Public Service Company of Oklahoma, et al.; Electric Rate and Corporate Regulation Filings

Federal RegisterApr 5, 1994

Ask Donna

What actually matters in this document.

Text

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. FA92-63-001, et al.]

Public Service Company of Oklahoma, et al.; Electric Rate and

Corporate Regulation Filings

March 29, 1994.

Take notice that the following filings have been made with the

Commission:

1. Public Service Company of Oklahoma

[Docket No. FA92-63-001]

Take notice that on December 6, 1993, Public Service Company of

Oklahoma tendered for filing its refund report in the above-referenced

docket.

Comment date: April 12, 1994, in accordance with Standard Paragraph

E at the end of this notice.

2. Arizona Public Service Company

[Docket No. FA93-37-001]

Take notice that on March 18, 1994, Arizona Public Service Company

tendered for filing its refund report in the above-referenced docket.

Comment date: April 12, 1994, in accordance with Standard Paragraph

E at the end of this notice.

3. Northeast Utilities Service Company

[Docket No. ER93-914-000]

Take notice that on March 21, 1994, Northeast Utilities Service

Company (NUSCO) tendered for filing a Letter Agreement to amend the

Sales Agreement with Respect to Slice-of-System Units between CL&P and

Massachusetts Municipal Wholesale Electric Company (MMWEC) dated

January 12, 1989 and provide for an equal Replacement Sale directly to

Littleton Electric Light Department (Littleton), an MMWEC participant.

NUSCO states that a copy of this information has been mailed to

MMWEC and Littleton.

Comment date: April 12, 1994, in accordance with Standard Paragraph

E at the end of this notice.

4. Florida Power Corporation

[Docket No. ER94-34-000]

Take notice that on March 15, 1994, Florida Power Corporation,

tendered for filing, as a result with discussion with Staff, an

amendment to its filing in this docket. The amendment shows $40,927.46

in Windemere breaker costs which the Company has collected from Orlando

CoGen Limited, L.P., as a contribution-in-aid-of-construction but

agrees to refund to Orlando CoGen, with interest.

Comment date: April 12, 1994, in accordance with Standard Paragraph

E at the end of this notice.

5. The Cleveland Electric Illuminating Company Duquesne Light Company

Ohio Edison Company Pennsylvania Power Company The Toledo Edison

Company

[Docket No. ER94-570-000]

Take notice that on March 21, 1994, The Cleveland Electric

Illuminating Company, Duquesne Light Company, Ohio Edison Company,

Pennsylvania Power Company and The Toledo Edison Company, tendered for

filing an amended filing to the filing made December 29, 1993 in this

docket which proposed changes in FERC Electric Service Rate Schedules

Nos. 25, 21, 157, 44 and 35, respectively.

The amended filing was made to provide additional explanation of

the proposed changes in these rate schedules as requested by the Staff.

The proposed changes amend the utilities' CAPCO Basic Operating

Agreement to uniformly require the payment of invoices at specified

times, require the payment of interest charges for non-timely payment

of invoices, restrict the adjustment of invoices after a four-year

period, and to eliminate provisions and references involving the CAPCO

Coordinating Office which was phased out during 1993. The proposed

changes are intended to standardize billing terms and conditions in the

various agreements among and between the member of utility companies of

the CPCO Group.

Copies of the filing were served upon the Public Utilities

Commission of Ohio and the Pennsylvania Public Utility Commission.

Comment date: April 12, 1994, in accordance with Standard Paragraph

E at the end of this notice.

6. Montaup Electric Company

[Docket No. ER94-696-000]

Take notice that on March 21, 1994, Montaup Electric filed a

supplement in this docket providing information requested by the Rate

Filing Staff concerning the nature of the Card Street line use rights

and wheeling arrangements upon expiration of those rights.

Comment date: April 12, 1994, in accordance with Standard Paragraph

E at the end of this notice.

