Public Service Company of Oklahoma, et al.; Electric Rate and Corporate Regulation Filings
Federal RegisterApr 5, 1994
Ask Donna
What actually matters in this document.
Text
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. FA92-63-001, et al.]
Public Service Company of Oklahoma, et al.; Electric Rate and
Corporate Regulation Filings
March 29, 1994.
Take notice that the following filings have been made with the
Commission:
1. Public Service Company of Oklahoma
[Docket No. FA92-63-001]
Take notice that on December 6, 1993, Public Service Company of
Oklahoma tendered for filing its refund report in the above-referenced
docket.
Comment date: April 12, 1994, in accordance with Standard Paragraph
E at the end of this notice.
2. Arizona Public Service Company
[Docket No. FA93-37-001]
Take notice that on March 18, 1994, Arizona Public Service Company
tendered for filing its refund report in the above-referenced docket.
Comment date: April 12, 1994, in accordance with Standard Paragraph
E at the end of this notice.
3. Northeast Utilities Service Company
[Docket No. ER93-914-000]
Take notice that on March 21, 1994, Northeast Utilities Service
Company (NUSCO) tendered for filing a Letter Agreement to amend the
Sales Agreement with Respect to Slice-of-System Units between CL&P and
Massachusetts Municipal Wholesale Electric Company (MMWEC) dated
January 12, 1989 and provide for an equal Replacement Sale directly to
Littleton Electric Light Department (Littleton), an MMWEC participant.
NUSCO states that a copy of this information has been mailed to
MMWEC and Littleton.
Comment date: April 12, 1994, in accordance with Standard Paragraph
E at the end of this notice.
4. Florida Power Corporation
[Docket No. ER94-34-000]
Take notice that on March 15, 1994, Florida Power Corporation,
tendered for filing, as a result with discussion with Staff, an
amendment to its filing in this docket. The amendment shows $40,927.46
in Windemere breaker costs which the Company has collected from Orlando
CoGen Limited, L.P., as a contribution-in-aid-of-construction but
agrees to refund to Orlando CoGen, with interest.
Comment date: April 12, 1994, in accordance with Standard Paragraph
E at the end of this notice.
5. The Cleveland Electric Illuminating Company Duquesne Light Company
Ohio Edison Company Pennsylvania Power Company The Toledo Edison
Company
[Docket No. ER94-570-000]
Take notice that on March 21, 1994, The Cleveland Electric
Illuminating Company, Duquesne Light Company, Ohio Edison Company,
Pennsylvania Power Company and The Toledo Edison Company, tendered for
filing an amended filing to the filing made December 29, 1993 in this
docket which proposed changes in FERC Electric Service Rate Schedules
Nos. 25, 21, 157, 44 and 35, respectively.
The amended filing was made to provide additional explanation of
the proposed changes in these rate schedules as requested by the Staff.
The proposed changes amend the utilities' CAPCO Basic Operating
Agreement to uniformly require the payment of invoices at specified
times, require the payment of interest charges for non-timely payment
of invoices, restrict the adjustment of invoices after a four-year
period, and to eliminate provisions and references involving the CAPCO
Coordinating Office which was phased out during 1993. The proposed
changes are intended to standardize billing terms and conditions in the
various agreements among and between the member of utility companies of
the CPCO Group.
Copies of the filing were served upon the Public Utilities
Commission of Ohio and the Pennsylvania Public Utility Commission.
Comment date: April 12, 1994, in accordance with Standard Paragraph
E at the end of this notice.
6. Montaup Electric Company
[Docket No. ER94-696-000]
Take notice that on March 21, 1994, Montaup Electric filed a
supplement in this docket providing information requested by the Rate
Filing Staff concerning the nature of the Card Street line use rights
and wheeling arrangements upon expiration of those rights.
Comment date: April 12, 1994, in accordance with Standard Paragraph
E at the end of this notice.
7. New York State Electric and Gas Corporation
[Docket No. ER94-960-000]
Take notice that on March 24, 1994, New York State Electric & Gas
Corporation (NYSEG), filed a request with the Federal Energy Regulatory
Commission to defer action on NYSEG's February 8, 1994 filing in this
docket. NYSEG's filing pertained to an agreement between NYSEG and
Baltimore Gas and Electric Company (BG&E), which provides for a
mechanism pursuant to which the parties can enter into separately
scheduled transactions under which NYSEG will sell to BG&E and BG&E
will purchase from NYSEG either electric generating capacity and
associated energy or energy only as the parties may mutually agree from
time to time.
NYSEG states that it served by mail copies of the filing upon the
New York State Public Service Commission, the Maryland Public Service
Commission and BG&E.
Comment date: April 12, 1994, in accordance with Standard Paragraph
E at the end of this notice.
8. Allegheny Power Service Corporation on Behalf of West Penn Power
Company, Monongahela Power Company, Ohio Edison Company and
Pennsylvania Power Company
[Docket No. ER94-1064-000]
Take notice that on March 21, 1994, Allegheny Power Service
Corporation, on behalf of West Penn Power Company, Monongahela Power
Company, Ohio Edison Company and Pennsylvania Power Company, filed an
Amendment No. 13 to the Interchange Agreement dated October 17, 1968.
