Integrated System Power Rates
Federal RegisterSep 30, 1996
Ask Donna
What actually matters in this document.
Text
DEPARTMENT OF ENERGY
Southwestern Power Administration
Integrated System Power Rates
AGENCY: Southwestern Power Administration, DOE.
ACTION: Notice of extension.
-----------------------------------------------------------------------
SUMMARY: The Deputy Secretary of Energy, acting under Amendment No. 3
to Delegation Order No. 0204-108, dated November 10, 1993, 58 FR 59717,
and pursuant to the implementation authorities in 10 CFR 903.22(h) and
903.23(a)(3), has approved Rate Order No. SWPA-34 which extends the
existing power rates for the Integrated System. This is an interim rate
action effective October 1, 1996, extending for a period of one year
through September 30, 1997.
FOR FURTHER INFORMATION CONTACT: George C. Grisaffe, Assistant
Administrator, Office of Administration and Rates, Southwestern Power
Administration, Department of Energy, P.O. Box 1619, Tulsa, Oklahoma
74101, (918) 595-6628.
SUPPLEMENTARY INFORMATION: The existing rate schedules for the
Integrated System were approved on a final basis by the Federal Energy
Regulatory Commission on September 18, 1991, for the period ending
September 30, 1994. These rates were extended on an interim basis by
the Deputy Secretary of Energy on August 24, 1994, and on August 8,
1995. The rates are scheduled to expire on September 30, 1996. On July
2, 1996, the Southwestern Power Administration (Southwestern) published
notice in the Federal Register, 61 FR 34432, of its intention to seek a
one-year extension of the existing power rates for the Integrated
System and provided for a 15-day comment period. No comments were
received. 10 CFR 903.22(h) and 903.23(a)(3) provide implementation
authority for such interim extension to the Deputy Secretary.
Issued at Washington, DC, this 23rd day of September, 1996.
Charles B. Curtis,
Deputy Secretary.
Department of Energy
Deputy Secretary of Energy
In the matter of: Southwestern Power Administration--Integrated
System Rates
[Rate Order No. SWPA-34]
Order Approving Extension of Power Rates on an Interim Basis
September 23, 1996.
Pursuant to Sections 302(a) and 301(b) of the Department of Energy
Organization Act, Public Law 95-91, the functions of the Secretary of
the Interior and the Federal Power Commission under Section 5 of the
Flood Control Act of 1944, 16 U.S.C. 825s, for the Southwestern Power
Administration were transferred to and vested in the Secretary of
Energy. By Delegation Order No. 0204-108, effective December 14, 1983,
48 FR 55664, the Secretary of Energy delegated to the Deputy Secretary
of Energy on a non-exclusive basis the authority to confirm, approve
and place into effect on an interim basis power and transmission rates,
and delegated to the Federal Energy Regulatory Commission (FERC) on an
exclusive basis the authority to confirm, approve and place in effect
on a final basis, or to disapprove power and transmission rates.
Amendment No. 1 to Delegation Order No. 0204-108, effective May 30,
1986, 51 FR 19744, revised the delegation of authority to confirm,
approve and place into effect on an interim basis power and
transmission rates by delegating such authority to the Under Secretary
of Energy rather than the Deputy Secretary of Energy. This delegation
was reassigned to the Deputy Secretary of Energy by Department of
Energy (DOE) Notice 1110.29, dated October 27, 1988, and clarified by
Secretary of Energy Notice SEN-10-89, dated August 3, 1989, and
subsequent revisions. By Amendment No. 2 to Delegation Order No. 0204-
108, effective August 23, 1991, 56 FR 41835, the Secretary of the
Department of Energy revised Delegation Order No. 0204-108 to delegate
to the Assistant Secretary, Conservation and Renewable Energy, the
authority which was previously delegated to the Deputy Secretary in
that Delegation Order. By Amendment No. 3 to Delegation Order No. 0204-
108, effective November 10, 1993, the Secretary of Energy re-delegated
to the Deputy Secretary of Energy, the authority to confirm, approve
and place into effect on an interim basis power and transmission rates
of the Power Marketing Administrations. This rate order is issued by
the Deputy Secretary pursuant to said Amendment to Delegation Order No.
