Amendments to Streamline the National Pollutant Discharge Elimination System Program Regulations: Round Two

Federal RegisterDec 11, 1996

Ask Donna

What actually matters in this document.

Text

SUMMARY: The Environmental Protection Agency (EPA) is today proposing

revisions to the National Pollutant Discharge Elimination System

(NPDES) regulations (40 CFR parts 122, 123, 124, and 125). This

proposal is part of an agency-wide effort to respond to a directive

issued by the President on February 21, 1995, which directed Federal

agencies to review their regulatory programs to eliminate any obsolete,

ineffective, or unduly burdensome regulations. In response to that

directive, EPA initiated a detailed review of its regulations to

determine which provisions were obsolete, duplicative, or unduly

burdensome. On June 29, 1995, EPA issued a rule (60 FR 33926) which

removed some regulatory provisions in the Office of Water program

regulations (including certain NPDES provisions) that were clearly

obsolete. Today's proposal is intended to further streamline NPDES and

RCRA permitting procedures by revising requirements in parts 122, 124,

and 125 to eliminate redundant regulatory language, provide

clarification, and remove or streamline unnecessary procedures which do

not provide any environmental benefits. Conforming changes to 40 CFR

parts 22, 117, 144, 270, and 271 are also proposed in today's notice.

These proposed revisions are identified and discussed in the

Supplementary Information section below.

DATES: Written comments on this proposed rule must be received by or

postmarked by February 10, 1997 to be considered timely.

ADDRESSES: Commenters are requested to submit written comments to: The

NPDES Round II Streamlining Rule, Comment Clerk, Water Docket MC-4101;

U.S. Environmental Protection Agency, 401 M Street, S.W., Washington,

D.C. 20460. Commenters are requested to submit any references cited in

their comments. Commenters are also requested to submit an original and

three copies of their comments. Commenters who would like

acknowledgment of receipt of their comments should include a self-

addressed, stamped envelope. All comments must be postmarked or

delivered by hand by the comment deadline. No facsimiles (faxes) will

be accepted.

EPA will also accept comments electronically. Comments should be

addressed to the following Internet address: [email protected].

Electronic comments must be submitted as an ASCII file avoiding the use

of special characters and any form of encryption. Electronic comments

will be transferred onto a paper version for the official record. EPA

will attempt to clarify electronic comments if there is an apparent

error in transmission. Comments provided electronically will be

considered timely if they are submitted electronically by 11:59 P.M.

(Eastern time) February 10, 1997. As EPA is experimenting with

electronic commenting, commenters may want to submit both electronic

comments and duplicate paper comments. This document has also been

placed on the Internet for public review and downloading at the

following location: gopher.epa.gov.

The public may inspect the administrative record for this

rulemaking at EPA's Water Docket, Room M2616, 401 M Street, S.W.,

Washington, D.C. 20460, between the hours of 9 a.m. and 3:30 p.m. on

business days. For access to docket materials, please call (202) 260-

3027 for an appointment during the aforementioned hours. A reasonable

fee will be charged for copying.

FOR FURTHER INFORMATION CONTACT: Thomas Charlton, Permits Division

(4203), U.S. Environmental Protection Agency, 401 M Street, S.W.,

Washington, D.C. 20460, (202) 260-6960.

SUPPLEMENTARY INFORMATION:

Regulated Entities

Entities potentially regulated by this action are EPA, authorized

State programs, and the Regulated Community.

------------------------------------------------------------------------

Examples of regulated

Category entities

------------------------------------------------------------------------

Federal Government........................ Federal NPDES Program.

State Government.......................... State NPDES Program.

Private................................... NPDES Regulated Community.

Private................................... RCRA Regulated Community.

------------------------------------------------------------------------

This table is not intended to be exhaustive, but rather provides a

guide for readers regarding entities likely to be regulated by this

action. This table lists the types of entities that EPA is now aware

could potentially be regulated by this action. Other types of entities

not listed in the table could also be regulated. To determine whether

your organization is likely to be regulated by this action, you should

carefully read the applicability language of today's rule. If you have

any questions regarding the applicability of this action to a

particular entity, consult the person listed in the preceding FOR

FURTHER INFORMATION CONTACT section.

Organization

Information in this preamble is organized as follows:

I. Background

II. Proposed Revisions

A. Proposed Revisions to Part 122

1. Purpose and Scope (40 CFR 122.1)

2. NPDES Program Definitions (40 CFR 122.2, 124.2)

3. New Sources/New Dischargers (40 CFR 122.4, 124.56)

4. EPA Application Forms (40 CFR 122.1(d)(1), 122.21(a),

122.21(d), 122.26(c)(1))

5. Effluent Characteristics (40 CFR 122.21(g)(7))

6. Signatories (40 CFR 122.22)

7. Group Permit Applications (40 CFR 122.26(c)(2))

8. General Permits (40 CFR 122.28)

9. Monitoring (40 CFR 122.41(j), 122.41(l)(4), 122.44(i)(1)(iv),

122.48)

10. Effluent Guideline Limits in Permits (40 CFR 122.44(a))

11. Reopener Clauses (40 CFR 122.44(c))

12. Best Management Practices (40 CFR 122.44(k))

13. Termination of Permits (40 CFR 122.64)

B. Proposed Revisions to Part 123

1. Requirements for Permitting (40 CFR 123.25)

2. Transmission of Information to EPA (40 CFR 123.44)

C. Proposed Revisions to Public Hearing Requirements for NPDES

Permit Actions and RCRA Permit Terminations

1. Background of the Current Rule

2. Proposed Elimination

a. Legal Basis

(1) The Language of Section 402(a)

(2) Reasonableness of interpretation

b. Proposed New System

(1) Permit issuance

(2) Termination of NPDES and RCRA Permits

(3) Stays of Contested Permit Conditions

(4) Procedures for Variances and New Source Determinations

(5) Transition to New Procedural Requirements

(6) Miscellaneous Changes

[[Page 65269]]

(7) Effect on State Programs

D. Proposed Reservation of Part 125, Subpart K--Criteria and

Standards for Best Management Practices Authorized under Section

304(e) of the Act

1. 40 CFR Part 125, Subpart K

2. 40 CFR 122.44(k)

E. Miscellaneous Corrections

III. Administrative Requirements

A. Executive Order 12866

B. The Regulatory Flexibility Act

C. The Paperwork Reduction Act

D. The Unfunded Mandates Reform Act

I. Background

On February 21, 1995, the President directed all Federal agencies

and departments to conduct a comprehensive review of the regulations

they administer and by June 1, 1995, identify those rules that are

obsolete or unduly burdensome. EPA conducted a review of all of its

rules, including those issued under the Federal Water Pollution Control

Act, as amended (``FWPCA'') (33 U.S.C. 1158 and 1251 et seq.) (also

cited below, as the Clean Water Act or ``CWA''), the Safe Drinking

Water Act (``SDWA'') (42 U.S.C. 300f et seq.), and the Marine

Protection, Research, and Sanctuaries Act (also known as the Ocean

Dumping Act) (33 U.S.C. 1401 et seq.). In March and April of 1995, EPA

solicited informal comments from the public, regulated entities,

States, and municipalities on ways to identify rules that are obsolete,

redundant, or unduly burdensome. Towards that end, a number of meetings

were held in the Regions. On April 3, 1995, the Office of Water issued

a preliminary report which identified those regulatory provisions that

were amenable to streamlining.

As a result of this review, EPA issued a final rule on June 29,

1995 (60 FR 33926) which removed a number of regulatory provisions that

were obsolete or redundant with other regulatory requirements. Today's

proposal is a continuation of this effort by EPA to revise the NPDES

program regulations in parts 122, 123, 124 and 125 to eliminate

redundant requirements, remove superfluous language, provide

clarification, and remove or streamline unnecessary procedures which do

not provide any environmental benefits. Included in today's notice are

proposed revisions which would revise the permit appeals process for

EPA-issued NPDES permits by replacing the evidentiary hearing

procedures found at part 124, subpart E with a direct appeal to the

Environmental Appeals Board. This is not intended to affect the permit

appeal procedures for State-authorized NPDES programs. Also contained

in today's proposal are conforming changes to parts 22, 117, 144, 270,

and 271. Today's proposal contains many of the revisions contained in

EPA's June 1, 1995 report to the President. EPA also proposes in

today's notice, amendments to its regulations that would correct

typographical errors, drafting errors, and misplaced or obsolete

references.

Today's proposal may, at times, print extensive portions of

existing regulatory text without change. This is done to better

describe the proposed revisions. For example, Sec. 122.21(g)(7) is

reprinted in its entirety to indicate where new paragraph headings are

proposed to be inserted. However, EPA does not solicit, and will not

respond to, comments on existing regulatory provisions not proposed to

be amended, nor will such provisions be subject to judicial review upon

promulgation of the final rule. EPA is soliciting comment only on the

revisions described in this preamble.

II. Proposed Revisions

A. Revisions to Part 122

1. Purpose and Scope (40 CFR 122.1)

Section 122.1 provides a general description of the purpose and

scope of the NPDES program regulations. Today, EPA proposes to amend

this section to remove superfluous language and to provide better

clarification. Paragraph (b)(2) states that concentrated animal feeding

operations, concentrated aquatic animal production facilities,

discharges into aquaculture projects, discharges of storm water, and

silvicultural point sources are all point sources requiring NPDES

permits for discharges. This information is already provided at

Secs. 122.23, 122.24, 122.25, 122.26, and 122.27. EPA proposes to

remove paragraph (b)(2). Existing paragraphs (b)(3) and (b)(4) are

proposed to be redesignated as (b)(2) and (b)(3) respectively.

References to existing Sec. 122.1(b)(3) are found at Sec. 122.2 and

Sec. 124.1. Today's notice would insert a reference to 122.1(b)(2) in

their place.

To provide better clarification, EPA is proposing to remove and

revise language found at paragraphs (c), (d), (e), and (f) and place it

in three new paragraphs (a)(3), (4), (5). Paragraphs (c), (d), (e), and

(f) would be removed. By these revisions to Sec. 122.1, EPA does not

intend to change any existing substantive requirements of the NPDES

program. EPA also proposes to provide a note at the end of this section

to assist readers in contacting EPA if they have questions regarding

the NPDES program or its rules. EPA may also provide for the electronic

submission of queries concerning the NPDES program and solicits comment

on that practice.

2. NPDES Program Definitions (40 CFR 122.2, 124.2)

In this proposed rule, EPA seeks to streamline the NPDES program

definitions found at parts 122 and 124 by removing redundant or

superfluous language found in its regulatory definitions.

a. EPA intends to amend Sec. 122.2 to add references to definitions

that are found elsewhere in parts 122 and 123. The inclusion of such

references in a single location is intended to assist readers in

finding specific provisions in the NPDES regulations. However, this

action is not intended to expand the application of those definitions

if they are restricted to a particular section. This proposed rule

would provide references to the following terms.

Animal feeding operation

Aquaculture project

Bypass

Concentrated animal feeding operation

Concentrated aquatic animal feeding operation

Individual control strategy

Municipal separate storm sewer system

Silvicultural point source

Sludge only facility

Storm water

Storm water discharge associated with industrial activity

Upset

b. In 40 CFR 124.2, EPA intends to remove definitions that are

already found in 122.2. This includes the terms, ``applicable standards

and limitations'', ``variances'', and ``NPDES''. EPA believes such

multiple definitions to be redundant because Sec. 124.2(a) already

provides that the definitions of Sec. 122.2 (as well as definitions for

the sludge management, UIC, PSD, 404, and RCRA programs) apply to part

124.

3. New Sources/New Dischargers (40 CFR 122.4, 124.56)

Section 122.4(i) prohibits the issuance of a permit to a new source

or new discharger if the discharge would cause or contribute to a

violation of water quality standards. A new source or new discharger

may, however, obtain a permit for discharge into a water segment which

does not meet applicable water quality standards by submitting

information demonstrating that there is sufficient loading capacity

remaining in waste load allocations (WLAs) for the stream segment to

accommodate the new discharge and that existing dischargers to that

segment are subject to compliance schedules designed to bring the

segment into compliance with the applicable water quality standards.

EPA is proposing to revise these information submission

requirements to

[[Page 65270]]

allow the Director to waive the present submittal of information

requirements under Sec. 122.4(i) where the permitting authority

determines that it already has the required information. In many

instances the information required to be submitted by the applicant

(such as waste load allocations available or compliance schedules for

existing discharges) may already be in the Director's files. Where the

information is not available or current, the Director may not waive the

requirement for the applicant to generate all supporting documentation.

EPA notes that this information (as with any information which details

how permit limits are derived) should be included in the fact sheet or

statement of basis for the permit. See 40 CFR 124.7, 124.8, and 124.56.

To underscore the importance of such information and to clarify an

existing requirement, EPA also proposes to include an express

requirement in Secs. 122.4(i) and 122.56(b)(1) that information which

demonstrates how the criteria for permit issuance in Sec. 122.4(i) are

met is included in the fact sheet for the permit. EPA notes that this

revision merely clarifies existing requirements found at Secs. 124.7,

124.8, and 124.56 and does not result in an increased burden to the

regulated community or permit issuing authorities.

4. EPA Application Forms (40 CFR 122.1(d)(1), 122.21(a), 122.21(d),

122.26(c)(1))

EPA's regulations contain two provisions, Secs. 122.1(d)(1) and

122.22(d) which require the use of EPA application forms for EPA-issued

permits. In today's notice EPA proposes to consolidate these provisions

and move them to a new location, Sec. 122.21(a). Section 122.1(d)(1)

requires that applicants for EPA-issued permits must submit

applications on EPA application forms when available and indicates that

most of the information requested on these application forms is

required by EPA's regulations. The provision also indicates that the

basic information required in the general form (Form 1) and the

additional information required for NPDES applications (Forms 2A

through 2D) are listed in Sec. 122.21. Applicants for State-issued

permits must use State forms which must require at a minimum the

information listed in EPA's application regulations.

Similarly, Sec. 122.21(d)(3)(i) requires that all applicants for

EPA-issued permits, other than POTWs, new sources, and ``sludge-only

facilities,'' must complete Forms 1 and either 2B or 2C of the

consolidated permit application forms to apply under Sec. 122.21.

Section 122.21(d)(3)(ii) requires that in addition to any other

applicable requirements in this part, all POTWs and other ``treatment

works treating domestic sewage,'' including ``sludge-only facilities,''

must submit with their applications the information listed at 40 CFR

501.15 (a)(2) within the time frames established in paragraph

Sec. 122.21(c)(2) of this section. Finally, Sec. 122.26(c)(1) requires

storm water discharges associated with industrial activity to submit

Form 1 and Form 2F.

Most of the requirements in these two paragraphs are duplicative.

Consequently, EPA proposes to consolidate the requirements of

Secs. 122.1(d) and 122.1(d)(3) and place them in a new paragraph

designated as Sec. 122.21(a)(2). EPA believes paragraph (a) is a more

appropriate location because it pertains to all permit applicants,

whereas, paragraph (d) concerns situations involving permit

reapplications. Section 122.1 is also not a particularly suitable

location because it concerns the scope of the NPDES program and not

application requirements. The requirements currently found at

Sec. 122.21(a) would be retained in new paragraph (a)(1). Section

122.21(d)(3) would be removed and reserved for future use. In

Sec. 122.21(c)(2)(i), EPA proposes to revise a reference to paragraph

(d)(3)(ii) found in Sec. 122.21(c)(2) (i) and (ii) to reflect those

provisions' new location, paragraph (a)(2). EPA is also in the process

of revising some of its application forms (60 FR 62546, Dec. 6, 1995).

Those proposed revisions, once finalized, will be coordinated with the

revisions proposed in today's notice. EPA also proposes to add language

in proposed Sec. 122.21(a)(2) to clarify which EPA forms may be

required for a particular discharger. This new language will also allow

for the possibility of electronic submittal of application information

in the event that the Agency approves the electronic application

submittal process. At that time, authorized-States would have the

option of using electronic submission of application information. EPA

notes that there are other ongoing efforts to update the EPA's forms

which may result in nonsubstantive revisions to paragraph (a)(2).

5. Effluent Characteristics (40 CFR 122.21(g)(7))

Section 122.21(g)(7) requires that applicants for permits for

existing manufacturing, commercial, mining, and silvicultural

discharges must submit information on effluent characteristics. On

November 16, 1990 (55 FR 48062), EPA revised Sec. 122.21(g)(7) to add

language which specifically addresses storm water application

requirements. However, the addition of this language has made paragraph

(g)(7) more difficult to read because there is a large amount of

uninterrupted text and it is difficult to separate out requirements

that are specific to storm water discharges. Today's proposal seeks to

better clarify paragraph (g)(7) through the insertion of additional

paragraph headings. No substantive changes to 40 CFR 122.21(g)(7) are

intended by this revision. EPA also proposes to revise references to

provisions in paragraph (g)(7) that are found elsewhere in the NPDES

regulations (Secs. 122.21(g)(8); 122.21 notes 1, 2, and 3;

122.26(c)(1)(i); and 122.26(d)(2)(iv)(C)(2)) to ensure those references

reflect Sec. 122.21(g)(7)'s new structure.

