DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

18 CFR Parts 2, 34, 35, 41, 131, 292, 294, 382, and 385

[Docket No. RM92-12-000]

Streamlining of Regulations Pertaining to Parts II and III of the

Federal Power Act and the Public Utility Regulatory Policies Act of

1978; Order No. 575

Issued January 13, 1995.

AGENCY: Federal Energy Regulatory Commission, DOE.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Federal Energy Regulatory Commission (Commission) is

amending its regulations governing public utilities and qualifying

facilities. The final rule revises and clarifies Commission policies

regarding: Rate filings by public utilities under the Federal Power

Act; issuances of securities and assumptions of liabilities by public

utilities, licensees and others; and procedural and technical rules

governing qualifying facilities. The final rule is intended to

streamline the Commission's processing of its workload and reduce

regulatory burdens on the electric utility and qualifying facility

industries.

EFFECTIVE DATE: This rule is effective February 24, 1995.

FOR FURTHER INFORMATION CONTACT:

Andre Goodson (Legal Information), Office of the General Counsel,

Federal Energy Regulatory Commission, 825 North Capitol St., N.E.,

Washington, D.C. 20426, Telephone: (202) 208-2167;

Joseph C. Lynch (Legal Information), Federal Energy Regulatory

Commission, Office of the General Counsel, 825 North Capitol Street,

N.E., Washington, D.C. 20426, Telephone: (202) 208-2128;

Wayne McDanal (Technical information concerning Part 34 matters),

Office of Chief Accountant, 825 North Capitol Street, N.E., Washington,

D.C. 20426, Telephone: (202) 219-2622;

Howard B. Forman (Technical information concerning Part 35 matters),

Office of Electric Power Regulation, 825 North Capitol Street, N.E.,

Washington, D.C. 20426, Telephone: (202) 208-0545;

Qualifying Facilities Desk Officer (Technical information concerning

Part 292 matters), Office of Electric Power Regulation, 825 North

Capitol Street, N.E., Washington, D.C. 20426, Telephone: (202) 208-

0571;

James K. Newton (Technical information concerning Part 294 matters),

Office of Electric Power Regulation, 825 North Capitol Street, N.E.,

Washington, D.C. 20426, Telephone: (202) 208-0578; or

William C. Booth (Technical information concerning Part 382 matters),

Office of Electric Power Regulation, 825 North Capitol Street, N.E.,

Washington, D.C. 20426, Telephone: (202) 208-0849.

SUPPLEMENTARY INFORMATION: In addition to publishing the full text of

this document in the Federal Register, the Commission also provides all

interested persons an opportunity to inspect or copy the contents of

this document during normal business hours in Room 3401, at 941 North

Capitol Street, N.E., Washington, D.C. 20426.

The Commission Issuance Posting System (CIPS), an electronic

bulletin board service, provides access to the texts of formal

documents issued by the Commission. CIPS is available at no charge to

the user and may be accessed using a personal computer with a modem by

dialing (202) 208-1397. To access CIPS, set your communications

software to 19200, 14400, 12000, 9600, 7200, 4800, 2400, 1200 or

300bps, full duplex, no parity, 8 data bits and 1 stop bit. The full

text of this document will be available on CIPS for 60 days from the

date of issuance in ASCII and WordPerfect 5.1 format. After 60 days the

document will be archived, but still accessible. The complete text on

diskette in WordPerfect format may also be purchased from the

Commission's copy contractor, La Dorn Systems Corporation, also located

in Room 3104, 941 North Capitol Street, N.E., Washington, D.C. 20426.

Table of Contents

I. Introduction

II. Public Reporting Burden

III. Discussion

A. Part 2--General Policy and Interpretations: Section 2.4(d)--

Initial Rate Schedules

B. Part 34--Application for Authorization of the Issuance of

Securities or the Assumption of Liabilities

1. Section 34.1(c)(1)--Exemption if State Regulates Security

Prior to Issuance

2. Section 34.1(c)(2)--Exemption for Short Term Notes or Drafts

3. Section 34.2--Placement of Securities

4. Section 34.3--Contents of Application for Issuance of

Securities

5. Section 34.4--Required Exhibits

6. Section 34.10--Reports

7. Section 34.11--Unopposed Applications to Issue Securities

and/or Assume Liabilities

8. Part 131--Forms: Section 131.50

C. Part 35--Filing of Rate Schedules

1. Sections 35.13(a)(2)(i)(A) and (B)--Rate Increases of Less

Than $200,000, Regardless of Customer Consent, and Rate Increases

Below $1,000,000, With Customer Consent

2. Other Changes to Section 35.13

D. Part 41--Accounts, Records and Memoranda: Sections 41.3 and

41.7

E. Proposed Procedural Modifications and Revised Definitions

Under Part 292--Regulations Under Sections 201 and 210 of the Public

Utility Regulatory Policies Act of 1978 (PURPA) With Regard to Small

Power Production and Cogeneration

1. Administration of the 90-Day Certification Period

2. Improvements in the Self-Certification Process

3. Revocation of Qualifying Status

4. Pre-Authorized Recertification [[Page 4832]]

5. Qualifying Transmission and Interconnection Equipment

6. Maximum Net Power Production Capacity

7. Increased Specificity of the Qualifying Facility

Certification Application Filing Requirements: Form 556

F. Proposed Technical Modifications for Qualifying Small Power

Production and Cogeneration Facilities Under Part 292

1. Calendar Year Operating and Efficiency Value Calculations

2. Clarification of the Sequential Use of Energy Requirement

3. Section 292.204(a)--Criteria for Small Power Production

Facilities

4. Waste

G. Part 294--Procedures for Shortages of Electric Energy and

Capacity Under Section 206 of the Public Utility Regulatory Policies

Act of 1978

H. Part 382--Annual Charges: Sections 382.102 and 382.201

I. Part 385--Rules of Practice and Procedure

IV. Environmental Statement

V. Regulatory Flexibility Certification

VI. Information Collection Statement

List of Subjects

Before Commissioners: Elizabeth Anne Moler, Chair; Vicky A.

Bailey, James J. Hoecker, William L. Massey, and Donald F. Santa,

Jr.

I. Introduction

On November 16, 1992, the Federal Energy Regulatory Commission

(Commission) issued a Notice of Proposed Rulemaking (NOPR) in which the

Commission proposed to revise its regulations regarding: (a) Rate

filings by public utilities under the Federal Power Act (FPA); (b)

assumptions of liabilities and issuances of securities by public

utilities, licensees, and certain other entities; and (c) procedural

and technical rules governing qualifying facilities.1 The

Commission requested that interested persons submit written comments no

later than January 15, 1993. Forty entities submitted comments.2

\1\Streamlining of Regulations Pertaining to Parts II and III of

the Federal Power Act and the Public Utility Regulatory Policies Act

of 1978, Notice of Proposed Rulemaking, 57 FR 55176 (Nov. 24, 1992),

IV FERC Stats. & Regs. 32,489 (1992), errata adding Appendix, 57 FR

58168 (Dec. 9, 1992), IV FERC Stats. & Regs. 32,491 (1992).

\2\The commenters are: American Cogeneration Association

(American Cogen); American Forest and Paper Association (American

Forest and Paper); American Gas Association (AGA); American Iron and

Steel Institute (American Iron and Steel); Anthracite Region

Independent Power Producers Association (Anthracite IPPs); Applied

Energy Services Corporation (Applied Energy); Arizona Public Service

Company (Arizona Public Service); Atlantic City Electric Company

(Atlantic Electric); Baltimore Gas & Electric Company (Baltimore Gas

& Electric); Public Utilities Commission of the State of California

(CPUC); Consumers Power Company (Consumers Power); Curran, Corbett &

Stiles; Delmarva Power & Light Company (Delmarva); Detroit Edison

Company (Detroit Edison); Steven A. Duff; Duke Power Company (Duke

Power); Edison Electric Institute (EEI); Electric Generation

Association; Florida Power & Light Company (Florida P&L); General

Electric Company (General Electric); Gulf States Utilities Company

(Gulf States); Long Island Lighting Company (LILCO); National

Independent Energy Producers (Independent Energy Producers); New

England Power Company (NEP); New York State Electric & Gas Company

(NYSEG); Niagara Mohawk Power Corporation (Niagara Mohawk); Oxbow

Power Corporation (Oxbow); Pennsylvania Power & Light Company

(Pennsylvania P&L); Ridgewood Power Corporation (Ridgewood); RW

Power Partners, L.P. (RW Partners); San Diego Gas & Electric Company

(SDG&E); Southern California Edison Company (Southern California

Edison); Southern Company Services, Inc. (Southern Companies);

Tenaska, Inc. (Tenaska); Texaco Cogeneration and Power Company

(Texaco); Texas-New Mexico Power Company (Texas-New Mexico); United

States Small Business Administration (Small Business

Administration); UtiliCorp United, Inc. (UtiliCorp); Utility Systems

Florida; and Donald L. Warner.

---------------------------------------------------------------------------

The Commission is now adopting a final rule revising its

regulations to streamline the processing of the Commission's workload

and to reduce regulatory burdens on the electric utility and qualifying

facility industries.

II. Public Reporting Burden

The final rule establishes new reporting requirements, modifies

existing reporting requirements and eliminates those requirements that

are now obsolete. On balance, the Commission believes that the overall

burden on industry and individuals will be lessened over time by these

proposed changes. The Commission seeks to simplify and streamline its

requirements to reduce the burden on respondents including

utilities,3 and/or persons seeking the following: Obtaining

Commission certification or filing a notice of the qualifying status of

their cogeneration facilities and small power producers; obtaining

Commission approval to issue securities or assume obligations or

liabilities; responding to the Commission's audits of their financial

records; filing in response to the assessment of Commission's annual

charges; submitting contingency plans in preparation of energy

shortages.

\3\As used in reference to the part 34 regulations, the term

``utility'' means public utility, licensee and other entities

subject to the provisions of the FPA.

---------------------------------------------------------------------------

The current public reporting burden for these information

collections is estimated to average the following number of hours per

response: FERC-516 976 hours for the 234 respondents that complete a

filing; FERC-523 120 hours for the 60 respondents that complete a

filing; FERC-525 193.25 hours per response for the 83 respondents that

respond to audit review; FERC Form 556 6.2 hours for 332 respondents

that complete an application for certification; FERC-582 4 hours for

179 respondents who prepare and submit remuneration for annual charges

assessed on them by the Commission; and FERC-585 76 hours per response

for average of 6 respondents who annually have submitted changes to

contingency plans (out of the 110 utilities with plans on file). These

estimates include the time for reviewing instructions, searching

existing data sources, gathering and maintaining the data needed, and

completing and reviewing the collection of information.

The changes in Part 34 (FERC-523) will reduce the reporting burden

by 10 hours per filing. The changes in Part 35 (FERC-516) will increase

the reporting burden by 0.1 hours per filing. The changes in Part 292

(FERC-556) will increase the reporting burden by 0.77 hours per filing

for notices of self-certification. However, these changes will reduce

the reporting burden for applications for Commission certification by

2.5 hours per filing. This reflects a reduction in the amount of

analysis to determine whether the facility is a qualifying facility.

The results from the changes in Parts 294 (FERC-585) and 382 (FERC-582)

on the reporting burden are difficult to quantify, but should, over

time, result in a reduction of the reporting burden. The changes in

Part 41 (FERC-525) will not affect the reporting burden.

With respect to the utilities and persons filing information under

FERC-523, the Commission believes that there will be an average burden

decrease due to the elimination of several requirements and increases

in the thresholds for the reporting of information to meet other

requirements. For the additional information that will be required

there should be a minimal burden increase as a result, because much of

the information is already collected by industry in other contexts. The

final rule simplifies the provisions for the issuance of short-term

notes and drafts with maturities of a year or less and deletes an

after-the fact filing requirement. Further, the final rule simplifies

the procedures for the placement of securities thereby streamlining the

regulatory process.

Likewise, the final rule deletes the requirement to include a copy

of the corporate charter or articles of incorporation, because a

statement of corporate purposes will provide the necessary information.

However, the final rule will require the submission of a Statement of

Cash Flows and Interest Coverage containing data on an actual basis for

the same twelve-month period. This information is to be submitted in a

format already prescribed in FERC Form No. 1. The Commission has

[[Page 4833]] instituted this requirement to facilitate the preparation

of financial statements to be submitted as part of the application

because the utilities already prepare quarterly financial statements

and may use such statements as the basis for the information required

to be submitted. The use of the FERC Form No. 1 format will relieve

utilities of the necessity of compiling data in a format that has

limited applicability.

For the information to be filed in Part 35 and collected under the

heading FERC-516, the Commission will require more information than is

currently required on small rate increases for requirements services.

However, the Commission believes that the additional information will

allow for more efficient processing of applications and, by reducing or

eliminating the need for extensive discovery, eliminate protracted

proceedings. The final rule creates a new abbreviated filing option for

small increases in rates for non-coordination, firm power and

transmission services.

Concerning FERC-525, the final rule modifies shortened procedures

for hearings on a utility's accounts, records and memoranda. The

Commission seeks to reduce the amount of litigation, particularly the

number of hearings when the material facts are not in dispute.

The Commission estimates that the public reporting burden for the

other filing requirements under this proposed final rule will reduce

the existing reporting burden. The requirements for the certification

of small power production and cogeneration facilities as qualifying

facilities under Part 292 of the regulations has been revised and

clarified to reflect changing industry conditions and the Commission's

experience with the qualifying facilities program. In particular, the

Commission intends to act within 90 days on the filing of an

application for certification, or within 90 days of the filing of the

supplement or amendment to the application. This will allow the

application process to be conducted in a timely fashion and with some

certainty to the applicant as to when the Commission deems an

application complete.

In the NOPR, the Commission proposed a standardized application

form, FERC Form 556, to facilitate successful applications for

Commission certification of qualifying status. Form 556 allows

cogenerators and small power producers to report the specific

characteristics of their facilities and provides a step-by-step

application of pertinent regulations to their facilities. To provide

greater assurance to lenders, electric utilities and state regulatory

institutions, the final rule also adopts the use of the FERC Form 556

information requirement format for notices of self-certification.

Through the use of Form 556, the self-certification process will be

similar to the Commission certification process, for it will

incorporate sufficient substantive information. But the notice of self-

certification will remain a simple procedure that is both quick and

economical. There will be no Commission review or filing fee, and the

process should promote discussions between the applicants, electric

utilities and affected regulatory commissions to resolve any problems.

To make Form 556 easier to use, the Commission is eliminating

redundancies and, wherever possible, cross-referencing items to related

sections of the Commission's regulations or stating the underlying

Federal Power Act (FPA) or Commission requirement.

In the proposed rule, the Commission also sought to make it easier

to determine the energy sources that certain qualifying small power

production facilities may use. To make it easier to certify a

qualifying facility, the Commission also proposed to list specific

energy sources that it had previously approved for treatment as waste.

In the final rule, the Commission publishes a list of waste energy

inputs already approved by the Commission. In addition, the Commission

is also streamlining its waste determination process for those energy

inputs that do not appear on the list by changing its approach to

require that the proposed waste fuel source only have little or no

commercial value.

In its changes to Part 382 of the regulations concerning the

submission of annual charges and the information collected under FERC-

582, the final rule clarifies the Commission's requirements by making

the calculation of annual charges consistent with the classification of

transaction volumes as reported on the FERC Form 1.

For the information collected under FERC-585 under Part 294 of the

Commission's regulations, the final rule provides a public utility with

the option of not separately reporting its contingency plans if it

already includes certain provisions in its wholesale rate schedules.

Otherwise, the public utility must file a brief statement, summarizing

its contingency plans. In the event the public utilities avail

themselves of this option, it would reduce the number of annual

respondents and total burden.

