

------------------------------------------------------------------------

* * * * *

11. Section 90.621 is amended by revising paragraphs (a)

introductory text, (a)(1)(iii), (b) introductory text, (c), and (e)

introductory text, removing paragraph (a)(1)(iv), and removing and

reserving paragraphs (e)(2), (e)(3), and (e)(4) to read as follows:

Sec. 90.621 Selection and assignment of frequencies.

(a) Applicants for frequencies in the Public Safety, Industrial/

Land Transportation, and Business Categories must specify on the

application the frequencies on which the proposed system will operate

pursuant to a recommendation by the applicable frequency coordinator.

Applicants for frequencies in the SMR Category must request specific

frequencies by including in their applications the frequencies

requested.

(1) * * *

(iii) There are no limitations on the number of frequencies that

may be trunked. Authorizations for non-SMR stations may be granted for

up to 20 trunked frequency pairs at a time in accordance with the

frequencies listed in Secs. 90.615, 90.617, and 90.619.

* * * * *

(b) Stations authorized on frequencies listed in this subpart,

except for those stations authorized pursuant to paragraph (g) of this

section and EA-based and MTA-based SMR systems, will be afforded

protection solely on the basis of fixed distance separation criteria.

The separation between co-channel systems will be a minimum of 113 km

(70 mi) with the following exceptions:

* * * * *

(c) Conventional systems authorized on frequencies in the Public

Safety (except for those systems that have participated in a formal

regional planning process as described in Sec. 90.16), Industrial/Land

Transportation, Business, and Spectrum Block D frequencies in the 800

MHz SMR service (formerly General) Categories which have not met the

loading levels necessary for channel exclusivity will not be afforded

co-channel protection.

* * * * *

(e) Frequencies in the 806-821/851-866 MHz bands listed as

available for eligibles in the Public Safety, Industrial/Land

Transportation, and Business Categories are available for inter-

category sharing under the following conditions:

* * * * *

12. Section 90.629 is amended by adding a new paragraph (e) to read

as follows:

Sec. 90.629 Extended implementation period.

* * * * *

(e) As of March 18, 1996, Specialized Mobile Radio systems are not

eligible for extended implementation periods under this section.

Additionally, all 800 MHz SMR licensees that are operating under

extended implementation authority as of March 18, 1996 must, by May 16,

1996, demonstrate that continuing to allow them to have an extended

period of time to construct their facilities is warranted and furthers

the public interest. If a licensee's extended implementation authority

showing is approved by the Bureau, such licensee will be afforded an

extended implementation of two years or the remainder of its current

extended implementation period, whichever is shorter. Upon the

termination of this period, the authorizations for those facilities

that remain unconstructed will terminate automatically. If a licensee

with a current extended implementation period fails to submit the

showing mentioned above within the designated timeframe or submits an

insufficient or incomplete showing, such licensee will have six months

from the last day on which it could timely file such a showing or from

the disapproval of its request to construct the remaining facilities

covered under its implementation plan to construct any unconstructed

facilities for which it is authorized. The authorizations for those

facilities remaining unconstructed after this six-month period will

terminate automatically.

13. Section 90.631(b) is amended by removing the words ``General

Category'' and adding in their place ``Spectrum Block D frequencies in

the 800 MHz SMR service (formerly General Category)''.

14. Subpart S is amended by adding a new centered heading following

Section 90.671 to read as follows:

[[Page 6158]]

Policies Governing the Licensing and Use of EA-Based SMR Systems in the

816-821/861-866 Band

15. A new Sec. 90.681 is added to Subpart S to read as follows:

Sec. 90.681 EA-based SMR service areas.

EA licenses for SMR spectrum blocks in the 816-821/861-866 band

listed in Table 4A of Sec. 90.617(d) are available in 175 Economic

Areas (EAs) as defined in Sec. 90.7.

16. A new Sec. 90.683 is added to Subpart S to read as follows:

Sec. 90.683 EA-Based SMR system operations.