6. Signatories (40 CFR 122.22)

Section 122.22 requires that all permit applications for

corporations shall be signed by a responsible corporate officer as

defined in paragraphs (a)(1)(i) or (a)(1)(ii) of that section.

Responsible corporate officer is defined at Sec. 122.22(a)(1)(i) as a

president, secretary, treasurer, or vice-president of the corporation

in charge of a principal business function, or any other person who

performs similar policy- or decision-making functions for the

corporation. Paragraph (a)(1)(ii) provides that a responsible corporate

officer may be the manager of one or more manufacturing, production, or

operating facilities employing more than 250 persons or having gross

annual sales or expenditures exceeding $25 million (in second-quarter

1980 dollars), if authority to sign documents has been assigned or

delegated to the manager in accordance with corporate procedures.

These numeric criteria (250 individuals, 25 million in second

quarter 1980 dollars) were added in 1983 (See 48 FR 39612 (Sept. 1,

1983)) to ensure that facility managers who sign permit applications

have high level corporate knowledge of a corporation's pollution

control operations and are authorized to make management decisions

which govern the operation of the regulated facility. EPA did not

intend signatories to include field supervisors or facility operators

because at the time that rule was established, we believed such

individuals might not have the ability to direct the activities of the

corporation so as to ensure that necessary procedures are established

or actions taken to gather complete and accurate information. EPA now

believes these criteria to be obsolete because they do not apply well

to current corporate

[[Page 65271]]

structures and facility operations in light of emerging trends in

automation and decentralization. The use of such rigid indicators may

operate to disqualify individuals who are best able to undertake the

responsibility of ensuring that permit applications are accurate and

complete. Today's proposal seeks to revise Sec. 122.22(a)(1)(ii) to

remove numerical criteria, and provide instead language which ensures

that facility managers who sign permit applications have high level

corporate knowledge of a corporation's pollution control operations and

are authorized to make management decisions which govern the operation

of the regulated facility including the ability to allocate resources,

make major capital investments, and initiate and direct the development

of other comprehensive measures to assure long term compliance with

environmental laws and regulations.

Instead of numeric criteria, today's proposal provides that

signatories to permit applications may include the manager of one or

more manufacturing, production, or operating facilities, provided, (1)

the manager is authorized to make management decisions which govern the

operation of the regulated facility including the ability to allocate

resources, make major capital investments, and initiate and direct

other comprehensive measures to assure long term environmental

compliance with environmental laws and regulations; (2) the manager can

ensure that the necessary systems are established or actions taken to

gather complete and accurate information for permit application

requirements; and (3) the manager has been assigned or delegated

authority to sign documents in accordance with corporate procedures.

EPA believes that today's proposed rule remains consistent with the

intent of the September 1, 1983 rulemaking to ensure that permit

application signatories are those who are best able to ensure that

accurate, complete, and truthful permit applications are submitted,

while allowing for greater flexibility in the use of signatories.

However, EPA invites comment on whether other criteria would prove more

appropriate in light of modern corporate management structures for

determining signatories for permit applications under

Sec. 122.22(a)(1)(ii).

7. Group Permit Applications (40 CFR 122.26(c)(2))

The 1987 amendments to the Clean Water Act (CWA) added section

402(p) which established a two phase approach for addressing point

source discharges of storm water. Under Section 402(p), Congress

identified five classes of point source storm water discharges that

would be included in Phase I of the Storm water program and required to

obtain NPDES permits. These are:

A discharge for which a permit has already been issued

under this section prior to February 4, 1987;

A discharge associated with industrial activity;

A discharge from a municipal separate storm sewer system

serving a population of 250,000 or more;

A discharge from a municipal separate storm sewer system

serving a population of 100,000 or more but less than 250,000; and

A discharge for which the Administrator or the State

determines that the storm water discharge contributes to a violation of

a water quality standard or is a significant contributor of pollutants

to waters of the U.S.

To implement the phase I provisions of Section 402(p) (1) through

(5), EPA published final storm water permit application regulations on

November 16, 1990 (55 FR 48063), as revised. For storm water discharges

associated with industrial activity, EPA defined eleven categories

comprising major groupings of industrial sectors that are identified

either by standard industrial classification (SIC) code or through

narrative descriptions. Industrial activities that fall within these

eleven industrial categories and which have a point source discharge of

storm water are required to seek a NPDES permit.

EPA anticipated that the implementation of the Phase I industrial

program would cover over 100,000 facilities. To ensure the timely

issuance of NPDES permits, EPA sought in the final rule to offer

several NPDES administrative approaches to facilitate extended permit

coverage as cost effectively and as efficiently as possible to large

numbers of permittees. In the November 16, 1990 final rule, EPA

provided that storm water discharges associated with industrial

activity could pursue one of three permit application options including

the submission of:

An individual permit application;

A notice of intent to be covered under a general permit;

or

A group permit application.

Today's revision focuses on group applications. This option allowed

facilities with very similar activities to form groups to submit a

joint application of which only ten percent of the group would have to

submit monitoring information. EPA developed this option to accomplish

the following goals:

To establish a procedure where adequate information would

be collected for developing permits for certain classes of storm water

discharges;

to reduce costs and administrative burdens on permit

applicants;

to reduce the amount of quantitative data by requiring

such data from only selected facilities within a group; and

to ease the burden on the permit issuing authority by

consolidating information.

In response to the group application option, EPA received over 1200

group applications encompassing 65,000 industrial activities. Using the

information provided by group applicants, EPA developed a multi-sector

storm water general permit (MSGP) which was published on September 29,

1995 (and revised on February 9, 1996). The MSGP includes baseline

conditions applicable to all industrial activities within 29 industrial

sectors and conditions that are specific to each sector. The MSGP is

available in States where EPA is the permitting authority. Industrial

facilities seeking coverage under the MSGP must submit a single page

notice of intent (NOI) to receive coverage. Where States have NPDES

authority, the MSGP is available as a model to assist those States in

providing permit coverage for storm water discharges in their

jurisdictions. While the MSGP was initially developed through the group

application process, it has evolved into a general permit whose

coverage is available to all facilities that meet its eligibility

requirements. It has also led to the development of a substantial body

of information regarding the permitting and control of storm water

discharges from industrial activity.

The group application process was designed to accommodate the

initial influx of first-time permit applications from Phase I

industrial activities and was based, in part, on the limited

availability of storm water general permits in States. However, the

deadlines for submitting group applications for Phase I facilities

expired on October 1, 1992, and coverage under storm water general

permits is now widely available. Forty States are authorized to issue

storm water general permits. EPA issues storm water general permits for

those States and jurisdictions that are without EPA authorization.

Industrial facilities may readily obtain permit coverage by submitting

a NOI to the appropriate permitting authority or through applying for

an individual permit. Consequently, EPA believes the group

[[Page 65272]]

application option is no longer needed. General permits provide a more

flexible approach to storm water coverage and can accomplish the goals

of the group permit application process (i.e., more efficient

monitoring, reduced application burdens) without requiring that

applicants form into groups prior to applying for permit

coverage.1 EPA also believes that storm water pollution prevention

plans (a principal requirement of most storm water general permits)

will ensure that permit conditions are appropriate and applicable for

the industrial activities covered. Consequently, today's notice

proposes to eliminate the group application option at

Sec. 122.26(c)(2), and proposes conforming changes to paragraph (c)(1).

The removal of the group application provisions will not impact EPA's

ability to reissue the MSGP because it is a general permit.

---------------------------------------------------------------------------

\1\ However, permittees may still be classified as belonging to

specific sectors or categories for the purpose of coverage under a

general permit. This may result in the imposition of sector or

category-specific conditions.

---------------------------------------------------------------------------

8. General Permits (40 CFR 122.28)

EPA's NPDES general permit program arose out of the broad grant of

authority in section 402(a) of the CWA and the decision of NRDC v.

Train, 396 F.Supp. 1393, 1402 (D.D.C. 1975), aff'd, NRDC v. Costle, 568

F.2d 1369 (D.C. Cir. 1977) which recognized EPA's authority to employ

administrative mechanisms, such as area (general) permits, to assist

the Agency in the practical administration of the NPDES permit program.

In 1979, EPA promulgated revisions to the NPDES regulations creating a

class of permits referred to as ``general permits.'' 44 FR 32873 (June

7, 1979). Under the general permit program, the permitting authority

may issue a permit to cover a class of similar dischargers or treatment

works treating domestic sewage in a defined geographic area with the

same effluent limitations.2 General permits have proven to be a

valuable tool by which to regulate classes of similar discharges. To

improve administration and operation of the general permit program and

to encourage more widespread use of general permits, the Agency is

proposing to amend the general permit regulations to allow general

permits to cover multiple categories of dischargers.

---------------------------------------------------------------------------

\2\ The provision allowing general permits to address treatment

works treating domestic sewage was added by EPA's sewage sludge

permit regulations issued on May 2, 1989 (54 FR 18716).

---------------------------------------------------------------------------

The current regulatory requirements for general permits are set out

at 40 CFR 122.28, and allow the Director to issue a single permit

covering more than one discharger (or treatment works treating domestic

sewage) within a specific geographic area. Historically, certain

regulatory restrictions have been applied to general permits. General

permits have been limited to specific areas corresponding to certain

geographic or political boundaries. 40 CFR 122.28(a)(1). Current

regulations also provide that general permits may regulate storm water

point sources, or a category of point sources other than storm water

that involve substantially similar types of operations, discharge the

same types of wastes or engage in the same types of sludge use or

disposal practice, require the same effluent limitations, require the

same or similar monitoring, and in the opinion of the permitting

authority, are more appropriately controlled under a general permit

than under individual permits. 40 CFR 122.28(a)(2). This provision has

been generally interpreted as limiting coverage of non-storm water

general permits to only a single category of point sources, such as a

single industrial category covered under an effluent guideline. (EPA's

regulations do allow general permits for storm water to regulate

multiple categories of point sources.)

In today's notice, EPA seeks to revise Sec. 122.28(a) (1) and (2)

to clarify that a general permit for non-storm water dischargers may

cover more than one category or subcategory of sources or treatment

works treating domestic sewage. This revision will enable greater

permit drafting flexibility and would allow the Director to write a

general permit covering (as separate categories) permittees whose

discharges or sludge use or disposal practices differ substantially,

for example, regarding flow or pollutant load, as well as for those

permittees with similar discharges or sludge use or disposal practices

(a single category). In another case, the Director might designate

different monitoring requirements for different categories based on

discharge flow or frequency and provide for this without having to

promulgate separate general permits for each group of dischargers or

treatment works treating domestic sewage in the general category.

The types of operations conducted or wastes discharged within each

category or subcategory authorized by the general permit (except for

general permits for storm water discharges) would still have to be

substantially the same. Within each identified category or subcategory,

limitations would have to be identical for all covered dischargers or

treatment works treating domestic sewage. In today's notice, EPA

proposes to revise Sec. 122.28 by adding a new paragraph, (a)(4), to

require that general permits must clearly identify the applicable

conditions for each category of dischargers or treatment works treating

domestic sewage and provide that general permits may exclude specified

sources or areas from coverage.

Today's proposal would also revise Sec. 122.28 by adding a new

paragraph, (a)(3), to provide that where dischargers (or treatment

works treating domestic sewage) are subject to water quality-based

limitations, the sources in that specific category or subcategory shall

be subject to the same water quality-based effluent limitations. While

this provision would appear at first to be redundant with existing

provisions at Sec. 122.28(a)(2)(i)(C) which require that non-storm

water sources covered under a general permit must require the same

effluent limitations, operating conditions, or standards for sewage

sludge or disposal, the restrictions contained in proposed paragraph

(a)(3) apply to storm water and non-storm water sources where water

quality-based limits are involved. EPA is proposing to add this

paragraph in part to clarify that general permit categories can be used

to impose water quality-based limitations as well as technology-based

limitations. However, paragraph (a)(3)'s requirement that sources in

categories or subcategories be subject to the same water quality-based

limits reflects EPA's position that general permits should not be used

to provide permit coverage to loosely grouped categories of dissimilar

discharges. While EPA has decided not to require that each category or

subcategory covered under a general permit discharge to waters that are

subject to the same water quality standards, permit writers may wish to

consider such a categorization particularly when calculating general

permit discharges as part of a waste load allocation.

Because the proposal would allow issuance of a single general

permit to cover multiple categories of facilities, it would facilitate

the use of general permits in areas with differing water quality

requirements or standards. It may allow the permitting authority to

issue general permits on a watershed or geographic basis to facilities

with the same water quality requirements. The proposal would allow a

permit drafted to cover a single category of dischargers or treatment

works treating domestic sewage to cover different subcategories subject

to different effluent limitations, standards, or conditions. This

should reduce the burden on the permitting agency by decreasing the

number of general permits issued. The proposal intends to provide

flexibility to deal

[[Page 65273]]

with the variations between the different dischargers or treatment

works treating domestic sewage (or water quality based stream segments)

covered under a single general permit. General permits are still

subject to the same reporting and monitoring requirements, limitations,

enforcement provisions, penalties, and other substantive requirements

as individual permits.

9. Monitoring (40 CFR 122.41(j), 122.41(l)(4), 122.44(i)(1)(iv),

122.48)

Monitoring requirements for NPDES permits are currently found in

different locations in EPA's regulations. Section 122.41(j)(1) requires

that monitoring be representative of the monitored activity. Paragraph

(j)(2) imposes requirements relating to the retention of monitoring

records. Paragraph (j)(3) places requirements on what information will

be provided in monitoring records. Paragraph (j)(4) requires that

monitoring be conducted according to part 136 testing procedures unless

otherwise specified. Paragraph (j)(5) imposes penalties for any person

who falsifies, tampers with, or knowingly renders inaccurate monitoring

devices or methods. Section 122.41(l)(4) addresses the reporting of

monitoring results and provides specific requirements relating to

Discharge Monitoring Reports (DMRs). Section 122.44(i) imposes

requirements on monitoring methodologies. Finally, Sec. 122.48 imposes

requirements for recording and reporting of monitoring results.

EPA believes this arrangement to be confusing. To provide better

clarification, EPA proposes to consolidate the monitoring provisions

found at Secs. 122.41 (j), (l)(4), and 122.44(i) and place them at

Sec. 122.48. In addition, a cross reference to the new consolidated

monitoring requirements will be placed at 122.41(j) to ensure

monitoring remains a standard condition for all NPDES permits. This

revision is not intended to result in any substantive changes to

monitoring requirements. EPA notes that the penalty provisions of 40

CFR 122.41(j)(5) (providing for penalties for falsifying, tampering or

knowingly rendering inaccurate monitoring devices or methods) remain a

standard condition of all EPA-issued NPDES permits. As described in

more detail below, 40 CFR 122.41(j)(5) (proposed Sec. 122.48(d) in

today's notice) is not required for authorized State programs. However,

40 CFR 123.27 contains a similar prohibition against falsifying,

tampering, or knowingly rendering inaccurate monitoring devices or

methods which must be included in authorized State programs.

As part of this consolidation, EPA is combining the provisions

currently found at Secs. 122.41(j)(4) and 122.44(i)(1)(iv) at proposed

Sec. 122.48(a)(3). Both of these provisions require that monitoring be

conducted in accordance with test procedures approved under 40 CFR part

136 unless an alternative test procedure has been approved under part

136. For sludge use or disposal, monitoring must be conducted in

accordance with test procedures approved under part 136 unless

otherwise specified in 40 CFR part 503. Both Secs. 122.41(j)(4) and

122.44(i)(1)(iv) were once promulgated as single provision (See 44 FR

32910 (June 7, 1979) (codified then as 40 CFR 122.20 (a)-(c))) and were

only broken out to conform to the organization of the consolidated

permit regulations. See 45 FR 33340-4, 33355, 33357, 33448, and 33450

(May 19, 1980). EPA is also clarifying that where no test procedure has

been approved under 40 CFR part 136, the Director shall specify a test

method in the permit. This reflects the current requirements found at

Sec. 122.44(i)(1)(iv) and as also expressed in EPA's June 7, 1979

rulemaking. EPA believes this revision does not result in any

substantive changes to the monitoring requirements but only clarifies

its existing interpretation of them.