Comments regarding these burden estimates or any other aspects of

these collections of information, including suggestions for reducing

the burden, can be sent to the Federal Energy Regulatory Commission,

941 North Capitol Street, N.E. Washington, D.C. 20426 [Attention:

Michael Miller, Information Services Division, (202) 208-1415]; and to

the Office of Information and Regulatory Affairs, Office of Management

and Budget [Attention: Desk Officer for Federal Energy Regulatory

Commission], FAX: (202) 395-5167.

III. Discussion

For the reasons discussed below, the Commission hereby deletes or

revises the following regulations:

A. Part 2--General Policy and Interpretations: Section 2.4(d)--Initial

Rate Schedules

The Commission noted in the NOPR that Sec. 2.4(d) provides that an

initial rate schedule can be suspended and an interim rate established,

and that both can be made subject to refund. However, the United States

Court of Appeals for the District of Columbia Circuit has held that the

Commission does not have authority to suspend initial rate

filings.4 Accordingly, in the NOPR the Commission proposed to

delete this provision from the regulations. Only Southern Companies

commented on this proposed change, and they agree that the deletion of

the provision is appropriate.5 For the reasons given in the NOPR,

and described above, the final rule will delete this provision from the

Commission's regulations.

\4\Middle South Energy, Inc. v. FERC, 747 F.2d 763 (D.C. Cir.

1984).

\5\Southern Companies also disagrees with the Commission's

interpretation of what constitutes an initial rate; however, that

issue is beyond the scope of this proceeding.

---------------------------------------------------------------------------

B. Part 34--Application for Authorization of the Issuance of Securities

or the Assumption of Liabilities

1. Section 34.1(c)(1)--Exemptions if State Regulates Security Prior to

Issuance

Under sections 19, 20 and 204 of the FPA,6 utilities,

licensees, and certain other entities are required to obtain Commission

authorization to issue securities or to assume any obligation or

liability with respect to the securities of another person.7 The

NOPR proposed [[Page 4834]] revising Sec. 34.1(c)(1) by clarifying that

section. No one commented on this proposed change; we will incorporate

the proposed change in the final rule to make it clear that if an

agency of a state in which a utility is organized and operating

approves or authorizes, in writing, the issuance of securities prior to

their issuance, the utility is exempt from the provisions of sections

19, 20 and 204 of the FPA and the regulations under 18 CFR part 34 with

respect to the issuance of such securities.

\6\16 U.S.C. 812, 813, 824c.

\7\There are certain exceptions to this requirement. Under

section 204(e) of the FPA, a public utility does not require

Commission authorization to issue, renew, or assume debt with a

maturity date of not more than one year, if the debt, together with

all of the other debt having a maturity of one year or less that the

utility has then outstanding, does not exceed five percent of the

par value of the utility's securities then outstanding.

Under section 204(f) of the FPA, a public utility does not

require Commission authorization to issue securities or assume debt

if the State commission in which it is organized and operating

regulates the issuance of its securities.

Under section 318 of the FPA, a utility that is subject to the

requirements of the Public Utility Holding Company Act is not

subject to the requirements of the FPA with respect to the issue,

sale, or guarantee of a security, or assumption of obligation or

liability.

---------------------------------------------------------------------------

2. Section 34.1(c)(2)--Exemptions for Short-Term Notes or Drafts

The NOPR proposed amending Sec. 34.1(c)(2), which relates to

exempting from the Commission's requirements the issuance or renewal of

short-term notes or drafts, to simplify the provisions and to delete an

unnecessary, after-the-fact filing requirement. The Commission proposed

to revise the language of this regulation to read as follows:

Under section 204(e) of the FPA, the issuance, renewal or

assumption of liability on a note or draft maturing not more than

one year after such issuance, renewal or assumption of liability is

not subject to the provisions of this Part if the note or draft

aggregates, along with all other then-outstanding notes and drafts,

not more than five percent of the:

(A) Par value of the then-outstanding securities of the utility

and,

(B) In the case of no par value securities, the fair market

value of such securities.

Baltimore Gas & Electric, EEI, Gulf States, and Pennsylvania P&L

commented on the proposed change. Baltimore Gas & Electric, EEI and

Gulf States suggest revising the proposed language to make it clear

that the exemption does not apply to notes and drafts with maturities

of more than one year.

We agree with these comments and will amend the text of

Sec. 34.1(c)(2) to avoid any confusion as to the securities to which

the regulations apply.

EEI and Gulf States suggest that the regulations not use the ``par

value'' of the then-outstanding securities in determining the value of

a company's then-outstanding securities because the par value may be

significantly lower than the issue price or current market value of

securities. Pennsylvania P&L also recommends that the Commission

provide a valuation date.

The arguments with regard to the use of par value are not

persuasive. Section 204(e) of the FPA refers to ``par value of the

other securities then outstanding.''8 It is clear from this

language that the statute requires the use of ``par value'' if the

security has a par value. We have no authority to recognize current

market value or issue price as the measure of the amount of securities

``then outstanding'' if there is a par value stated. However, in the

case of securities having no par value, we believe that fair market

value is appropriate.

\8\16 U.S.C. 824c(e).

---------------------------------------------------------------------------

As to a specific date for the 5 percent measurement, although the

precise timing of the issuance of securities is wholly within the

purview of utility management, we will clarify the language to indicate

that the 5 percent test would be applied as of the date of the issuance

or renewal of the securities or assumption of the liabilities.

3. Section 34.2--Placement of Securities

The NOPR proposed amending Sec. 34.2, to rename the section and to

allow for the placement of securities by either competitive bid or

negotiated placement. The proposed amendment recognized exemptions from

these requirements, simplified the placement procedures and streamlined

the regulatory process. The Commission proposed to revise the title and

language of this regulation as follows:

Section 34.2--Placement of Securities

(a) Method of issuance. Upon obtaining authorization from the

Commission, utilities may issue securities by either a competitive bid

or negotiated placement, provided that:

(i) Competitive bids are obtained from at least two prospective

dealers, purchasers or underwriters; or

(ii) Negotiated offers are obtained from at least three prospective

dealers, purchasers or underwriters; and

(iii) The utility:

(A) Accepts the bid or offer that provides the utility with the

lowest cost of money for fixed or variable interest or dividend rate

securities, or

(B) Accepts the bid or offer that provides the utility with the

greatest net proceeds for securities with no specified interest or

dividend rates or,

(C) Has filed for and obtained authorization from the Commission to

accept bids or offers other than those specified in (iii)(A) or

(iii)(B) above.

(b) Exemptions. (i) Multiple bids or offers are not required for

the issuance of securities:

(A) To existing holders of securities on a pro rata basis;

(B) When the utility receives an unsolicited proposal to purchase

its securities; or

(C) With maturities of one year or less.

(ii) The utility may request exemption from the multiple bid or

offer rule when the utility believes such an exemption is appropriate,

based on the facts and circumstances of the particular issuance.

(c) Prohibitions. No securities shall be placed with any person

who:

(i) Has performed any service or accepted any fee or compensation

with respect to the proposed issuance of securities; or

(ii) Would be in violation of section 305(a) of the FPA.

Baltimore Gas & Electric suggests that we change Sec. 34.2(b) so

that this section will clearly provide exemptions from the multiple bid

or offer requirements of Sec. 34.2(a). EEI, Gulf States and UtiliCorp

suggest that we include within the exemptions from negotiated bid and

placement requirements particular types of securities (treasury stock

and securities ``backing up'' pollution control debt issued by a third

party, for instance).

These comments have merit, and we will modify the final rule

accordingly. We will not, however, include treasury stock among the

list of exempted securities; we are not persuaded that a blanket

exemption is justified for treasury stock. For all practical purposes,

the issuance of treasury stock is not substantially different from the

issuance of new shares of common stock.

EEI and Gulf States suggest that we delete the prohibition in

Sec. 34.2(c)(1) against accepting bids from or entering into

negotiations with persons that have accepted a fee for services

performed in connection with the proposed issuance of securities. We

reject this recommendation. However, we note that proposed

Sec. 34.2(c)(1) did not include language (which is currently in this

paragraph of our regulations) indicating that it involves services

performed prior to the submission of bids or the beginning of

negotiations. The proposed rule, like the existing rule, should contain

this language. Upon further consideration, the final rule will include

this language in the regulations.

EEI and Gulf States suggest that we codify the Commission's policy

of allowing utilities to issue securities or assume obligations or

liabilities over a two-year period. EEI and Gulf States are correct

that it is the Commission's policy to allow companies to issue

securities at any time within a two-year [[Page 4835]] period, without

any additional authorization from the Commission.9 Our policy

regarding the two-year authorization period is clear and working well.

We do not think that the requested codification is necessary. The

matter is best dealt with through the Commission's authorization

process, leaving the Commission the flexibility to address the facts

and circumstances in the filings on a case-by-case basis and, where

appropriate, to grant authorizations for periods different than the

basic two-year period. Accordingly, we will not adopt the suggestion.

\9\See Montana-Dakota Utilities Company, 21 FERC 62,358 (1982).

---------------------------------------------------------------------------

4. Sec. 34.3--Contents of Application for Issuance of Securities

The NOPR proposed amending Sec. 34.3, which governs the contents of

an application to issue securities. No one commented on this aspect of

the proposed rule, and we will adopt the proposed change.

UtiliCorp suggests that an application also include a draft order,

prepared by the applicant. We will reject this suggestion. The

inclusion of a requirement that applications include a draft order will

increase the burden on the applicants without substantially aiding the

Commission in its processing of filings.

5. Sec. 34.4--Required Exhibits

a. Section 34.4(a), Exhibit A. The Commission proposed to delete

the current language in paragraph (a) and to substitute the following:

The applicant must file the statement of corporate purposes from

its articles of incorporation.

The Commission stated that it has found that the information

currently required in paragraph (a) is not necessary for the processing

of a securities application. A statement of corporate purposes will

provide the information necessary without the need for applications to

include the entire corporate charter or articles of incorporation. No

one commented on the proposed change to Exhibit A; we will adopt the

change as proposed.

b. Sections 34.4 (c) and (d), Exhibits C, D and E. The Commission

proposed to delete paragraph (c), and to redesignate paragraphs (d) and

(e) as paragraphs (c) and (d), respectively. The Commission also

proposed to revise newly-designated paragraphs (c) and (d) and to add a

new paragraph (e).

The Commission noted that current paragraph (c) requires a

statement of control over the utility by firms issuing securities or

supplying electrical equipment and that the Commission can obtain this

information from other existing sources.

The NOPR proposed that the newly-designated and revised paragraphs

(c) and (d) would require that a balance sheet and income statement be

submitted for the twelve-month period ending with the most recent

calendar quarter. New paragraph (e) would require the submission of a

four-column Statement of Cash Flows and Interest Coverage, containing

data on an actual basis for the same twelve-month period, and on a pro-

forma basis for each of the next two succeeding 12-month periods.

The Commission proposed these changes to facilitate the preparation

of financial statements to be submitted as part of the application

because the utilities already prepare quarterly financial statements

and may use such statements as the basis for the information required

to be submitted. The Commission expected that the addition of the

statement of cash flows and interest coverage would facilitate the

processing of applications under Part 34.

Baltimore Gas & Electric and Consumers Power suggest that we change

the proposed regulations to allow for the submission, for Exhibits C,

D, and E, of financial statements for periods other than those ending

with the latest calendar quarter, if such statements are the latest

available statements. We agree with this suggestion and will, in large

part, adopt it. We recognize that financial statements other than for

the latest calendar year quarter may be available, and we will revise

the proposed language to require the filing of financial statements for

the most recent 12-month period, provided that the period ended no more

than 4 months prior to the date of the filing of the application.

Consumers Power suggests that we allow utilities to present their

financial statements to us in the format required by the Securities and

Exchange Commission (SEC). We will not adopt this suggestion. The

Commission's information needs are different than the information needs

of the SEC. The use of information prepared in a SEC format presents

problems from a number of perspectives: for instance, the consolidation

of certain majority-owned subsidiaries, the aggregation of detailed

financial information and the use of different reporting standards.

Information reported to the SEC may include the utility and certain

consolidated, majority-owned subsidiary companies. As a result, the

financial statements would include mixtures of financial information on

the regulated utility and the consolidated, majority-owned

subsidiaries, as if it were financial information of the utility. The

Income Statement would not, therefore, present the utility's stand-

alone results of operations. Further, information reported to the SEC

is aggregated in a summary fashion without the detailed financial

information presented on a basis consistent with the classifications in

the Uniform System of Accounts. (For instance, the Commission requires

that accumulated deferred income taxes be classified among four

accounts depending on the type of the deferral; the SEC, however,

allows deferred income taxes to be netted in a single amount.) Another

area of concern is the reliance upon different reporting standards. For

instance, the SEC allows currently maturing long-term debt to be

classified as a current liability; the Commission requires that long-

term debt, regardless of the maturity, to be classified as long-term

debt until retired. We have configured our information formats, which

include FERC Form No. 1, to meet our regulatory responsibilities.

Utilities reporting to us must submit their information to us in a form

more suited to our needs.10 Accordingly, we will continue to

require that utilities prepare the required financial statements

consistent with this Commission's FERC Form No. 1 and Uniform System of

Accounts.

\10\See Electronic Filing of FERC Form No. 1 and Delegation to

Chief Accountant; Notice of Intent to Act and Response to Comments,

59 FR 1687, 1689 (Jan. 12, 1994).

---------------------------------------------------------------------------

Baltimore Gas & Electric, Consumers Power, EEI, Pennsylvania P&L,

Gulf States, Texas-New Mexico and UtiliCorp object to the submission of

the proposed projected cash flow statement in Exhibit E. These

commenters assert that these forecasts are unreliable and that the

filing of such information would expose utilities to potential

liability. They also note that the SEC allows but does not require the

filing of projected financial statements. Pennsylvania P&L suggests

that we change proposed Exhibit E by adding a line entitled either

``Interest Coverage'' or ``Times Interest Earned'' to provide a

location for the coverage ratio.

We agree with these comments. We will delete the requirement for

the projected cash flow statement. We will also revise Exhibit E,

Statement of Cash Flows and Interest Coverage, to require the

submission of a Statement of Cash Flows in the form prescribed in the

FERC Form No. 1, followed by the interest coverage calculation as

proposed in the NOPR. Adoption of the [[Page 4836]] FERC Form No. 1

format will relieve utilities of the necessity of compiling data in a

format that has limited applicability. Further, utilities may be able

to use the Statement as included in the FERC Form No. 1, depending upon

the timing of the filings, thus further reducing the burden of

compliance.

The final rule clarifies the interest coverage calculation

worksheet required in Exhibit E by adding a line entitled ``Interest

Coverage'' as suggested and a ``division'' sign at the end of the line

entitled ``Total Interest Expense'' and an ``equals'' sign at the end

of the line entitled ``Income Before Interest and Income Taxes.''

c. Sections 34.4 (g) and (h), Exhibits G and H. The NOPR proposed

to delete paragraphs (g) and (h). The Commission noted that the

information currently required by Sec. 34.4(g) is directed toward

competitively-bid securities placements, which the Commission intends

that its regulations should no longer require. The pre-issuance filing

contemplated by Sec. 34.4(h) will no longer be necessary, since the

Commission intends to authorize applicants to issue securities under

conditions specified under proposed Sec. 34.2. The Commission pointed

out that it will, therefore, only be necessary that applicants provide

the Commission with a report of their securities issuances after the

fact under the provisions of existing Sec. 131.43 and revised

Sec. 131.50.

No one commented on the proposed changes to Exhibits G and H; we

will adopt those changes as proposed.

6. Sec. 34.10--Reports

In the NOPR, the Commission proposed to revise its rules to require

applicants to file reports under Sec. 131.43 and Sec. 131.50 no later

than 30 days after the sale or placement of long-term debt or equity

securities or the entry into guarantees or assumptions of liabilities.

The Commission has received no comments regarding this proposal and

will adopt it unchanged.