7. New York State Electric and Gas Corporation

[Docket No. ER94-960-000]

Take notice that on March 24, 1994, New York State Electric & Gas

Corporation (NYSEG), filed a request with the Federal Energy Regulatory

Commission to defer action on NYSEG's February 8, 1994 filing in this

docket. NYSEG's filing pertained to an agreement between NYSEG and

Baltimore Gas and Electric Company (BG&E), which provides for a

mechanism pursuant to which the parties can enter into separately

scheduled transactions under which NYSEG will sell to BG&E and BG&E

will purchase from NYSEG either electric generating capacity and

associated energy or energy only as the parties may mutually agree from

time to time.

NYSEG states that it served by mail copies of the filing upon the

New York State Public Service Commission, the Maryland Public Service

Commission and BG&E.

Comment date: April 12, 1994, in accordance with Standard Paragraph

E at the end of this notice.

8. Allegheny Power Service Corporation on Behalf of West Penn Power

Company, Monongahela Power Company, Ohio Edison Company and

Pennsylvania Power Company

[Docket No. ER94-1064-000]

Take notice that on March 21, 1994, Allegheny Power Service

Corporation, on behalf of West Penn Power Company, Monongahela Power

Company, Ohio Edison Company and Pennsylvania Power Company, filed an

Amendment No. 13 to the Interchange Agreement dated October 17, 1968.

The parties to the Interchange Agreement request changes to the rates

charged by the parties for transactions amongst themselves and other

companies and systems under the Schedules, as well as changes to

reorganize, standardize and update language used in those Schedules and

throughout the Interchange Agreement.

Copies of the filing were served upon the public utility's relevant

state public regulatory commission.

Comment date: April 12, 1994, in accordance with Standard Paragraph

E at the end of this notice.

9. Ocean State Power Company

[Docket No. ER94-1068-000]

Take notice that on March 21, 1994, Ocean State Power (Ocean State)

tendered for filing the following supplement (the ``Supplement'') to

its rate schedules with the Federal Energy Regulatory Commission

(``FERC'' or the ``Commission''):

Supplement No. 15 to Rate Schedule FERC No. 4.

This filing requests approval of the assignment, and Ocean State's

acceptance thereof, by Newport Electric Corporation (Newport) of all of

its rights and obligations under its unit power agreement (the

``Agreement'') with Ocean State to Montaup Electric Company (Montaup).

On March 27, 1990, Newport became a wholly owned subsidiary of Eastern

Utilities Associates (EUA), a registered public utility holding

company. Newport intends to become an all-requirements customer of

Montaup, the bulk-power supply entity of the EUA system, and has,

therefore, assigned all of its rights and obligations under the

Agreement to Montaup, such assignment to become effective on the FERC-

allowed effective date for Montaup's modified all-requirements

wholesale tariff, filed on March 21, 1994.

Ocean State, pursuant to Section 10.6 of the Agreement, has

consented to the assignment by Newport of its rights and obligations

under the Agreement to Montaup.

Comment date: April 12, 1994, in accordance with Standard Paragraph

E at the end of this notice.

10. Boston Edison Company, Blackstone Valley Electric Company and

Commonwealth Electric Company

[Docket No. ER94-1070-000]

Take notice that on March 21, 1994, Boston Edison Company,

Blackstone Valley Electric Company and Commonwealth Electric Company

filed an agreement among them dated August 31, 1971 under which they

share use rights to the Massachusetts and Rhode Island segments of a

345 kV transmission line which extends from a point on the Connecticut

Light and Power Company's system in the vicinity of Willimantic,

Connecticut, to a point on the Edison system in the vicinity of West

Medway, Massachusetts. The agreement was supplied to the Commission as

an attachment to a Section 203 application for Federal Power Commission

approval of a sale of a 20% undivided joint ownership interest in the

Card Street line by Edison to New Bedford Gas & Edison Light Company

(Commonwealth's predecessor) which was granted by order of November 18,

1974 in Docket No. E-9022. The agreement is being tendered for filing

here under section 205 of the Federal Power Act. The parties to this

filing request that the agreement be allowed to become effective as of

August 31, 1971 when it was executed and that the notice requirement be

waived to permit it to become effective on that date.

