DEPARTMENT OF ENERGY
Record of Decision for Remedial Actions at Operable Unit 4,
Fernald Environmental Management Project, Fernald, Ohio
AGENCY: U.S. Department of Energy.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: The Record of Decision (ROD) for Operable Unit 4 (OU4) at the
Fernald Environmental Management Project was signed by the Department
of Energy on November 3, 1994, and was approved by the Environmental
Protection Agency (EPA) Region V on December 7, 1994, with concurrence
of the Ohio Environmental Protection Agency. This decision was made in
accordance with the provisions of the Comprehensive Environmental
Response, Compensation, and Liability Act (CERCLA), 42 U.S.C. 9601 et
seq. For OU4 at Fernald, the Department has chosen to complete an
integrated CERCLA/National Environmental Policy Act (NEPA) process. To
support the selection of a remedy for OU4, which includes K-65 silo
wastes, the [[Page 2093]] Department prepared an integrated Feasibility
Study/Proposed Plan-Environmental Impact Statement (FS/PP-EIS) (DOE/
EIS-0195). Subsequent to the public involvement opportunities on the
draft and final FS/PP-EIS documents, and after having considered the
comments received, a remedy was selected in a joint CERCLA/NEPA ROD.
The Department is publishing this Declaration Statement of the joint
CERCLA/NEPA ROD, as originally signed in November 1994, as specified in
the Department NEPA regulations [10 CFR 1021.315(c)].
FOR FURTHER INFORMATION CONTACT:
For further information on the CERCLA/NEPA ROD at Fernald, contact:
Mr. Gary Stegner, Public Affairs Specialist, Fernald Area Office, U.S.
Department of Energy, P.O. Box 538705, Cincinnati, Ohio 45253-8705,
(513) 648-3014.
For further information on the DOE NEPA process, contact: Ms. Carol
M. Borgstrom, Director, Office of NEPA Oversight, EH-25, U.S.
Department of Energy, 1000 Independence Ave, SW., Washington, D.C.
20585, (202) 586-4600 or (800) 472-2756.
Issued in Washington, D.C., this 30th day of December, 1994.
Clyde Frank,
Acting Assistant Secretary for Environmental Management.
SUPPLEMENTARY INFORMATION: The following is the verbatim Declaration
Statement of the joint CERCLA/NEPA ROD for Remedial Actions at OU4 at
Fernald, Ohio.
Site Name and Location
Fernald Environmental Management Project (FEMP) Site--Operable Unit
4, Fernald, Hamilton County, Ohio
Statement of Basis and Purpose
This decision document presents the selected remedial action for
Operable Unit 4 of the Fernald Site in Fernald, Ohio. This remedial
action was selected in accordance with the Comprehensive Environmental
Response, Compensation, and Liability Act (CERCLA), as amended by the
Superfund Amendments and Reauthorization Act of 1986 (SARA), and to the
extent practicable 40 Code of Federal Regulations (CFR) Part 300, the
National Oil and Hazardous Substances Pollution Contingency Plan (NCP).
For Operable Unit 4 at the FEMP, DOE has chosen to complete an
integrated CERCLA/NEPA process. This decision was based on the
longstanding interest on the part of local stakeholders to prepare an
Environmental Impact Statement (EIS) on the restoration activities at
the FEMP and on the recognition that the draft document was issued and
public comments received. Therefore, this single document is intended
to serve as DOE's ROD for Operable Unit 4 under both CERCLA and NEPA;
however, it is not the intent of the DOE to make a statement on the
legal applicability of NEPA to CERCLA actions.
The decision presented herein is based on the information available
in the administrative record for Operable Unit 4 and maintained in
accordance with CERCLA. The major documents prepared through the CERCLA
process include the Remedial Investigation (RI), the Feasibility Study
(FS), and the Proposed Plan (PP) for Operable Unit 4. The FS and the PP
also comprised DOE's draft EIS and were made available for public
review and comment. This decision is also based on the public hearing
held on March 21, 1994, in Harrison, Ohio, and the public meeting held
on May 11, 1994, in Las Vegas, Nevada following the issuance of the
Feasibility Study/Proposed Plan-Draft Environmental Impact Statement
(FS/PP-DEIS). DOE has considered all comments received during the
public comment period on the FS/PP-DEIS and following issuance of the
final EIS in the preparation of this ROD.
The State of Ohio concurs with the remedy and the applicable or
relevant and appropriate requirements (ARARs) put forth in this ROD for
Operable Unit 4.