7. Sec. 34.11--Unopposed Applications to Issue Securities and/or Assume

Liabilities

In the NOPR, the Commission proposed to revise part 34 by adding a

new Sec. 34.11 to provide for authorization of unopposed applications

for authorization of the issuance of securities or assumption of

liabilities upon the terms and conditions and for the purposes set

forth in the application unless, within 90 days after the date of the

application, the Commission issues an order delaying the effectiveness

of the transaction, setting the matter for hearing or taking other

action. The NOPR proposed the rule in order to eliminate needless

regulation and aid the processing of unopposed applications, while

preserving the right of interested parties to oppose the applications.

Baltimore Gas & Electric, Consumers Power, Detroit Edison, EEI,

Gulf States and Utilicorp commented on the proposed 90-day period for

automatic approval of security issuances (i.e., without Commission

action). Several commenters11 suggested different periods--30, 45

or 60 days after the date of the application, or 15 days after

publication of the notice. Utilicorp noted that the proposal more than

doubled the time presently taken to process most applications.

Utilicorp also noted that, if the Commission adopts an automatic

mechanism for the processing of these applications, utilities will have

to obtain written assurances for their lenders that the Commission has

a ``self executing'' rule, provide copies of the rule to the lenders

and then provide a ``date stamped'' copy of the filing made with the

Commission. The utilities would then have to prove that no one had

protested their applications and that the Commission did not issue an

order within the 90-day period that would preclude the automatic

issuance.

\11\The commenters are Baltimore Gas & Electric, Consumers

Power, Detroit Edison, EEI, Gulf States.

---------------------------------------------------------------------------

Utilicorp's comments concerning an automatic approval mechanism are

well taken. Utilities and their lenders rely on the certainty that a

Commission order confers. The proposed automatic approval would

introduce an element of uncertainty into the approval process and place

a greater burden upon utilities to provide adequate assurances to their

lenders. At this juncture, we believe the uncertainty and the

concomitant burden upon lenders and utilities outweigh the time and

resources that the Commission would save in preparing and issuing

orders. Accordingly, we will not adopt the proposed automatic approval

mechanism.

8. Part 131--Forms

Section 131.50. The NOPR proposed to rename Sec. 131.50 to read

``Report of proposals received.'' The NOPR also proposed to delete the

current language of Sec. 131.50 and to revise the language of

Sec. 131.50 to read as follows:

Section 131.50 Report of Proposals Received. No later than 30 days

after the sale or placement of long-term debt or equity securities or

the entry into guarantees or assumptions of liabilities (collectively

referred to as ``placement'') pursuant to authority granted under part

34, the applicant shall file a summary of each proposal received for

the placement. Each proposal accepted shall be indicated. The

information to be filed shall include:

(a) Par or stated value of securities;

(b) Number of units (shares of stock, number of bonds) issued;

(c) Total dollar value of the issue;

(d) Life of the securities, including maximum life and average life

of sinking fund issues;

(e) Dividend or interest rate;

(f) Call provisions;

(g) Sinking fund provisions;

(h) Offering price;

(i) Discount or premium;

(j) Commission or underwriter's spread;

(k) Net proceeds to company for each unit of security and for the

total issue;

(l) Net cost to the company for securities with a stated interest

or dividend rate.

The revision of this regulation represents a reclassification of

information previously reported as Exhibit H under Sec. 34.4. The NOPR

noted that this information is necessary to analyze compliance with the

Commission's regulations and orders authorizing placement. No one

commented on this proposed revision, and we will adopt it.

C. Part 35--Filing of Rate Schedules

1. Sections 35.13(a)(2)(i) (A) and (B)--Rate Increases of Less Than

$200,000, Regardless of Customer Consent, and Rate Increases Below

$1,000,000, with Customer Consent

The Proposed Rule. The NOPR proposed revising the abbreviated

filing requirements of Secs. 35.13(a)(2)(i)(A) and (B), involving

certain rate increases of less than $200,000, regardless of customer

consent, and rate increases below $1,000,000, with customer consent.

The revised sections would require public utilities filing relatively

small rate increases for requirements services to submit more

information than the regulations currently require. This new

information would include, inter alia, a cost of service analysis for

an historical test year, a complete derivation of all allocation

factors and special assignments, and a complete calculation of revenues

for the test period and for the first twelve months after the proposed

effective date. The Commission's preliminary view was that the proposed

filing requirements would allow the Commission to process these

applications more efficiently and would eliminate unnecessarily

protracted proceedings (including, e.g., [[Page 4837]] extensive

discovery in proceedings set for trial-type hearing) that are

attributable solely to the fact that the existing filing requirements

for these applications require insufficient data from which to

determine whether the proposed rates are cost-justified.

The NOPR also proposed to afford filing utilities an opportunity to

file additional cost data and supporting testimony in the event that

the Commission suspends the proposed rate increase and orders a

hearing.

The NOPR retained the existing abbreviated filing requirements for

short-term and non-firm coordination sales rates in

Sec. 35.13(a)(2)(ii).

The NOPR also proposed to revise Sec. 35.13(h)(24) to require that

companies submit Statement AX (other recent and pending rate changes)

only if the proposed rate design tracks retail rates. This proposed

change was intended to streamline the public utility's rate

presentation and expedite Commission review by eliminating submission

of information not generally needed for Commission review.

Comments: Several commenters12 express concern that the

proposed regulations will increase the time and costs associated with

preparing rate filings, and thereby discourage utilities from entering

into small transactions for the sale or transmission of power, which

will in turn result in a less competitive bulk power market.

\12\Arizona Public Service, Atlantic Electric, Baltimore Gas &

Electric, Delmarva, LILCO, NEP, Pennsylvania P&L, Southern

Companies.

---------------------------------------------------------------------------

Many commenters also express concerns or uncertainty about the

number and variety of filings subject to the proposed regulations.\13\

The commenters recommend that the Commission narrowly define the class

of rate filings subjects to the proposed rule to include only those

filings for which the Commission must have additional information to

properly and expeditiously perform its duties under the FPA.\14\

\13\E.g., Delmarva, Detroit Edison, NEP.

\14\Some commenters infer that a large number and variety of

filings would be subject to the new rules. EEI asserts that the

changed regulations would greatly increase the regulatory burden of

all applicants, while saving time and effort in only a small number

of cases. Some commenters conclude that the Commission proposed to

modify the abbreviated filing requirements for coordination rates.

Commenters such as NEP and Southern Companies focus on the increased

filing requirements for small rate increases.

---------------------------------------------------------------------------

Other commenters express the view that the new filing requirements

are vague.15 EEI recommends that the regulations state with

greater specificity the information that public utilities must file.

\15\EEI and several other commenters infer that the Commission

is now requiring companies to submit Statements AA through BM.

Detroit Edison argues that it would be burdensome and expensive to

calculate thirteen-month average plant balances, and Southern

Companies interprets the proposed regulations to require the use of

end-of-year balances instead of thirteen-month averages.

---------------------------------------------------------------------------

With respect to filings based on retail rate decisions, NYSEG

asserts that it is unclear what calculations would have to be provided

to show how all retail rate treatments are factored into the cost of

service. If the Commission changes the abbreviated filing requirements,

NYSEG requests that the Commission clarify its specific requirements

regarding information to be provided for filings based on retail rates.

The Commission's Response: We agree with the commenters that the

Commission should attempt to minimize regulatory burdens and improve

the flexibility accorded public utilities covered by its rules.

However, contrary to the statements of many commenters, the proposed

regulations do not change the abbreviated filing requirements for most

proposed rate increases. Neither do the proposed regulations require

companies to file comprehensive cost of service statements (Statements

AA-BM). Rather, the proposed regulations require only that a company

that files a small rate increase for non-coordination services support

the calculations it makes, explain why it makes those calculations, and

show the revenue impact of the proposed rates on its customers.

Based on concerns expressed, however, we will make several changes

to the proposed regulations to more clearly define the class of filings

subject to the rule and the information that must be submitted in order

for the Commission to perform its preliminary analyses of small, non-

coordination filings. Finally, the Commission reiterates that any

company may request waiver of the filing requirements for good cause.

Filings Covered by the Rule: Many of the commenters express

uncertainty concerning the types of rate increase filings that are

affected by the proposed regulations.

We agree with the commenters that the Commission should more

clearly define the class of filings subject to the new rule. The

Commission's intent is to create a new, abbreviated filing option for

small increases in rates for non-coordination, firm power and

transmission services, particularly small requirements rate increase

filings that are based on a fully distributed cost of service analysis

(sometimes known as a ``net plant'' cost of service).16 The

Commission will revise the regulations to identify the class of filings

covered by new Sec. 35.13(a)(2)(i) as power or transmission services

that are: (1) not covered by the filing requirements of

Sec. 35.13(a)(2)(ii); and (2) for which the rate increase being sought

is less than $200,000 (without customer consent) or less than $1

million (with customer consent).

\16\In most but not all cases, rates developed under a net plant

approach are customer-specific, in that costs are first allocated to

each wholesale customer group based on the demand and energy loads

it imposes on the company, after which customer group-specific rates

are developed based on the customer group's projected billing

determinants. See generally Southern Company Services, Inc., 61 FERC

61,339 at 62,337-38 (1992), reh'g denied, 63 FERC 61,217 (1993),

appeal pending, No. 93-1165 (D.C. Cir. filed Feb. 11, 1993).

---------------------------------------------------------------------------

We will also change our regulations to permit utilities to file

under Sec. 35.13(a)(2)(ii) rate increases, without regard to the size

of the proposed increase, for firm coordination and interchange

services.

Filing Requirements: EEI maintains that if the Commission decides

to adopt new filing requirements for small rate increases, then greater

clarity and specificity in the filing requirements is needed to avoid

confusion and errors in responding to the changes. We agree. However,

we disagree with EEI that the Commission should or must explain, at the

level of detail used in the current Sec. 35.13(h), what is expected.

Such specificity would unduly increase the regulatory burden on most

utilities that file under this subparagraph. To meet EEI's concerns and

those of other commenters, we will make the following changes.

First, the final rule provides that filing utilities should submit

cost of service, allocation, revenue, fuel clause and rate design data

that are ``consistent with the requirements'' of other paragraphs of

part 35 that require similar information. The final rule also requires

filing utilities to explain in narrative form how and why various

calculations are made to develop the proposed rates.17

\17\Narrative statements should address the rate design and

allocation factors employed in the filing, explain all pro forma

adjustments to test period data, and describe specific costs or rate

components that are drawn from retail rate decisions.

---------------------------------------------------------------------------

Second, the NOPR proposed to make Sec. 35.13(a)(2)(i) mandatory

rather than optional, thereby precluding utilities from electing to

file comprehensive Period I statements, as allowed under

Sec. 35.13(a)(1). The revised regulation makes clear that the filing

utility may elect to file under either paragraph.

Third, the revised regulation clarifies the two-stage filing

process proposed in the NOPR. A utility that elects to file

[[Page 4838]] under revised Sec. 35.13(a)(2)(i) need not submit a

comprehensive filing when it makes its initial submittal, but it must

support all calculations that are not derived directly from Form 1, and

explain how it has functionalized, classified and allocated its costs.

Should the Commission set the proposed increase for hearing, the filing

utility will be afforded a reasonable opportunity to file testimony and

exhibits to fully support the reasonableness of its proposed rates.

This approach minimizes regulatory burdens while allowing the applicant

to balance the expense of preparing a comprehensive filing versus the

risk of not initially sustaining its burden of proof with an

abbreviated filing.

Fourth, the NOPR used the terms ``historical test year'' and ``test

period'' interchangeably and without reference to the definition of

Period I applicable to other paragraphs of Sec. 35.13. The revised

regulation adds a definition for ``Test Period,'' deletes references to

the ``historical test year'' and provides that utilities that file

under this subparagraph must use as the test period the most recent

calendar year for which actual data are available. Utilities that elect

to use a non-calendar year test period must file rate increases under

Sec. 35.13(d).

The Commission notes that proposed Sec. 35.13(a)(2)(i)

inadvertently eliminated the requirement that utilities submit rate

design information and the general information now required for all

abbreviated rate change filings. The final rule requires submission of

the general information specified in paragraphs (b), (c)(2) and (c)(3)

of Sec. 35.13 and in Sec. 35.12(b)(2), while the information required

by Sec. 35.13(c)(1), Sec. 35.12(b)(5) and Sec. 35.13(h)(37) is elicited

as part of the revenue data, allocation data and rate design

information requirements.

The final rule also requires that filings under Secs. 35.13(a)(2)

(i) and (ii) comply with Commission precedent and policy.

2. Other Changes to Sec. 35.13

The Commission will eliminate Sec. 35.13(a)(2)(ii)(B) of the

proposed regulations\18\ and make corresponding editorial changes to

Sec. 35.13(a)(2)(iii)(A). Section 35.13(a)(2)(ii)(B) cross-references

rate decrease filings made under Sec. 35.27 pursuant to the 1987

reduction in federal corporate income tax rates under the Tax Reform

Act of 1986. However, Sec. 35.27 was eliminated in a previous

rulemaking.\19\ Therefore, this section is now superfluous.

\18\It is Sec. 35.13(a)(2)(iii)(B) in the proposed regulations.

\19\Eliminating Unnecessary Regulation, Order No. 541, 57 FR

21730 (May 22, 1992), III FERC Stats. & Regs. 30,943 (1992).

---------------------------------------------------------------------------

A cross-reference to Sec. 35.13(a)(2)(ii) has been added to

Sec. 35.13(d)(1), mirroring the existing reference to subparagraph

(a)(2)(i). In addition, existing paragraph (d)(1), as printed in the

1994 Code of Federal Regulations, omits the word ``this'' prior to

``section'' as shown by brackets in the text below:

(d) Cost of service information--(1) Filing of Period I data. Any

utility that is required under Section (a)(1) of [ ] section to submit

cost of service information * * * The final rule corrects these

omissions.

D. Part 41--Accounts, Records and Memoranda: Sections 41.3 and 41.7

In the NOPR the Commission proposed to change its regulations to

provide that if a utility consents to a matter's being handled under

the shortened procedure under Sec. 41.3, that utility has waived any

right to subsequently request a hearing under Sec. 41.7 and may not

later request such a hearing. The Commission also re-stated its policy

that it will not assign proceedings for hearings when there are no

material facts in dispute.

Baltimore Gas & Electric, Duke Power, EEI and Southern Companies

commented on this proposed change. Baltimore Gas & Electric recognizes

that the proposed change would eliminate redundancy in the Commission's

regulations and supports the proposed change. Duke Power and EEI argue

that, rather than streamlining the Commission's procedures, the

proposed change will encourage utilities to contest more issues under

Sec. 41.7 in order to preserve the right to a full hearing.

We disagree. Persons subject to the Commission's accounting

requirements have the right of election under the Commission's

procedures and, under Sec. 41.7, have a right to seek a hearing on any

issue that they wish to contest. The proposed change in the

Commission's regulations would merely prevent such persons from

changing their minds in mid-proceeding and deciding to contest an issue

that they had previously recognized involved no disputed issue of

material fact. We do not think that requiring persons to make their

election of procedure at the outset of a proceeding will necessarily

lead to more hearings. Rather, it will more likely reduce the number of

hearings, because public utilities will no longer have the election to

bring to hearing an issue that they had previously considered not to be

worthy of a hearing.

Southern Companies challenges the Commission's reiteration of its

policy that it will not assign proceedings for hearings where no

material facts are in dispute. Southern Companies fears that the

Commission may use this policy to deprive a person of the due process

right to a hearing. Southern Companies' concern is misplaced. The

proposed change will not deprive anyone of the right to a trial-type

evidentiary hearing when such a hearing is warranted. However, as

Southern Companies recognizes, a trial-type evidentiary hearing is not

necessary if no material facts are in dispute.\20\

\20\See, e.g., General Motors Corp. v. FERC, 656 F.2d 791 (D.C.

