North Shore Project, Lake Tahoe Basin Management Unit (LTBMU), Washoe County, Nevada; Placer County, California
Federal RegisterJun 6, 1995
Ask Donna
What actually matters in this document.
Text
[[Page 29820]]
DEPARTMENT OF AGRICULTURE
Forest Service
North Shore Project, Lake Tahoe Basin Management Unit (LTBMU),
Washoe County, Nevada; Placer County, California
AGENCY: Forest Service, USDA.
ACTION: Notice, intent to prepare environmental impact statement.
-----------------------------------------------------------------------
SUMMARY: The Forest Service will prepare an environmental impact
statement on a proposal to implement ecosystem management principles on
approximately 7,000 acres of National Forest System lands, north of
Lake Tahoe, within the Lake Tahoe Basin. Proposed activities include
harvest of approximately twenty to thirty million board feet of both
merchantable and unmerchantable wood products. Dead and dying trees
would be cut, and thinning of live trees is also proposed to improve
forest health and to reduce fire danger. The proposed action also uses
prescribed fire and analyzes post sale treatments, including watershed
improvement projects. Stream and riparian area enhancement and wildlife
habitat improvements are also planned.
DATES: Agencies and the public are invited to participate at any stage
of the process; however, the Forest Supervisor requests that
individuals concerned with the scope of the analysis comment by July 1,
1995.
ADDRESSES: Written comments concerning the DEIS should be sent to the
responsible official, Forest supervisor, LTBMU, 870 Emerald Bay Road,
Suite 1, South Lake Tahoe, California, 96150.
FOR FURTHER INFORMATION CONTACT:
Direct questions concerning the proposed action and alternatives to Joe
Oden, Interdisciplinary team Leader, at (916) 573-2600 or the above
address.
SUPPLEMENTARY INFORMATION: The proposed action would harvest dead,
dying, and diseased trees over approximately 7,000 acres of an 24,000-
acre study area. Trees would be thinned from overstocked stands, over
about 6,000 acres, some of which overlap the salvage acreage, and some
of which is separate. Some of the 20 to 30 million board feet removed
would be useful lumber; much of the timber removed would have no
commercial value.
Trees would be removed from slope less than thirty percent by
tractor skidding systems. Trees would be flown from slopes over thirty
percent by helicopter. No new permanent roads would be constructed;
however, construction of additional temporary access roads and landing
sites may be required, as well as reconstruction and restoration of
existing roads.
The proposed action includes treatments that would follow tree
removal activities. This would include (but is not limited to) site
preparation, planting, treatment of slash generated by the project,
fuel treatment adjacent to residential areas, closing of temporary and
unneeded roads, and restoration of landings. The use of prescribed fire
will be analyzed, both as a post-harvest treatment and as a means to
reintroduce fire to the ecosystem on untreated areas. Wildlife habitat
would be improved by thinning stands of small lodgepole pines and
underburning older brushfields.
Heritage (historic archaeological) resources are dispersed
throughout the study area. Most are the remains of 19th century
logging. Sites determined to be significant will be protected. In
addition to mitigation negotiated with the Advisory Council of Historic
Preservation, a key component of the analysis is to seek and address
enhancement opportunities for representative heritage properties.
Watershed restoration projects and road closures are also included
in the proposed action if they are, in the language of the National
Environmental Policy Act (NEPA--. ``connected'', ``cumulative'' or are
``ripe for decision''.
These actions are proposed to promote stable ecosystems as
described in ``desired condition'' portions of the Forest Plan and the
North Shore Ecosystem Report.
Beginning in the 1850's many of the 200-500 year old pine trees
around Lake Tahoe were harvested in support of silver mining activities
of the Comstock Lode. Earlier, the forest had consisted of diverse
species that better resisted drought and insect attacks. After logging
slowed in the 1890's, the area began to revegetate naturally. But a new
and different forest grew to replace the old. In the absence of
frequently recurring fires, dense thickets of moisture-loving fir trees
replaced much of the open pine forest that has been cut. The drought
that begin in 1987 weakened and killed many of the fir trees that had
sprouted after the massive Comstock cutting.
Forty years of fire suppression has dramatically increased the
density of trees and the amount of dead wood, both standing and on the
ground. Members of the public have expressed concern over the large
numbers of dead trees and the amount of forest fuels now present. Many
requests have been made for projects to remove timber to reduce safety
hazards, fire danger, and to improve visual quality. Such projects
would reduce the ``fuel loading'' and could decrease the risk and
severity of a catastrophic fire. Additionally, thinning of overstocked
stands can be an effective way to reduce the risk of future
catastrophic insect and disease outbreaks.