10. Effluent Guideline Limits in Permits (40 CFR 122.44(a))

Currently, Sec. 122.44(a) is interpreted to require that where a

facility is covered by a particular effluent guideline, any permit

issued to that facility must contain effluent limitations for every

pollutant or parameter listed in the guideline (also known as

``guideline-listed pollutants''). These limits would be required

regardless of whether the facility would actually be discharging those

parameters. Because permittees must also monitor for all parameters

limited in a permit (see 40 CFR 122.44(i)(1)(i)), there are concerns

that this requirement may subject many facilities to the unnecessary

expense of monitoring for pollutants that they are not and will not be

discharging.

To provide permit writers with more flexibility in reducing the

burdens associated with unnecessary monitoring, EPA is proposing to

revise Sec. 122.44(a) so that it does not require limits for all

guideline-listed pollutants under certain circumstances. Existing

paragraph (a) would be redesignated as (a)(1). A new paragraph, (a)(2),

would allow permit writers on a case-by-case basis not to include

limits for guideline listed pollutants where a permit applicant

certifies and provides supporting information that the facility does

not discharge and will not discharge certain guideline-listed

pollutants. In such cases, permit writers may decide not to include a

limit for those parameters in the permit. However, it should be clearly

understood that in such instances, the permit would not authorize any

discharges of those excluded parameters in any amounts. For the

exclusion to be valid, the permit would have to contain an express

condition which notes that the permit does not authorize the discharge

of those excluded pollutants. This exclusion is good only for the term

of the permit. To receive an exclusion under proposed paragraph (a)(2),

Permittees must submit certifications (along with supporting

information) each time a permit is applied for (including permit

reissuances). For such an exclusion to be valid, it must be included as

an express condition each time a permit is issued.

EPA believes that this approach provides permittees and permit

writers with needed flexibility in reducing the burdens associated with

conducting unnecessary monitoring while ensuring that permits are not

interpreted as an authorization to discharge excluded pollutants in

unlimited amounts. This revision is not intended to allow the exclusion

of any pollutants that should be limited on the basis of water quality

standards.

Applicants should not pursue this approach if there is any

possibility those excluded parameters might be discharged. Applicants

may instead utilize the existing process of having limits placed on all

guideline-listed pollutants and seek minimum monitoring for those

parameters whose presence in the discharge is not expected. EPA

solicits comments on this proposal and also invites public comment on

other ways this process can be streamlined to remove any unnecessary

burdens with respect to limiting and monitoring for pollutants.

11. Reopener Clauses (40 CFR 122.44(c))

Section 122.44(c) provides for reopener clauses in permits. Section

122.44(c)(1)(i) requires that any permit issued to a discharger in a

primary industry category (listed in Appendix A of part 122) on or

before June 30, 1981, must contain an reopener clause to allow for

permit modification, revocation, or reissuance if an applicable

standard or limitation is promulgated under sections 301(b)(2)(C) and

(D), 304(b)(2), and 307(a)(2) of the CWA after such a permit was issued

and the standard or limitation is more stringent than what is found in

the

[[Page 65274]]

permit or controls a pollutant not limited in the permit. Where

applicable standards and limitations have already been promulgated,

Sec. 122.44(c)(1)(ii) requires that subsequent permits include those

limitations. Section 122.44(c)(3) imposes a duty on permitting

authorities to promptly modify, revoke, and reissue permits to which

Sec. 122.44(c)(1)(i) applies.

These provisions were established to implement the requirements of

a settlement agreement approved by the United States District Court for

the District of Columbia issued on June 8, 1976 in Natural Resources

Defense Council et al. v. Train, 8 E.R.C. 2120 (D.D.C. 1976). See 43 FR

22161 (May 23, 1978). This settlement agreement resulted in a new

program for the establishment of effluent limitations guidelines, new

source performance standards, and pretreatment standards for 21 major

categories of industries as well as the incorporation of those limits

in permits issued to dischargers from those categories. To meet that

goal, the agreement resulted in the imposition of a number of

deadlines. On May 19, 1980 (45 FR 33449), those deadlines were replaced

with a single deadline, June 30, 1981, which is found at

Sec. 122.44(c)(1).

In today's notice, EPA proposes to remove paragraphs (c)(1),

(c)(2), and (c)(3) of Sec. 122.44. Paragraphs (c)(1) and (c)(3) apply

only to permits issued on or before June 30, 1981. These provisions are

obsolete as more than 14 years have passed since that deadline and any

permits issued on or before that date are either no longer in existence

or in administrative continuance. EPA also proposes to remove paragraph

(c)(2) and consolidate its requirements with those found at

Sec. 122.44(a). Paragraph (c)(2) provides that any permit issued after

the deadline provided by section 301(b)(2) (A), (C), and (E)

(established as March 31 1989 by the 1987 amendments to the Clean Water

Act), must meet BAT and BCT standards whether or not applicable

effluent limits have been promulgated or approved. Paragraph (c)(2)

further states that such permits need not incorporate the reopener

clause found in section paragraph (c)(1). Paragraph (c)(2) largely

reiterates requirements found at Section 122.44(a) because paragraph

(a) already requires that permits must meet all technology-based

effluent limitations and standards promulgated under section 301, all

new source performance standards under section 306 of the CWA, and

case-by-case effluent limitations determined under section 402(a)(1) of

the CWA. EPA proposes in today's notice to consolidate the requirements

of 40 CFR 122.44(a) and (c)(2) into a new paragraph, (a)(1). (As noted

in greater detail above, EPA is also creating a new paragraph, (a)(2),

which contains language concerning guideline listed pollutants.)

Proposed paragraph (a)(1) requires that permits shall include

technology-based effluent limitations and standards based on: Effluent

limitations and standards promulgated under section 301(b)(1) or

301(b)(2), as appropriate, new source performance standards promulgated

under section 306 of CWA, case-by-case effluent limitations determined

under section 402(a)(1) of CWA, or on a combination of the three, in

accordance with Sec. 125.3. For new sources or new dischargers,

paragraph (a)(2) also notes that these technology based limitations and

standards are subject to the provisions of Sec. 122.29(d) (protection

period).

Paragraph (c)(4) covers reopeners of sludge conditions in NPDES

permits. EPA is proposing to retain that provision and redesignate it

as paragraph (c).

By removing these provisions, EPA does not intend to limit the

ability of permitting authorities to place reopener clauses in permits

on a case-by-case basis particularly where reopeners may result in more

environmentally protective permit limits, standards, or conditions.

12. Best Management Practices (40 CFR 122.44(k))

As described in more detail below, EPA is proposing in today's

notice a non-substantive revision to Sec. 122.44(k) which would provide

a reference to available agency guidance on best management practices.

The addition of this language is merely intended to assist readers in

developing and implementing best management practices. It is not

intended in anyway to change the requirements of Sec. 122.44(k).

13. Termination of Permits (40 CFR 122.64)

Section 122.64 lists the causes for EPA termination of an NPDES

permit during its term, or for denial of an application for permit

renewal. If the Director decides to terminate a permit, he or she

currently must follow the procedures at Sec. 124.5, or approved State

procedures, which require preparation of a notice of intent to

terminate (a type of draft permit) and public notice and comment. (As

discussed in more detail in Section II.B below, EPA is proposing to

substitute part 22 procedures for termination of permits other than at

the request of the permittee, also known as ``termination for cause''.)

These procedures are intended primarily to assure that the rights of

the permittee are adequately considered. This is because permit

termination has been considered as essentially an enforcement

mechanism. See 45 FR 33316 (May 19, 1980); 44 FR 34249 (June 14, 1979).

However, there may be situations outside of enforcement where

termination is desirable because the permittee has discontinued

operation or connected the discharge to a POTW. In those situations,

EPA sees little benefit in requiring the procedures of Sec. 124.5 as

currently written (or part 22 as proposed).

EPA is proposing to revise Sec. 122.64 to allow the Director to

terminate a permit by giving notice to the permittee and without

following part 22 or 124 procedures where the permittee has permanently

terminated its entire discharge (by elimination of its process flow or

other discharge components) or has redirected that discharge into a

POTW. However, where a permittee objects to the termination, this

revision would require the Director to follow the existing part 124

procedures to terminate the permit. (But as noted in more detail below

at Section II.B, formal hearings under part 22 would not be necessary

since the termination would not be one for cause and today's proposal

would remove formal hearing requirements for permit terminations that

are not for cause. EPA notes that these expedited permit termination

procedures would not be allowed where a permittee is subject to pending

State and/or Federal enforcement actions including citizen suits

brought under State or Federal law. In such situations, the public has

a strong interest in participating in any permit termination

proceedings and permittees should not use expedited permit termination

procedures as a way to avoid enforcement liability. Therefore, EPA is

adding language in proposed Sec. 122.64 to state that expedited permit

termination procedures are not available to permittees that are subject

to pending State and/or Federal enforcement actions including citizen

suits brought under State or Federal law. EPA will also require that

permittees who request expedited permit termination procedures must

certify that they are not subject to any pending State and/or Federal

enforcement actions including citizen suits brought under State or

Federal law. EPA specifically invites comment on how EPA and permitees

may determine if there are pending State and/or Federal enforcement

actions. One possible approach may be to deny the availability of

expedited permit terminations where EPA, the

[[Page 65275]]

State, or any person has commenced an action against a permittee under

State and/or Federal Law, or where a permittee, the Administrator, or

the State has received notice of an intent to sue pursuant to 40 CFR

Sec. 135 or State law. EPA invites comment on that approach.

Also, EPA is not proposing to eliminate the requirement to follow

part 124 termination procedures if the pollutants will be disposed of

either in wells or by land application of effluent, even if the

permittee requests termination. In such cases, it is important that the

public be notified and able to pursue any concerns about such disposal

methods under other appropriate Federal, State or local regulatory

programs. EPA also notes that there are situations where permits are

appropriate for no discharge facilities, particularly where there is

the possibility of an inadvertent discharge into waters of the United

States.

This proposal would enable the Director to terminate permits when

the discharger has eliminated its discharge without waiting for permit

expiration. EPA notes that a permittee terminating its discharge due to

connection to a POTW would be subject to applicable pretreatment

requirements, including those in parts 403 and 405-471, along with any

local requirements. An existing categorical industrial user initiating

a discharge to a POTW must notify the POTW in accord with Sec. 403.12.

EPA also notes that permittees should be very sure that they have, in

fact, eliminated their discharge when requesting expedited permit

termination procedures. This is because any pollutants discharged by

the facility subsequent to permit termination could violate section 301

of the CWA (prohibition against unpermitted discharges).

This proposal would streamline the permit termination process

without sacrificing any procedural safeguards. EPA specifically invites

comment on whether members of the public, other than the permittee,

would have a significant interest in such terminations such that public

notice should continue to be required.

EPA is also proposing conforming changes to Sec. 124.5 procedures

to reflect abbreviated termination procedures proposed for the cases

discussed in proposed Sec. 122.64(b). One pre-notice commenter has

recommended that these expedited permit termination procedures be

employed where an existing discharger seeks to terminate its individual

permit coverage and obtain coverage under a general permit for the same

discharge. EPA invites comment on whether expedited permit termination

procedures should be employed for this and other situations.

B. Proposed Revisions to Part 123

1. Requirements for Permitting (40 CFR 123.25)

EPA is today proposing revisions to 40 CFR 123.25(a) to clarify

that certain provisions which detail penalty amounts in Sec. 122.41

(a)(2), (a)(3), and (j)(5) are not required of State NPDES programs.

Instead, the applicable penalty provisions for State NPDES programs are

found at 40 CFR 123.27. This is consistent with EPA's long standing

interpretation of the Clean Water Act and its regulations. See OGC

Opinion dated May 31, 1973. However, EPA notes that while the penalty

provisions of 122.41 (a)(2) and (a)(3) need not be included in State

NPDES programs, Sec. 122.41(a)'s condition, ``a duty to comply'' does.

With respect to existing Sec. 122.41(j) (proposed in today's notice as

Sec. 122.48(d)), EPA notes that it does not have to be included in

NPDES State Programs. However, EPA wishes it to be clear that it

interprets Sec. 123.27(a)(3) to contain the same prohibitions as those

found in paragraph Sec. 122.41(j). That is, a person who falsifies,

tampers with, or knowingly renders inaccurate, any monitoring device or

method required under a permit is subject to criminal fines and

penalties as determined under Sec. 123.27. Finally, EPA notes that

States are not prohibited from adopting penalty amounts that are the

same as those found at Sec. 122.41 if they wish to do so.

2. Transmission of Information to EPA (40 CFR 123.44)

EPA is today proposing revisions to 40 CFR 123.44 to remove

references to the Office of Water Enforcement and Permits (OWEP) and

its role in commenting on and objecting to State-issued general

permits. At one time, OWEP (now known as the Office of Wastewater

Management) was expected to play an active role in reviewing,

commenting, and objecting to State-issued general permits. Under

provisions once found at 40 CFR 123.43(b) and 124.58, authorized States

were required to provide copies of draft general permits (other than

those for separate storm sewers) to the Director of OWEP for review.

Section 123.44(a)(2) of EPA's current regulations further provides that

the Director of OWEP may comment upon, object to, or make

recommendations with respect to proposed State-issued general permits

(other than those for separate storm sewers) on EPA's behalf. The

introductory text of Sec. 123.43(b)(2) also expressly provides OWEP

with a role in objecting to State-issued general permits. Finally,

Sec. 123.44(i) makes the role of the Director of OWEP coextensive with

that of the Regional Administrator for the purposes of objecting to

proposed State-issued general permits (other than those for separate

storm sewers).

The Office of Wastewater Management no longer plays an active role

in reviewing State-issued general permits. The number of State general

permit programs have increased with a corresponding increase in the

number of State-issued general permits. This has resulted in the

Regions assuming the primary role in reviewing State-issued general

permits. Moreover, as States have gained more experience in running

general permit programs, EPA believes that an extra level of EPA review

is no longer warranted. On June 29, 1995, EPA removed Secs. 123.44(b)

and 124.58 from the Code of Federal regulations as unnecessary in light

of the Regions' primary role in reviewing State permits. See 60 FR

33931. To conform to those earlier changes and to continue EPA's effort

to streamline Federal oversight of State NPDES permit programs, EPA

proposes in today's notice to revise Sec. 123.44 (a)(2) and (b)(2) to

remove those references to OWEP and its role in reviewing State-issued

general permits. EPA would also remove and reserve 40 CFR 123.44(i).

C. Proposed Revisions to Public Hearing Requirements for NPDES Permit

Actions and RCRA Permit Terminations

EPA is today proposing substantial revisions to its existing

procedural requirements for issuing NPDES permits in those States and

territories (and in Indian Country) where EPA retains the authority to

issue NPDES permits. EPA is proposing to eliminate as unnecessary the

existing procedures for conducting formal evidentiary hearings on NPDES

permit conditions contained in 40 CFR part 124, subpart E, and is

further proposing to eliminate the alternative ``Non-Adversary Panel

Procedures'' in part 124, subpart F. EPA is also proposing to eliminate

Appendix A to part 124 (Guide to Decisionmaking under part 124) because

its role in explaining subpart E and subpart F procedures would no

longer be relevant in the absence of those subparts. EPA is also

proposing to modify the procedures for terminating NPDES and RCRA

permits. These revisions do not apply to authorized State NPDES

Programs.

[[Page 65276]]

1. Background of the Current Rule

Section 402(a) of the CWA authorizes the Administrator to issue an

NPDES permit ``after opportunity for a hearing.'' In the late 1970's,

three United States Circuit Courts of Appeals concluded that section

402(a) of the CWA requires that NPDES permit adjudications be conducted

according to formal adjudicatory procedures that meet the standards set

forth in sections 554, 556 and 557 of the Administrative Procedure Act

(``APA''). 5 U.S.C. 554, 556 & 557. These courts reasoned that the

reference to a ``hearing'' in section 402(a), in light of the ``quasi-

judicial'' nature of the fact finding involved in NPDES permit

proceedings, indicated Congressional intent to require formal

adjudicatory procedures, notwithstanding the absence of an explicit

requirement in the Act that such procedures be followed. Seacoast Anti-

Pollution League v. Costle, 572 F.2d 872, 877 (1st Cir. 1978); Marathon

Oil Co. v. EPA, 564 F.2d 1253, 1264 (9th Cir. 1977); United States

Steel Corp. v. Train, 556 F.2d 822, 833 (7th Cir. 1977).

Largely because of the holdings in these cases, EPA promulgated the

current part 124 regulations in 1979, which require formal evidentiary

hearings of the type contemplated by section 554 of the APA. 44 FR

32854, 32855 (June 7, 1979). These procedures apply to any NPDES permit

decision (i.e., a decision to grant a permit, to deny a permit, or to

terminate a permit for cause under 40 CFR 122.64), and to a decision to

terminate a permit for a hazardous waste treatment, storage, or

disposal facility issued under Section 3005 of RCRA. 40 CFR 124.71,

270.43.