Cir. 1981); Citizens for Allegan County, Inc. v. Federal Power

Commission, 414 F.2d 1125 (D.C. Cir. 1969).

---------------------------------------------------------------------------

E. Proposed Procedural Modifications and Revised Definitions Under Part

292--Regulations Under Sections 201 and 210 of the Public Utility

Regulatory Policies Act of 1978 (PURPA)\21\ With Regard to Small Power

Production and Cogeneration

\21\16 U.S.C. 796(17)-(23), 824a-3.

---------------------------------------------------------------------------

The Commission is revising and clarifying its procedural and

technical rules to reflect its experience with the qualifying

facilities (QF) program. By adopting these clarifying changes, the

Commission is satisfying its continuing PURPA obligation to review its

policies and rules that encourage cogeneration and small power

production, energy conservation, efficient use of facilities and

resources by electric utilities and equitable rates for electric

consumers.

1. Administration of the 90-Day Certification Period

When an applicant files an application for Commission certification

of qualifying status with the Secretary under Sec. 292.207 of the

Commission's regulations, Sec. 292.207(b)(5) provides that within 90

days of the filing of an application the Commission will issue an order

granting or denying the application, setting the matter for hearing, or

``tolling'' the time for issuance of an order. In the NOPR, the

Commission noted some confusion on the part of many applicants as to

when the 90-day period starts. The Commission proposed to codify its

practice by revising Sec. 292.207(b)(3)(ii) to provide that the 90-day

period for issuance of an order granting or denying an application for

Commission certification of the qualifying status of a facility does

not begin until an applicant has submitted all the information

[[Page 4839]] necessary to complete the application, along with the

appropriate filing fee.

Comments: Tenaska contends that the proposed clarification

perpetuates uncertainty, since there is no provision to notify an

applicant when the Commission considers the filing complete. Electric

Generation Association points out that, without an explicitly announced

beginning point for each application, no party can know when, if ever,

the 90-day period will expire. It suggests that setting a clear date

for determining when the Commission deems an application complete would

be consistent with the 60-day ``deficiency'' notification process for

electric rate filings under Sec. 35.2(c) of the Commission's

regulations. Independent Energy Producers suggests that the Commission

establish a maximum period for staff to send to an applicant any

questions regarding the application.\22\

\22\Some commenters advocate an initial period ending 10 to 30

days after the filing of the application, after which the

application would be treated as complete and no notification of a

deficiency could be made. Some commenters further suggest that the

number of deficiency inquiries be limited to two. NEP also suggests

that a copy of the deficiency letter be served on the utilities with

which the QF is expected to deal.

American Cogen, American Forest and Paper, American Iron and

Steel, Electric Generation Association, Independent Energy

Producers, SDG&E, Tenaska, and Texaco express concern that repeated

requests for additional information by the Commission's staff have

the effect of extending the process indefinitely. These commenters

suggest that the Commission treat an application for Commission

certification as automatically complete when a completed Form 556

has been filed and/or the application is otherwise literally

responsive to the Commission's regulations.

---------------------------------------------------------------------------

SDG&E suggests that the Commission's Federal Register notice of

each supplemental filing that responds to a staff inquiry identify the

project, its location, when the Commission deems the application

complete, when the Commission will issue a decision or tolling order on

the application, or when the Commission will deem the application

granted by virtue of the passage of time.\23\

\23\Atlantic Electric and EEI want the Commission to issue

notices of all responses to deficiency inquiries. Electric

Generation Association also proposes that the Commission delete the

reference to the Commission's tolling the time for issuance of an

order. Electric Generation Association contends that tolling has

caused unnecessary delay in the processing of applications and that

the only basis for tolling the operation of the 90-day period should

be an incomplete application. As noted above, in this regard,

proposed Sec. 292.207(b)(3)(i) merely corresponds to the

Commission's existing 90-day action regulation at

Sec. 292.207(b)(5). Electric Generation Association's tolling policy

proposal is outside the scope of the instant proceeding.

---------------------------------------------------------------------------

Commission Response: While the Commission intends to process a

pending application for Commission certification of qualifying status

as rapidly as possible, the Commission will not further restrict its

ability to evaluate such applications by providing a maximum period for

considering the sufficiency of the application.\24\ Likewise, the

Commission will not adopt the practice of formally notifying an

applicant with respect to deficiencies by a date certain;\25\ nor will

the Commission indicate by notice in the Federal Register when a filing

is complete.\26\

\24\This is also consistent with the Commission's policy

applicable to electric rate filings of not providing a maximum

period (within the 60-day statutory review period) for considering

the sufficiency of the application. Regarding the 60-day statutory

review period, see Duke Power Company, 57 FERC 61,215 at 61,713

(1991); see also Southern Company Services, Inc., 60 FERC 61,297 at

61,065-66 & n.12 (1992), aff'd sub nom. Alabama Power Company v.

FERC, 22 F.3d 270 (11th Cir. 1994) (any amendment or supplemental

filing establishes a new filing date for the filing in question).

The steps the Commission has taken elsewhere in this proceeding

to improve the QF application process, through clarifications and

the establishment of step-by-step procedures to follow in Form 556,

should result in more complete applications being filed in the first

place. However, in the end, the speed with which the Commission

processes an application depends, in addition to staff availability,

primarily on the quality of the submittal, its complexity, its

novelty, whether it is opposed, and the response time of the

applicant to any information inquiries.

\25\In uncontested proceedings, staff informally requests

additional information by telephone in order to speed the processing

of an application. In contested applications, staff must resort to

formal deficiency letters to obtain additional information.

\26\The Commission will continue to notice responses to

deficiencies in the Federal Register.

---------------------------------------------------------------------------

However, the Commission will amend its regulations to provide that

the Commission will act within 90 days of the filing of the

application, or, if the application is supplemented or amended, within

90 days of the filing of the supplement or amendment. Commission action

may include finding the application deficient, granting or denying the

application, or tolling the time for action.

2. Improvements to the Self-Certification Process

In the NOPR, the Commission proposed to amend Sec. 292.207(a)(1) to

require that notices of self-certification be in the form of an

affidavit signed by the facility's owner, operator or authorized

representative. The Commission's intention was to provide interested

financing institutions, electric utilities and state regulatory

authorities with greater assurance that a self-certified cogeneration

or small power production facility conforms to the Commission's

ownership and technical criteria. The NOPR also proposed that a self-

certifying facility provide a copy of its notice of self-certification

to the utility with which the cogenerator or small power producer

intends to deal. These proposed revisions were intended to reduce

reliance on the alternative process through which the cogenerator or

small power producer submits an application for Commission

certification accompanied by a filing fee.

Comments: Southern Companies maintains that, in order for lenders

and investors to derive comfort from the affidavit requirement, the

Commission must ensure that a notice of self-certification with an

affidavit is accurate and reliable.\27\ SDG&E suggests that the reason

that more facilities have not taken advantage of the self-certification

process is that the process is inadequate.\28\ SDG&E does not think

that an affidavit is sufficient to provide the requisite level of

comfort to lenders and to utilities with which the self-certifying

facilities intend to interact.\29\ SDG&E points out that even under the

proposed self-certification procedure, there is no substantive

information requirement, no guarantee that submittals will contain the

minimum information required, and no expectation that any party or the

Commission will ensure that a self-certified facility meets the QF

criteria.\30\

\27\Among other comments, SDG&E asserts that it is reasonable,

in the absence of Commission review, to require greater specificity

as to what the affidavit and notice of self-certification should

pertain to. SDG&E also suggests that an affidavit requirement

implies that a prior self-certification submitted without an

affidavit is of dubious legal value. Electric Generation Association

maintains that there is no reason to require an affidavit, since

even a Commission determination on qualifying status is considered

void if it is based on erroneous facts. Electric Generation

Association further contends that the current regulations do not

suggest that a notice of self-certification signed by an officer or

partner of the developer is less trustworthy or less legally binding

than a Commission certification of qualifying status. NEP observes

that an affidavit will underscore the importance to the owner or

operator of accurately describing its facility. The CPUC suggests

that, in fairness to all interested parties, including the signatory

to the affidavit, the Commission should set forth more clearly the

contents of the notice of self-certification.

\28\Ridgewood observes that it is disputes about the

interpretation of the Commission's regulations by lenders, state

commissions and utilities that have prevented greater reliance on

the existing self-certification process.

\29\Florida P&L observes that a utility, before seriously

undertaking any negotiations for integrating a QF into the utility's

system, needs something more concrete than a notice of self-

certification with an affidavit. Niagara Mohawk proposes that a

notice of self-certification describe how a facility meets the QF

criteria.

\30\Southern California Edison notes that the affidavit does not

provide ongoing assurance that a facility will continue to meet the

QF criteria. In this regard, Florida P&L suggests that the

Commission adopt a standardized annual or biennial affidavit

reporting requirement. Niagara Mohawk also proposes that the

Commission allow a utility to periodically inspect the QF's

operations. These monitoring proposals are outside the scope of the

instant rulemaking proceeding. [[Page 4840]]

---------------------------------------------------------------------------

Similarly, Curran, Corbett & Stiles submits that, since the

proposed self-certification process will continue to involve nothing

more than file-stamping a submittal, lenders, government agencies and

utilities will continue to demand proof of qualifying status for loan

approvals and other crucial transactions, and cogenerators and small

power producers will continue to apply for Commission

certification.\31\

\31\American Forest and Paper maintains that the affected

utility also will likely continue to want a Commission

certification. Tenaska predicts that lenders will not rely on an

affidavit, as long as the alternative, Commission certification

process is available. AGA and Utilicorp state that lenders will not

assume the risk to finance QF projects that do not undergo a full

Commission certification process.

---------------------------------------------------------------------------

SDG&E suggests that the self-certification process would be more

meaningful if it were more like the full Commission certification

process. SDG&E urges the Commission to require that a notice of self-

certification incorporate the Form 556 information as the Commission

has proposed for applications for Commission certification.32

SDG&E also asks the Commission to amend Sec. 292.207 to provide that,

unless a person files an objection with the Commission within 90 days,

the utility must meet its QF obligations under Sec. 292.303.\33\

\32\Atlantic Electric and EEI also favor a requirement to

include Form 556 information. SDG&E contends that, contrary to what

the Commission had anticipated when it issued its existing QF

regulations, there has not always been a free flow of information

between utilities and potential QFs.

SDG&E also maintains that a utility which does not believe that

a self-certified facility is qualified does not have to purchase the

electrical output from the facility.

\33\Curran, Corbett & Stiles asks the Commission to state that a

notice of self-certification constitutes prima facie evidence that

the facility is a QF. Curran, Corbett & Stiles also suggests that

the Commission either indicate that the application conforms to the

requirements of Sec. 292.203 or, within a certain time period, issue

a specific finding to the contrary. American Cogen and Electrical

Generation Association suggest that the Commission reinforce the

self-certification process by stating in the preamble to this rule

and/or in Sec. 292.207 that self-certification has the equivalent

legal effect of a Commission certification. Independent Energy

Producers suggests that the Commission delineate what situations

call for Commission certification, in order to convince lenders to

rely more on self-certification.

---------------------------------------------------------------------------

Arizona Public Service and SDG&E suggest that the Commission

require self-certifying cogenerators and small power producers to

provide copies of their submittals to electric utilities (a) with which

they intend to interconnect for the purpose of transmitting and selling

electric power; and (b) from which they intend to purchase

supplementary, standby, backup and maintenance power.\34\ Arizona

Public Service also suggests that self-certifying cogeneration and

small power producers specify their anticipated service needs so that

utilities may better plan and prepare their local and system

facilities, and obtain any necessary regulatory approvals.\35\

\34\Florida P&L notes that the Commission's current regulations

at Sec. 292.207(c)(1) require that a cogenerator or small power

producer that chooses to self-certify must provide the electric

utility purchaser with at least 90 days' advance notice of the

transaction.

\35\Detroit Edison suggests that a notice of self-certification

include a notice, suitable for publication in the Federal Register,

that sets out the pertinent data regarding the application. Detroit

Edison submits that publication of such a notice would allow

interested parties to bring errors in the application to the

Commission's attention. Detroit Edison also suggests that the

applicant provide the appropriate state commission and the affected

utility with a copy of any notice of self-certification, or

application for Commission certification or recertification filed

with the Commission. Similarly, Atlantic Electric, Arizona Public

Service, EEI, Florida P&L, LILCO, NEP and SDG&E suggest that either

the Commission or the applicant apprise affected parties (including

the regulatory commission of each state where the QF and the

affected utility is located) of any QF submittal or any Commission

deficiency letter, through Federal Register notice and/or by sending

each a copy of the document.

---------------------------------------------------------------------------

Commission Response: As the commenters observe, some lenders,

regulators and utilities appear to have been unwilling to rely on the

self-certification process because they did not think that the process

provided them with sufficient information to independently verify the

qualifying status of the subject facility. Many of the commenters have

argued that simply adding an affidavit to the notice of self-

certification would not instill enough confidence to make the self-

certification process more authoritative.

The Commission continues to believe that self-certification should

be retained as an option; it is unnecessary to conduct a full review of

each facility, even in instances where outside lenders and investors

will be involved. However, in consideration of the various comments,

and in recognition of the various other clarifications being made in

this final rule, the Commission will not adopt the proposed affidavit

requirement. Instead, the Commission will modify the self-certification

process to: (a) Incorporate the Form 556 information requirement that

the Commission is also adopting for applications for Commission

certification; and (b) require that cogenerators and small power

producers provide copies of the notice of self-certification to each

affected state commission and to each affected electric utility.\36\

The self-certifying cogenerator or small power producer must also

specify the utility services that it intends to request (see item 3b of

Form 556).

\36\Affected state commissions are the regulatory commissions of

the states where the QF and any affected electric utilities are

located. An affected utility is an electric utility to which the QF

intends to interconnect, transmit and sell electric energy, or from

which the QF intends to purchase supplementary, standby, back-up or

maintenance power.

---------------------------------------------------------------------------

If electric utilities do not agree that a notice of self-

certification is valid, they may challenge QF status by filing a

petition for a declaratory order. If lenders, etc. are not convinced,

they will continue to require that the potential QF facility obtain

Commission certification of QF status before financing a project.

The formal completion and submission of Form 556 to demonstrate

that a facility conforms with the Commission's QF criteria will not

constitute a substantive burden on those selecting the self-

certification process. A cogenerator or small power producer submitting

a notice of self-certification under the current regulations already

must analyze the characteristics of its facility to determine whether

it meets the Commission's qualifying criteria. The completion of Form

556 will assist both novice and experienced cogenerators and small

power producers. It will serve as a step-by-step guide to determining

whether a proposed facility qualifies for certification. Many notices

of self-certification recently filed with the Commission have

incorporated similar documentation.

Through the use of Form 556, the self-certification process will be

similar to the Commission certification process, because it will

incorporate sufficient substantive information to allow an affected

commission or electric utility to challenge the notice of self-

certification.

The self-certification process will largely remain a simple, quick

and economical procedure. There will continue to be no Commission

review or filing fee, and the process should promote discussions

between self-certifying cogenerators or small power producers and the

affected electric utilities and regulatory commissions. These

discussions should provide the parties an opportunity to timely and

informally resolve any problems. The final rule revises proposed

Sec. 292.207(a)(1)(ii) accordingly.

3. Revocation of Qualifying Status

Proposed Sec. 292.207(d)(1) provided that the Commission may revoke

the [[Page 4841]] qualifying status of a QF that it has certified under

Sec. 292.207, if the facility fails to comply with any of the facts or

representations that it presented in its application for Commission

certification.\37\ The NOPR further provided that, before undertaking

any substantial alteration or modification of a qualifying facility

that has been certified under Sec. 292.207, a small power producer or

cogenerator may apply to the Commission for a determination that the

proposed alteration or modification will not result in a revocation of

qualifying status. The NOPR provided that the small power producer or

cogenerator should accompany the application for recertification with

supporting material, notice and a filing fee.

