DEPARTMENT OF ENERGY

[Docket No. EG94-40-000, et al.]

NGR Gladstone Operating Services Pty Ltd, et al.; Electric Rate

and Corporate Regulation Filings

March 31, 1994.

Take notice that the following filings have been made with the

Commission:

1. NRG Gladstone Operating Services Pty Ltd

[Docket No. EG94-40-000]

On March 25, 1994, NRG Gladstone Operating Services Pty Ltd (``NRG

Gladstone''), with its principal office at the Gladstone Power Station,

Hanson Road, Gladstone, Queensland 4680, Australia, filed with the

Federal Energy Regulatory Commission an application for determination

of exempt wholesale generator status pursuant to Part 365 of the

Commission's regulations.

NRG Gladstone states that it is a corporation organized under the

laws of the Australian Capital Territory. NRG Gladstone will be engaged

directly and exclusively in operating and maintaining the Gladstone

Power Station, a predominantly coal-fired electric generating facility

with a maximum net power production capacity of approximately 1627 MW.

Energy and capacity from the facility will be sold at wholesale to the

Queensland Electricity Commission of Queensland, Australia, and at

retail to an industrial customer in Queensland, Australia. None of the

electric energy generated by the facility will be sold to consumers in

the United States. NRG Gladstone represents that, as operator of the

Gladstone Power Station, it has an agency relationship with the persons

who sell electric energy from the Power Station.

Comment date: April 14, 1994, in accordance with Standard Paragraph

E at the end of this notice.

2. United States Department of Energy--Southeastern Power

Administration (Jim Woodruff Project)

[Docket No. EF94-3031-000]

Take notice that on March 21, 1994, the Deputy Secretary of Energy

submitted proposed rates for power from the Jim Woodruff Project of the

Southeastern Power Administration, with a request for final

confirmation and approval of the rates by the Commission. Final

approval is sought for the rates for the period beginning September 30,

1994 and ending September 19, 1995.

Comment date: April 18, 1994, in accordance with Standard Paragraph

E at the end of this notice.

3. United States Department of Energy--Bonneville Power Administration

[Docket No. EF94-2091-000]

Take notice that on March 30, 1994, the Bonneville Power

Administration (Bonneville) tendered for filing a proposed rate (CO-94

Capacity Ownership Rate) pursuant to section 7(a)(2) of the Pacific

Northwest Electric Power Planning and Conservation Act, 16 U.S.C.

839e(a)(2). Bonneville further states in its filing that in accordance

with sections 7(a)(2) and 7(i)(6) of the Northwest Power Act, 16 U.S.C.

839e(a)(2) and 839e(i)(6), and pursuant to 18 CFR 300.10(3)(ii), it

requests interim approval of CO-94, to be effective no later than 60

days from the date of its filing, March 30, 1994. Bonneville further

states that it requests waiver of the requirements of

Sec. 300.10(a)(3)(iii) pursuant to 18 CFR 300.13, and asks the

Commission to grant final approval of CO-94 pursuant to 18 CFR 300.21

as expeditiously as possible, but no later than 90 days from the date

of its filing, March 30, 1994. Bonneville asserts that expeditious

approval will permit Pacific Northwest scheduling utilities and joint

agencies to use the rights provided by this transaction as soon as

possible, and would enable Bonneville not only to collect the payments

for the estimated Capacity Ownership price but to also use the receipts

to return funds to the United States Treasury.

Bonneville states that the rate for which it seeks confirmation and

approval is a new rate to recover a share of the actual capital and

related costs associated with (a) the sale of 725 MW of transmission

capacity on the Pacific Northwest Alternating Current Intertie for the

life of the facilities and (b) any upgrades to the Intertie that

Capacity Owners elect to participate in. Bonneville further states that

it requests approval of the CO-94 Capacity Ownership Rate for an

indefinite period to correspond with the life-of-facilities capacity

rights.

Comment date: April 27, 1994, in accordance with Standard Paragraph

E at the end of this notice.

4. Sunshine State Power B.V.

[Docket No. EG94-41-000]

On March 25, 1994, Sunshine State Power B.V. (``Sunshine''), with

its principal office at 1221 Nicollet Mall, Suite 700, Minneapolis,

Minnesota 55403, filed with the Federal Energy Regulatory Commission an

application for determination of exempt wholesale generator status

pursuant to Part 365 of the Commission's regulations.

Sunshine states that it is a corporation organized under the laws

of The Netherlands. Sunshine will be engaged directly and exclusively

in owning a 20% undivided interest in the Gladstone Power Station, a

predominantly coal-fired electric generating facility with a maximum

net power production capacity of approximately 1627 MW. Sunshine will

sell its pro rata share of energy and capacity from the facility at

wholesale to the Queensland Electricity Commission of Queensland,

Australia, and at retail to an industrial customer in Queensland,

Australia. None of the electric energy generated by the facility will

be sold to consumers in the United States.

Comment date: April 14, 1994, in accordance with Standard Paragraph

E at the end of this notice.

5. Sunshine State Power (No. 2) B.V.

[Docket No. EG94-39-000]

On March 25, 1994, Sunshine State Power (No. 2) B.V. (``Sunshine

2''), with its principal office at 1221 Nicollet Mall, Suite 700,

Minneapolis, Minnesota 55403, filed with the Federal Energy Regulatory

Commission an application for determination of exempt wholesale

generator status pursuant to Part 365 of the Commission's regulations.

Sunshine 2 states that it is a corporation organized under the laws

of The Netherlands. Sunshine 2 will be engaged directly and exclusively

in owning a 17.5% undivided interest in the Gladstone Power Station, a

predominantly coal-fired electric generating facility with a maximum

net power production capacity of approximately 1627 MW. Sunshine 2 will

sell its pro rata share of energy and capacity from the facility at

wholesale to the Queensland Electricity Commission of Queensland,

Australia, and at retail to an industrial customer in Queensland,

Australia. None of the electric energy generated by the facility will

be sold to consumers in the United States.

Comment date: April 14, 1994, in accordance with Standard Paragraph

E at the end of this notice.

6. Nevada Power Company

[Docket No. EL92-41-001]

Take notice that on March 4, 1994, Nevada Power Company tendered

for filing copies of its revised FERC Rate Schedule 41 to its request

for waiver.

Comment date: April 14, 1994, in accordance with Standard Paragraph

E at the end of this notice.

7. Kentucky Utilities Company

[Docket No. ER94-209-000]

Take notice that on February 23, 1994, Kentucky Utilities Company

(KU) tendered for filing a letter advising the Commission that it will

provide the information requested by staff in its January 28, 1994

letter.

On March 22, 1994, KU tendered for filing a revised Interchange

Agreement between KU and East Kentucky Power Cooperative.

Comment date: April 13, 1994, in accordance with Standard Paragraph

E at the end of this notice.

Standard Paragraphs

E. Any person desiring to be heard or to protest said filing should

file a motion to intervene or protest with the Federal Energy

Regulatory Commission, 825 North Capitol Street, NE., Washington, DC

20426, in accordance with Rules 211 and 214 of the Commission's Rules

of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such

motions or protests should be filed on or before the comment date.

Protests will be considered by the Commission in determining the

appropriate action to be taken, but will not serve to make protestants

parties to the proceeding. Any person wishing to become a party must

file a motion to intervene. Copies of this filing are on file with the

Commission and are available for public inspection.

Lois D. Cashell,

Secretary.

[FR Doc. 94-8536 Filed 4-8-94; 8:45 am]

BILLING CODE 6717-01-P

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.