Comment date: April 12, 1994, in accordance with Standard Paragraph

E at the end of this notice.

11. Portland General Electric Company

[Docket No. ER94-1071-000]

Take notice that on March 21, 1994, Portland General Electric

Company (PGE) tendered for filing a Supplement to the Long Term Power

Sale Agreement (LTPSA) Between Portland General Electric Company (PGE)

and San Diego Gas & Electric, Fale-Safe Rate Schedule FERC No. 1.

Comment date: April 12, 1994, in accordance with Standard Paragraph

E at the end of this notice.

12. Green Mountain Power Corporation

[Docket No. ER94-1073-000]

Take notice that on March 22, 1994, Green Mountain Power

Corporation (GMP) tendered for filing a Service Agreement and

Certificate of Concurrence for Commonwealth Electric Company under FERC

Electric Tariff No. 2, known as GMP's Opportunity Transaction Tariff

(Tariff). The Service Agreement is intended to supersede the unexecuted

Service Agreement for Commonwealth Electric Company, identified as Rate

Schedule No. 17 under GMP's Electric Tariff No. 2. The Service

Agreement and Certificate of Concurrence will allow Commonwealth

Electric Company to enter into transactions, including exchange unit

transactions, in accordance with the Tariff. No terms or conditions of

the Tariff are affected by the form of Service Agreement.

Comment date: April 12, 1994, in accordance with Standard Paragraph

E at the end of this notice.

13. New England Power Company

[Docket No. ER94-1074-000]

Take notice that on March 22, 1994, New England Power Company

(NEP), tendered for filing an amendment to its service agreements with

its three retail affiliates under NEP's all-requirements tariff.

According to NEP, the amendment has no direct or immediate effect on

rates. Rather, the Memorandum to Understanding which forms the

amendment seeks to coordinate review of NEP's integrated resource plan

by the three state commissions with jurisdiction over NEP's retail

affiliates.

Comment date: April 12, 1994, in accordance with Standard Paragraph

E at the end of this notice.

14. Public Service Company of Colorado

[Docket No. ER94-1075-000]

Take notice that on March 22, 1994, Public Service Company of

Colorado tendered for filing a notice of cancellation of the letter

agreement between the Colorado-Ute Electric Association, Inc. and the

Municipal Energy Agency of Nebraska.

Comment date: April 12, 1994, in accordance with Standard Paragraph

E at the end of this notice.

15. Public Service Company of Colorado

[Docket No. ER-1076-000]

Take notice that on March 22, 1994, Public Service Company of

Colorado tendered for filing a notice of cancellation of its existing

Rate Schedule FERC No. 57, in its entirety, effective May 1, 1994.

Comment date: April 12, 1994, in accordance with Standard Paragraph

E at the end of this notice.

16. Southwestern Electric Power Company

[Docket No. ER94-1078-000]

Take notice that on March 22, 1994, Southwestern Electric Power

Company (SWEPCO) tendered for filing letter agreements reflecting

SWEPCO's consent to the assignment of certain rights and obligations

under SWEPCO's contracts with Northeast Texas Electric Cooperative,

Inc. (NTEC) and Tex-La Electric Cooperative of Texas, Inc. (Tex-La).

Specifically, NTEC and SWEPCO will assign certain rights and

obligations to purchase power and energy from SWEPCO to East Texas

Electric Cooperative, Inc. (ETEC).

SWEPCO requests an effective date for the letter agreements the

later of April 1, 1994 or the date on which the Commission accepts for

filing ETEC's currently pending initial rate schedules. Accordingly,

SWEPCO seeks waiver to the extent necessary of the Commission's notice

regulations. The assignment itself will not occur until ETEC has also

secured approval from the Rural Electrification Administration.

Copies of the filing were served on NTEC, Tex-La, ETEC and the

Public Utility Commission of Texas.

Comment date: April 12, 1994, in accordance with Standard Paragraph

E at the end of this notice.