\37\The Commission's regulations do not provide for revocation

of a notice of self-certification. Other entities (e.g., electric

utilities) may: (1) Move for revocation of a Commission

certification of QF status; or (2) file a petition for a declaratory

order that a self-certified or Commission-certified facility does

not comply with all applicable QF requirements. See, e.g., UNIGAS

Corp., 67 FERC 61,142 (1994).

---------------------------------------------------------------------------

Comments: American Forest and Paper maintains that revocation of

qualifying status under proposed Sec. 292.207(d)(1) pertains only to

material facts or representations, and even then, only to reliance on

the Commission's order on qualifying status. It notes that the

Commission has held on a number of occasions that the failure of a

facility to operate in accordance with any of the facts or

representations presented in an application for Commission

certification does not necessarily affect the continued qualifying

status of the facility. Rather, the failure affects only the legal

force of the Commission's certification order that relied on those

facts and representations.\38\

\38\See, e.g., Sithe/Independence Power Partners, L.P., 61 FERC

 61,212 at 61,786 (1992).

---------------------------------------------------------------------------

EEI reads proposed Sec. 292.207(d)(1) as allowing any person to

request that the Commission revoke the qualifying status of a facility.

NEP suggests that the owners of qualifying facilities should provide

filings under Sec. 292.207(d)(2) to the utilities with which they

interconnect.

Finally, NYSEG and Niagara Mohawk argue that the Commission should

make it clear that a utility may deem a facility to be ineligible for

PURPA benefits even if the Commission has not decertified the facility.

They reason that, if a notice of self-certification is sufficient to

qualify facilities for PURPA benefits, and Commission certification is

not necessary, then utilities should be able to declare facilities

ineligible for PURPA benefits without any action on the Commission's

part. NYSEG and Niagara Mohawk also suggest that the Commission amend

Sec. 292.207(d)(1) to provide that, after gathering sufficient data

demonstrating that a facility is not a QF, a utility may file an

affidavit to that effect with the Commission.

Commission Response: The Commission agrees with American Forest and

Paper's assessment of the consequences of a facility's failing to

operate as represented in the cogenerator's or small power producer's

application for Commission certification. The Commission will amend

proposed Sec. 292.207(d)(1) to make it clear that a facility may

continue to be qualified despite changed circumstances, provided that

the facility continues to meet the qualifying criteria.\39\

\39\Under proposed Sec. 292.207(d)(1) any person with standing

to do so may request the Commission to revoke the qualifying status

of a facility. See Liquid Carbonic Industries Corp. v. FERC, 29 F.3d

697 (D.C. Cir. 1994) with regard to standing to contest a QF

certification.

---------------------------------------------------------------------------

The Commission will not require owners of facilities to provide a

copy of a filing made under Sec. 292.207(d)(2) directly to each utility

that transacts business with the facility because the Commission will

publish notice of such filings in the Federal Register. The final rule

clarifies and revises Sec. 292.207(d)(1) accordingly.

Regarding Niagara Mohawk and NYSEG's argument that a utility may

deem a facility to be ineligible for PURPA benefits, we note that, in

Independent Energy Producers Association, Inc. v. California Public

Utilities Commission, 36 F.3d 848 (9th Cir. 1994), the court struck

down, as preempted by federal law, a CPUC program that allowed electric

utilities to suspend payment of contractually-authorized rates in favor

of lower, alternative rates when QFs do not meet the applicable

operating and efficiency standards. The court found that the Commission

has exclusive authority to determine whether a QF is in compliance with

the applicable operating and efficiency standards. Id. at 853-59. The

court added that it is the Commission's responsibility to decertify

QFs--not the state's responsibility. Id. at 855, 859. While the

Commission may take up this matter in the future, we will not delay

this proceeding in order to address it at this time.

4. Pre-Authorized Recertification

The Commission proposed at Sec. 292.207(a)(2) to provide for

streamlined Commission recertification of certain minor changes to

those facilities which the Commission had already accorded qualifying

status under Sec. 292.207(b). The NOPR proposed that a cogenerator or

small power producer would simply report such a change in the form of a

letter describing the change in sufficient detail to enable the

Commission to readily determine that the modification falls within the

scope of a list of pre-approved minor changes. A report of a pre-

authorized change would not require a filing fee.40

\40\The Commission proposed that if it approves the change(s),

it would return the report stamped ``approved.'' The proposed rule

further provided that if the Commission does not approve the

proposed change(s), it would treat the report as a full

Sec. 292.207(b) filing and assess a filing fee.

---------------------------------------------------------------------------

Comments: Detroit Edison requests that the pre-authorized

recertification procedure provide for notice in the Federal Register

and/or service of the application for recertification upon each

affected utility and state commission. Detroit Edison submits that this

would provide state commissions and utilities with information for

system planning and would allow state commissions and utilities to

bring to the Commission's attention special circumstances regarding a

particular facility and/or factual errors in an application for

recertification. EEI, Atlantic Electric and NEP also recommend

publishing notices of recertification in the Federal Register and

request that the Commission direct cogenerators and small power

producers to provide copies of the notice directly to all affected

parties.41

\41\NEP also suggests that applicants also provide a copy of any

filing under Sec. 292.207(d)(2) to each of the utilities with which

the QF is expected to transact business.

---------------------------------------------------------------------------

SDG&E would limit pre-authorized changes to those changes involving

name, installation or operation date, or change to power generation

equipment. It argues that, except for these changes, meaningful

evaluation of a facility's continued adherence to the Commission's

standards cannot occur unless the owner or operator of the facility

supplies sufficient information to conduct an analysis. Based on this

reasoning, SDG&E contends that the Commission should generally require

a cogenerator or a small power producer to apply for a Commission

determination under Sec. 292.207(d)(2) that a change to its facility

will not result in revocation of qualifying status. Alternatively,

SDG&E suggests that the cogenerator or small power producer provide

notice to the Commission of the change in the form of an affidavit. In

either case, SDG&E recommends that the cogenerator or small power

producer provide an updated Form 556 and a copy of the filing to each

affected utility.

EEI contends that some of the proposed pre-authorized changes can

[[Page 4842]] have a significant effect on purchasing and wheeling

utilities. EEI states, for example, that a change in the maximum net

power production capacity of a QF can affect utility obligations

regarding the amount of power to be purchased and the amount of backup

and maintenance power that the utility must provide to the QF; that a

location change can affect a utility's point of interconnection with

the QF, as well as a utility's transmission and distribution system

requirements; or that a change in the QF's fuel could affect the

facility's performance and reliability.

Southern California Edison is concerned that some of the proposed

pre-authorized changes (i.e., changes with regard to site, thermal

load, fuel use, plant size, cogeneration thermal host or prime-mover

technology) may result in a new QF project and may have a significant

effect on a contracting utility. It urges the Commission to delete

these changes from the Commission's list of automatically approved,

pre-certified changes.42

\42\Southern California Edison notes that the CPUC has

instructed utilities not to accept certain modifications under

existing power purchase contracts in the absence of corresponding

concessions from the cogenerator or small power producer. Southern

California Edison is concerned that the Commission's treatment will

conflict with the CPUC's directive.

---------------------------------------------------------------------------

Southern Companies is concerned about the effects that a change in

location may have on utility planning, and on transmission and

distribution systems, in the absence of adequate notice to the utility.

Detroit Edison points out that a change in location of a QF may affect

the local utility's ability to accommodate the facility, especially

since the Commission's pre-authorized change proposal seems to

contemplate that a QF may move from the service territory of one

utility to that of another, or even move from one state to another.

On the other hand, Tenaska suggests that the Commission's list of

automatically approved, pre-certified changes should be even more

expansive. It proposes that the Commission permit a change in power

generation equipment whenever there is no material or substantial

change in capacity or operating characteristics of the facility.

Tenaska also urges that the Commission extend to coal, other fossil

fuels, and waste the pre-authorized changes permitted for oil and

natural gas usage by a cogeneration facility.

American Cogen and Electric Generation Association propose

additional pre-approvals: (a) For changes within an existing corporate

structure; (b) for changes in the equity interests (to ensure that the

facility continues to comply with the ownership requirements of

Sec. 292.206); and (c) for changes in the steam host that do not affect

levels of thermal output or the operating and efficiency values of the

facility.

EEI recommends that the Commission clarify that a self-certified

cogenerator or small power producer also may file a notice of self-

recertification with regard to the Commission's pre-authorized changes

and that such minor changes will not result in a self-certified

facility's losing its qualifying status.43

\43\EEI observes that proposed Sec. 292.207(a)(2)(i) limits

reports of pre-authorized minor changes to those QFs previously

certified by the Commission, and that this seems to suggest that a

self-certified facility might be subject to revocation of qualified

status as a consequence of the institution of similar minor changes.

In addition, EEI states that Sec. 292.207(a)(2)(ii) is confusing

because of its reference to the term ``application.'' According to

EEI, the term makes it appear to require that a Sec. 292.207(d)(2)

filing, which pertains to a change that will not result in the

revocation of qualifying status, is mandatory for a Commission

certified facility but discretionary for a self-certified facility.

Yet, EEI argues, Sec. 292.207(d)(2) seems to suggest that a filing

under that section is discretionary for all QFs.

---------------------------------------------------------------------------

Commission Response: In consideration of the comments, the

Commission will adopt the proposed rule with the modifications

discussed below. The Commission will pre-authorize ownership changes

within a corporate family that do not affect the ultimate upstream

derivative ownership in the facility (Sec. 292.207(a)(2)(i)(A)).44

The Commission will also pre-authorize changes in the steam host when

there is no change in the thermal application or process

(Sec. 292.207(a)(2)(i)(M)), and extend its pre-authorization of changes

in oil and natural gas use by a cogeneration facility to other fuels

(Sec. 292.207(a)(2)(i)(E)).45

\44\We encourage applicants to describe such ownership changes

with the aid of a corporate relationship chart.

\45\Because there is no efficiency standard applicable to the

use of other fuels by a cogeneration facility, any change in the use

of such fuels also warrants pre-authorization.

---------------------------------------------------------------------------

The Commission will not adopt EEI's suggestion that the Commission

extend the pre-authorized changes to the self-certification procedure.

The Pre-authorized Commission recertification procedure is not

available to a self-certified facility because, under self-

certification, the owner or operator of the facility is free to report

any change.

We are also deleting the proposed regulatory text which stated that

the Commission would return these submittals stamped ``approved.'' The

deleted text is inconsistent with the new procedure that pre-approves

certain types of changes.

Finally, because of concerns about the effect on utility planning

and utility systems, the Commission will require that cogenerators and

small power producers provide affected utilities and state commissions

a copy of any report of pre-authorized changes filed under

Sec. 292.207(a)(2).

The Commission declines to adopt the CPUC's proposal that it

indicate which modifications the Commission considers too fundamental

to include in a list of pre-approved changes. The intent of adopting a

list of pre-authorized changes in the final rule is to authorize

changes that are sufficiently minor for purposes of QF status that it

is unnecessary to obtain specific Commission approval each time such

changes are made. If a change is not included on the list, then the

pre-authorized change procedure cannot be used, and the cogenerator or

small power producer must apply for recertification or file a notice of

self-recertification.

The final rule revises Sec. 292.207(a)(2) accordingly.

5. Qualifying Transmission and Interconnection Equipment

The Commission proposed to amend the definition of the term

``qualifying facility'' to include transmission lines, transformers and

switchyards to reflect Commission precedent.46 As proposed,

cogenerators, small power producers and utilities could use such

equipment only to transmit qualifying power from the QF to the

purchasing electric utility and to transmit supplementary, standby,

backup and maintenance power from an electric utility to the QF.

\46\See, e.g., Clarion Power Company (Clarion), 39 FERC 61,317

(1987); Kern River Cogeneration Company, 31 FERC 61,183 (1985)

(Kern River); Malacha Power Project, Inc. (Malacha), 41 FERC 61,350

(1987); see also, Oxbow Geothermal Corporation, 67 FERC 61,193

(1994) (Oxbow) (granting recertification when the QF leased spare

transmission capacity to an adjacent QF and disclaiming FPA

jurisdiction over the lease).

---------------------------------------------------------------------------

Comments: NEP contends that a generic rule that allows transmission

equipment to be a component of a QF is ill-advised. NEP and

Pennsylvania P&L suggest that the Commission should continue to

consider this issue on a case-by-case basis. NEP is concerned that,

under a generic rule, electric utilities may find themselves in the

difficult situation of needing to tap into QF transmission lines and

obtain wheeling in order to serve load growth in their own service

territories. NEP is also concerned that the presence of qualifying

transmission facilities might affect: (a) A utility's transmission and

distribution plans; (b) public safety; and (c) the environment.

Pennsylvania P&L is concerned that codification of the QF

transmission line [[Page 4843]] and interconnection lines precedent

could result in the exemption of more transmission lines from state

environmental siting review. It notes that the State of Pennsylvania

does not regulate QF-owned transmission lines.47 Southern

California Edison is concerned that the proposed definition may cause

conflicts with state and local authorities that regulate the

construction, ownership and/or operation of transmission facilities,

despite the Commission's clarification in the NOPR with respect to the

continued applicability of Federal, state and local siting and

environmental requirements to such equipment. Edison, Arizona Public

Service and EEI ask the Commission to clearly state in the final rule

that Federal, state and local siting requirements continue to apply to

QF-owned transmission lines.

\47\This is Pennsylvania's choice. Certification does not exempt

QFs from environmental siting requirements.

---------------------------------------------------------------------------

EEI also observes that the proposed reference to the use of

qualifying transmission and interconnection equipment for ``qualified

power'' sales by QFs is ambiguous, since the term is undefined. EEI

further observes that the reference is unnecessary because the

Commission is only concerned about power sales by the QF portion of a

facility. Finally, EEI submits that one could interpret the proposed

definition of qualifying facility to prohibit a QF's use of qualifying

transmission and interconnection facilities to purchase power other

than supplementary, standby, maintenance and backup power for the non-

qualifying portions of a facility. EEI suggests that the Commission did

not intend to be so restrictive in its definition.

American Cogen, American Iron and Steel, General Electric,

Independent Energy Producers, and Texaco want to expand the permitted

uses of qualifying transmission and interconnection facilities to

include transmission and wheeling of a QF's power to other parties.

Texaco suggests that the Commission should include in the definition of

a qualifying facility any facilities that deliver electric energy to

third parties, such as thermal hosts or other entities, and any

facilities that provide transmission access under the provisions of the

Energy Policy Act of 1992.

American Cogen contends that, whether a QF is selling electric

energy at retail to industrial customers is irrelevant for the purpose

of determining QF status. American Cogen argues that it would make no

sense to deny qualifying status to the transmission and/or

interconnection portion of a facility merely because the facility is

engaged in power sales to end users. American Cogen says that the

Commission's inquiry has been focused on and should continue to focus

on whether a facility meets the fuel use standard, operating and

efficiency standards and ownership criteria. American Iron and Steel

contends that restricting the use of qualifying transmission and

interconnection equipment to transactions with utilities would be

contrary to precedent.48

\48\American Iron and Steel refers to PRI Energy Systems, Inc.,

(PRI Energy), 26 FERC 61,177 (1984); Oxbow Geothermal Corporation,

36 FERC 61,398 (1986); and Union Carbide Corp., 48 FERC 61,130,

reh'g denied, 49 FERC 61,209 (1989), affirmed sub nom., Gulf States

Utilities Co. v. FERC, 922 F.2d 873 (D.C. Cir. 1991) (Union

Carbide).

---------------------------------------------------------------------------

American Iron and Steel also suggests that, since PURPA does not

bar retail sales where such sales are permissible under state law, the

Commission should clarify the definition of a QF to provide for

qualifying status of transmission and interconnection facilities and

similar facilities that provide power to non-utility parties.