Under part 124, when issuing, denying, or terminating an NPDES

permit (or terminating a RCRA permit), EPA undergoes a complicated 3-

step administrative process. Step 1 begins when a discharger submits an

application for a new or revised NPDES permit. Based on the

application, the appropriate EPA Regional Office prepares a draft

permit (or draft decision to deny) detailing the proposed conditions on

the discharger. The EPA Region provides notice and an opportunity for

public comment on draft permits (40 CFR 124.10) and provides a public

hearing when there is a significant degree of public interest. 40 CFR

124.12(c). Step 1 ends when the Regional Administrator (or his or her

designee) issues a final permit decision, incorporating any changes in

the draft permit occasioned by the public comments received.

The permit takes effect 30 days after issuance unless the permittee

or any other member of the public who commented on the draft permit

initiates Step 2 (or if one of the other two exceptions at 40 CFR

124.15(b) are met i.e., a later effective date is specified in the

permit decision, or if no comments have requested a change in the draft

permit, it becomes effective immediately upon issuance). In Step 2, a

party appeals the permit decision by requesting an evidentiary hearing.

40 CFR 124.15(b). To exhaust administrative remedies, the permittee (or

the public) must request an evidentiary hearing on all contested issues

(legal and factual). The EPA Regional Administrator must then decide

whether to grant or deny the request for a hearing. The Regional

Administrator shall grant a hearing on any issue for which there is a

genuine dispute of material fact, and on any legal issue which is

intertwined with such material factual issues. The Regional

Administrator will deny a hearing on any other legal issues, or on any

factual issues for which there is no material dispute. If a hearing is

granted on any issue, an Administrative Law Judge presides over a

formal evidentiary hearing following the procedures of 40 CFR part 124

subpart E.

As an alternative to the full adjudicatory proceeding, EPA

regulations also provide that Steps 1 and 2 may be combined in a single

semi-formal hearing process before a non-adversary panel of EPA experts

(called a ``Non-Adversary Panel Procedure'' or ``NAPP''). 40 CFR part

124 subpart F. These procedures apply only to NPDES permits which

constitute an ``initial licensing'' proceeding under the Administrative

Procedure Act, or if a party to the proceeding requests such a hearing.

40 CFR 124.74(c)(8), 124.111(a)(1).

For issues decided in an evidentiary hearing or Non-Adversary Panel

Procedure (and for issues arising when a request for an evidentiary

hearing is denied), a party may initiate Step 3 by appealing the

Regional Administrator's decision to EPA's Environmental Appeals Board.

40 CFR 124.91, 124.127. The appeal provides an opportunity to review

any factual conclusions (under a ``clear error'' standard), policy

decisions, or legal conclusions. The appeal is the final prerequisite

to judicial review. The entire administrative process (that is, to

comment at Step 1, to appeal at Step 2, and to further appeal at Step

3) must be exhausted in order to obtain judicial review.

By contrast, permits issued or denied under RCRA Subtitle C, the

UIC program of the Safe Drinking Water Act, or the PSD program of the

Clean Air Act, use Steps 1 and 3 of the above-described process, but

not Step 2. In other words, a party may appeal from the Regional

Administrator's permit decision directly to the Environmental Appeals

Board. 40 CFR 124.19(a). There is no provision for formal adjudicatory

hearings, unless the RCRA, UIC, or PSD permit has been consolidated for

purposes of permit issuance with an NPDES permit for which a request

for evidentiary hearing has been granted. 40 CFR 124.71(a).

EPA's experience with the evidentiary hearing process suggests that

it causes significant delays in NPDES permit issuance without causing

noticeable improvements in the quality of the permit decisions made. As

discussed in more detail below, EPA statistics suggest that at least

80% of all requests for evidentiary hearing are resolved without a

hearing taking place or any changes being made to the permit.

Nonetheless, it takes an average of 18-21 months to complete the 2-part

appeals process for such permits. EPA has maintained the process

primarily due to concerns about the legality of adopting less formal

procedures. As discussed below, however, these concerns no longer hold

true.

2. Proposed Elimination

In EPA's opinion, formal evidentiary hearings are not required by

the CWA, nor are they necessary to protect the due process rights of

permittees or other interested parties. EPA therefore proposes to

eliminate the requirement for such hearings prior to EPA's issuance of

NPDES permits.

a. Legal Basis. (1) The Language of Section 402(a). EPA has

concluded that due to the progress of the law in the Courts of Appeals,

the Seacoast and Marathon decisions are no longer good law, and that

the CWA may be interpreted not to impose a formal hearing requirement.

As noted earlier, Section 402(a) does not explicitly state that public

hearings on NPDES permits must be conducted ``on the record,'' the

phrase normally associated with a requirement that hearings be

conducted under section 554 of the APA. The absence of an explicit

requirement in section 402(a) that formal APA procedures be used is

significant in light of certain judicial decisions that followed the

promulgation of the part 124 regulations. These decisions, which

address procedural requirements under statutory provisions other than

section 402(a) of the CWA, have abandoned the presumption that trial-

type hearings are required by the APA where a statute calls for an

adjudicatory hearing

[[Page 65277]]

without explicitly requiring formal procedures. Chemical Waste

Management v. EPA, 873 F.2d 1477 (D.C. Cir. 1989) (``CWM'') (RCRA

section 3008(h)); Buttrey v. United States, 690 F.2d 1170 (5th Cir.

1982) (CWA section 404).

In CWM, the D.C. Circuit upheld RCRA regulations establishing

informal procedures for adjudicating corrective action orders under

RCRA section 3008(h). 873 F.2d at 1478. RCRA section 3008(h) does not

specifically provide for hearings, but section 3008(b) provides that

``[a]ny order issued under this section shall become final unless * * *

the person or persons named therein request a public hearing. Upon such

a request the Administrator shall promptly conduct a public hearing.''

42 U.S.C. section 6928(b). Under the RCRA corrective action hearing

regulations at 40 CFR part 24, the operator of a hazardous waste

facility may submit written information and arguments for inclusion in

the record and may make an oral presentation at the hearing itself.

Direct and cross-examination of witnesses is not permitted, but the

Presiding Officer may direct questions to either party. The Presiding

Officer is to be either the Regional Judicial Officer or an attorney

employed by the Agency who has not had any prior connection with the

case. The RCRA regulations contain detailed requirements for the

establishment of the administrative record. The Presiding Officer must

review the record and file a recommended decision with the Regional

Administrator, who in turn renders a final decision that is judicially

reviewable under the APA. These procedures closely parallel, of course,

the procedures for processing a permit under part 124, subpart A.

In Buttrey, the Fifth Circuit upheld the hearing regulations used

by the Army Corps of Engineers to issue or deny CWA section 404

permits. 690 F.2d at 1172. Section 404 provides that the Secretary may

issue permits for the discharge of dredge or fill material ``after

notice and opportunity for public hearings.'' 33 U.S.C. section

1344(a). The Corps' section 404 procedures authorize a ``paper

hearing,'' with public notice and comment on the proposed permit

action. Corps procedures do not explicitly provide an opportunity for

oral presentations.

Both Buttrey and CWM seriously question the continuing validity of

Seacoast and Marathon. CWM, in particular, notes that the cases were

decided prior to the Supreme Court's decision in Chevron, U.S.A. v.

NRDC, 467 U.S. 837, 843 (1984), which held that where Congress has

failed to express a clear intent to the contrary, an agency charged

with administering the statute may adopt any interpretation which is

reasonable in light of the goals and purposes of the statute. Where a

statute fails to use the term ``on the record,'' the court will

evaluate whether the hearing procedures adopted by the agency are

reasonable in light of the statute and also any due process

considerations. CWM, 873 F.2d at 1482. The D.C. Circuit has also noted

that even assuming formal hearings are required for issuance of NPDES

permits, there is no absolute right to provide oral testimony or to

cross examine witnesses in such hearings. NRDC v. EPA, 859 F.2d 156,

193 (D.C. Cir. 1988) (upholding EPA's Non-Adversary Panel Procedures

and distinguishing Seacoast).

(2) Reasonableness of Interpretation. As with the 3008(h) rules and

the procedures for issuance of RCRA or UIC permits, EPA believes that

providing for informal hearings prior to issuance of NPDES permits is a

reasonable interpretation of section 402(a).

First and most important, EPA believes that formal hearings are not

necessary to protect the due process rights of permittees or other

interested parties. The leading Supreme Court case discussing due

process requirements is Mathews v. Eldridge, 424 U.S. 319 (1976).

Mathews establishes a 3-part analysis that balances the following

factors in deciding what procedures are required by the Due Process

clause: (1) The private interests at stake, (2) the risk of erroneous

decision-making, and (3) the nature of the government interest. Due

process generally requires, at a minimum, that EPA provide independent

and objective fact-finding, see Wong Yang Sung v. McGrath, 339 U.S. 33,

41 (1949), Morrisey v. Brewer, 408 U.S. 471, 489 (1972), as well as a

complete administrative record containing the information upon which

the Agency relies. See Camp v. Pitts, 411 U.S. 138, 139-142 (1973). Due

process also requires that, prior to final agency action, EPA must

provide to affected parties notice of what the Agency intends so that,

should those parties disagree, they may submit contrary arguments or

evidence. See Goss v. Lopez, 419 U.S. 565, 581 (1975). See generally,

Kenneth C. Davis, Administrative Law Treatise, 10:3, 10:7, 13:1-2,

13:7, & 18:2 (2d ed. 1980). The procedures for processing permits under

part 124 subpart A meet all of these minimum requirements.

In an NPDES permit proceeding, the private interests at stake are

those of a potential discharger in obtaining a permit to conduct its

economic activities in a lawful manner (and the interests of private

individuals in challenging permits). Yet, no personal liberty interests

are at stake, there is no ``right to pollute,'' and the granting of an

NPDES permit does not convey a property right of any sort, or any

exclusive privilege. See 40 CFR 122.25(b).

EPA has previously concluded that, in general, due process

considerations dictate that most administrative enforcement actions

should proceed under formal hearing procedures. In such a proceeding,

EPA is accusing respondents of violations of ``established legal

standards,'' and the decision maker is called upon to adjudicate

specific factual issues relating to the violations in question. See 45

FR 24,360 (Apr. 9, 1980 (promulgating part 22)). The Agency concluded

that, without full adjudicatory hearings, there was a significant risk

that EPA might be vulnerable to arguments that the Agency lacked the

means to properly resolve disputed factual matters upon which the

alleged violator's interests were dependent.

However, EPA believes that the nature of the typical hearing on an

NPDES permit will differ significantly from the type of hearing held on

a compliance or penalty order. Hearings on permits are less apt to

present the kind of factual issues regarding the conduct of the

discharger, which case law identifies as being uniquely susceptible to

resolution in a formal evidentiary hearing. Rather, the issues posed in

proceedings on permits will typically relate to legal, policy, or

technical matters concerning the appropriate limitations on the

pollutants in the discharge, which are most appropriately addressed in

informal hearings. The primary factual issues in a hearing on an NPDES

permit are likely to involve what technology-based and water quality-

based limitations are necessary for inclusion in the permit, and

whether EPA has properly derived those limits. These kinds of issues

are apt to involve wide-ranging and complex facts and are more

susceptible to resolution through analysis of a full documentary record

than through examination and cross-examination of witnesses. The goal

should then be to compile a full and fair documentary record upon which

EPA can base its decision. The procedures in subpart A allow the

permittee, other interested parties, and the Agency every opportunity

to develop just such a record. Where an issue is in dispute, the

Regional Administrator can typically resolve the dispute through

analysis of the written affidavits and arguments of

[[Page 65278]]

the parties' technical experts. The risk of an erroneous deprivation of

the discharger's rights in deciding these issues is accordingly very

low.

By contrast, there is a significant public interest in an expedited

process for issuing NPDES permits. EPA's experience since 1979 has been

that the opportunity to request an evidentiary hearing has led to

significant delays in permit issuance. EPA does not have complete data

on evidentiary hearing process all the way back to 1979. However, EPA

kept comprehensive statistics on the numbers of evidentiary hearing

requested, resolved, and pending between 1990 and 1994. As of July 1,

1994, the latest period for which data are available, 194 requests for

evidentiary hearing were pending at EPA. That is, 194 requests were

awaiting a decision by the Region on the request for evidentiary

hearing, were waiting a hearing, or were awaiting action on appeal to

the EAB.

Between March, 1990, and July 1, 1994, 59 requests for a hearing

were finally resolved, involving 55 different permits. Of those 59, 22

requests for hearing were withdrawn, 26 were denied by the Regional

Administrator (RA) or the EAB, and the remaining 11 were settled

without hearing. Only four hearings were conducted during this period,

and only one hearing resulted in EPA being ordered to make changes to

the NPDES permit. Of the 194 pending hearing requests, 19 had been

pending with the Agency for 5 years or more. For the 53 permits

resolved during the period for which EPA has data, the average time

between request and resolution was over 18 months; if one counts only

the 33 proceedings which were resolved on the merits (i.e., other than

by withdrawal of the administrative appeal), the average time increases

to over 21 months. In contrast, EAB appeals for NPDES, RCRA, or UIC

permits average under 9 months .

These statistics suggest that evidentiary hearings themselves

rarely result in changes in permits. In only 20% of the permits for

which EPA has data did the appeal process result in modifications to

the permit, and only one out of 55 of those as a direct result of a

decision in an actual evidentiary hearing. Rather, any changes to the

permits usually resulted from informal settlement discussions between

the Region and the permittee (or occasionally by unilateral decision by

the Region to change the permit). For the remainder of the requests,

the decision of the Regional Administrator or the EAB was sufficient to

resolve all issues, and the complete evidentiary hearing and appeal

process resulted in no changes to the permits.

Yet, the evidentiary hearing process clearly delays the time in

which the permit becomes fully effective. Under current regulations

(Sec. 124.60), contested permit conditions are not in effect pending

the dual appeals process. The 18-21 month average appeal time means

that many permit limits do not take effect until well into the 5-year

permit term (the 5-year term generally begins when the RA issues the

permit under Sec. 124.15). For new sources and NPDES dischargers

without a prior NPDES permit, they cannot begin to discharge until the

permit appeals are resolved. For existing sources, any new or modified

permit limits to protect water quality which are contested cannot take

effect. Thus, the long lag time in resolving permit appeals can affect

all sectors of the public. In particular, the need to pursue multiple

levels of administrative appeals imposes unnecessary costs on the

regulated community or other parties participating in the permit

processes.

The lengthy appeals process also impacts those members of the

public who have an interest in participating in the permit process.

Citizen participation is a vital component of the NPDES program.

Section 101(e) of the CWA explicitly requires EPA to provide for,

encourage, and assist in the development of requirements under the CWA.

As EPA has noted before, adequate public participation helps to ensure

permits which are protective of the environment by giving permit

writers the valuable insights of participants other than the permittee.

61 FR 20973-74 (May 8, 1996). The lengthy formal hearing process

effectively requires all interested parties to obtain legal counsel and

spend a significant amount of time to request, prepare for, and conduct

a trial-type hearing before an ALJ. Citizens groups interested in the

content of an NPDES permit are likely to lack the same level of

resources necessary to participate in such a proceeding that either the

government or an NPDES permittee will possess. Thus, the formal process

may pose a barrier to citizen involvement in the NPDES permit process.

In addition to affecting the government and public interests in

effective permits and effective public participation in permit

proceedings, the evidentiary hearing process also represents a

significant drain on Agency resources. EPA Regions utilized over 25

work years of staff time between 1990 and 1994 on processing requests

for evidentiary hearings, preparing for hearings, or defending before

the EAB a permittee's appeal of decisions to deny requests for

hearings. Only about 5 and \1/4\ of those work years were spent

actually preparing for or conducting the hearings; the remainder of EPA

staff time was used responding to (and usually denying) requests for a

hearing and defending a permittee's appeal of those denials before the

EAB.

The evidentiary hearing process uses significant Agency resources

with little or no apparent gain in the quality of the decision-making.

Often, the key issue before the EAB involves whether the RA properly

denied the request for evidentiary hearing, either because there was no

genuine issue of material fact raised (see In re Mayaguez Regional

Sewage Treatment Plant, Puerto Rico Aqueduct & Sewerage Authority,

NPDES Appeal No. 92-23, at 11 (EAB, Aug. 23, 1993), aff'd, Puerto Rico

Aqueduct & Sewer Auth. v. Browner, 35 F.3d 600 (1st Cir. 1994)), or

because the only issues raised were legal issues for which no hearing

is necessary (and which the EAB can resolve). EPA utilized 8 work years

between 1990 and 1994 defending denials of evidentiary hearing

requests, and very few of those decisions were reversed by the EAB. It

seems particularly unnecessary for the RA to have to review a request

for hearing, prepare a decision to deny the request on the grounds that

the only issues are ones for which there is no genuine dispute of

material fact, and then defend that decision to deny before the EAB.