(a) EA-based licensees authorized in the 816-821/861-866 MHz band

pursuant to Sec. 90.681 may construct and operate base stations using

any of the base station frequencies identified in their spectrum block

anywhere within their authorized EA, provided that:

(1) The EA licensee affords protection, in accordance with

Sec. 90.621(b), to all previously authorized co-channel stations that

are not associated with another EA license;

(2) The EA licensee complies with any rules and international

agreements that restrict use of frequencies identified in their

spectrum block, including the provisions of Sec. 90.619 relating to

U.S./Canadian and U.S./Mexican border areas;

(3) The EA licensee limits the field strength of its base stations

at any location on the border of the EA service area in accordance with

Sec. 90.689;

(4) The EA licensee notifies the Commission within 30 days of the

completion of the addition, removal, relocation or modification of any

of its facilities within the EA. Such notification must be made by

submitting an FCC Form 600 and must include the appropriate filing fee,

if any; and

(5) For any construction or alteration that would exceed the

requirements of Sec. 17.7 of this chapter, licensees must notify the

appropriate Regional Office of the Federal Aviation Administration (FAA

Form 7460-1) and file a request for antenna height clearance and

obstruction marking and lighting specifications (FCC Form 854) with the

FCC, WTB, Support Services Branch, Gettysburg, PA 17325.

(6) Any additional transmitters placed in operation must not have a

significant environmental effect as defined by Secs. 1.1301 through

1.1319 of this chapter.

(b) In the event that the authorization for a previously authorized

co-channel station within the EA licensee's spectrum block is

terminated or revoked, the EA licensee's co-channel obligations to such

station will cease upon deletion of the facility from the Commission's

official licensing records, and the EA licensee then will be able to

construct and operate without regard to that previous authorization.

17. A new Sec. 90.685 is added to Subpart S to read as follows:

Sec. 90.685 Authorization, construction and implementation of EA

licenses.

(a) EA licenses in the 816-821/861-866 MHz band will be issued for

a term not to exceed ten years. Additionally, EA licensees generally

will be afforded a renewal expectancy only for those stations put into

service after August 10, 1996.

(b) EA licensees in the 816-821/861-866 band will be permitted five

years to construct their stations. This five-year period will commence

with the issuance of the EA-based license and will apply to all of the

licensee's stations within the EA spectrum block, including any

stations that may have been subject to an earlier construction deadline

arising from a pre-existing authorization.

(c) EA licensees in the 816-821/861-866 MHz band must, within three

years, construct and place into operation a sufficient number of base

stations to provide coverage to at least one-third of the population of

its EA-based service area. Further, each EA licensee must provide

coverage to at least two-thirds of the population of the EA-based

service area within five years.

(d) Channel use requirement. In addition to the population coverage

requirements described in this section, we will require EA licensees to

construct 50 percent of the total channels included in their spectrum

block in at least one location in their respective EA-based service

area within three years of initial license grant and to retain such

channel usage for the remainder of the construction period.

(e) An EA licensee's failure to meet the population coverage

requirements of paragraphs (c) and (d) of this section, will result in

forfeiture of the entire EA license. Forfeiture of the EA license,

however, would not result in the loss of any constructed facilities

authorized to the licensee prior to the date of the commencement of the

auction for the EA licenses.

18. A new Sec. 90.687 is added to Subpart S to read as follows:

Sec. 90.687 Special provisions regarding assignments and transfers of

authorizations for incumbent SMR licensees in the 816-821/861-866 MHz

band.

An SMR licensee initially authorized on any of the channels listed

in Table 4A of Sec. 90.617 may transfer or assign its channel(s) to

another entity subject to the provisions of Secs. 90.153 and 90.609(b).

If the proposed transferee or assignee is the EA licensee for the

spectrum block to which the channel is allocated, such transfer or

assignment presumptively will be deemed to be in the public interest.

However, such presumption will be rebuttable.

19. A new Sec. 90.689 is added to Subpart S to read as follows:

Sec. 90.689 Field strength limits.

(a) For purposes of implementing Secs. 90.689 through 90.699,

predicted 40 dBuV/m contours shall be calculated using Figure 10 of

Sec. 73.699 of this chapter with a correction factor of -9 dB, and

predicted 22 dBuV/m contours shall be calculated using Figure 10a of

Sec. 73.699 of this chapter with a correction factor of -9 dB.

(b) The predicted or measured field strength at any location on the

border of the EA-based service area for EA licensees must not exceed 40

dBuV/m unless all bordering EA licensees agree to a higher field

strength. In the event that this standard conflicts with the EA

licensee's obligation to provide co-channel protection to incumbent

licensees pursuant to Sec. 90.621(b), the requirements of

Sec. 90.621(b) shall prevail.