Otherwise, American Iron and Steel argues, by precluding qualifying

transmission and interconnection facilities where a QF transmits

electric energy to retail customers, the Commission would place

restrictions on state authority over retail sales, a restriction that

Congress sought to prevent under PURPA.

AGA counters that the Commission should not permit the transmission

and wheeling of electric energy for and to third parties over

qualifying transmission facilities, because Sec. 210 of PURPA only

encourages the local generation of alternative energy. According to

AGA, PURPA does not encourage the transmission of alternative sources

of electric energy to third parties.

Commission Response: The Commission will codify its precedent

concerning qualifying transmission lines and interconnection equipment

at Sec. 292.101(b)(1). The Commission is not changing the case-by-case

disposition of applications for the certification of qualifying

facility status that include transmission lines and interconnection

facilities.

The Commission also agrees with the suggestions of several

commenters that it should more fully codify Commission precedent by

clarifying or expanding the defined uses of transmission lines and

interconnection facilities. PURPA does not preclude QFs from selling at

retail.49 However, transmission lines or interconnection

facilities that are found to be part of a QF--whether used for

wholesale or retail sales--may be used only for the purpose of

effectuating the QF's sale of power; transmitting other QFs' power;

transmitting standby, maintenance, supplementary and backup power to

other QFs; 50 or transmitting back-up power, etc. to the QF or its

thermal users in appropriate circumstances.51 In other words, the

final rule will allow the transmission and interconnection components

of the QF to serve the same users that are served by the power

production components of QFs, to serve other QFs, and to serve the

backup, etc. needs of the QF, and its thermal host, in appropriate

circumstances. The Commission's modified definition of qualifying

facility will, accordingly, recognize that QFs may use transmission

lines and interconnection facilities to exchange electric power without

regard to the nature of the purchaser of the QF's power.52

\49\See PRI Energy, supra, n.48.

\50\See Oxbow, supra, n.46.

\51\See Union Carbide, supra, n.48.

\52\Purchasers that receive electric energy over the QF's

transmission lines and interconnection facilities may be directly or

indirectly interconnected purchasing utilities as contemplated in,

e.g., Kern River; Western Massachusetts Electric Company, 59 FERC

61,091, reh'g denied, 61 FERC 61,182 (1992), and Sec. 292.303 (a)

and (d) of the Commission's regulations; they may also be affiliated

and unaffiliated thermal hosts in accord with, e.g., Kern River;

Alcon (Puerto Rico), 38 FERC 61,301 (1987), affirmed, Puerto Rico

Elec. Power Auth. v.FERC, 848 F.2d 243 (D.C. Cir. 1988); and Union

Carbide; or they may be retail customers, when permitted by state

law, in accord with PRI Energy.

---------------------------------------------------------------------------

EEI's reference to the qualifying ``portion'' of an entire facility

is unclear. It is, therefore, difficult to evaluate EEI's concern that

the proposed revised definition of a QF may overly restrict the

allowable types of power purchases that qualifying transmission lines

and interconnection facilities may transmit. In any event, the

Commission, in this proceeding, is simply codifying its practice and

precedent concerning the transmission lines and interconnection

facilities of a QF.

With respect to Texaco's suggestion to expand the facilities

covered in the definition to those used to provide transmission access

under the provisions of the Energy Policy Act,53 the suggestion is

beyond the scope of this rulemaking.54

\53\The Energy Policy Act became effective on October 24, 1992.

Public Law No. 102-486, 106 Stat 2776 (1992). The Commission issued

the NOPR in this proceeding on November 16, 1992.

\54\However, the Commission's preliminary view is that a QF that

is a transmitting utility, see 16 U.S.C. 793(23), would not lose its

qualifying status if the Commission ordered the QF to provide

transmission services under FPA section 211.

---------------------------------------------------------------------------

The Commission agrees with Southern California Edison, EEI and

[[Page 4844]] Arizona Power that it is appropriate to modify the

definition of qualifying facility to make it clear that Federal, state

and local siting and environmental requirements apply to such

transmission lines and interconnection facilities.

The final rule revises Sec. 292.101(b)(1) accordingly.

6. Power Production Capacity

In the NOPR, the Commission proposed to add a new Sec. 292.202(s),

which would codify Commission precedent regarding the power production

capacity of a QF. The Commission proposed to determine a QF's maximum

net sendout based on the safe and reliable operation of the facility.

The Commission also proposed to measure the QF's power production

capacity at the point of delivery to the transmission system of the

interconnected utility.55

\55\Net output determines whether small power production

facilities that are not eligible solar, wind, waste or geothermal

facilities as defined by section 3(17)(E) of the FPA, conform to the

80 MW size limit of Sec. 292.204(a) and whether their owners and

operators are eligible for regulatory exemptions provided at

Secs. 292.601 and 292.602 of the Commission's regulations. See,

e.g., Malacha Power Project, Inc., 41 FERC 61,350 (1987);

Massachusetts Refusetech, Incorporated, 25 FERC 61,406 (1983); Power

Developers, Inc., 32 FERC 61,101 (1985), rehearing denied, 34 FERC

61,136 (1986); and Penntech Papers, Inc., 48 FERC 61,120 (1989).

---------------------------------------------------------------------------

Comments: Commenters recommended that the Commission measure power

production capacity at each point of interconnection with each

purchaser,56 or at the first point of interconnection with the

transmitting utility.57 The CPUC suggests that electric power

output must be net of any parasitic loads.

\56\Comments of American Cogen.

\57\Comments of Independent Energy Producers.

---------------------------------------------------------------------------

Southern California Edison suggests that the Commission define

power production capacity in terms of the expected operating conditions

during the period when the purchasing utility most needs power, taking

into account factors such as ambient temperature at the time of system

peak load and the QF's power commitment.58 Southern California

Edison is also concerned that one could construe the proposed

Sec. 292.202(s) language to allow the owners and operators of QFs to

choose to purchase power to meet a facility's auxiliary load

requirements in order to artificially increase the amount of power

sendout.

\58\According to Southern California Edison, its QF power

purchase contracts specify the amount of electric power which it can

rely on at the time of its maximum system peak demands. Southern

California uses such contract capacity in its long-term system

planning because the QF capacity amount reflects expected operating

conditions rather than the most favorable operating conditions.

---------------------------------------------------------------------------

General Electric suggests case-specific treatment for cogeneration

facilities that employ gasifiers.59

\59\A gasification system converts coal, waste and other by-

product materials to fuel gas, which may be burned in a power

production facility.

---------------------------------------------------------------------------

On November 29, 1993, as supplemented on December 3, 1993, Granite

State Hydropower Association (Granite State Hydropower), whose members

own or operate approximately 40 small hydroelectric projects in New

Hampshire, filed an ``emergency'' motion for clarification or to reopen

this proceeding and rescind the proposal to codify decisions.60

Granite State Hydropower opposes codification of the Commission's

decisions in Power Developers, Inc.,61 and Turners Falls Limited

Partnership,62 at least insofar as it might apply to hydroelectric

small power production facilities that are in operation when such

codification might take effect.63 Granite State Hydropower

requests that the Commission either rescind the proposed rule or

clarify that it would apply such a change in eligibility requirements

to future hydroelectric small power production facilities only.

\60\We shall treat their motion as a comment on the NOPR.

\61\32 FERC 61,101 (1985) (Power Developers).

\62\55 FERC 61,136 (1991) (Turners Falls).

\63\According to Granite State Hydropower, the New Hampshire

Public Utility Commission (New Hampshire Commission) has interpreted

the eligibility restrictions of Turners Falls to have, in effect,

overruled the New Hampshire Commission's 1981 regulations

implementing PURPA and certain of this Commission's Part 292

regulations.

---------------------------------------------------------------------------

Commission Response: The Commission notes that in two pending

proceedings 64 issues have been raised concerning the policy set

forth in Turners Falls. The Commission is reviewing those issues and

will address them in those proceedings. The Commission is not prepared

at this time to issue a final rule regarding the policy set forth in

Turners Falls. The Commission may, in the future, codify its policy on

this matter after it has had more experience with the issue. The

Commission will not adopt the proposed definition of power production

capacity at this time.

\64\Carolina Power & Light Company, v. Stone Container Corp.,

Docket Nos. EL94-62-000 and QF85-102-005; Connecticut Valley Light &

Power Company v. Wheelabrator Claremont Company, Docket Nos. EL94-

10-000 and QF86-177-001.

---------------------------------------------------------------------------

7. Increased Specificity of the Qualifying Facility Filing

Requirements: Form 556

In the NOPR, the Commission proposed a standardized application

form (Form 556) to facilitate successful applications for Commission

certification of qualifying status. The Commission intended that Form

556 would also make small power producers and cogenerators more aware

of the QF standards that apply to their facilities; under the current

regulations one must examine the history of related cases and the

language of the pertinent regulations to be sure of the specific

standards that apply to particular facilities. To make this effort less

burdensome to applicants, Form 556 allows cogenerators and small power

producers to report the specific characteristics of their facilities.

The form also provides for the step-by-step application of pertinent

regulations to their facilities. When accurately completed, Form 556

should readily reveal whether a facility substantially complies with

the applicable criteria, and reduce the number of Staff inquiries for

more information from applicants.

Comments: With respect to the general requirement for Form 556,

SDG&E suggests changing the title of Form 556 to make it clear that it

applies to proposed, as well as to existing facilities. American Cogen

cautions that verifying the useful thermal output of proposed

facilities (item 14a): (a) Will be an extremely cumbersome procedure;

(b) will, of necessity, be based on approximations; and (c) may raise

utility concerns, prompt premature interventions, and cause

administrative difficulties.

Southern California Edison recommends that applicants include an

updated Form 556 with each filing submitted under Sec. 292.207(d)(2) in

connection with a substantial modification to a facility. AGA urges the

Commission to dispense with the detailed information requirements and

request only the most basic technical information.65 American

Forest and Paper maintains that identification of the utility that will

purchase and/or wheel the facility's qualified power (item 3b) is

unnecessary, since that information has nothing to do with qualifying

status.

\65\While the Commission notes that AGA's suggestion that the

Commission change its policy and rely on minimal information is

beyond the scope of this proceeding, its proposal would undercut the

Commission's efforts to reduce the incidence of incomplete filings.

---------------------------------------------------------------------------

Arizona Public Service proposes that the QF specify the name of

each affected utility customer, as well as the magnitude of its

displaced load. SDG&E proposes that the applicant describe in writing

the operation of the principal components of the facility, and that the

applicant also address supplementary firing devices and incorporate a

detailed [[Page 4845]] thermodynamic heat balance diagram.66 SDG&E

recommends that Form 556 require an applicant to more narrowly specify

the facility's electric power production capacity in terms of the

qualified portion of the facility instead of simply on a stand-alone

basis (item 4b).

\66\This information should be provided in Form 556, items 4a

and 10.

---------------------------------------------------------------------------

American Forest and Paper asks the Commission to delete the

proposed inquiry into the total energy input of a facility (items 4d

and 5). It notes that, for a small power production facility, item 7

addresses compliance with the fossil fuel use limits and that, for a

cogeneration facility, the fuel used is relevant only for compliance

with the efficiency standard. According to American Forest and Paper,

item 11, concerning operating and efficiency values for cogeneration,

should apply only to oil or natural gas fueled cogeneration facilities.

EEI recommends that the Commission broaden its consideration of

waste energy input (item 4d) to include the Commission's ``no current

commercial value'' test or a United States Department of the Interior,

Bureau of Land Management (BLM) waste determination. SDG&E recommends

that the Commission add new item 4e, which would require a description

of the QF's point of delivery with the purchasing utility. It also

suggests that Form 556 require an applicant to present the facility's

energy input (item 5) in terms of ``lower heating value.''67

\67\Lower heating value refers to the amount of useful heat

energy that can be obtained during the combustion process, since the

latent heat of water vaporization in the combustion of hydrocarbon

fuels is not recoverable. Order No. 69, FERC Stats. and Regs.,

Regulations Preambles 1977-1981 30,134 at 30,937. Section

292.202(m) requires that one use lower heating value to measure the

energy input of oil or natural gas. SDG&E also asks the Commission

to require an applicant to specify the conversion factor that it

uses to convert the higher heating value to the lower heating value.

---------------------------------------------------------------------------

EEI suggests that the Commission make its determination of the

amount of total energy input into a small power production facility

(Item 7) in terms of Btu/lb. or Btu/cubic ft. of gas at standard

temperature and pressure and that Form 556 require an applicant to

specify the annual Btu consumption of primary fuel. EEI notes that Form

556 does not define eligible and non-eligible small power production

facilities (Item 8).\68\

\68\Under section 3(17)(E) of the FPA, eligible facilities are

certain solar, wind, waste and geothermal powered small power

production facilities that are not capped at the PURPA 80 MW size

limit, for which a filing regarding QF status had been submitted to

the Commission by the end of 1994 and for which the construction

must generally commence before the end of 1999.

---------------------------------------------------------------------------

American Cogen maintains that a cogeneration system cycle diagram

depicting the physical arrangement of system components (item 10) is

often premature and burdensome, since certification often occurs before

selecting a general contractor and completing the detailed layout.

American Cogen also contends that small facilities, under 2 MW, should

be exempt from the cycle diagram requirement. The CPUC, observing that

items 10 and 14 address cogeneration system input and output values,

suggests that it would be useful to directly relate each input and

output value to the cycle diagram to show more clearly what each value

represents.\69\ SDG&E suggests that, for absorption chiller thermal

applications, there should be specification of the heat that will be

sent to the chiller's cooling tower, and any factor converting the

chilled water in terms of net Btu cooling output to net heat input to

the chiller, as well as the relevant flow rates, temperature, pressure,

and enthalpy.

\69\The Commission agrees that there should be a correlation

between the input and output information provided in items 10 and

14.

---------------------------------------------------------------------------

SDG&E suggests that the Commission should require an applicant to

specify the entity that will purchase the useful thermal energy output

from the facility and any affiliation such entity may have with the

cogenerator (item 12). SDG&E further recommends that the description of

any heat dump, exhaust bypass or other such device for dumping,

transferring or applying heat to something other than the designated

useful thermal energy output application, be provided in writing along

with a simple diagram (item 13). AGA contends that, since distribution

heat losses are an inherent and unavoidable characteristic of thermal

consumption and are not a function of how thermal energy is created,

Form 556 should not call for calculations of distribution heat losses.

EEI proposes that, if the Commission decides that applicants must

include a completed Form 556 with all QF related filings, the

Commission specify the type of filing that the Form 556 submission

pertains to (e.g., Commission recertification, self-recertification, or

pre-authorized change). EEI also suggests a requirement that, at all

times, proper and accurate metering or other measuring and recording

will be conducted to verify continuing compliance with the operating

and efficiency standards. American Forest and Paper contends that the

routine Federal Register notice accorded applications for Commission

certification should be sufficient to alert nearby utilities and other

interested parties about potential QF obligations.

Commission Response: Applications for Commission certification

under Sec. 292.207(b) must include Form 556. Further, because the final

rule will require filings under Sec. 292.207(d)(2) to conform to the

requirements of Sec. 292.207(b), filings under Sec. 292.207(d)(2) will

include a completed and current Form 556. The Commission will also

require that notices of self-certification under Sec. 292.207(a)(1)

include a completed Form 556. However, the final rule does not require

applicants to include Form 556 with preauthorized change filings under

Sec. 292.207(a)(2). To do so would be inconsistent with the notion that

preauthorized changes do not require additional Commission review.

Concerning EEI's comments about verification of compliance with

operating and efficiency standards, the Commission notes that

cogenerators and small power producers are responsible for installing

adequate monitoring equipment to ensure compliance with the

Commission's regulations.