Rather, it would seem to make more sense to take the legal issues

appropriate for EAB resolution straight to the EAB, and leave

resolution of the factual issues for the informal hearing process under

subpart A. In those instances where the EAB finds that the Region has

made a clear error in resolving a factual issue, the EAB could, as it

does for RCRA, UIC, or PSD permits, remand the permit decision for

further consideration including further development of the

administrative record using the informal hearing process. Furthermore,

to the extent that informal settlement discussions are necessary to

resolve outstanding issues, such discussions could and would take place

during EAB review; the formal evidentiary hearing process is not

necessary to provide an opportunity for such discussions.

Balancing the private interests at stake in an NPDES permit

proceeding with the public interest in ensuring that such permits

control discharges (and ensure protection of the environment) in an

expeditious and effective manner and the public interest in effective

citizen participation in the permit process, and given that the

availability of formal hearings do not appear to reduce

[[Page 65279]]

significantly the already low risk of erroneous decision-making, EPA

concludes that due process considerations do not mandate formal

hearings.

EPA also notes that the primary goal of the Clean Water Act is to

ensure that waters of the United States obtain ``fishable/swimmable''

status as early as possible. CWA section 101(a). Section 301(b)(1)(C),

in particular, requires that NPDES discharges do not cause or

contribute to violations of State water quality standards. The long lag

time between permit issuance and when effluent limitations take effect

under the current proceedings impairs achievement of these goals.

Finally, the number of States in which EPA is the permit issuing

authority is small and getting smaller, and EPA anticipates that its

role as a permit issuing authority will continue to diminish. Forty-two

States or Territories have obtained authorization to issue NPDES

permits; EPA retains permitting authority in only 15 States/Territories

and in Indian Country. Many States do not provide for formal hearings

prior to issuance of NPDES permits, and EPA is unaware that there have

been significant problems with the content of such permits as a

result.3 EPA sees no reason to retain formal hearings for a

fraction of the NPDES permits issued nationwide.

---------------------------------------------------------------------------

\3\ However, EPA believes that the ability to judicially

challenge final permits is an essential element of public

participation under the Clean Water Act. On May 1, 1996, EPA issued

a final rule which will require that all States that administer or

seek to administer the NPDES program shall provide an opportunity

for judicial review in State court of the final approval or denial

of permits by the State that is sufficient to provide for,

encourage, and assist public participation in the NPDES permitting

process. This rule does not, at this time, apply to Indian Tribes.

See 61 FR 20972 (May 8, 1996).

---------------------------------------------------------------------------

For all of these reasons, EPA believes that neither due process nor

the Congressional goals for the NPDES program counsels in favor of

maintaining the evidentiary hearing process, and that, consistent with

the principles of Chevron, EPA may reasonably interpret Section 402(a)

to authorize use of informal hearings when issuing NPDES permits.

b. Proposed New System. (1) Permit Issuance. The existing process

for RCRA, UIC, and PSD permits has proven effective in resolving all

factual, legal, and policy issues, providing for adequate public

participation, and ensuring that permit issues are resolved in a

relatively short time frame. EPA therefore proposes to place NPDES

permits under the same system.

NPDES permits would therefore utilize Steps 1 and 3 of the existing

process; Step 2 would be eliminated. The EPA Regional Office would

continue to prepare a draft permit, provide notice and an opportunity

for public comment on the draft permit and opportunity for a public

hearing when there is a significant degree of public interest, and

issue a final permit decision, incorporating any changes in the draft

permit occasioned by the public comments received. After that initial

decision, however, a party would appeal from the Regional

Administrator's permit decision directly to the Environmental Appeals

Board. As provided in Sec. 124.19, a party could appeal any factual or

legal determination in the Regional Administrator's decision (if the

issue were properly raised in public comments on the draft permit, as

provided in 124.13).4 Subpart E would be eliminated in its

entirety.

---------------------------------------------------------------------------

\4\ The party need not, however, submit all supporting factual

information during the comment period; rather the Regional

Administrator may instruct the party to submit such information if

desired. 40 CFR 124.13 (``Commenters shall make supporting materials

not already included in the administrative record available to EPA

as directed by the Regional Administrator'') (emphasis added); 49 FR

38,042 (Sept. 26, 1984) (``Generally supporting information would

not be required to be submitted during the comment period'').

---------------------------------------------------------------------------

EPA also proposes to eliminate the NAPP procedure in subpart F.

Subpart F was designed to be a less onerous alternative hearing

procedure for NPDES permits, to substitute for subpart E when the

parties so agreed. EPA has conducted no hearings under subpart F, and

EPA is aware of only three permits where a party requested use of the

proceeding. One of those involved a RCRA permit denial in EPA Region

IX. The purpose of requesting the NAPP in that proceeding appears to

have been solely to delay final issuance of the permit denial decision.

(See the public docket for today's proposal for details.) With the

elimination of subpart E, and given the fact that there has been so

little interest in the use of subpart F, EPA sees no reason to retain

it.

(2) Termination of NPDES and RCRA Permits. EPA's regulations also

currently provide for a formal hearing prior to terminating an NPDES or

RCRA permit during its term. EPA regulations treat termination of a

RCRA or NPDES permit in the same manner as the issuance or denial of an

NPDES permit. That is, termination of a permit begins with preparation

of a draft notice of intent to terminate. The notice of intent to

terminate is subject to public comment and possibly an informal

hearing. After the informal process, the Regional Administrator issues

an initial decision, from which a party may request an evidentiary

hearing under subpart E, and subsequently an appeal to the EAB.

In developing today's proposal, EPA seriously considered proposing

to eliminate all formal hearing procedures for RCRA and NPDES permit

terminations and instead treat such terminations just like permit

issuance or denial. EPA recognizes that due process considerations may

not mandate such procedures. As noted above, issuance of an NPDES

permit conveys no property right to the permittee. Thus, the only

private interests at stake relate to the expectation of a permittee to

continue discharging until the end of a permit term, which can be up to

5 years at most. Otherwise, the permittee cannot presume it will be

able to continue discharging beyond the end of the permit term,

particularly if the permittee has violated the terms of the permit or

misrepresented information on its permit application (the bases for

terminating a permit). Thus, the private interests at stake in a permit

termination are only marginally stronger than those at stake in a

permit denial proceeding (which EPA has always conducted using informal

hearing procedures except for NPDES). Yet, EPA also recognizes some

differences between permit terminations and other permit proceedings.

In contrast to the issuance of a permit, the decision to terminate a

permit, other than at the request of the permittee, is more likely to

involve factual issues for which formal hearings are appropriate. Under

EPA regulations (40 CFR 122.64, 270.43), EPA may terminate a permit

only for reasons such as the non-compliance with the permit or failure

to have disclosed relevant information in the permit application. In

other words, a permit termination is akin to an enforcement action (and

indeed often accompanies an administrative enforcement action), where

credibility of witnesses will be a more significant concern.

On balance, EPA's preferred option is to maintain the formal

hearing requirement for these type of proceedings. EPA solicits comment

on whether the formal hearing requirement should be eliminated entirely

for RCRA and NPDES permit terminations, and whether there is an

adequate basis for doing so.

Termination of NPDES and RCRA permits is a rare occurrence; EPA is

aware of only one EPA-issued permit that has been terminated using

these procedures since 1980 (the NPDES permit for Marine Shale

Processors in Louisiana). EPA's ``Consolidated Rules

[[Page 65280]]

of Procedure'' at 40 CFR part 22 specify procedures for formal hearings

in a variety of administrative enforcement actions, including civil

compliance or penalty actions for violations of the CWA and RCRA. These

regulations also cover the suspension/revocation of permits issued

under the Marine Protection Research and Sanctuaries Act (Ocean Dumping

Act). There is no significant difference between practice and the

procedural guarantees under part 22 and under part 124 subpart E. The

only difference is that a formal hearing under part 22 begins with

EPA's issuance of a complaint against an alleged violator, whereas

subpart E constitutes an appeal of an initial decision after a non-

formal public comment and hearing process. Since there are no

significant differences between the two sets of rules, EPA sees no

reason to leave subpart E in the Code of Federal Regulations solely to

cover the very occasional involuntary NPDES or RCRA permit termination.

Instead, EPA today proposes to amend part 22 to mandate use of its

procedures for such terminations. Instead of the current three-part

process under part 124, such permit terminations would occur in a two-

step process. Step 1 would be a hearing under part 22; the outcome of

the hearing could then be appealed to the EAB under Sec. 22.30.

For terminations at the request of the permittee, the part 124

process, as modified under today's proposal, would be used. In other

words, EPA would provide for an informal public comment and hearing

under subpart A, with opportunity for appeal to the EAB. This will

allow other interested parties to comment on the proposed termination.

Also, as noted above, EPA is proposing in today's notice revisions to

Sec. 122.64(b) which would allow Directors to terminate a permit by

giving notice to the permittee and without following the part 22 or 124

procedures (or State equivalent) where the permittee has permanently

terminated its entire discharge (by elimination of its process flow or

other discharge components) or has redirected that discharge into a

POTW. EPA notes that NPDES-authorized States are not required to use

part 22 procedures for permit terminations.

EPA believes that the existing part 22 is generally adequate to

cover involuntary permit terminations without substantive amendment.

However, where permits are terminated for cause, existing part 124

treats the proceeding the same as for the issuance or denial of a

permit. EPA is proposing to incorporate relevant provisions of part 124

into such a permit termination proceeding, i.e., consideration of the

administrative record and provision for informal public comment on the

proposed permit termination. EPA is also proposing one minor

clarification to part 22. Part 22 refers to involuntary removal of a

permit as ``revocation[s].'' Since the existing NPDES and RCRA

regulations use the term ``revocation'' to refer to permits which are

to be reissued (see 40 CFR 122.62, 124.5), EPA is proposing to add the

term ``termination'' of permits to the appropriate references in part

22. EPA solicits comment on using the part 22 procedures to cover

termination of NPDES and RCRA permits, and whether further amendments

to part 22 would be necessary to make the regulations effective for

this purpose.

Today's proposal is based on the current version of part 22.

However, EPA will soon propose more comprehensive revisions to part 22

designed to make the regulations more readable and thus easier for the

public to use. The changes proposed today will be harmonized with that

proposal before final rules are issued.

(3) Stays of Contested Permit Conditions. Existing EPA regulations

at Sec. 124.15 specify that NPDES, RCRA, and UIC permits take effect 30

days after the Regional Administrator issues an initial permit

decision, unless the permit is appealed (or if one of the other

exceptions at 40 CFR 124.15(b) are met). Section 124.16(a) further

provides that if an initial permit decision is appealed by requesting

EAB review (for RCRA and UIC permits) or appealed by filing a request

for evidentiary hearing (for NPDES permits) and the request is granted,

the contested conditions of the permit (and any uncontested conditions

which are not severable from the contested ones) are stayed (i.e., they

do not take effect) pending the outcome of the appeal/evidentiary

hearing. Existing regulations at Sec. 124.60 supplement Sec. 124.16 for

purposes of NPDES permits. Section 124.60(a)(2) authorizes the Regional

Administrator to issue an order to a new source or new discharger for

whom an evidentiary hearing request has been granted authorizing the

source to begin discharging pending the outcome of the hearing process.

Section 124.60(c)(7) authorizes the Regional Administrator to impose

interim permit requirements for offshore oil rigs that do not have an

existing permit, but only when necessary to avoid ``irreparable

environmental harm.'' The provisions of Secs. 124.60(c)(1)-(c)(6)

provide detailed rules for determining what constitutes ``contested

conditions'' stayed pending an evidentiary hearing. Section 124.60(f)

specifies that the date of compliance with permit conditions which have

been stayed pending the outcome of an evidentiary hearing generally

shall be extended for the period of the stay. Other provisions of

Sec. 124.60 parallel provisions contained in Secs. 124.15, 124.16, or

124.19.

EPA today proposes substantial revisions to Sec. 124.60 consistent

with the proposal to eliminate evidentiary hearings. Sections

124.60(a)(2) and 124.60(f) grant certain relief to the regulated

community to reflect the long lag time between when a permit is issued

and when it becomes effective if an evidentiary hearing takes place. By

eliminating the evidentiary hearing step, today's proposal would

dramatically shorten that lag time. EPA believes that these provisions

would no longer be necessary and proposes to delete them. The existing

Sec. 124.60(c)(7) also provides for temporary authorization pending the

outcome of administrative review, but only for a very limited number of

facilities and only as necessary to prevent environmental damage. EPA

is unaware that this provision has ever been invoked, but is proposing

today to retain it (recodified at Sec. 124.60(a)) in case the need

arises.

The existing Secs. 124.60(a)(1), 124.60(c)(1), and 124.60(e)

generally clarify that only uncontested permit conditions take effect

pending appeal, and that the prior existing permit (if any) remains in

effect (to the extent they match the contested conditions in the new

permit). As noted above, EPA is today proposing to provide for a direct

appeal of the Regional Administrator's initial permit decision to the

EAB. The existing regulations at Sec. 124.16 contain virtually the same

requirements regarding contested permit conditions when a RCRA or UIC

permit is appealed to the EAB. Compare Sec. 124.60(a)(1) with

Sec. 124.16(a)(1); Sec. 124.60(c)(1) with Sec. 124.16(a)(2); 124.60(e)

with 124.16(c)(2). EPA proposes to eliminate the redundant portions of

Sec. 124.60 in favor of the generally applicable provisions in

Sec. 124.16. However, EPA proposes to retain the NPDES-specific

provisions of existing Sec. 124.60(c) (2)-(6) concerning what

constitutes a ``contested condition;'' these would be recodified at

Sec. 124.60(b)(2)-(6). EPA also proposes to retain the specific

language of 124.60(e) as recodified at 124.60(c).

EPA also proposes to make a more general change to its practice

surrounding effective dates, contested permit conditions, and stays. In

the past, there has been significant confusion surrounding when a RCRA,

UIC, or PSD permit takes effect if appealed to the EAB, and somewhat

less

[[Page 65281]]

confusion with respect to the same issue for NPDES permits. Section

124.15(b) specifies that permits generally take effect 30 days after

issuance by the Regional Administrator unless EAB review is requested

under Sec. 124.19 (for RCRA, UIC, or PSD) or an evidentiary hearing is

requested (for NPDES) (or if one of the other exceptions at 40 CFR

124.15(b) are met). Existing Secs. 124.16(a) (for non-NPDES) and

124.60(c)(1) clarify that, once the EAB grants review or the RA grants

the evidentiary hearing request, contested conditions are stayed but

uncontested conditions take effect. Both sections require that the

Regional Administrator identify the uncontested provisions. Section

124.60(c)(1) explicitly requires the Regional Administrator to notify

all interested parties. The regulations are not clear, however, as to

whether any conditions of the permit are in effect during the period

between filing of the request for review and the decision to grant or

deny review. EPA has, in the past, interpreted Sec. 124.16(a)(2) to

apply during this period as well. In other words, the uncontested

conditions take effect even prior to a decision to grant or deny review

under 40 CFR 124.19. See Memorandum from Lisa K. Friedman, ``Stays of

Contested Permit Conditions,'' Mar. 22, 1988 (in the docket for today's

proposal).

EPA today proposes to amend Sec. 124.16 to clearly reflect the

Agency's interpretation. Section 124.16(a)(1) would clarify that

contested permit conditions are stayed as of the date of filing a

request for review with the EAB under Sec. 124.19, and any contested

conditions will remain stayed until EPA takes final action (either a

decision of the EAB or a decision of the Regional Administrator on

remand) under Sec. 124.19(f). Uncontested permit conditions would also

be stayed upon filing of a request for review, but only for a temporary

period. Importing language from the existing Sec. 124.60(c)(1), the new

Sec. 124.16(a)(2) would clarify that the uncontested conditions take

effect 30 days after the Regional Administrator notifies the EAB, the

permit applicant, and other interested parties as to which conditions

are uncontested. Since EPA is proposing to use the same appeals process

for NPDES permits as for other permits, the new Sec. 124.16 would apply

to NPDES permits as well.

The language of the existing Sec. 124.60(b) specifies that the

Regional Administrator may, at any time prior to the Administrative Law

Judge's (ALJ) decision in an evidentiary hearing, withdraw contested

conditions of an NPDES permit and reissue them in accordance with the

procedures of subpart A. In practice, EPA has withdrawn and reissued

permits under all statutes prior to decisions of the EAB as well as

prior to ALJ decisions. EPA therefore proposes to clarify that the

Regional Administrator may withdraw and reissue any NPDES, RCRA, UIC,

or PSD permit (or a contested condition thereof) prior to a decision of

the EAB to grant or deny review under Sec. 124.19(c). To make this

change, the existing Sec. 124.60(b), as slightly modified, would be

recodified as Sec. 124.19(d).

This proposal, once finalized, will serve the public interest by

shortening the time for appeals that may be brought by interested

citizens, allowing for the more timely resolution of these appeals,

with a shorter stay of conditions.