The parties to the Interchange Agreement request changes to the rates
charged by the parties for transactions amongst themselves and other
companies and systems under the Schedules, as well as changes to
reorganize, standardize and update language used in those Schedules and
throughout the Interchange Agreement.
Copies of the filing were served upon the public utility's relevant
state public regulatory commission.
Comment date: April 12, 1994, in accordance with Standard Paragraph
E at the end of this notice.
9. Ocean State Power Company
[Docket No. ER94-1068-000]
Take notice that on March 21, 1994, Ocean State Power (Ocean State)
tendered for filing the following supplement (the ``Supplement'') to
its rate schedules with the Federal Energy Regulatory Commission
(``FERC'' or the ``Commission''):
Supplement No. 15 to Rate Schedule FERC No. 4.
This filing requests approval of the assignment, and Ocean State's
acceptance thereof, by Newport Electric Corporation (Newport) of all of
its rights and obligations under its unit power agreement (the
``Agreement'') with Ocean State to Montaup Electric Company (Montaup).
On March 27, 1990, Newport became a wholly owned subsidiary of Eastern
Utilities Associates (EUA), a registered public utility holding
company. Newport intends to become an all-requirements customer of
Montaup, the bulk-power supply entity of the EUA system, and has,
therefore, assigned all of its rights and obligations under the
Agreement to Montaup, such assignment to become effective on the FERC-
allowed effective date for Montaup's modified all-requirements
wholesale tariff, filed on March 21, 1994.
Ocean State, pursuant to Section 10.6 of the Agreement, has
consented to the assignment by Newport of its rights and obligations
under the Agreement to Montaup.
Comment date: April 12, 1994, in accordance with Standard Paragraph
E at the end of this notice.
10. Boston Edison Company, Blackstone Valley Electric Company and
Commonwealth Electric Company
[Docket No. ER94-1070-000]
Take notice that on March 21, 1994, Boston Edison Company,
Blackstone Valley Electric Company and Commonwealth Electric Company
filed an agreement among them dated August 31, 1971 under which they
share use rights to the Massachusetts and Rhode Island segments of a
345 kV transmission line which extends from a point on the Connecticut
Light and Power Company's system in the vicinity of Willimantic,
Connecticut, to a point on the Edison system in the vicinity of West
Medway, Massachusetts. The agreement was supplied to the Commission as
an attachment to a Section 203 application for Federal Power Commission
approval of a sale of a 20% undivided joint ownership interest in the
Card Street line by Edison to New Bedford Gas & Edison Light Company
(Commonwealth's predecessor) which was granted by order of November 18,
1974 in Docket No. E-9022. The agreement is being tendered for filing
here under section 205 of the Federal Power Act. The parties to this
filing request that the agreement be allowed to become effective as of
August 31, 1971 when it was executed and that the notice requirement be
waived to permit it to become effective on that date.
Comment date: April 12, 1994, in accordance with Standard Paragraph
E at the end of this notice.
11. Portland General Electric Company
[Docket No. ER94-1071-000]
Take notice that on March 21, 1994, Portland General Electric
Company (PGE) tendered for filing a Supplement to the Long Term Power
Sale Agreement (LTPSA) Between Portland General Electric Company (PGE)
and San Diego Gas & Electric, Fale-Safe Rate Schedule FERC No. 1.
Comment date: April 12, 1994, in accordance with Standard Paragraph
E at the end of this notice.
12. Green Mountain Power Corporation
[Docket No. ER94-1073-000]
Take notice that on March 22, 1994, Green Mountain Power
Corporation (GMP) tendered for filing a Service Agreement and
Certificate of Concurrence for Commonwealth Electric Company under FERC
Electric Tariff No. 2, known as GMP's Opportunity Transaction Tariff
(Tariff). The Service Agreement is intended to supersede the unexecuted
Service Agreement for Commonwealth Electric Company, identified as Rate
Schedule No. 17 under GMP's Electric Tariff No. 2. The Service
Agreement and Certificate of Concurrence will allow Commonwealth
Electric Company to enter into transactions, including exchange unit
transactions, in accordance with the Tariff. No terms or conditions of
the Tariff are affected by the form of Service Agreement.
Comment date: April 12, 1994, in accordance with Standard Paragraph
E at the end of this notice.
13. New England Power Company
[Docket No. ER94-1074-000]
Take notice that on March 22, 1994, New England Power Company
(NEP), tendered for filing an amendment to its service agreements with
its three retail affiliates under NEP's all-requirements tariff.
According to NEP, the amendment has no direct or immediate effect on
rates. Rather, the Memorandum to Understanding which forms the
amendment seeks to coordinate review of NEP's integrated resource plan
by the three state commissions with jurisdiction over NEP's retail
affiliates.
Comment date: April 12, 1994, in accordance with Standard Paragraph
E at the end of this notice.
14. Public Service Company of Colorado
[Docket No. ER94-1075-000]
Take notice that on March 22, 1994, Public Service Company of
Colorado tendered for filing a notice of cancellation of the letter
agreement between the Colorado-Ute Electric Association, Inc. and the
Municipal Energy Agency of Nebraska.