In response to American Forest and Paper's comment that Federal

Register notice should suffice for applications for Commission

certification, as we noted above, the adoption of Form 556 is intended

to benefit QFs by facilitating successful applications for Commission

certification and making cogenerators and small power producers more

aware of QF standards. American Forest and Paper's comments concerning

notice to affected utilities does not account for these benefits.

Moreover, as discussed elsewhere in this final rule, the Commission is

requiring a completed Form 556 for each self-certification filing,

which, at revised item 3b, will specify the purchasing and wheeling

utilities, if known. Since the Commission does not publish notices of

self-certification in the Federal Register, the Commission will require

that applicants provide copies of notices of self-certification to each

affected utility and state commission.

We decline to adopt American Cogen's proposal to exempt facilities

under 2 MW from the cycle diagram requirement. A cycle diagram is a

minimal showing of the operation of the cogeneration process.

We decline to adopt SDG&E's suggestion that applicants specify

several factors related to absorption chiller thermal applications. The

Commission has held that PURPA does not require the thermal use to be

the [[Page 4846]] most efficient; the requirement is that it be

``useful.''\70\

\70\See Bayside Cogeneration, L.P., 67 FERC  61,290 at 62,007 &

n. 7 (1994).

---------------------------------------------------------------------------

Concerning AGA's comment that Form 556 should not require

calculations of distribution heat losses, the Commission recognizes

that accounting for inefficiencies of heating and cooling equipment is

burdensome and unnecessary. Form 556 will not require that applicants

specify this information.

The Commission will publish Form 556 in Part 131 of the

Commission's regulations. To help focus attention on the relevant

standards, the Commission will divide the form into three parts. Part

A, entitled ``General Information To Be Submitted By All Applicants''

(items 1-6), covers: (a) The identity of the applicant; (b) the type of

facility (small power or cogeneration); (c) the expected or actual

installation and operation dates, (d) the fuel input and power output;

and (e) the identity of the relevant utilities with which the facility

will transact business. Part B, entitled ``Description Of the Small

Power Production Facility'' (items 7-8), concerns certain restrictions

on use of oil, natural gas and coal and the one-mile limit on common

fuel supplies shared by multiple facilities. Part C, entitled

``Description Of the Cogeneration Facility'' (items 9-15), concerns

compliance with, inter alia, the operating and/or efficiency standards,

and contains sections that specifically pertain to topping-cycle (items

13-14b) and bottoming-cycle (item 15) facilities.

To make Form 556 easier to use, the Commission is eliminating

redundancies and, wherever possible, cross-referencing items to related

sections of the Commission's regulations or stating the underlying FPA

or Commission requirement.

The Commission is also modifying the title of Form 556 to indicate

that applicants must complete up-to-date Forms 556 for both existing

and proposed facilities.\71\ The Commission is requiring a description

of the operation of the principal components of the facility (item 4a).

The Commission is clarifying the reference to eligible small power

production facilities (item 8) with an explanation and a reference to

section 3(17)(E) of the Federal Power Act. The Commission is also

requiring that an applicant specify the identity of the thermal host;

but the Commission is not requiring that in all cases applicants must

divulge their affiliation with the cogenerator (item 13).\72\

\71\The Commission is not requiring owners and/or operators of

facilities that have applications for certification pending before

the Commission, or that the Commission has already certified, or

that have already filed a notice of self-certification to file Form

556 unless they file for Commission recertification or self-

recertification after the effective date of this final rule.

With respect to facilities not yet built or operating, small

power producers and cogenerators must present the relevant

information, to the extent possible, in the form of planned

compliance. If the small power producer or cogenerator does not

supply sufficient information, the Commission will not be able to

certify the facility, or the information in a notice of self-

certification will not be adequate to ensure that the facility is a

QF.

\72\The affiliate relationship between the cogenerator and the

thermal host is not relevant unless the thermal application or

process, or the end product produced with the aid of the thermal

output from the facility, is not common. Since most thermal

applications or processes, and/or the end products produced with the

aid of such, are common, this information is usually not necessary.

---------------------------------------------------------------------------

The Commission is also not requiring applicants to specify the

utility load that a QF will displace, since it is sufficient for

utility planning and system operating purposes that applicants identify

all of the utilities with which they expect to transact business. The

Commission's practice has long required that applicants provide

information on thermal delivery losses and any thermal energy return,

in order to determine the amount of the useful thermal energy output of

the facility (item 14a). Experienced cogenerators have routinely

provided this information. The Commission is not eliminating this

critical requirement.\73\ The final rule clarifies Form 556

accordingly.

\73\Section 292.202(h), as revised in this final rule, defines

thermal energy in terms of thermal energy: (1) Which is made

available to an industrial or commercial process (net of any heat

contained in condensate return and/or makeup water); (2) which is

used in a heating application (e.g., space heating, domestic hot

water heating); or (3) which is used in a space cooling application

(i.e., steam or hot water used by an absorption chiller). Item 14a

will contain these three categories.

Line losses and heat exchanging equipment losses must be

deducted from the total thermal energy actually consumed. For

example, any thermal energy rejected by an absorption system at the

input to the chiller must be deducted from the useful thermal

output, since what is rejected is not used for cooling purposes.

Also, the proper location of the metering equipment at the host site

can eliminate the need to calculate line losses.

---------------------------------------------------------------------------

F. Proposed Technical Modifications for Qualifying Small Power

Production and Cogeneration Facilities Under Part 292

1. Calendar Year Fossil Fuel Use and Operating and Efficiency Value

Calculations

The Commission's current rules require cogeneration facilities to

meet the operating and efficiency standards on a calendar year

basis.\74\ Small power production facilities must meet a similar

requirement with respect to the proportion of fossil fuel use.

\74\See, e.g., Everett Energy Corporation, 45 FERC  61,314

(1988).

---------------------------------------------------------------------------

The NOPR proposed to convert the existing calendar year operating

and efficiency standards (for cogeneration facilities\75\) and the

current calendar year fossil fuel standard (for small power production

facilities\76\) to 12-month standards, because many QFs have

experienced difficulty meeting the standards during the first calendar

year of operation. For example, if a cogeneration facility first

produces electric energy late in the year, it may not have enough time

under normal operation during the remainder of the calendar year to

meet the Commission's operating and/or efficiency standards. Likewise,

it may miss the peak thermal usage of its host(s), and so may be unable

to comply with the Commission's operating and/or efficiency standards

for that calendar year.

\75\The current operating standard requires all topping-cycle

cogeneration facilities to have at least a 5 percent operating value

with regard to useful thermal energy output (Sec. 292.205(a)). Oil

or gas-fired topping-cycle cogeneration facilities are also subject

to an efficiency standard (Sec. 292.205(a)). The useful electric

power output of the facility plus one-half the useful thermal energy

output must be no less than 42.5 percent of the total energy input

of natural gas or oil. If the useful thermal energy output is less

than 15 percent of the total energy output (i.e., the operating

value is less than 15 percent), the efficiency value must be 45

percent rather than 42.5 percent. For supplementary fired bottoming-

cycle facilities, the useful electric power output must be at least

45 percent of the total oil and natural gas input

(Sec. 292.205(b)(1)).

\76\The use of coal, oil and natural gas by qualifying small

power production facilities is limited to certain purposes and

cannot exceed 25 percent of the total fuel input

(Sec. 292.204(b)(2)).

---------------------------------------------------------------------------

In the NOPR, the Commission proposed to base its determination of

whether a QF meets the Commission's technical standards in its first

year of operation by examining the facility's operation for a period of

12 consecutive months beginning with the date on which the QF first

produces electric energy. The Commission proposed to base subsequent

determinations upon each ensuing 12-month period. Accordingly, the

Commission proposed to replace the phrase ``during any calendar year''

in Secs. 292.204(b)(2), 292.205(a) and 292.205(b) with the phrase ``on

a consecutive 12-month basis beginning with the date the facility first

produces electric energy.''

Comments: American Forest and Paper suggests a 60 to 90-day grace

period beginning with the first production of electric energy to permit

the completion of facility testing. Upon commercial operation, the 12-

month standard would apply. Independent Energy Producers suggests that

the Commission apply the new 12-month [[Page 4847]] standard to

consecutive 12-month periods, rather than to rolling 12-month periods

beginning with each month.

Pennsylvania P&L suggests that the Commission apply the 12-month

standard only to new QFs in order to minimize administrative problems

with existing QFs whose power purchase contracts may be based on

calendar year periods. SDG&E and Southern California Edison suggest

that the Commission continue to apply the existing calendar year

standard, beginning with the first full calendar year of a QF's

operation and apply the new 12-month standard only to the initial

period of operation.\77\ SDG&E and Southern California Edison believe

that this would respond to the Commission's concern about the

difficulties QFs initially encounter in their operation and make it

easier for utilities to monitor the operation of a large number of

QFs.\78\

\77\Southern California Edison also suggests that, since certain

combined-cycle configurations have characteristics of both topping-

cycle and bottoming-cycle facilities, the Commission should make the

operating and efficiency standards for combined-cycle facilities the

same as for topping-cycle facilities. The Commission considers

combined-cycle installations to be topping-cycle facilities subject

to the operating and efficiency standards applicable to such

facilities.

Southern California Edison suggests that the Commission should

also require combined cycle facilities to calculate the efficiency

value to take into account total energy input. The Commission

includes the total energy input of only oil or natural gas to such

topping cycle facilities in the calculation of the efficiency value.

\78\SDG&E also contends that the current operating and

efficiency standards have failed to encourage alternative energy

development and conservation and suggests that the Commission should

initiate a new rulemaking proceeding to raise the operating and the

efficiency standards. At this juncture, however, the Commission is

primarily concerned with codifying QF precedent and otherwise

streamlining its QF regulations. It is not prepared to initiate

another generic QF proceeding at this time.

---------------------------------------------------------------------------

Commission Response: American Forest and Paper's proposal to

establish a 60-90 day grace period for new facilities is beyond the

scope of this proceeding and the Commission will not adopt it.

The Commission is revising its regulations to require that the

technical standards be measured during the first year of operation, on

a consecutive 12-month basis beginning with the date the facility first

produces electric energy. A new facility can fail to meet the technical

standards in any period from one to 11 months as long as the facility

meets the technical standards for the 12-month period. Compliance with

the technical standards will be required on a calendar year basis

beginning with the first full calendar year of operation following the

date of initial electric power production.\79\ This should simplify

compliance with contracts and regulations. The final rule revises the

Commission's operating, efficiency and small power fuel use standards

accordingly.

\79\Under this approach, small power producers and cogenerators

will account for the early period of a QF's operation under both the

12-month standard and the calendar year standard. For example, with

respect to a facility that first produces power on July 1, 1994,

conformance with the 12-month standard will be necessary for the 12-

month period ending June 30, 1995. In addition, conformance with the

calendar year standard will be necessary for that facility for the

calendar year ending December 31, 1995.

---------------------------------------------------------------------------

2. Clarification of the Sequential Use of Energy Requirement

In the NOPR, the Commission proposed to clarify its requirements

pertaining to cogeneration facilities' sequential use of energy and

useful thermal energy output. The Commission, therefore, proposed to

define sequential use of energy in a new Sec. 292.202(t); in the final

rule, this new section is designated Sec. 292.202(s). The NOPR also

proposed to codify Commission precedent that: (a) A topping-cycle

installation must subsequently use some of the reject heat from the

electric power production process for a useful thermal purpose; and (b)

that the useful portion of thermal energy output refers to the heat

used in a heating or cooling application or made available to a

commercial or industrial process.\80\ In the case of a bottoming-cycle

cogeneration installation, where all of the energy is first used for a

commercial or industrial process, the Commission proposed that the

facility must subsequently use some of the reject heat to produce

electric power.

\80\Under the Commission's proposal, a topping-cycle cogenerator

applicant would provide a mass, heat balance (cycle) diagram to

demonstrate sequentiality, an adequate level of useful thermal

energy output, and conformance with the operating and efficiency

standards. Cycle diagrams delineate average annual hourly energy

flows at various points of the cogeneration facility (including

points of fuel input and working fluid input), accounting for hourly

and seasonal variations, and conditions such as temperature,

pressure and enthalpy (heat content) at these inputs, at the outputs

of the prime movers, and at delivery points to the thermal

application/process, and account for losses between the cogenerator

and the host.

---------------------------------------------------------------------------

Comments: EEI refers to a multiple turbine cogeneration

configuration in which some of the turbines are sequentially producing

electric power and useful thermal output, and other turbines are only

producing electric power. EEI contends that the latter turbines should

not qualify because they do not save fuel. Southern Companies also

maintains that sequential energy use must remain central to the

qualifying cogeneration facility concept. AGA approves of the

Commission's discussion in the NOPR on this matter, because it

contemplates that useful thermal energy will be extracted at any point

along a chain of linked turbines rather than from every turbine in a

multi-turbine topping-cycle installation.

SDG&E asks the Commission to specify a minimum percentage threshold

for sequentially produced useful thermal energy output. It submits that

the setting of a minimum threshold would better promote the

conservation and efficiency goals of PURPA. SDG&E also recommends that

the Commission exclude from the operating and efficiency values of a

facility the incremental electrical and thermal output related to any

supplementary firing in a combined-cycle (topping-cycle) extraction

turbine configuration. SDG&E contends that to allow supplementary

firing when only a token portion of the thermal input is converted to

useful thermal energy output is not an efficient use of energy.

American Cogen suggests that the Commission require facilities to

account for inefficiencies in the thermal host's equipment with greater

specificity. However, if the Commission's intent is to net out such

inefficiencies from the useful thermal energy output at each point of

interconnection with the thermal process or application, American Cogen

contends that accounting for such inefficiencies is onerous and should

not be adopted. Electric Generation Association raises similar

concerns. Independent Energy Producers suggests that the Commission use

an approach similar to that proposed for waste fuels and provide a non-

exclusive list of useful thermal purposes to help reduce any

uncertainty.

SDG&E is concerned that the proposed revised definition of useful

thermal energy output does not exclude heat dumped or rejected after

delivery to the process, and that space and domestic water heating and

cooling uses have not been included in useful thermal energy

output.\81\ SDG&E also suggests that a modified independent business

purpose test be applied to determine the usefulness of novel thermal

applications or processes.

\81\(See Electrodyne Research Corporation, 32 FERC  61,102

(1985) (Electrodyne)).

---------------------------------------------------------------------------

Commission Response: With regard to the concerns of EEI, Southern

Companies and American Cogen, the Commission's final rule both

maintains the sequential use of energy concept and permits a QF to

extract useful thermal energy at any point along a chain of

[[Page 4848]] turbines as long as the turbines are linked in a

sequential energy flow. While SDG&E believes that the proposed

definition of sequential use of energy was too vague, the Commission

notes that the new definition explicitly considers the operating

standard with respect to topping-cycle cogeneration facilities. Under

the operating standard, 5 percent of the total energy output of a

topping-cycle cogeneration facility must be useful thermal energy

output in order for a facility to meet the sequentiality requirement.

The Commission agrees with American Cogen and Electric Generation

Association that it is unduly burdensome for cogenerators to compile

data on net useful thermal energy output that accounts for host

equipment inefficiencies, and that this requirement would not be

consonant with streamlining the QF regulations. It is not practical to

account for inefficiencies related to each piece of host equipment. The

Commission, however, agrees with SDG&E's proposal to clarify the

definition of useful thermal energy output to clearly account for such

common applications as space heating and space cooling, and domestic

water heating.

The Commission declines to adopt Independent Energy Producers'

proposal to create a non-exclusive list of useful thermal energy output

applications and processes similar to the proposed list for waste

fuels. Since, by design, most thermal applications and processes are

common and, therefore, presumptively useful, a listing of permitted

thermal applications/processes would be virtually impossible to

compile. Also, any such list would likely exclude unforeseen variations

of previously allowed thermal applications/processes that would also

fall within the presumptively useful category.