20. A new Sec. 90.691 is added to Subpart S to read as follows:

Sec. 90.691 Emission mask requirements for EA-based systems.

(a) Out-of-band emission requirement shall apply only to the

``outer'' channels included in an EA license and to spectrum adjacent

to interior channels used by incumbent licensees. The emission limits

are as follows:

(1) For any frequency removed from the EA licensee's frequency

block by up to and including 37.5 kHz, the power of any emission shall

be attenuated below the transmitter power (P) in watts by at least 116

Log10(f/6.1) decibels or 50 + 10 Log10(P) decibels or 80

decibels, whichever is the lesser attenuation, where f is the frequency

removed from the center of the outer channel in the block in kilohertz

and where f is greater than 12.5 kHz.

(2) For any frequency removed from the EA licensee's frequency

block greater than 37.5 kHz, the power of any emission shall be

attenuated below the transmitter power (P) in watts by at least 43 +

10Log10(P) decibels or 80 decibels, whichever is the lesser

attenuation, where f is the frequency removed from the center of the

outer channel in the block in kilohertz and where f is greater than

37.5 kHz.

[[Page 6159]]

(b) When an emission outside of the authorized bandwidth causes

harmful interference, the Commission may, at its discretion, require

greater attenuation than specified in this section.

21. A new Sec. 90.693 is added to Subpart S to read as follows:

Sec. 90.693 Grandfathering provisions for incumbent licensees in

spectrum blocks A, B, and C.

(a) These provisions apply to ``incumbent licensees'', all 800 MHz

SMR licensees who obtained licenses or filed applications on or before

December 15, 1995. An incumbent licensee's service area shall be

defined by its originally-licensed 40 dBu field strength contour and

its interference contour shall be defined as its originally-licensed 22

dBu field strength contour. Incumbent licensees are permitted to add,

remove or modify transmitter sites within this existing service area

without prior notification to the Commission so long as their original

22 dBu field strength contour is not expanded and the station complies

with the Commission's short-spacing criteria in Secs. 90.621(b)(4)

through 90.621(b)(6). The incumbent licensee must, however, notify the

Commission within 30 days of the completion of any changes in technical

parameters or additional stations constructed through a minor

modification of their license. Such notification must be made by

submitting an FCC Form 600 and must include the appropriate filing fee,

if any. These minor modification applications are not subject to public

notice and petition to deny requirements or mutually exclusive

applications.

(b) Incumbent licensees operating at multiple sites may, after

grant of EA licenses has been completed, exchange multiple site

licenses for a single license, authorizing operations throughout the

contiguous and overlapping 40 dBu field strength contours of the

multiple sites. Incumbents exercising this license exchange option must

submit specific information for each of their external base sites after

the close of the 800 MHz SMR auction.

22. A new Sec. 90.699 is added to Subpart S to read as follows:

Sec. 90.699 Transition of the upper 200 channels in the 800 MHz band

to EA licensing.

In order to facilitate provision of service throughout an EA, an EA

licensee may relocate incumbent licensees in its EA by providing

``comparable facilities'' on other frequencies in the 800 MHz band.

Such relocation is subject to the following provisions:

(a) EA licensees may negotiate with incumbent licensees as defined

in Sec. 90.693 operating on frequencies in Spectrum Blocks A, B, and C

for the purpose of agreeing to terms under which the incumbents would

relocate their operations to other channels in the 800 MHz band, or

alternatively, would accept a sharing arrangement with the EA licensee

that may result in an otherwise impermissible level of interference to

the incumbent licensee's operations. EA licensees may also negotiate

agreements for relocation of the incumbents' facilities within Spectrum

Blocks A, B or C in which all interested parties agree to the

relocation of the incumbent's facilities elsewhere within these bands.

``All interested parties'' includes the incumbent licensee, the EA

licensee requesting and paying for the relocation, and any EA licensee

of the spectrum to which the incumbent's facilities are to be

relocated.

(b) The relocation mechanism consists of two phases that must be

completed before an EA licensee may proceed to request the involuntary

relocation of an incumbent licensee.