The environmental analysis provides the decisionmaker--the LTBMU
Forest Supervisor--with an evaluation of what will happen if nothing is
done, and what may result from the proposed action and other
alternatives. Such disclosure will allow a reasoned choice between
management options. If an alternative other than No Action is selected
the work should proceed without delay. Delaying the removal of dead,
dying, or diseased trees can reduce their commercial value. The
anticipated high cost of implementation could deter potential bidders
as the soundness of the trees declines. Consequently, project
implementation is expected to begin during the spring or summer of
1996.
Over sixty agencies, organizations, and individuals were notified
of this proposed project through the LTBMU NEPA Status Report. Public
meetings were held on March 10, 13 and 24, as part of the scoping
process. Some people also provided written comments. Tahoe Regional
Planning agency staff was briefed about the project on March 13, 1995.
Participants in the planning process will be sent copies of the
draft EIS for the public comment period. Availability of the draft EIS
will also be noticed in the Federal Register and the Tahoe Daily
Tribune, the LTBMU's newspaper of record. Written comments received by
July 1, 1994 will be addressed in the draft EIS.
The ``no action'' alternative (Alternative 1) proposes a
continuation of the current types of management activities currently
conducted in the study area, without imposing impacts from proposed
fuels treatments, logging, wildlife or streamzone enhancements, or
watershed improvement work.
Alternative 3 emphasizes fuels treatments to reduce the threat of
intense wildfires. It harvests dead, dying, diseased, and overcrowded
trees over approximately 3,600 acres, concentrating on areas of high
tree mortality and areas adjacent to residential neighborhoods. Removal
of 15 to 20 MMBF of both merchantable and unmerchantable material is
anticipated. This alternative includes all components of the proposed
action, except when modified as described: Tree removal activities and
prescribed underburning would be located adjacent to proposed
fuelbreaks to maximize fire defensible space
strategies. [[Page 29821]]
Alternative 4 represents a ``wildlife habitat emphasis.'' It
includes harvests of dead, dying, diseased, and overcrowded trees over
approximately 3,000 acres, for the purpose of improving wildlife
habitat. Removal of about 10 MMBF of both merchantable and
unmerchantable material is anticipated. This alternative includes all
components of the proposed action, except as modified: while treatment
of activity fuels will occur, the use of prescribed fire as a
management tool will be limited to improving wildlife habitat; a
greater level of road closures would be implemented to reduce
disturbance to wildlife.
Implementation of this project requires permits from the Tahoe
Regional Planning Agency (TRPA) and the California Regional Water
Quality Control Board, Lahontan Region. Additionally, encroachment
permits from the California and Nevada Departments of Transportation
will be required for project implementation. Consultation with both the
California and Nevada State Historic Preservation Offices (SHPO) and
the Advisory Council on Historic Preservation (ACHP) in accordance with
the National Historic Preservation Act of 1966 (16 U.S.C. 470 et seq.)
is required. Concurrence from the U.S. Fish and Wildlife Service is
needed if the Forest Service Biological Assessment results in a ``may
affect'' determination.
The decision on this analysis, pursuant to NEPA, is made by Lake
Tahoe Basin Management Unit Forest Supervisor, Robert Harris, as the
Forest Service is the lead agency under NEPA. There is no other joint
lead agency and no cooperating agencies under NEPA.
The draft EIS is anticipated to be filed with the Environmental
Protection Agency and made available to the public for comment in
September 1995. The final EIS and its Record of Decision is expected in
January 1996. The decision will be appealable under Forest Service
regulations found at 36 CFR 215.
The comment period for the draft EIS will be 45 days from the date
the Environmental Protection Agency's notice of availability appears in
the Federal Register. The public will also be informed of the
availability of the DEIS by news releases issued to the media in the
Lake Tahoe region. It is very important that those interested in this
proposed action participate at that time. To be the most helpful,
comments on the draft EIS should be as specific as possible and may
address the adequacy of the statement or the merits of the alternatives
discussed (see the Council on Environmental Quality Regulations for
implementing the procedural provisions of NEPA at 40 CFR 1503.3).
In addition, Federal court decisions have established that
reviewers of draft EIS' must structure their participation in the
environmental review of the proposal so that it is meaningful and
alerts an agency to the reviewers' position and contentions. ``Vermont
Yankee Nuclear Power Corp. v. NRDC,'' 435 U.S. 519, 553 (1978).
Environmental objections that could have been raised at the draft stage
may be waived if not raised until after completion of the final EIS.
``City of Angoon v. Hodel,'' (9th Circuit, 1986) and ``Wisconsin
Heritages, Inc. v. Harris,'' 490 F. Supp. 1334, 1338 (E.D. Wis. 1980).
The reason for this is to ensure that substantive comments and
objections are made available for the Forest Service at a time when it
can meaningfully consider them and respond to them in the final.
Dated: May 23, 1995.
Robert E. Harris,
Forest Supervisor.
[FR Doc. 95-13725 Filed 6-5-95; 8:45 am]
BILLING CODE 3410-11-M
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.