Finally, Sec. 124.60(f) specifies that exhaustion of the

evidentiary hearing process is a prerequisite to judicial review of an

NPDES permit. EPA proposes to eliminate this language in favor of the

general exhaustion provision at Sec. 124.19(e).

(4) Procedures for Variances and New Source Determinations. EPA

also proposes changes in various NPDES permit-related administrative

procedures. Existing regulations at Sec. 122.21(m) specify that

applications for a ``fundamentally different factors'' variance must be

filed within 180 days of promulgation of the applicable effluent

limitations guideline. Section 125.32(a) contemplates that the

application for a variance be submitted in accordance with part 124,

subpart F. (However, subpart F does not appear to have ever been used.)

All other effluent limitation variances under Sec. 122.21(m) are

processed as part of the underlying permit application in accordance

with the procedures of part 124, subpart A. EPA sees no continuing

reason to treat Fundamentally Different Factors (FDF) variances

differently. EPA therefore proposes to amend Sec. 125.32 to require an

applicant for an FDF variance to submit an application under the

procedures of part 124, subpart A. EPA will process the request for a

variance as if it were an application for an NPDES permit.

Existing Sec. 122.21(l)(2) requires EPA to make an initial

determination of whether an applicant for an NPDES permit constitutes a

``new source'' subject to the additional requirements of Sec. 122.29.

Section 122.21(l)(4) allows for appeal of that initial determination by

requesting an evidentiary hearing. Consistent with its proposal to

eliminate evidentiary hearings for NPDES permits themselves, EPA

proposes to modify this section to allow instead for an appeal of a new

source determination to the EAB. Similar to the existing language, the

proposed amendment would allow the EAB, with consent of the parties, to

defer review of the determination until a decision is made on the

permit for the source, and to consolidate review of the new source

determination with any review of the permit decision.

(5) Transition to New Procedural Requirements. If EPA decides to

issue the final rule as proposed today, there will be no further

opportunity to request an evidentiary hearing and the existing

procedural rules will be deleted from the CFR. The question arises,

however, how today's proposal will affect ongoing NPDES permit

issuance/denial or termination proceedings or RCRA permit termination

proceedings. EPA proposes largely to ``grandfather'' such proceedings

under the prior rules.

Under today's proposal, contained in Sec. 124.21, ongoing

proceedings would be treated as follows: For any NPDES permit for which

a request for evidentiary hearing was granted or denied as of the date

of the final rule, but for which a hearing had not yet been completed,

the permit process would continue under the procedures of the prior

part 124. Similarly, appeals pending before the EAB would be reviewed

under the procedures of prior part 124. In other words, the evidentiary

hearing would be conducted under the old subpart E; an appeal from the

evidentiary hearing decision (or an appeal from the denial of a request

for an evidentiary hearing) would proceed under the prior Sec. 124.91;

and any further proceedings conducted pursuant to a remand from the EAB

would proceed under the appropriate provisions of the old part 124.

Ongoing proceedings to terminate an NPDES or RCRA permit similarly

would continue under the prior rules.

EPA is proposing to grandfather these proceedings in the interests

of efficiency, fairness and minimizing the confusion to the regulated

community. As of July 1, 1994, there were two NPDES permits for which

an evidentiary hearing had been granted but the proceedings had not yet

concluded, and 17 for which an appeal was pending before the EAB.

Interested parties involved in an ongoing evidentiary hearing process

may have invested significant resources to prepare or conduct the

hearing to date, as would have EPA. It could prove to be a waste of all

parties' resources to suspend such proceedings in mid-stream. Such

preparation may have taken place even if the hearing itself has not

begun. For ongoing proceedings before the EAB, all

[[Page 65282]]

parties may have invested resources in a prior evidentiary hearing or

in briefing before the EAB. Rather than try to separate out on a case-

by-case basis which proceedings are sufficiently advanced to justify

continuing under the old rules, EPA proposes to let them all continue

if the parties wish. (Today's proposal would allow an ongoing

evidentiary hearing proceeding to be terminated with right of appeal to

the EAB if all parties agree.) EPA solicits comment on whether it is

appropriate to have these permits proceed under the prior rules or

whether EPA should suspend all current proceedings and provide instead

for an appeal to the EAB.

For any NPDES permit decision for which a request for evidentiary

hearing remains pending, considerations of efficiency and fairness are

less significant. Neither the parties nor EPA are likely to have

invested any significant resources yet. Therefore, EPA is proposing not

to grandfather these permits. Rather, EPA proposes to let interested

parties refile an appeal directly to the EAB. For such permits, the EPA

Region would, within 30 days after the final rule takes effect, notify

the requester that the request for evidentiary hearing is being

returned without prejudice. Notwithstanding the time limit in

Sec. 124.19(a), the requester would be allowed to file an appeal with

the Board, in accordance with the other requirements of Sec. 124.19(a),

within 30 days.

(6) Miscellaneous Changes. EPA proposes a conforming change to part

117, which establishes regulations concerning the reporting of releases

of hazardous substances under section 311 of the CWA. The reporting

obligation does not cover discharges of hazardous substances

``resulting from circumstances identified, reviewed, and made a part of

the public record with respect to a[n NPDES] permit.'' 40 CFR

117.12(a)(2). Section 117.1 defines the ``public record'' to include

the permit itself and the record prepared during a NAPP proceeding

under (now) subpart F. Since EPA is today proposing to eliminate

subpart F, EPA proposes to modify this definition to refer instead to

the administrative record required for all permits under Sec. 124.18.

Finally, today's proposal would amend various sections of parts

122, 124, 144, 270, and 271 to eliminate obsolete references to

subparts E or F of part 124. Many of these references authorize RCRA,

UIC, or PSD permits to be processed under subparts E or F if

consolidated with an NPDES permit undergoing an evidentiary hearing or

NAPP. As reflected by the proposed language in Sec. 124.1(d), today's

proposal would continue to authorize permits to be processed in

consolidated fashion under subpart A.

(7) Effect on State Programs. Under EPA's current regulations (40

CFR 123.25), EPA does not require States and Indian Tribes wishing to

obtain authorization to issue NPDES permits to provide for formal

evidentiary hearings, either under part 124 or part 22. Instead, EPA

requires States and Tribes to provide for the informal process outlined

in subpart A of part 124 and requires States to provide an opportunity

for judicial review in State court of the final approval or denial of

permits by the State that is sufficient to provide for, encourage, and

assist public participation in the NPDES permitting process. EPA also

does not require States nor Tribes to provide for formal hearings prior

to termination of NPDES or RCRA permits. This proposed revision

concerning permit appeal and termination procedures does not change the

requirements of State programs. However, as described in more detail

above, another revision proposed in today's package for 40 CFR

122.64(b) would allow States to terminate NPDES permits without

following part 124 procedures (or their State equivalent) under certain

circumstances. Of course, States and Tribes may continue to provide for

formal evidentiary hearings on such permit decisions if they wish,

under section 510 of the CWA and section 3009 of RCRA.

D. Proposed Removal and Reservation of Part 125, Subpart K

1. 40 CFR Part 125, Subpart K

In today's notice, EPA proposes to remove and reserve part 125,

subpart K (40 CFR 125.100-104) titled ``Criteria and Standards for Best

Management Practices Authorized Under Section 304(e) of the Act''. This

provision was originally promulgated on June 7, 1979 (44 FR 32954) and

would have established criteria and standards for imposing best

management practices (BMPs) in NPDES permits under the authority

provided in sections 304(e) and 402(a)(1) of the CWA. However, for

reasons set forth in more detail below, subpart K has never been

activated and its original purpose is now better served by EPA's

existing BMP provisions at 40 CFR 122.44(k) and accompanying guidance

for developing and implementing BMPS.

BMPs are schedules of activities, prohibitions of practices,

maintenance procedures, and other management practices to prevent or

reduce the pollution of ``waters of the United States.'' BMPs include

treatment requirements, operating procedures, and practices to control

plant site runoff, spillage or leaks, sludge or waste disposal, or

drainage from raw material storage. BMPs are authorized under two

provisions of the CWA, sections 304(e) and 402(a)(1). Section 304(e) of

the Act authorizes the Administrator to publish regulations which are

supplemental to effluent limitation guidelines, for a class or category

of point sources, for any toxic or hazardous pollutant regulated under

sections 307(a)(1) or 311 of the CWA, in order to control plant site

runoff, spillage or leaks, sludge or waste disposal, and drainage from

raw material storage, which the Administrator determines are associated

with or ancillary to the industrial manufacturing or treatment process

within such class or category of point sources and which may contribute

significant amounts of toxic or hazardous pollutants to the waters of

the United States. In addition, section 402(a)(1) of the Act authorizes

permitting authorities to include BMPs in permits using Best

Professional Judgment (BPJ). EPA's authority to impose BMPS under

section 402(a)(1) was recognized by the D.C. Circuit in NRDC v. Costle,

568 F.2d 1369 (D.C. Cir. 1977).

In addition to these statutory authorities for BMPs, EPA's

regulations at 40 CFR 122.44(k) specifically authorize EPA to require

BMPs in NPDES permits to control or abate the discharge of pollutants

where: (1) Authorized under section 304(e) of the CWA for the control

of toxic pollutants and hazardous substances, (2) numeric effluent

limitations are infeasible, or (3) the practices are reasonably

necessary to achieve effluent limitations and standards or to carry out

the purposes and intent of the CWA. EPA has used Sec. 122.44(k) to

require specific BMPs in permits and has required, as a permit

condition, that permittees develop and implement BMP plans. These are

also known as storm water pollution prevention plans (SWPPPs) in

certain storm water general permits). See EPA's ``Storm Water

Multisector General Permit for Industrial Activities finalized on

September 29, 1995 (50 FR 50804) as well as EPA's baseline storm water

general permits finalized on September 9, 1992 (57 FR 41175) and

September 25, 1992 (57 FR 44412).

The regulatory history covering the development of part 125,

subpart K is lengthy. On August 21, 1978, EPA proposed regulations (43

FR 37089) that provided a definition of ``Best Management Practices''

(``BMPs''). In addition, subpart L--``Criteria and

[[Page 65283]]

Standards for Best Management Practices Authorized Under Section 304(e)

of the Act'', was created under part 125 and was reserved for later

rulemaking.

On September 1, 1978, EPA proposed a rule to revise the existing

regulations governing the NPDES program in order to reflect new

controls on toxic and hazardous pollutants under the 1977 amendments to

the CWA. The proposed rule indicated how BMPs for on-site industrial

activities (such as materials storage and waste disposal) may be

required in NPDES permits to prevent the release of toxic and hazardous

pollutants to surface waters. This regulation was proposed under part

125, subpart L--Criteria and Standards for Imposing Best Management

Practices Under Section 304(e) of the Act (43 FR 39282).

After evaluating the comments received on the proposed regulation,

EPA promulgated the BMP regulation in part 125, subpart K on June 7,

1979 (44 FR 32954). The revised regulation described how BMPs for

control of toxic or hazardous pollutants that are ancillary to

industrial activities under section 304(e) of the Act shall be

reflected in permits, including BMPs promulgated in effluent

limitations guidelines under section 304, and BMPs established on a

case-by-case basis in permits under sections 301(b) and 402(a) of the

Act.

In addition to the regulation, EPA had intended to publish

technical information supporting the development of BMP programs in a

guidance document. However, on August 10, 1979, three days before the

regulations were to become effective, the Agency announced that the

guidance document had been unavoidably delayed and that the Agency was

deferring the effective date of the BMP regulation until 60 days after

EPA published a Federal Register notice of the availability of the BMP

program guidance document (44 FR 47063).

On March 20, 1980, EPA announced the availability of the draft

guidance document and provided a 45-day comment period (45 FR 17997).

EPA noted that after reviewing the comments on the guidance document,

the document would be finalized and a notice would be published in the

Federal Register announcing the effective date of the BMP regulations.

In response to public comment on the guidance document, the comment

period was extended twice, resulting in a 120-day comment period. After

evaluating the comments on the guidance document, the Agency made

revisions and in June 1981 published ``NPDES Best Management Practices

Guidance Document.'' (The BMP Guidance Document has since been revised.

The revised guidance was published in October 1993.) However, the

effective date of the regulation was never announced and subpart K

never became effective.

The continued inactive status of the subpart K has not hindered

EPA's ability to require BMPs in permits because Sec. 122.44(k)

remained effective. Moreover, a number of guidance documents have since

become available to assist permit issuing authorities and permittees in

developing and implementing BMPs and BMP plans. While part 125, subpart

K has remained in the Code of Federal Regulations as an inactive

regulation, it has nonetheless been valuable as a model for imposing

BMPS under 40 CFR 122.44(k). This was particularly true when there was

less guidance available on how to develop and implement BMPs.

At present, requirements for the preparation and implementation of

BMPs (and BMP plans) are commonly found in NPDES permits as permit

conditions under 40 CFR 122.44(k). EPA has continued to work with

industry to identify the generic BMPs that most well-operated

facilities use for pollution control, fire prevention, occupational

safety and health, or product loss prevention. Experience has shown

that BMPs can be appropriately used and that permits containing BMP

programs can effectively reduce pollutant discharges in a cost-

effective manner. BMPs are also an effective mechanism for promoting

the goals of pollution prevention. There are now a number of EPA

guidance documents available to assist permit issuing authorities and

the regulated community in developing and implementing BMPs and BMP

plans. Moreover, the BMP provisions of EPA's baseline and multisector

storm water general permits also provide guidance on how to implement

BMPs.

Given these events and the continued successful use of BMPs for

NPDES permits under existing Sec. 122.44(k) and its associated

guidance, EPA now believes that there is no longer a reason to activate

part 125, subpart K. Because BMPs are often best tailored for specific

industries, EPA believes that the use of existing Sec. 122.44(k) in

combination with guidance provides a more flexible and effective

approach in developing and implementing BMPs than that found under part

125, subpart K. Finally, the provisions of subpart K are now over 16

years old and are antiquated on a number of fronts particularly with

respect storm water discharges which form the bulk of BMP applications.

For those reasons, EPA is proposing to remove the provisions of part

125, subpart K.

2. 40 CFR 122.44(k)

In today's notice, EPA proposes to add a note to 40 CFR

Sec. 122.44(k) which lists the various EPA BMP guidance documents. This

will assist readers in developing and implementing BMPs and BMP plans.

E. Miscellaneous Corrections

EPA also proposes in today's notice a number of minor non-

substantive revisions to its regulations that would correct

typographical or drafting errors, and misplaced or obsolete references.

EPA wishes to be clear that these corrections and not intended in

anyway to result in substantive changes to its programs. In proposing

these corrections, EPA does not solicit, and will not respond to,

comments on the existing regulatory provisions which underlie those

corrections. Furthermore, by including these corrections in the

proposed rule, EPA is not conceding that any or all such changes

require notice and comment. However, these errors were discovered while

developing this proposed rule and EPA believes it is more cost

effective to correct them in this rulemaking than in a separate Federal

Register notice. EPA proposes the following corrections:

1. Section 122.1(b)(4) contains an erroneous cite to Sec. 122.1.

EPA proposes to amend Sec. 122.1(b)(4) to add the correct cite which is

Sec. 122.2.

2. In Sec. 122.21(l)(1), EPA proposes to replace the term

``paragaraph'' with its correct spelling, ``paragraph''.

3. The current heading for Sec. 122.24(b) is written incorrectly as

``Defintion''. EPA proposes to correct that error by inserting the

correct term ``Definition''.

4. Section 40 CFR 122.21(l)(2)(ii) incorrectly refers to paragraph

``(k)(2)(i)''. EPA proposes to insert the correct reference, paragraph

``(l)(2)''.

5. Section 40 CFR 122.21(l)(3) incorrectly refers to paragraph

``(k)(2)''. EPA proposes to insert the correct reference ``paragraph

(l)(2)''.

6. In Sec. 122.26(b)(15), EPA proposes to replace the term

``landill'' with its correct spelling, ``landfill''.

7. In Sec. 122.26(d)(1)(iii)(D)(1), EPA proposes to replace the

term ``overlayed'' with its correct spelling, ``overlaid''.

8. EPA proposes to remove an obsolete reference to Sec. 124.58

found in the last sentence of Sec. 122.28(b)(1). Section 124.58 was

removed from the EPA's regulations on June 29, 1995. See 60 FR 33927.

[[Page 65284]]

9. Section 122.29(c)(1)(i) incorrectly refers to

``Sec. 122.21(k)''. EPA proposes to provide the correct reference,

``Sec. 122.21(l)''.

10. In Sec. 122.41(l)(6)(i), EPA proposes to replace the term

``becames'' with the correct term, ``becomes''.

11. In Sec. 122.43(b)(1), EPA proposes to replace the term

``additonal'' with its correct spelling, ``additional''.