(1) Voluntary period. There is a one year voluntary period during

which an EA licensee and an incumbent may negotiate any mutually

agreeable relocation agreement. The Commission will announce the

commencement of the first phase voluntary period by Public Notice. EA

licensees must notify incumbents operating on frequencies included in

their spectrum block of their intention to relocate such incumbents

within 90 days of the release of the Public Notice that commences the

voluntary negotiation period. Failure on the part of the EA licensee to

notify the incumbent licensee during this 90 period of its intention to

relocate the incumbent will result in the forfeiture of the EA

licensee's right to request involuntary relocation of the incumbent at

any time in the future.

(2) Mandatory period. If no agreement is reached by the end of the

voluntary period, a two-year mandatory period will begin during which

both the EA licensee and the incumbent must negotiate in ``good

faith''. Failure on the part of the EA licensee to negotiate in good

faith during this mandatory period will result in the forfeiture of the

EA licensee's right to request involuntary relocation of the incumbent

at any time in the future.

(c) If no agreement is reached during either the voluntary or

mandatory negotiating periods, the EA licensee may request involuntary

relocation of the incumbent's system. In such a situation, the EA

licensee must:

(1) Guarantee payment of all costs of relocating the incumbent to a

comparable facility;

(2) Complete all activities necessary for placing the new

facilities into operation; and

(3) Build and test the new system.

(d) If an EA licensee cannot provide comparable facilities to an

incumbent licensee as defined in this section, the incumbent licensee

may continue to operate its system on a primary basis in accordance

with the provisions of this part.

23. A new Subpart V, Sections 90.901 through 90.913, is added to

read as follows:

Subpart V--Competitive Bidding Procedures for 800 MHz Specialized

Mobile Radio Service

Sec. 90.901 800 MHz SMR spectrum subject to competitive bidding.

Sec. 90.902 Competitive bidding design for 800 MHz SMR licensing.

Sec. 90.903 Competitive bidding mechanisms.

Sec. 90.904 Aggregation of EA licenses for spectrum blocks A, B,

and C.

Sec. 90.905 Withdrawal, default and disqualification payments.

Sec. 90.906 Bidding application (FCC Form 175 and 175-S Short-

form).

Sec. 90.907 Submission of upfront payments and down payments.

Sec. 90.908 Long-form applications.

Sec. 90.909 License grant, denial, default, and disqualification

for spectrum blocks A, B, and C.

Sec. 90.910 Installment payments for licenses for spectrum blocks

A, B, and C.

Sec. 90.911 Procedures for partitioned licenses in spectrum blocks

A, B, and C.

Sec. 90.912 Definitions for spectrum blocks A, B, and C.

Sec. 90.913 Eligibility for small business status for spectrum

blocks A, B, and C.

Sec. 90.901. 800 MHz SMR spectrum subject to competitive bidding.

Mutually exclusive initial applications for Spectrum Blocks A, B,

and C in the 800 MHz band are subject to competitive bidding

procedures. The general competitive bidding procedures provided in part

1, subpart Q of this chapter will apply unless otherwise indicated in

this subpart.

Sec. 90.902 Competitive bidding design for 800 MHz SMR licensing.

The Commission will employ a simultaneous multiple round auction

design when selecting from among mutually exclusive initial

applications for EA licenses for Spectrum Blocks A, B, and C in the 800

MHz band, unless otherwise specified by the Wireless Telecommunications

Bureau before the auction.

[[Page 6160]]

Sec. 90.903 Competitive bidding mechanisms.

(a) Sequencing. The Wireless Telecommunications Bureau will

establish and may vary the sequence in which 800 MHz SMR licenses for

Spectrum Blocks A, B, and C will be auctioned.

(b) Grouping. All EA licenses for Spectrum Blocks A, B, and C will

be auctioned simultaneously, unless the Wireless Telecommunications

Bureau announces, by Public Notice prior to the auction, an alternative

competitive bidding design.

(c) Minimum Bid Increments. The Wireless Telecommunications Bureau

will, by announcement before or during an auction, require minimum bid

increments in dollar or percentage terms.

(d) Stopping Rules. The Wireless Telecommunications Bureau will

establish stopping rules before or during the multiple round auctions

in order to terminate an auction within a reasonable time.

(e) Activity Rules. The Wireless Telecommunications Bureau will

est

This text is long and has been trimmed here. Open the source document for the complete record.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.