17. PacifiCorp

[Docket No. ER94-1079-000]

Take notice that on March 23, 1994, PacifiCorp, tendered for filing

in accordance with 18 CFR 35.13 of the Commission's Rules and

Regulations, a Long-Term Power Sales Agreement (Agreement) between

PacifiCorp and the City of Redding, California (Redding) dated October

19, 1993. Under terms of the Agreement, PacifiCorp will sell to Redding

firm capacity and energy for the period of June 1, 1994 through May 31,

2014. PacifiCorp requests that the effective date of the Agreement be

June 1, 1994.

Copies of this filing were supplied to Redding, the Utah Public

Service Commission, the Public Utility Commission of Oregon and the

Public Utilities Commission of the State of California.

Comment date: April 12, 1994, in accordance with Standard Paragraph

E at the end of this notice.

18. Entergy Power, Inc.

[Docket No. ER94-1080-000]

Take notice that on March 23, 1994, Entergy Power, Inc. (Entergy

Power), tendered for filing a unit power sale agreement between Entergy

Power and East Texas Electric Cooperative, Inc. Entergy Power requests

waiver of the Commission's cost support requirements under Secs. 35.12

or 35.13 of the Commission's Regulations, to the extent they are

otherwise applicable to this filing.

Comment date: April 12, 1994, in accordance with Standard Paragraph

E at the end of this notice.

19. Southern California Edison Company

[Docket No. ER94-1081-000]

Take notice that on March 23, 1994, Southern California Edison

Company (Edison) tendered for filing, as an initial rate schedule, the

following agreement, executed on March 16, 1994, by the respective

parties:

Edison--SDG&E Sylmar--SONGS Firm Transmission Service Agreement

(Agreement) Between Southern California Edison Company and San Diego

Gas & Electric Company

The Agreement contains the terms and conditions whereby Edison

shall provide firm bidirectional transmission service between Sylmar

Switching Station and the San Onofre Nuclear Generating Station, in

amounts varying between 40 and 60 MW, during specified months for the

years 1994-1996.

Copies of this filing were served upon the Public Utilities

Commission of the State of California and all interested parties.

Comment date: April 12, 1994, in accordance with Standard Paragraph

E at the end of this notice.

20. Arizona Public Service Company

[Docket No. ER94-1083-000]

Take notice that on March 23, 1994, Arizona Public Service Company

(APS) tendered for filing revised Exhibit A to the Wholesale Power

Supply Agreement (Agreement) between APS and the United States of

America, Bureau of Indian Affairs on behalf of the San Carlos Indian

Irrigation Project (SCIIP) (APS-FERC Rate Schedule No. 201).

Comment date: April 12, 1994, in accordance with Standard Paragraph

E at the end of this notice.

21. Kansas City Power & Light Company

[ Docket No. ES94-19-000]

Take notice that on March 23, 1994, Kansas City Power & Light

Company filed an application under section 204 of the Federal Power Act

seeking authorization to issue not more than $750 million of short-term

debt instruments on or before June 30, 1996, with a final maturity date

no later than June 30, 1997.

Comment date: April 22, 1994, in accordance with Standard Paragraph

E at the end of this notice.

Standard Paragraphs

E. Any person desiring to be heard or to protest said filing should

file a motion to intervene or protest with the Federal Energy

Regulatory Commission, 825 North Capitol Street, NE., Washington, DC

20426, in accordance with Rules 211 and 214 of the Commission's Rules

of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such

motions or protests should be filed on or before the comment date.

Protests will be considered by the Commission in determining the

appropriate action to be taken, but will not serve to make protestants

parties to the proceeding. Any person wishing to become a party must

file a motion to intervene. Copies of this filing are on file with the

Commission and are available for public inspection.

Lois D. Cashell,

Secretary.

[FR Doc. 94-8096 Filed 4-4-94; 8:45 am]

BILLING CODE 6717-01-P

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.

Public Service Company of Oklahoma, et al.; Electric Rate and Corporate Regulation Filings | Frix