12. EPA proposes to correct two inaccurate cites currently found at

Sec. 122.44(i)(1)(iii). Paragraph (iii) incorrectly refers to internal

waste stream provisions as occurring at Sec. 122.45(i). The correct

cite is Sec. 122.45(h). Paragraph (iii) also incorrectly refers to

intake credit as being located at Sec. 122.45(f). The correct cite is

Sec. 122.45(g).

13. The language in paragraph Sec. 122.44(e)(1) contains a

reference to Sec. 122.21(g)(10). That cite is no longer current because

Sec. 122.21(g)(10) is reserved. EPA proposes to remove that reference.

14. In section 122.44(k), EPA proposes to amend paragraph (k)(2) to

replace the comma after with word ``infeasible'' with a semicolon. This

provision was originally promulgated with a semicolon on June 7, 1979

(44 FR 32907). However, when these provisions were combined with other

EPA permit regulations as part of the June 14, 1979 permit

consolidation proposed rulemaking (44 FR 38244), a comma was wrongly

inserted in place of the semicolon. EPA proposes to correct that

typographical error in today's notice.

15. Section 122.44(q) incorrectly refers to Sec. 124.58 in support

of the requirement that NPDES permits must include, where applicable,

conditions that the Secretary of the Army considers necessary to ensure

that navigation and anchorage will not be substantially impaired. The

correct cite is Sec. 124.59. EPA proposes to revise this paragraph to

include the correct cite.

16. In the introductory text of Sec. 122.47(b), EPA proposes to

replace the term ``requriements'' with the correct spelling,

``requirements''.

17. Section 122.62(a)(8) contains two references that are

incorrect. Paragraph (a)(8)(i) allows a permit to be modified upon

request of a permittee who qualifies for a net basis under

Sec. 122.45(h). Net basis and net limitations pertain to pollutants in

intake waters which are found at Sec. 122.45(g) and not at

Sec. 122.45(h). Paragraph (a)(ii) would allow permit modification when

a discharger is no longer eligible for net limitations, as provided in

Sec. 122.45(h)(1)(ii)(B). Net limitations are actually found at

Sec. 122.45(g)(1)(ii). EPA proposes insert the correct references in

today's notice.

18. 40 CFR 123.25(a)(36) requires that authorized States must have

legal authority to implement the provisions of part 125, subparts A, B,

C, D, H, I, J, K, L. However, subparts C, I, J, and L are currently

reserved and subpart K is proposed to be reserved in today's notice.

EPA proposes to revise 40 CFR 123.25(a)(36) to remove the references to

subparts C, I, J, K, and L.

19. In 40 CFR 123.25(b), EPA proposes to replace the citation, 40

CFR 35.1500, with the correct citation, 40 CFR 130.5. This error

occurred in 1985, when part 130 was created from former subparts of

part 35.

20. Language which is the same as that found in the definition of

``State Director'' is incorrectly inserted into the definition of

``State'' at Sec. 124.2. EPA proposes to remove that language.

21. EPA proposes to remove the term ``consultation with the

Regional Administrator'' from Sec. 124.2 because it is obsolete. This

term applies specifically to 301(k) compliance extensions which have

not been available since March 31, 1991. On June 29, 1995, EPA removed

regulatory provisions which implement Sec. 301(k). See 60 FR 33926,

June 29, 1995.

22. EPA proposes to correct two references in Sec. 124.55. Each

refers to ``certification conditions'' specified in Sec. 124.53(d); the

correct citation is to 124.53(e).

III. Administrative Requirements

A. Executive Order 12866

Under Executive Order 12866 (58 FR 51735 (October 4, 1993)), the

Agency must determine whether the regulatory action is ``significant''

and therefore subject to review by the Office of Management and Budget

(OMB) and the requirements of the Executive Order. The Order defines

``significant regulatory action'' as one that is likely to result in a

rule that may:

(1) Have an annual effect on the economy of $100 million or more or

adversely affect in a material way the economy, a sector of the

economy, productivity, competition, jobs, the environment, public

health or safety, or State, local, or Tribal governments or

communities;

(2) Create a serious inconsistency or otherwise interfere with an

action taken or planned by another agency;

(3) Materially alter the budgetary impact of entitlements, grants,

user fees, or loan programs or the rights and obligations of recipients

thereof; or

(4) Raise novel legal or policy issues arising out of legal

mandates, the President's priorities, or the principles set forth in

the Executive Order.''

It has been determined that this rule is not a ``significant

regulatory action'' under the terms of Executive Order 12866 and is

therefore not subject to OMB review.

B. The Regulatory Flexibility Act

Under the Regulatory Flexibility Act (RFA), 5 U.S.C. 601 et seq.,

EPA must prepare a Regulatory Flexibility Analysis for all regulations

that have a significant impact on a substantial number of small

entities. The RFA recognizes three kinds of small entities and defines

them as follows:

--Small governmental jurisdictions--any government of a district with a

population of less than 50,000.

--Small business--any business which is independently owned and

operated and not dominant in its field as defined by Small Business

Administration regulations under section 3 of the Small Business Act.

--Small organization--any not-for-profit enterprise that is

independently owned and operated and not dominant in its field (e.g.,

private hospitals and educational institutions).

Under section 605(b) of the Act, an agency may, in lieu of

preparing an initial regulatory flexibility analysis, certify that a

rule will not have a ``significant impact on a substantial number of

small entities.'' Then no further analysis is required.

Most of the changes in today's proposal are purely technical and

will have no effect on compliance costs for NPDES permittees. Also, to

the extent these technical changes clarify and simplify the

regulations, they will make them easier to understand and comply with,

reducing the burden on small entities. The other changes will reduce

the costs of obtaining and complying with NPDES permits. For instance,

the proposal would make it easier for facilities to obtain coverage

under general permits, rather than go through the more complicated and

expensive individual permit procedure. EPA also proposes to minimize

monitoring and recordkeeping for permittees subject to effluent

limitation guidelines, and streamline permit application requirements

for storm water dischargers and new sources/new dischargers. EPA is

also proposing to streamline the permit appeals and permit termination

processes, which should further reduce the costs of obtaining (or

modifying) or terminating an individual permit. None of these proposed

changes are expected to

[[Page 65285]]

increase, and most of the changes will actually decrease, the costs of

compliance for NPDES dischargers, including small entities (if any).

Therefore, I certify that the proposed rule will not have a significant

impact on a substantial number of small entities.

C. Paperwork Reduction Act

The proposed regulations are designed specifically to streamline

the regulatory process and will not impose any additional information

collection requirements on either the regulated community or permit

issuing authorities. Therefore, EPA did not prepare an Information

Request document for approval by the Office of Management and Budget.

Should any reviewer feel that the proposed rulemaking will require

additional information collection activities, they should send their

comments regarding the burden estimate or any other aspect pertaining

to collection of information, including suggestions for reducing this

burden to Chief, Information Policy Branch; EPA; 401 M St., S.W. (Mail

Code 2136); Washington, DC 20460; and to the Office of Information and

Regulatory Affairs, Office of Management and Budget, Washington, DC

20503, marked ``Attention: Desk Officer for EPA.'' The final rule will

respond to any OMB or public comments on any information collection

requirements generated by this proposal.

D. Unfunded Mandates Reform Act

Title II of the Unfunded Mandates Reform Act of 1995 (UMRA), Public

Law 104-4, establishes requirements for Federal agencies to assess the

effects of their regulatory actions on State, local, and Tribal

governments and the private sector. Under section 202 of the UMRA, EPA

generally must prepare a written statement, including a cost-benefit

analysis, for proposed and final rules with ``Federal mandates'' that

may result in expenditures to State, local, and Tribal governments, in

the aggregate, or to the private sector, of $100 million or more in any

one year. Before promulgating an EPA rule for which a written statement

is needed, section 205 of the UMRA generally requires EPA to identify

and consider a reasonable number of regulatory alternatives and adopt

the least costly, most cost-effective or least burdensome alternative

that achieves the objectives of the rule. The provisions of section 205

do not apply when they are inconsistent with applicable law. Moreover,

section 205 allows EPA to adopt an alternative other than the least

costly, most cost-effective or least burdensome alternative if the

Administrator publishes with the final rule an explanation why that

alternative was not adopted.

Under section 204 of the UMRA, EPA generally must develop a process

to permit elected officials of State, local and Tribal governments (or

their designated employees with authority to act on their behalf) to

provide meaningful and timely input in the development of regulatory

proposals containing significant Federal intergovernmental mandates.

These consultation requirements build on those of Executive Order 12875

(``Enhancing the Intergovernmental Partnership'').

Before EPA establishes any regulatory requirements that may

significantly or uniquely affect small governments, including Tribal

governments, it must have developed under section 203 of the UMRA a

small government agency plan. The plan must provide for notifying

potentially affected small governments, enabling officials of affected

small governments to have meaningful and timely input in the

development of EPA regulatory proposals with significant Federal

intergovernmental mandates, and informing, educating, and advising

small governments on compliance with the regulatory requirements.

Today's rule contains no Federal mandates (under the regulatory

provisions of Title II of the UMRA) for State, local, or Tribal

governments or the private sector. The proposed rulemaking is basically

``deregulatory'' in nature and does not impose any enforceable duties

on any of these governmental entities or the private sector.

In any event, EPA has determined that this rule does not contain a

Federal mandate that may result in expenditures of $100 million or more

for State, local, and Tribal governments, in the aggregate, or the

private sector in anyone year. This rule is intended to streamline

NPDES permitting requirements and should result in resource savings to

Federal and State permitting authorities as well as to the regulated

community. Thus, today's rule is not subject to the requirements of

sections 202, 204 and 205 of UMRA.

With respect to section 203 of UMRA, EPA has determined that this

rule contains no regulatory requirements that might significantly or

uniquely affect small governments. As previously stated, EPA believes

that the rule will reduce the regulatory burden on Federal and State

NPDES Permitting authorities as well as on the regulated community.

This overall reduction will be applied across the board to all

permitting authorities and the regulated community. While, EPA cannot

document the effects of these streamlining measures on each affected

entity, those smaller governments that are NPDES permittees are

expected to benefit from the proposed modifications.

List of Subjects

40 CFR Part 22

Environmental protection, Administrative practice and procedure,

Air pollution control, Hazardous substances, Hazardous waste,

Penalties, Pesticides and pests, Poison prevention, Water pollution

control.

40 CFR Part 117

Environmental Protection Agency, Hazardous substances, Penalties,

Reporting and recordkeeping requirements, Water pollution control.

40 CFR Part 122

Administrative practice and procedure, Confidential business

information, Hazardous substances, Reporting and recordkeeping

requirements, Water pollution control.

40 CFR Part 123

Administrative practice and procedure, Confidential business

information, Hazardous substances, Indians-lands, Intergovernmental

relations, Penalties, Reporting and recordkeeping requirements, Water

pollution control.

40 CFR Part 124

Environmental protection, Administrative practice and procedure,

Air pollution control, Hazardous waste, Indians--lands, Reporting and

recordkeeping requirements, Water pollution control, Water supply.

40 CFR Part 125

Environmental protection, Reporting and recordkeeping requirements,

Waste treatment and disposal, Water pollution control.

40 CFR Part 144

Environmental protection, Administrative practice and procedure,

Confidential business information, Hazardous waste, Indians--lands,

Reporting and recordkeeping requirements, Surety bonds, Water supply.

40 CFR Part 270

Environmental protection, Administrative practice and procedure,

Confidential business information, Hazardous materials transportation,

[[Page 65286]]

Hazardous waste, Reporting and recordkeeping requirements, Water

pollution control, Water supply.

40 CFR Part 271

Environmental protection, Administrative practice and procedure,

Confidential business information, Hazardous materials transportation,

Hazardous waste, Indians-lands, Intergovernmental relations, Penalties,

Reporting and recordkeeping requirements, Water pollution control,

Water supply.

Dated: November 21, 1996.

Carol M. Browner,

Administrator.

For the reasons set forth in the preamble, EPA proposes to amend 40

CFR parts 22, 117, 122, 123, 124, and 125, 144, 270, and 271 as

follows:

PART 22--[AMENDED]

1. The title of part 22 is revised to read as follows:

PART 22--CONSOLIDATED RULES OF PRACTICE GOVERNING THE

ADMINISTRATIVE ASSESSMENT OF CIVIL PENALTIES AND THE REVOCATION/

TERMINATION OR SUSPENSION OF PERMITS

2. The authority citation for part 22 is revised to read as

follows:

Authority: 7 U.S.C. 136(l); 15 U.S.C. 2615; 33 U.S.C. 1319,

1342, 1361, 1415 and 1418; 42 U.S.C. 300g-3(g), 6912, 6925, 6928,

6991e and 6992d; 42 U.S.C. 7413(d), 7524(c), 7545(d), 7547, 7601 and

7607(a), 9609, and 11045.

3. Section 22.01 is amended by revising paragraphs (a)(4) and

(a)(6) to read as follows:

Sec. 22.01 Scope of these rules.

(a) * * *

(4) The issuance of a compliance order or the issuance of a

corrective action order, the termination of a permit pursuant to

section 3005(d), the suspension or revocation of authority to operate

pursuant to section 3005(e), or the assessment of any civil penalty

under sections 3008, 9006, and 11005 of the Solid Waste Disposal Act,

as amended (42 U.S.C. 6925(d), 6925(e), 6928, 6991e, and 6992d)),

except as provided in 40 CFR part 24;

* * * * *

(6) The assessment of any Class II penalty under section 309(g), or

the termination of any permit issued pursuant to section 402(a) of the

Clean Water Act, as amended (33 U.S.C. 1319(g), 1342(a));

* * * * *

4. Section 22.03 is amended by revising the definition for

``Consent Agreement'' to read as follows:

Sec. 22.03 Definitions.

* * * * *

Consent Agreement means any written document, signed by the

parties, containing stipulations or conclusions of fact or law and a

proposed penalty or proposed revocation/termination or suspension

acceptable to both complainant and respondent.

* * * * *

5. Section 22.13 is amended by revising paragraph (c) to read as

follows:

Sec. 22.13 Issuance of complaint.

* * * * *

(c) Other good cause exists for such action, he may institute a

proceeding for the revocation/termination or suspension of a permit by

issuing a complaint under the Act and these rules of practice. A

complaint may be for the suspension or revocation/termination of a

permit in addition to the assessment of a civil penalty.

6. Section 22.14 is amended by revising paragraph (b) introductory

text and paragraphs (b)(4), (b)(5), and (b)(6) to read as follows:

Sec. 22.14 Content and amendment of the complaint.

* * * * *

(b) Complaint for the revocation/termination, or suspension of a

permit. Each complaint for the revocation/termination or suspension of

a permit shall include:

* * * * *

(4) A request for an order either to revoke/terminate or suspend

the permit and a statement of the terms and conditions or any proposed

partial suspension or revocation/termination;

(5) A statement indicating the basis for recommending the

revocation/termination, rather than the suspension, of the permit, or

vice versa, as the case may be;

(6) Notice of the respondent's right to request a hearing on any

material fact contained in the complaint, or on the appropriateness of

the proposed revocation/termination or suspension.

* * * * *

7. Section 22.15 is amended by revising (a)(2) to read as follows:

Sec. 22.15 Answer to the complaint.

(a) * * *

(2) Contends that the amount of the penalty proposed in the

complaint or the proposed revocation/termination or suspension, as the

case may be, is inappropriate; or * * *

* * * * *

8. Section 22.17 is amended by revising the second-to-last sentence

of paragraph (a) and by revising paragraph (c) to read as follows:

Sec. 22.17 Default order.

(a) * * * If the complaint is for the revocation or suspension of a

permit, the conditions of revocation or suspension proposed in the

complaint shall become effective without further proceedings on the

date designated by the Administrator in his final order issued upon

default. * * *

* * * * *

(c) Contents of a default order. A default order shall include

findings of fact showing the grounds for the order, conclusions

regarding all material issues of law or discretion, and the penalty

which is recommended to be assessed or the terms and conditions of

permit revocation/termination or suspension, as appropriate.

* * * * *

9. Section 22.18 is amended by revising paragraph (b)(3) to read as

follows:

Sec. 22.18 Informal settlement; consent agreement and order.

* * * * *

(b) * * *

(3) consents to the assessment of a stated civil penalty or to the

stated permit revocation/termination or suspension, as the case may be.

* * *

* * * * *

10. Section 22.24 is amended by revising the first sentence to read

as follows:

Sec. 22.24 Burden of presentation; burden of persuasion.

The complainant has the burden of going forward with and of proving

that the violation occurred as set forth in the complaint and that the

proposed civil penalty, revocation/termination, or suspension, as the

case may be, is appropriate. * * *

11. Section 22.44 is added to subpart H to read as follows:

Sec. 22.44 Supplemental rules of practice governing the termination of

permits under section 402(a) of the Clean Water Act or under section

3005(d) of the Resource Conservation and Recovery Act.