Assessment of the Site
Actual or threatened releases of hazardous substances from Operable
Unit 4, if not addressed by implementing the response action selected
in this ROD, may present an imminent and substantial endangerment to
public health, welfare, or the environment.
Description of the Remedy
This is the selected remedial action for Operable Unit 4, one of
five operable units at the FEMP. The materials within Operable Unit 4
exhibit a wide range of properties. Most notable would be the elevated
direct radiation associated with the K-65 residues versus the much
lower direct radiation associated with cold metal oxides in Silo 3.
Even more significant would be the much lower levels of contamination
associated with the soils and building materials, like concrete, within
the Operable Unit 4 Study Area. To account for these differences and
for the varied cleanup alternatives applying to each waste type,
Operable Unit 4 was segmented into three subunits. These subunits are
described as follows:
Subunit A: Silos 1 and 2 contents (K-65 residues and bentonite clay)
and the sludge in the decant sump tank
Subunit B: Silo 3 contents (cold metal oxides)
Subunit C: Silos 1, 2, 3, and 4 structures; contaminated soils within
the Operable Unit 4 boundary, including surface and subsurface soils
and the earthen berm around Silos 1 and 2; the decant sump tank; the
radon treatment system; the concrete pipe trench and the miscellaneous
concrete structures within Operable Unit 4, any debris (i.e., concrete,
piping, etc.) generated through implementing cleanup for Subunits A and
B, and any perched groundwater encountered during remedial activities.
On the basis of the evaluation of final alternatives, the selected
remedy addressing Operable Unit 4 at the FEMP is a combination of
Alternatives 3A.1/Vit--Removal, Vitrification, and Off-site Disposal--
Nevada Test Site (NTS); 3B.1/Vit--Removal, Vitrification, and Off-site
Disposal--NTS; and 2C--Demolition, Removal and On-Property Disposal.
These alternatives apply to Subunits A, B, and C respectively. The
major components of the selected remedy include:
Removal of the contents of Silos 1, 2, and 3 (K-65
residues and cold metal oxides) and the decant sump tank sludge.
Vitrification (glassification) to stabilize the residues
and sludges removed from the silos and decant sump tank.
Off-site shipment for disposal at the NTS of the vitrified
contents of Silos 1, 2, 3, and the decant sump tank.
Demolition of Silos 1, 2, 3, and 4 and decontamination, to
the extent practicable, of the concrete rubble, piping, and other
generated construction debris.
Removal of the earthen berms and excavation of
contaminated soils within the boundary of Operable Unit 4, to achieve
remediation levels. Placement of clean backfill to original grade
following excavation.
Demolition of the vitrification treatment unit and
associated facilities after use. Decontamination or recycling of debris
prior to disposition.
On-property interim storage of excavated contaminated
soils and contaminated debris in a manner consistent with the approved
Work Plan for Removal Action 17 (improved storage of soil and debris)
pending final disposition in accordance with the [[Page 2094]] Records
of Decision for Operable Units 5 and 3, respectively.
Continued access controls and maintenance and monitoring
of the stored wastes inventories.
Institutional controls of the Operable Unit 4 area such as
deed and land use restrictions.
Potential additional treatment of stored Operable Unit 4
soil and debris using Operable Unit 3 and 5 waste treatment systems.
Pumping and treatment as required of any contaminated
perched groundwater encountered during remedial activities.
Disposal of Operable Unit 4 contaminated debris and soils
consistent with the Records of Decision for Operable Units 3 and 5,
respectively.
The remedy specifies off-site disposal of vitrified contents of
Silos 1, 2 and 3 at the NTS. At the time of the signing of this ROD,
The Department of Energy--Nevada Operations Office (DOE-NV) is in the
process of preparing a site-wide environmental impact statement (EIS)
under NEPA for the NTS. Shipments of Operable Unit 4 vitrified waste
are not proposed to begin until after the planned completion of the EIS
for the NTS.
The planned date of completion of the EIS for the NTS is December
1995, at which time a Record of Decision is expected to be issued.
Shipments of low-level waste generated from the remediation of Operable
Unit 4 are not proposed to begin until mid-1997, which should be after
the planned completion of the NTS site-wide EIS. Given these
timeframes, DOE does not anticipate the NTS EIS schedule will
negatively impact the Operable Unit 4 remediation schedule discussed in
the ROD.