Comment date: April 12, 1994, in accordance with Standard Paragraph
E at the end of this notice.
15. Public Service Company of Colorado
[Docket No. ER-1076-000]
Take notice that on March 22, 1994, Public Service Company of
Colorado tendered for filing a notice of cancellation of its existing
Rate Schedule FERC No. 57, in its entirety, effective May 1, 1994.
Comment date: April 12, 1994, in accordance with Standard Paragraph
E at the end of this notice.
16. Southwestern Electric Power Company
[Docket No. ER94-1078-000]
Take notice that on March 22, 1994, Southwestern Electric Power
Company (SWEPCO) tendered for filing letter agreements reflecting
SWEPCO's consent to the assignment of certain rights and obligations
under SWEPCO's contracts with Northeast Texas Electric Cooperative,
Inc. (NTEC) and Tex-La Electric Cooperative of Texas, Inc. (Tex-La).
Specifically, NTEC and SWEPCO will assign certain rights and
obligations to purchase power and energy from SWEPCO to East Texas
Electric Cooperative, Inc. (ETEC).
SWEPCO requests an effective date for the letter agreements the
later of April 1, 1994 or the date on which the Commission accepts for
filing ETEC's currently pending initial rate schedules. Accordingly,
SWEPCO seeks waiver to the extent necessary of the Commission's notice
regulations. The assignment itself will not occur until ETEC has also
secured approval from the Rural Electrification Administration.
Copies of the filing were served on NTEC, Tex-La, ETEC and the
Public Utility Commission of Texas.
Comment date: April 12, 1994, in accordance with Standard Paragraph
E at the end of this notice.
17. PacifiCorp
[Docket No. ER94-1079-000]
Take notice that on March 23, 1994, PacifiCorp, tendered for filing
in accordance with 18 CFR 35.13 of the Commission's Rules and
Regulations, a Long-Term Power Sales Agreement (Agreement) between
PacifiCorp and the City of Redding, California (Redding) dated October
19, 1993. Under terms of the Agreement, PacifiCorp will sell to Redding
firm capacity and energy for the period of June 1, 1994 through May 31,
2014. PacifiCorp requests that the effective date of the Agreement be
June 1, 1994.
Copies of this filing were supplied to Redding, the Utah Public
Service Commission, the Public Utility Commission of Oregon and the
Public Utilities Commission of the State of California.
Comment date: April 12, 1994, in accordance with Standard Paragraph
E at the end of this notice.
18. Entergy Power, Inc.
[Docket No. ER94-1080-000]
Take notice that on March 23, 1994, Entergy Power, Inc. (Entergy
Power), tendered for filing a unit power sale agreement between Entergy
Power and East Texas Electric Cooperative, Inc. Entergy Power requests
waiver of the Commission's cost support requirements under Secs. 35.12
or 35.13 of the Commission's Regulations, to the extent they are
otherwise applicable to this filing.
Comment date: April 12, 1994, in accordance with Standard Paragraph
E at the end of this notice.
19. Southern California Edison Company
[Docket No. ER94-1081-000]
Take notice that on March 23, 1994, Southern California Edison
Company (Edison) tendered for filing, as an initial rate schedule, the
following agreement, executed on March 16, 1994, by the respective
parties:
Edison--SDG&E Sylmar--SONGS Firm Transmission Service Agreement
(Agreement) Between Southern California Edison Company and San Diego
Gas & Electric Company
The Agreement contains the terms and conditions whereby Edison
shall provide firm bidirectional transmission service between Sylmar
Switching Station and the San Onofre Nuclear Generating Station, in
amounts varying between 40 and 60 MW, during specified months for the
years 1994-1996.
Copies of this filing were served upon the Public Utilities
Commission of the State of California and all interested parties.
Comment date: April 12, 1994, in accordance with Standard Paragraph
E at the end of this notice.
20. Arizona Public Service Company
[Docket No. ER94-1083-000]
Take notice that on March 23, 1994, Arizona Public Service Company
(APS) tendered for filing revised Exhibit A to the Wholesale Power
Supply Agreement (Agreement) between APS and the United States of
America, Bureau of Indian Affairs on behalf of the San Carlos Indian
Irrigation Project (SCIIP) (APS-FERC Rate Schedule No. 201).
Comment date: April 12, 1994, in accordance with Standard Paragraph
E at the end of this notice.
21. Kansas City Power & Light Company
[ Docket No. ES94-19-000]
Take notice that on March 23, 1994, Kansas City Power & Light
Company filed an application under section 204 of the Federal Power Act
seeking authorization to issue not more than $750 million of short-term
debt instruments on or before June 30, 1996, with a final maturity date
no later than June 30, 1997.
Comment date: April 22, 1994, in accordance with Standard Paragraph
E at the end of this notice.
Standard Paragraphs
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 825 North Capitol Street, NE., Washington, DC
20426, in accordance with Rules 211 and 214 of the Commission's Rules
of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the
Commission and are available for public inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 94-8096 Filed 4-4-94; 8:45 am]