(a) Scope of these Supplemental Rules. These supplemental rules of

practice shall govern, in conjunction with the preceding Consolidated

Rules of Practice (40 CFR part 22), administrative proceedings for the

termination of permits under section 402(a) of the Clean Water Act or

under section 3005(d) of the Resource Conservation and Recovery Act.

Where

[[Page 65287]]

inconsistencies exist between these supplemental rules and the

Consolidated Rules, these Supplemental Rules shall apply.

(b) In any proceeding to terminate a permit for cause under 40 CFR

122.64 or 270.42 during the term of the permit:

(1) The complaint shall, in addition to the requirements of

Sec. 22.14(b), contain any additional information specified in 40 CFR

124.8;

(2) The Director (as defined in 40 CFR 124.2) shall provide public

notice of the complaint in accordance with 40 CFR 124.10, and allow for

public comment in accordance with 40 CFR 124.11; and

(3) The Presiding Officer shall admit into evidence the contents of

the Administrative Record described in 40 CFR 124.9, and any public

comments received.

PART 117--DETERMINATION OF REPORTABLE QUANTITIES FOR HAZARDOUS

SUBSTANCES

1. The authority citation for part 117 continues to read as

follows:

Authority: Secs. 311 and 501(a), Federal Water Pollution Control

Act (33 U.S.C. 1251 et. seq.), (``the Act'') and Executive Order

11735, superseded by Executive Order 12177, 56 FR 54757.

2. Section 117.1(d) is revised to read as follows:

Sec. 117.1 Definitions.

* * * * *

(d) Public record means the NPDES permit application or the NPDES

permit itself and the materials comprising the administrative record

for the permit decision specified in 40 CFR 124.18.

* * * * *

PART 122--EPA ADMINISTERED PERMIT PROGRAMS: THE NATIONAL POLLUTANT

DISCHARGE ELIMINATION SYSTEM

1. The authority citation for part 122 continues to read as

follows:

Authority: The Clean Water Act, 33 U.S.C. 1251 et seq.

2. Section 122.1 is revised to read as follows:

Sec. 122.1 Purpose and scope.

(a) Coverage. (1) The regulatory provisions contained in 40 CFR

parts 122, 123, and 124 implement the National Pollutant Discharge

Elimination System (NPDES) Program under sections 318, 402, and 405 of

the Clean Water Act (CWA) (Pub. L. 92-500, as amended, 33 U.S.C. 1251

et seq.)

(2) These provisions cover basic EPA permitting requirements (part

122), what a State must do to obtain approval to operate its program in

lieu of a Federal program and minimum requirements for administering

the approved State program (part 123), and procedures for EPA

processing of permit applications and appeals (part 124).

(3) These provisions also establish the requirements for public

participation in EPA and State permit issuance and enforcement and

related variance proceedings, and in the approval of State NPDES

programs. These provisions carry out the purposes of the public

participation requirements of 40 CFR part 25, and supersede the

requirements of that part as they apply to actions covered under parts

122, 123, and 124.

(4) The NPDES permit program has separate additional provisions

that are used by permit issuing authorities to determine what

requirements must be placed in permits if issued. These provisions are

located at 40 CFR parts 125, 129, 133, 136, 40 CFR subchapter N (parts

400 through 460), and 40 CFR part 503.

(5) Certain requirements set forth in parts 122 and 124 are made

applicable to approved State programs by reference in part 123. These

references are set forth in Sec. 123.25. If a section or paragraph of

part 122 or 124 is applicable to States, through reference in

Sec. 123.25, that fact is signaled by the following words at the end of

the section or paragraph heading: (Applicable to State programs, see

Sec. 123.25). If these words are absent, the section (or paragraph)

applies only to EPA administered permits. Nothing in parts 122, 123, or

124 precludes more stringent State regulation of any activity covered

by these regulations, whether or not under an approved State program.

(b) Scope of the NPDES permit requirement. (1) The NPDES program

requires permits for the discharge of ``pollutants'' from any ``point

source'' into ``waters of the United States.'' The terms ``pollutant'',

``point source'' and ``waters of the United States'' are defined at

Sec. 122.2.

(2) The permit program established under this part also applies to

owners or operators of any treatment works treating domestic sewage,

whether or not the treatment works is otherwise required to obtain an

NPDES permit, unless all requirements implementing section 405(d) of

the CWA applicable to the treatment works treating domestic sewage are

included in a permit issued under the appropriate provisions of

subtitle C of the Solid Waste Disposal Act, Part C of the Safe Drinking

Water Act, the Marine Protection, Research, and Sanctuaries Act of

1972, or the Clean Air Act, or under State permit programs approved by

the Administrator as adequate to assure compliance with section 405 of

the CWA.

(3) The Regional Administrator may designate any person subject to

the standards for sewage sludge use and disposal as a ``treatment works

treating domestic sewage'' as defined in Sec. 122.2, where he or she

finds that a permit is necessary to protect public health and the

environment from the adverse effects of sewage sludge or to ensure

compliance with the technical standards for sludge use and disposal

developed under CWA section 405(d). Any person designated as a

``treatment works treating domestic sewage'' shall submit an

application for a permit under Sec. 122.21 within 180 days of being

notified by the Regional Administrator that a permit is required. The

Regional Administrator's decision to designate a person as a

``treatment works treating domestic sewage'' under this paragraph shall

be stated in the fact sheet or statement of basis for the permit.

[Note: Information concerning the NPDES program and its regulations

can be obtained by contacting the Permits Division (4203), Office of

Wastewater Management, U.S.E.P.A., 401 M Street, SW., Washington, DC

20460 at (202) 260-9545.]

3. Section 122.2 is amended by adding new definitions in

alphabetical order, and by revising the definition of ``Sludge-only

facility'' to read as follows:

Sec. 122.2 Definitions.

* * * * *

Animal feeding operation is defined at Sec. 122.23 of this part.

* * * * *

Aquaculture project is defined at Sec. 122.25 of this part.

* * * * *

Bypass is defined at Sec. 122.41(m) of this part.

* * * * *

Concentrated animal feeding operation is defined at Sec. 122.23 of

this part.

Concentrated aquatic animal feeding operation is defined at

Sec. 122.24 of this part.

* * * * *

Individual control strategy is defined at 40 CFR 123.46(c).

* * * * *

Municipal separate storm sewer system is defined at Sec. 122.26

(b)(4) and (b)(7) of this part.

* * * * *

Silvicultural point source is defined at Sec. 122.27 of this part.

* * * * *

[[Page 65288]]

Sludge-only facility means any ``treatment works treating domestic

sewage'' whose methods of sewage sludge use or disposal are subject to

regulations promulgated pursuant to section 405(d) of the CWA, and is

required to obtain a permit under Sec. 122.1(b)(2) of this part.

* * * * *

Storm water is defined at Sec. 122.26(b)(13) of this part.

Storm water discharge associated with industrial activity is

defined at Sec. 122.26(b)(14) of this part.

* * * * *

Upset is defined at Sec. 122.41(n) of this part.

4. Section 122.4 is amended by revising paragraph (i)(2) to read as

follows:

Sec. 122.4 Prohibitions (applicable to State NPDES programs, see

Sec. 123.25).

* * * * *

(i) * * *

(2) The existing dischargers into that segment are subject to

compliance schedules designed to bring the segment into compliance with

applicable water quality standards. The Director may waive the

submission of information by the new source or new discharger required

by paragraph (i) of this section if the Director determines that the

Director already has adequate information to evaluate the request. An

explanation of the development of limitations to meet the criteria of

this paragraph is to be included in the fact sheet to the permit under

Sec. 124.56(b)(1).

5. Section 122.21 is amended by revising paragraphs (a), (c)(2)(i),

(c)(2)(ii), (g)(7), (g)(8), (l)(1), (l)(2)(ii), (l)(3), (l)(4), and

notes 1, and the introductory text of notes 2, and 3; and by removing

and reserving paragraph (d)(3) to read as follows:

Sec. 122.21 Application for a permit (applicable to State programs,

see Sec. 123.25).

(a) Duty to apply. (1) Any person who discharges or proposes to

discharge pollutants or who owns or operates a ``sludge-only facility''

and who does not have an effective permit, except persons covered by

general permits under Sec. 122.28, excluded under Sec. 122.3, or a user

of a privately owned treatment works unless the Director requires

otherwise under Sec. 122.44(m), shall submit a complete application to

the Director in accordance with this section and part 124.

(2) Application Forms: (i) All applicants for EPA-issued permits

must submit applications on EPA permit application forms. More than one

application form may be required from a facility depending on the

number and types of discharges or outfalls found there. Applications

for EPA-issued permits shall be submitted as follows:

(A) All applicants must submit Form 1 containing general

information except as otherwise provided in another EPA application

form.

(B) Applicants for new and existing POTWs must submit the

information contained in Sec. 122.21 (f) and (j).

(C) Applicants for concentrated animal feeding operations or

aquatic animal production facilities must submit Form 2B.

(D) Applicants for existing industrial facilities (including

manufacturing facilities, commercial facilities, mining activities,

silvicultural activities, privately owned waste treatment facilities,

and water treatment facilities plants whether publicly or privately

owned that discharge process wastewater must submit Form 2C.

(E) Applicants for new industrial facilities that discharge process

wastewater must submit Form 2D.

(F) Applicants for new and existing industrial facilities that

discharge only nonprocess wastewater must submit Form 2E.

(G) Applicants for new and existing industrial facilities that

whose discharge is composed entirely of storm water must submit Form

2F. If the discharge is composed of storm water and non-storm water,

the applicant must also submit, Forms 2C, 2D, and/or 2E, as appropriate

(in addition to Form 2F).

(H) In addition to any other applicable requirements in this part,

all POTWs and other ``treatment works treating domestic sewage,''

including ``sludge-only facilities,'' must submit with their

applications the information listed at 40 CFR 501.15(a)(2) within the

timeframes established in paragraph (c)(2) of this section.

(ii) The application information required by Sec. 122.21(a)(2)(i)

may be electronically submitted if such method of submittal is approved

by EPA or authorized NPDES State Director.

(iii) Applicants can obtain copies of these forms by contacting the

Water Management Divisions (or equivalent division which contains the

NPDES permitting function) of the EPA Regional Offices. The Regional

Offices' addresses can be found at Sec. 1.7 of this title.

(iv) Applicants for State-issued permits must use State forms which

must require at a minimum the information required for permit

applications in this paragraph(a).

* * * * *

(c) * * *

(2) * * *

(i) Any existing ``treatment works treating domestic sewage''

required to have, or requesting site-specific pollutant limits as

provided in 40 CFR part 503, must submit the permit application

information required by paragraph(a)(2) of this section within 180 days

after publication of a standard applicable to its sewage sludge use or

disposal practice(s). After this 180 day period, ``treatment works

treating domestic sewage'' may only apply for site-specific pollutant

limits for good cause and such requests must be made within 180 days of

becoming aware that good cause exists.

(ii) Any ``treatment works treating domestic sewage'' with a

currently effective NPDES permit, not addressed under paragraph

(c)(2)(i) of this section, must submit the application information

required by paragraph (a)(2) of this section at the time of its next

NPDES permit renewal application. Such information must be submitted in

accordance with paragraph (d) of this section.

* * * * *

(g) * * *

(7) Effluent characteristics. (i) Information on the discharge of

pollutants specified in this paragraph (g)(7) of this section (except

information on storm water discharges which is to be provided as

specified in Sec. 122.26). When ``quantitative data'' for a pollutant

are required, the applicant must collect a sample of effluent and

analyze it for the pollutant in accordance with analytical methods

approved under 40 CFR part 136. When no analytical method is approved

the applicant may use any suitable method but must provide a

description of the method. When an applicant has two or more outfalls

with substantially identical effluents, the Director may allow the

applicant to test only one outfall and report that the quantitative

data also apply to the substantially identical outfall. The

requirements in paragraphs (g)(7) (iii) and (iv) of this section that

an applicant must provide quantitative data for certain pollutants

known or believed to be present do not apply to pollutants present in a

discharge solely as the result of their presence in intake water;

however, an applicant must report such pollutants as present. Grab

samples must be used for pH, temperature, cyanide, total phenols,

residual chlorine, oil and grease, fecal coliform and fecal

streptococcus. For all other pollutants, 24-hour composite samples must

be used. However, a minimum of one grab sample may be taken for

effluents from holding ponds or other impoundments with a retention

[[Page 65289]]

period greater than 24 hours. In addition, for discharges other than

storm water discharges, the Director may waive composite sampling for

any outfall for which the applicant demonstrates that the use of an

automatic sampler is infeasible and that the minimum of four (4) grab

samples will be a representative sample of the effluent being

discharged.

(ii) For storm water discharges, all samples shall be collected

from the discharge resulting from a storm event that is greater than

0.1 inch and at least 72 hours from the previously measurable (greater

than 0.1 inch rainfall) storm event. Where feasible, the variance in

the duration of the event and the total rainfall of the event should

not exceed 50 percent from the average or median rainfall event in that

area. For all applicants, a flow-weighted composite shall be taken for

either the entire discharge or for the first three hours of the

discharge. The flow-weighted composite sample for a storm water

discharge may be taken with a continuous sampler or as a combination of

a minimum of three sample aliquots taken in each hour of discharge for

the entire discharge or for the first three hours of the discharge,

with each aliquot being separated by a minimum period of fifteen

minutes (applicants submitting permit applications for storm water

discharges under Sec. 122.26(d) may collect flow-weighted composite

samples using different protocols with respect to the time duration

between the collection of sample aliquots, subject to the approval of

the Director). However, a minimum of one grab sample may be taken for

storm water discharges from holding ponds or other impoundments with a

retention period greater than 24 hours. For a flow-weighted composite

sample, only one analysis of the composite of aliquots is required. For

storm water discharge samples taken from discharges associated with

industrial activities, quantitative data must be reported for the grab

sample taken during the first thirty minutes (or as soon thereafter as

practicable) of the discharge for all pollutants specified in

Sec. 122.26(c)(1). For all storm water permit applicants taking flow-

weighted composites, quantitative data must be reported for all

pollutants specified in Sec. 122.26 except pH, temperature, cyanide,

total phenols, residual chlorine, oil and grease, fecal coliform, and

fecal streptococcus. The Director may allow or establish appropriate

site-specific sampling procedures or requirements, including sampling

locations, the season in which the sampling takes place, the minimum

duration between the previous measurable storm event and the storm

event sampled, the minimum or maximum level of precipitation required

for an appropriate storm event, the form of precipitation sampled (snow

melt or rain fall), protocols for collecting samples under 40 CFR part

136, and additional time for submitting data on a case-by-case basis.

An applicant is expected to ``know or have reason to believe'' that a

pollutant is present in an effluent based on an evaluation of the

expected use, production, or storage of the pollutant, or on any

previous analyses for the pollutant. (For example, any pesticide

manufactured by a facility may be expected to be present in

contaminated storm water runoff from the facility.)

(iii) Every applicant must report quantitative data for every

outfall for the following pollutants:

Biochemical Oxygen Demand (BOD5)

Chemical Oxygen Demand

Total Organic Carbon

Total Suspended Solids

Ammonia (as N)

Temperature (both winter and summer)

pH

(iv) The Director may waive the reporting requirements for

individual point sources or for a particular industry category for one

or more of the pollutants listed in paragraph (g)(7)(iii) of this

section if the applicant has demonstrated that such a waiver is

appropriate because information adequate to support issuance of a

permit can be obtained with less stringent requirements.

(v) Each applicant with processes in one or more primary industry

category (see appendix A to part 122) contributing to a discharge must

report quantitative data for the following pollutants in each outfall

containing process wastewater:

(A) The organic toxic pollutants in the fractions designated in

table I of appendix D of this part for the applicant's industrial

category or categories unless the applicant qualifies as a small

business under paragraph (g)(8) of this section. Table II of appendix D

of this part lists the organic toxic pollutants in each fraction. The

fractions result from the sample preparation required by the analytical

procedure which uses gas chromatography/mass spectrometry. A

determination that an applicant falls within a particular industrial

category for the purposes of selecting fractions for testing is not

conclusive as to the applicant's inclusion in that category for any

other purposes. [See Notes 2, 3, and 4 of this section.]

(B) The pollutants listed in table III of appendix D of this part

(the toxic metals, cyanide, and total phenols).

(vi)(A) Each applicant must indicate whether it knows or has reason

to believe that any of the pollutants in table IV of appendix D of this

part (certain conventional and nonconventional pollutants) is

discharged from each outfall. If an applicable effluent limitations

guideline either directly limits the pollutant or, by its express

terms, indirectly limits the pollutant through limitations on an

indicator, the applicant must report quantitative data. For every

pol

This text is long and has been trimmed here. Open the source document for the complete record.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.