SDG&E has raised a concern about separate firing in combined cycle

facilities, in which fuel is used to produce steam, some of which is

directly used in the thermal application/process and some of which is

used in an extraction turbine generator to produce additional electric

energy and subsequently additional thermal output. As long as the

direct and indirect use of thermal output amounts to 5 percent of the

facility's total energy output, the facility meets the operating

standard and the sequential use of energy requirement. The Commission

does not allow the use of duct burners (i.e., separate firing of heat

recovery boilers) solely to produce electric power in condensing

turbine configurations.\82\ In response to SDG&E's suggestion to modify

the independent business purpose test, the Commission, has not proposed

to modify its Electrodyne standard in this proceeding. Thus, SDG&E's

proposal is beyond the scope of the instant proceeding.

\82\See Adolf Coors Company, 34 FERC  61,209 (1986).

---------------------------------------------------------------------------

The final rule adopts Sec. 292.202(s) accordingly.

3. Section 292.204(a)--Criteria for Small Power Production Facilities

In the NOPR, the Commission proposed to amend Sec. 292.204(a) of

its regulations to reflect the addition by Congress of subsection

3(17)(E) of the Federal Power Act (FPA) pursuant to the Solar, Wind,

Waste, and Geothermal Power Production Incentives Act of 1990, as

subsequently amended in 1991 (the Incentives Act). Subsection 3(17)(E)

temporarily removed the otherwise applicable subsection 3(17)(A) 80 MW

size limitation on eligible small power production facilities.

Eligible facilities are those solar, wind, waste and geothermal

powered small power production facilities for which either a notice of

self-certification, or an application for Commission certification, was

submitted to the Commission by December 31, 1994. In addition,

construction of eligible facilities must commence not later than

December 31, 1999, or, if not by then, reasonable diligence must be

exercised toward the completion of such facilities taking into account

all factors relevant to their construction.

Comments: EEI suggests that the Commission require that operators

of eligible facilities provide evidence that they have made a good

faith effort toward the timely completion of such facilities by

December 31, 1999, taking into account all factors relevant to their

construction, in order to maintain eligibility for exemption from the

size restriction.

Independent Energy Producers expresses concern that under the

Incentives Act, as amended, existing small power production facilities

of greater than 80 MW may lose their qualifying status if they must be

recertified subsequent to December 31, 1994. They request that the

Commission clarify that recertification of an existing eligible solar,

wind, waste or geothermal small power production facility larger than

80 MW after December 31, 1994, will not endanger that project's

qualifying status. Independent Energy Producers asserts that it would

be unreasonable to interpret the Incentives Act, as amended, to take

away existing benefits from a project which otherwise meets all

eligibility requirements simply because it undergoes modification or

some other change in circumstances, not related to the size cap,

requiring a subsequent filing some time during the project's useful

life. Such modifications include minor changes in a project's size,

transmission routing, or ownership and occur frequently, according to

Independent Energy Producers.

Commission Response: In adding Subsection 3(17)(E) to the FPA,

Congress only required that applicants exercise reasonable diligence

toward the completion of construction of eligible small power

production facilities, in those instances when construction has not

commenced by December 31, 1999. In deciding to allow eligible small

power producers to start construction after December 31, 1999, Congress

obviously considered the potential for delays, yet, notably, it did not

establish a requirement that construction be completed by any

particular date. Therefore, it would not be appropriate for the

Commission to adopt EEI's suggestion to require in all cases eligible

small power producers to demonstrate reasonable diligence to complete

construction of eligible facilities by December 31, 1999.

In response to Independent Energy Producers, we do not believe that

an eligible solar, wind waste or geothermal facility will lose QF

status if, subsequent to December 31, 1994, such facility either files

a notice of self-recertification or an application for Commission

recertification, as long as the project is not fundamentally altered

from the project described in the notice of self-certification or

application for Commission certification filed prior to January 1,

1995.\83\

\83\At this juncture, the Commission believes it is appropriate

to determine whether a project has been fundamentally altered on a

case-by-case basis.

---------------------------------------------------------------------------

The Commission will retain the proposed regulatory text for 18 CFR

292.204(a).

4. Waste

In the NOPR the Commission proposed to drop the existing definition

of ``waste'' as a by-product material.\84\ [[Page 4849]] The Commission

intended to make it easier to determine the energy sources that certain

qualifying small power production facilities can use. To make it easier

to certify a qualifying facility, the Commission also proposed to list

specific energy sources that it had previously approved for treatment

as waste.\85\

\84\PURPA does not define the term ``waste.'' In the preamble to

its final rule implementing PURPA, the Commission defined waste as

``by-product materials other than biomass.'' FERC Stats. and Regs.,

Regulations Preambles, 1977-1981  30,134 at 30,934. In Kenvil

Energy Corporation (Kenvil), 23 FERC  61,139 (1983), the Commission

found that, to be waste, an energy source must be both a by-product

and have no commercial value. Subsequently, the Commission found

that applying the by-product test is not only cumbersome, but also

is not needed to address the issue of what constitutes waste. For

example, in Big Horn Energy Partners, 38 FERC  61,265, order on

rehearing, 40 FERC  61,305 (1987) (Big Horn), the Commission

certified as waste, coal which was not a true by-product of the coal

mining operation but was simply not extracted because it was

unwanted.

Section 292.202(a) defines ``biomass'' as any organic material

not derived from fossil fuels.

\85\The Commission intended that its waste list not be

exclusive.

---------------------------------------------------------------------------

Comments: EEI and Southern Companies are concerned that eliminating

the by-product test in the revised definition of waste may encourage

the deliberate creation of a waste material. Each recommends that an

energy source not qualify as waste unless it would otherwise exist in

the absence of the QF that will rely on it.

American Iron and Steel, Utility Systems Florida, Anthracite IPPs

and Independent Energy Producers suggest that whether the owner or

operator of a QF pays for the energy source, incurs costs associated

with its removal and transportation to the QF, and adds value by way of

upgrade, should not affect the determination of commercial value.

American Iron and Steel proposes that the Commission consider

commercial value in the context of its value to potential purchasers

other than owners and operators of QFs. Anthracite IPPs observes that

upgrades, such as cleaning and washing, might be necessary before a QF

can use a waste. Utility Systems Florida notes that almost everything

has some commercial value after it is cleaned, and suggests that the

Commission define waste in terms of an energy source that is both an

environmental hazard and has little or no commercial value.

American Iron and Steel, EEI and Southern Companies urge the

Commission to state that, once the Commission determines that a QF's

energy source is waste, the Commission will continue to treat that

energy source as waste even if the waste subsequently acquires

commercial value. They maintain that this approach is necessary to

maintain the QF's qualifying status.

The CPUC, EEI and Southern Companies propose that the Commission

periodically review and update its list of waste materials.86

Anthracite IPPS and Applied Energy argue that it is unnecessary to

limit petroleum coke and used rubber tires to that which cannot be

commercially marketed, since the Commission has already listed each

item as waste.87 American Iron and Steel suggests that the

Commission specifically list coke oven gas and blast furnace gas as

waste.88

\86\The CPUC notes that the proposed waste list is based upon

market data for the period 1987 through 1991. EEI is concerned that

technology may quickly cause a listed waste to acquire some economic

value. Southern Companies, concerned about delay, recommends that

the Commission establish a list of wastes but not include the list

in the Commission's regulations. Southern Companies suggests that

the Commission invite public comment on the list and update the list

periodically.

\87\Anthracite IPPs cites Sunlaw Energy Corp., 37 FERC 62,255

(1986) and Exeter Energy Limited Partnership, 48 FERC 62,135

(1985). Applied Energy cites Ultrapower, Inc., 34 FERC 62,144

(1986), GWF Power Systems Company, Inc., 45 FERC 62,159 (1988), and

the Commission's discussion of petroleum coke without regard to its

commercial value at FERC Stats. and Regs., Regulations Preambles

1977-1981 30,134 at 30,934. In that latter discussion, the

Commission also referred to refinery gas and plastics as additional

examples of waste.

\88\American Iron and Steel states that these gases cannot be

marketed outside the steel industry due to low Btu content,

intermittent production, and capture and storage problems. It also

suggests that the Commission consider including as waste steel

industry process gases such as Corex off-gas and direct steel making

off-gas.

---------------------------------------------------------------------------

Ridgewood and RW Partners suggest that the Commission include on

the list of waste environmentally problematic substances such as used

crankcase oil and other used petroleum products.89 Anthracite IPPs

recommends that the Commission include on the waste list coal

``fines,'' regardless of their BTU content.90 It argues that fines

are extremely difficult to handle because of their small particle size

and their tendency to become difficult to handle when wet.91

Anthracite IPPs also proposes that the list be expanded to include

subbituminous coal or blends of bituminous and subbituminous coal,

regardless of whether such material is in place or is a refuse.92

\89\Ridgewood, RW Partners, Utility Systems Florida, Donald L.

Warner and Steven Anthony Duff maintain that listing used crankcase

oil as waste would provide an incentive for its proper disposal,

reduce its role as an environmental nuisance, encourage its

recycling for use in electric generation, help reduce oil imports,

and remove skepticism among lenders as to the status of self-

certified facilities that rely on it.

\90\Fines are small or powdery-sized particles of coal that

result from coal mining, sizing or processing operations.

\91\Anthracite IPPs further states that utilities do not

specifically purchase fines, and that fines are typically in the

form of silt comprised of coal fines and ash materials from coal

washing operations and are disposed of in settling or slurry ponds.

\92\Subbituminous coal has a lower heat content than bituminous

coal, averaging 9,000 Btu/lb.

Anthracite IPPs also proposes that the Commission regard as

waste: (1) Top or bottom anthracite coal, and (2) subbituminous and

bituminous coal that the United States Department of the Interior's

Bureau of Land Management (BLM) has determined to be waste,

including any of this coal with the same characteristics that may

extend onto non-Federal or Indian land not under the BLM's

jurisdiction. Anthracite IPPs notes that, since BLM jurisdiction

only extends to Federal or Indian lands, the waste list's reference

to BLM approved wastes on such lands is redundant.

Anthracite IPPs also wants the Commission to provide in its

regulations that any coal source not listed as a waste in the

Commission's regulations may qualify as waste upon a showing that it

has no commercial value. Anthracite IPPs also wants all references

to Btu or ash content to refer to average values so that variations

in Btu or ash content will not preclude a potential fuel source from

qualifying.

---------------------------------------------------------------------------

Commission Response: The Commission is simplifying the qualifying

status determination of facilities that use waste energy inputs in two

ways. First, the Commission is publishing a list of waste energy inputs

that the Commission has previously approved. Second, the Commission is

streamlining its waste determination process for those energy inputs

that do not appear on the list, by changing its two-part Kenvil

approach (i.e., application of a ``by-product test'' in conjunction

with a ``little or no current commercial value'' test) to require only

that the proposed waste fuel source have little or no current

commercial value.

Section 292.204(b) requires that, for a waste-fueled qualifying

small power production facility, 75 percent or more of the total energy

input to the facility must be waste.93 Determining whether a

facility meets this criterion will entail an evaluation of the average

quality characteristics of the fuel, if the fuel is a waste fossil fuel

energy input to a facility, or a description of the facility's energy

input if it is not using a waste fossil fuel.

\93\Section 292.204 reads in relevant part, as follows:

(b) Fuel use. (1)(i) The primary energy source of the facility

must be biomass, waste, renewable resources, geothermal resources,

or any combination thereof, and 75 percent or more of the total

energy input must be from these sources.

---------------------------------------------------------------------------

The final rule will provide that even if the owner and/or operator

of a QF pays for a material and incurs expenses to transport and

upgrade it, the material is a waste if no other sector of the Nation's

economy uses the material; but, if there is a demand for the material,

other than in the QF industry, the material is considered to have

commercial value and is, therefore, not waste under the ``little or no

commercial value'' test. The Commission will not consider value to the

cogenerator or small power producer as commercial value. Should a waste

material acquire commercial value after the Commission has certified a

facility that uses such material, or after a small power

[[Page 4850]] producer or cogenerator has filed a notice of self-

certification referring to such material, the facility will not lose

its qualifying status because the material from which it generates

electric energy has acquired commercial value.94

\94\The Commission rejects Southern Companies' suggestion that

the Commission publish updated lists of waste materials without

revising its regulations. Under Southern Companies' recommended

procedure, there would still be notice and comments and the

Commission would still frequently have to update its list of waste

materials. The Commission would be taking on an additional

administrative burden without saving any time.

It would be impractical to establish a special update procedure

for the waste list. Since various materials may gain or lose

commercial value over time, a detailed listing of waste materials

could require frequent revisions of the Commission's regulations.

---------------------------------------------------------------------------

The requirement that the waste energy input exist in the absence of

the QF industry will allow the Commission to regard as waste those

materials that are not by-products of industrial processes but are

nevertheless unwanted, while precluding the creation of contrived

energy inputs for the sole purpose of having the Commission view them

as ``waste.''

It is virtually impossible to develop a simplified determination

procedure that will work perfectly to determine what is waste. There

may, for example, be substances that the Commission has not listed as

waste and do not qualify as waste under the ``no commercial value''

component of the test that, nevertheless, may truly be waste. The

Commission will consider reasonable proposals for the special treatment

of specific materials as ``waste,'' on a case-by-case basis.

The Commission will list petroleum coke and used rubber tires as

waste, without reference to their commercial marketability.95 The

Commission will also add refinery off-gas and plastic to the list of

those materials that it regards as waste. The Commission will consider

the average Btu and ash content of coal located in refuse ponds when

determining whether it is waste.

\95\Petroleum coke is a by-product of the oil refining process

that is very low in volatile matter, usually high in sulfur content,

and an environmentally hazardous waste. Used rubber tires, while

high in heat content, are not burned in conventional boilers, do not

represent an energy source for electric utilities, and are

detrimental to the environment.

---------------------------------------------------------------------------

The Commission notes that it currently accepts BLM determinations

regarding waste coal located both within BLM's jurisdiction and located

on non-Federal or non-Indian lands outside of BLM's jurisdiction,

provided that applicants show that the latter refuse is an extension of

a portion of the relevant coal seam (e.g., top or bottom coal) or other

refuse source (e.g., refuse pile) determined to be waste by BLM.

However, since reference to Federal or Indian lands serves to clarify

the extent of BLM's jurisdiction for all applicants, the Commission

sees no reason to modify the regulatory text in this regard.96

\96\See Big Horn.

---------------------------------------------------------------------------

The Commission will not list as waste: Anthracite and bituminous

coal fines; subbituminous coal; blends of bituminous and subbituminous

coal having an average heat value greater than 9,500 Btu per pound with

an average of 25 percent or more ash content; or used crankcase oil or

other used petroleum products.97

\97\Some Anthracite and bituminous coal fines, when dried and

where transportation distances are short, have a high Btu content

and commercial value. Some public utilities and various other

entities use anthracite silt ponds as a source of fuel. See

Electrodyne. Form 423 data for 1992 suggest that electric utilities

purchase subbituminous coal with a heat content of 9,500 Btu per

pound and an ash content of more than 25 percent.

Used crankcase oil is currently reprocessed for use as an

industrial boiler fuel, in asphalt production and cement kilns. It

is also refined for use in lubricants and for reuse as motor oil.

The Commission lacks sufficient information to support a generic

finding that hot gases, such as oxygen furnace off-gas and hot blast

furnace air, have no commercial value.

---------------------------------------------------------------------------

In this proceeding, the Commission does not intend to make generic

rulings on specific materials that it has not previously considered.

With respect to materials which the

This text is long and has been trimmed here. Open the source document for the complete record.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.

Streamlining of Regulations Pertaining to Parts II and III of the Federal Power Act and the Public Utility Regulatory Policies Act of 1978; Order No. 575 · 60 FR 4831 | Frix