0204-108.
This is an interim rate extension. It is made pursuant to the
authorities as implemented in 10 CFR 903.22(h) and 903.23(a)(3).
Background
Southwestern Power Administration (Southwestern) currently has
marketing responsibility for 2.2 million kilowatts of power from 24
multiple-purpose reservoir projects, generally in all or portions of
the states of Arkansas, Kansas, Louisiana, Missouri, Oklahoma and
Texas, with power facilities constructed and operated by the U.S. Army
Corps of Engineers. The Integrated System, comprised of 22 of the
projects, is interconnected through a transmission system presently
consisting of 138- and 161-kV high-voltage transmission lines, 69-kV
transmission lines, and numerous bulk power substations and switching
stations. In addition, contractual transmission arrangements provide
for integration of other projects into the system.
The remaining two projects, Sam Rayburn Dam and Robert Douglas
Willis, are isolated hydraulically and electrically from the
Southwestern transmission system, and their power is marketed under
separate contracts
[[Page 51103]]
through which the customer purchases the entire power output of the
project at the dam. A separate Power Repayment Study (PRS) is prepared
for each isolated project, and each has a special rate which is not a
part of this study.
The existing rate schedules for the Integrated System were
confirmed and approved on a final basis by the FERC on September 18,
1991, for the period October 1, 1990, through September 30, 1994. These
rates were extended on an interim basis by the Deputy Secretary of
Energy on August 28, 1994, and again on August 8, 1995. The rates are
scheduled to expire September 30, 1996. The FY 1996 Integrated System
PRSs indicate the need for a rate adjustment of $1,239,868 annually, or
1.3 percent.
Pursuant to implementing authority in 10 CFR 903.22(h) and
903.23(a)(3), the Deputy Secretary of Energy may extend a FERC-approved
rate on an interim basis. The Administrator, Southwestern, published
notice in the Federal Register on July 2, 1996, 61 FR 34432, announcing
a 15-day period for public review and comment concerning the proposed
interim rate extension. In addition, meetings that discussed the
proposal were held with customer representatives in April and July
1996. Written comments were accepted through July 17, 1996. No comments
on the proposed interim extension were received.
Discussion
The existing Integrated System rates are based on the FY 1990 PRS.
PRSs have been completed on the Integrated System each year since
approval of the existing rates. Rate changes identified by the PRSs
since that period have indicated the need for minimal rate increases or
decreases. Since the revenue changes reflected by the PRSs were within
the plus-or-minus two percent Rate Adjustment Threshold established by
Southwestern's Administrator on June 23, 1987, these rate adjustments
were deferred in the best interest of the government and provided for
the next year's PRS to determine the appropriate level of revenues
needed for the next rate period.
The FY 1996 PRS indicates the need for an annual revenue increase
of 1.3 percent. As has been the case since the existing rates were
approved, the FY 1996 rate adjustment needed falls within
Southwestern's plus-or-minus two percent Rate Adjustment Threshold and
would normally be deferred. However, the existing rates expire on
September 30, 1996. Consequently, Southwestern proposes to extend the
existing rates for a one-year period ending September 30, 1997, on an
interim basis under the implementation authorities noted in 10 CFR
903.22(h) and 903.23(a)(3).
Southwestern continues to make significant progress toward
repayment of the Federal investment in the Integrated System. Through
FY 1995, status of repayment for the Integrated System was
$355,572,353, which represents approximately 36 percent of the
$982,272,106 Federal investment for the Integrated System. The status
has increased almost 82 percent since the existing rates were placed in
effect.
Information regarding this rate extension, including studies and
other supporting material, is available for public review and comment
in the offices of Southwestern Power Administration, One West Third
Street, Tulsa, Oklahoma 74101.
Order
In view of the foregoing and pursuant to the authority delegated to
me by the Secretary of Energy, I hereby extend on an interim basis, for
the period of one year, effective October 1, 1996, the current FERC-
approved Southwestern Power Administration Integrated System Rates.
Issued at Washington, DC, the 23rd day of September 1996.
Charles B. Curtis,
Deputy Secretary.
[FR Doc. 96-24984 Filed 9-27-96; 8:45 am]
BILLING CODE 6450-01-P
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.