The containerized vitrified product will require interim storage at
the FEMP prior to its transportation to the NTS for disposal. The
purpose of this interim storage is two-fold; first, the vitrified
product will require verification sampling in order to certify that
each production lot has met specific performance and waste disposal
criteria; and second, to provide the Fernald waste shipping program a
buffer staging area where the material can be safely managed prior to
its shipment to NTS in accordance with DOE as low as reasonably
achievable (ALARA) principles, ARARs identified and included in the
Operable Unit 4 ROD, as well as in a manner protective of human health
and the environment. It has been anticipated that the interim storage
area will be needed to accommodate the interim handling of
approximately 90 days of vitrification production.
The decision regarding the final disposition of the remaining
Operable Unit 4 contaminated soil and debris will be placed in
abeyance, until completion of the Records of Decision for Operable
Units 3 and 5 remedial actions, in order to take full advantage of
planned and in progress waste minimization treatment processes by these
operable units. Further, this strategy enables the integration of
disposal decisions for contaminated soils and debris on a site- wide
basis.
In the unlikely event unforeseen circumstances preclude the
integration of Operable Unit 4 soil and debris into the Operable Unit 3
and/or Operable Unit 5 treatment and disposal decisions, the disposal
decision for Operable Unit 4 contaminated soils and debris will be
documented in a ROD amendment for Operable Unit 4 in accordance with
Section 117(c) of CERCLA and United States Environmental Protection
Agency (EPA) guidance. The ROD amendment will provide the public and
the EPA further opportunity to review and comment on the final disposal
option for Operable Unit 4 soils and debris. A ROD amendment to the
Operable Unit 4 ROD will not be necessary in the event the Operable
Unit 3 remedy for debris and the Operable Unit 5 remedy for
contaminated soils can be feasibly implemented for Operable Unit 4.
In reaching the decision to implement this remedial alternative,
DOE evaluated other alternatives for each subunit, in addition to no
action. The other alternatives are: (a) Subunit A--Silos 1 and 2
Contents: (1) Removal, Cement Stabilization, Off-Site Disposal at
Nevada Test Site; (b) Subunit B--Silo 3 Contents: (1) Removal,
Vitrification, On-Property Disposal; (2) Removal, Cement Stabilization,
On-Property Disposal; (3) Removal, Cement Stabilization, Off-Site
Disposal at Nevada Test Site; (c) Subunit C--Silos 1, 2, 3, and 4
Structures, Soils, and Debris: (1) Demolition, Removal, Off-Site
Disposal at Nevada Test Site; (2) Demolition, Removal, Off-Site
Disposal at Permitted Commercial Facility.
A description of the alternatives is provided in the Decision
Summary of the ROD, hereby incorporated by reference for DOE's NEPA
ROD, and is available in the Administrative Record. CERCLA's nine
criteria set forth in 40 CFR Part 300, the National Oil and Hazardous
Substances Pollution Contingency Plan were used to evaluate the
alternatives. The selected remedy represents the best balance among the
alternatives with respect to these criteria and is the environmentally
preferable alternative.
The preferred alternative for Operable Unit 4 provides the best
performance when compared with the other alternatives, with respect to
the evaluation criteria. This remedy will achieve substantial risk
reduction by removing the sources of contamination, treating the
material which poses the highest risk, shipping the treated residues
off-site for disposal, managing the remaining contaminated soils and
debris consistent with the site-wide strategy. The selected treatment
alternative both reduces the mobility of the hazardous constituents and
results in significant reduction in the volume of materials requiring
disposal. The selected remedy also provides the highest degree of long-
term protectiveness for human health and the environment.
Statutory Determinations
The selected remedy is protective of human health and the
environment, complies with Federal and State requirements that are
legally applicable or relevant and appropriate to the remedial action,
and is cost effective. This remedy utilizes permanent solutions and
alternative treatment (or resource recovery) technologies to the
maximum extent practicable, and satisfies the statutory preference for
remedies that employ treatment, and also reduce toxicity, mobility, or
volume as a principal element. This remedy will result in contaminated
debris and soil being dispositioned by Operable Units 3 and 5,
respectively. Because this remedy will result in hazardous substances
(i.e., contaminated soil and debris) remaining on site, above health-
based levels, a review will be conducted every five years after
commencement of remedial action to ensure that the remedy continues to
provide adequate protection of human health and the environment.
All practical means to avoid or minimize environmental harm from
implementation of the selected remedy have been adopted. During
excavation activities, sediment controls will be implemented to
eliminate potential surface water runoff and sediment deposition to
Paddys Run. Final site layout and design will include all practicable
means (e.g., sound engineering practices and proper construction
practices) to minimize environmental impacts.
[FR Doc. 95-345 Filed 1-5-95; 8:45 am]
BILLING CODE 6450-01-P
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.