Texas Gas Transmission Corporation; Notice of Intent To Prepare an Environmental Assessment for the Proposed Herbert-Cannelton Looping Project and Request for Comments on Environmental Issues
Federal RegisterJun 6, 1995
Ask Donna
What actually matters in this document.
Text
DEPARTMENT OF ENERGY
[Docket No. CP95-341-000]
Texas Gas Transmission Corporation; Notice of Intent To Prepare
an Environmental Assessment for the Proposed Herbert-Cannelton Looping
Project and Request for Comments on Environmental Issues
May 31, 1995.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the construction and operation of
the facility proposed in the Herbert-Cannelton Looping Project.\1\ This
EA will be used by the Commission in its decision-making process to
determine whether an environmental impact statement is necessary and
whether to approve the project.
\1\ Texas Gas Transmission Corporation's application was filed
with the Commission under Section 7 of the Natural Gas Act and Part
157 of the Commission's regulations.
---------------------------------------------------------------------------
Summary of the Proposed Project
Texas Gas Transmission Corporation (Texas Gas) wants to expand the
capacity of its facilities in Ohio and Hancock Counties, Kentucky to
transport 500 million British thermal units per day of natural gas to a
local distribution company. Texas Gas requests Commission authorization
to construct and operate 0.93 mile of 8-inch-diameter pipeline in Ohio
and Hancock Counties. Kentucky needed to transport those volumes.
The general location of the project facility is shown in appendix
1.\2\
\2\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies are available from the
Commission's Public Reference and Files Maintenance Branch, Room
3104, 941 North Capitol Street, N.E., Washington, D.C. 20426, or
call (202) 208-1371. Copies of the appendices were sent to all those
receiving this notice in the mail.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of the proposed facility would disturb about 24.66
acres of land. Following construction, about 2.82 acres would be
maintained as new right-of-way. About 4.53 acres are located within an
existing right-of-way. The remaining 17.33 acres of land would be
restored and allowed to revert to its former use.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
to discover and address concerns the public may have about proposals.
We call this ``scoping.'' The main goal of the scoping process is to
focus the analysis in the EA on the important environmental issues. By
this Notice of Intent, the Commission requests public comments on the
scope of the issues it will address in the EA. All comments received
are considered during the preparation of the EA. State and local
government representatives are encouraged to notify their constituents
of this proposed action and encourage them to comment on their areas of
concern.
The EA will discuss impacts that could occur as a result of the
construction and operation of the proposed project under these general
headings:
Geology and soils.
Water resources, fisheries, and wetlands.
Vegetation and wildlife.
Endangered and threatened species. [[Page 29840]]
Land use.
Cultural resources.
Air quality and noise.
Public safety.
We will also evaluate possible alternatives to the proposed project
or portions of the project, and make recommendations on how to lessen
or avoid impacts on the various resource areas.
Our independent analysis of the issues will be in the EA. Depending
on the comments received during the scoping process, the EA may be
published and mailed to Federal, state, and local agencies, public
interest groups, interested individuals, affected landowners,
newspapers, libraries, and the Commission's official service list for
this proceeding. A comment period will be allotted for review if the EA
is published. We will consider all comments on the EA before we
recommend that the Commission approve or not approve the project.
Currently Identified Environmental Issues
We have already identified two issues that we think deserve
attention based on a preliminary review of the proposed facilities and
the environmental information provided by Texas Gas. Keep in mind that
this is a preliminary list. The list of issues may be added to,
subtracted from, or changed based on your comments and our analysis.
Issues are:
Two federally listed endangered or threatened species may
occur in the proposed project area.
Two proposed workspace areas may be located within 50
feet of a residence, one of which may directly impact an adjacent
building.
Public Participation
You can make a difference by sending a letter addressing your
specific comments or concerns about the project. You should focus on
the potential environmental effects of the proposal, alternatives to
the proposal (including alternative routes), and measures to avoid or
lessen environmental impact. The more specific your comments, the more
useful they will be. Please follow the instructions below to ensure
that your comments are received and properly recorded:
Address your letter to: Lois Cashell, Secretary, Federal
Energy Regulatory Commission, 825 North Capital Street NE., Washington,
D.C. 20426;
Reference Docket No. CP95-341-000;
Send a copy of your letter to: Ms. Amy Olson, EA Project
Manager, Federal Energy Regulatory Commission, 825 North Capitol Street
NE., Room 7312, Washington, D.C. 20426; and
Mail your comments so that they will be received in
Washington, D.C. on or before June 30, 1995.
If you wish to receive a copy of the EA, you should request one
from Ms. Olson at the above address.
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an official party to the proceeding or become an
``intervenor''. Among other things, intervenors have the right to
receive copies of case-related Commission documents and filings by
other intervenors. Likewise, each intervenor must provide copies of its
filings to all other parties. If you want to become an intervenor you
must file a motion to intervene according to Rule 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.214) (see
appendix 2).
The date for filing of timely motions to intervene in this
proceeding has passed. Therefore, parties now seeking to file late
interventions must show good cause, as required by section
385.214(b)(3), why this time limitation should be waived. Environmental
issues have been viewed as good cause for late intervention. You do not
need intervenor status to have your scoping comments considered.
Additional information about the proposed project is available from
Ms. Amy Olson, EA Project Manager, at (202) 208-1199.
Lois D. Cashell,
Secretary.
[FR Doc. 95-13728 Filed 6-5-95; 8:45 am]
BILLING CODE 6717-01-M
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.